CN109837102A - The quick method for dismounting of capacity coke oven ontology refractory masonry - Google Patents

The quick method for dismounting of capacity coke oven ontology refractory masonry Download PDF

Info

Publication number
CN109837102A
CN109837102A CN201910226203.5A CN201910226203A CN109837102A CN 109837102 A CN109837102 A CN 109837102A CN 201910226203 A CN201910226203 A CN 201910226203A CN 109837102 A CN109837102 A CN 109837102A
Authority
CN
China
Prior art keywords
coke oven
coke
oven
refractory
ontology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910226203.5A
Other languages
Chinese (zh)
Other versions
CN109837102B (en
Inventor
任社安
李晓霞
雷智慧
谢明洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201910226203.5A priority Critical patent/CN109837102B/en
Publication of CN109837102A publication Critical patent/CN109837102A/en
Application granted granted Critical
Publication of CN109837102B publication Critical patent/CN109837102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coke Industry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A kind of quick method for dismounting of capacity coke oven ontology refractory masonry, characterized by the following steps: a, preparation before the dismounting of coke oven ontology refractory masonry, b, 2 mini-excavators are hung to oven top of coke oven with truck crane, c, high-front shovel is run on coke oven chute position by the slope to be started to oven top of coke oven, carbonization chamber carries out dismounting operation, d, utilize 2 large excavators, it carries out removing chute and regenerative chamber from coke oven machine side both ends to coke side, e, coke oven horizontal flue bottom uses based on manual demolition, f, coke oven furnace bed board is repaired in cleaning, lower jet pipe, clean out the brick slag sundries fallen into seam, the masonry work again of coking furnace shaft refractory brick is carried out after the completion of cleaning.The advantages of present invention is reasonable with removal step design, linking is proper, links closely step by step, is in good order, and projects are safe and reliable, quickly remove refractory masonry, reduces labor intensity, saving construction period and reduction engineering cost.

Description

The quick method for dismounting of capacity coke oven ontology refractory masonry
Technical field
The present invention relates to a kind of refractory masonry method for dismounting, specifically, being that a kind of capacity coke oven ontology refractory masonry is fast Fast method for dismounting.
Background technique
China has the capacity coke oven that more than 100 seats have been in the middle and later periods in furnace life at present.Over time, coke oven ontology Masonry will increasingly aging, refractory brick badly broken;Furnace retaining ironware is broken, is poorly sealed with ontology masonry, leads to coke oven ontology Large area, which is smoldered, in process of production burns with anger, and seriously affects production, environmental requirement is not achieved.And the original coal tower of coke oven, platform, Coke oven base, resistance wall and furnace end stand are all intact, can continue to use.For save the cost, many coke-oven plants are using reservation institute There is civil engineering position, remove coke oven ontology masonry, furnace retaining ironware and associated process equipment, then re-starts coke oven ontology masonry block Furnace retaining ironware and associated process equipment are built and installed, coke oven is allowed to continue to put into production.Therefore it is badly in need of a kind of capacity coke oven sheet in the industry The quick method for dismounting of body refractory masonry.
Summary of the invention
The purpose of the present invention is that proposing that one kind is safe and reliable removes refractory masonry, effective protection coke oven base platform, supports The quick method for dismounting of capacity coke oven ontology refractory masonry of equipment under anti-wall, furnace.
To achieve the above object, the technical solution of the invention is as follows:
A kind of quick method for dismounting of capacity coke oven ontology refractory masonry, it is characterised in that the following steps are included:
A, the preparation before coke oven ontology refractory masonry is removed:
(1) coke oven ontology refractory masonry properly protects to coking furnace shaft surrounding before removing, the gap between coke oven ontology and platform Canopy-protected is carried out using several protection boards;To waste gas valve hole on flue using the wooden springboard canopy-protected, refractory brick is prevented Fall to coke oven basement;It is blocked at the railing of coke side platform outer using waste and old pallet, prevents the refractory brick tumbled from falling into On coke-quenching vehicle track;Burlap is filled up out of basement downward jet pipe, prevents brick slag in demolishing process from falling into blocking;
(2) coke oven door is won, coke oven door frame, furnace top equipment pipeline, pusher side and coke side platform, furnace retaining ironware are removed;
B, since oven top structure for coke oven load-bearing is limited, 2 mini-excavators are hung to oven top of coke oven with truck crane, using small-sized digging Pick machine is removed from oven top of coke oven end stand and platform pusher side between middle coke oven, and oven top of coke oven and carbonization chamber are removed, and Make a part filling for the useless refractory brick for first removing generation to coke furnace carbonization chamber, another part gives up refractory brick to coke oven machine side direction It has bad luck, so that useless refractory brick is formed slope in coke oven machine side, after removing 10 hole of coke oven machine side refractory masonry so as to high-front shovel Climb to operation on coke oven chute position;
C, high-front shovel is run on coke oven chute position by the slope starts to remove oven coke furnace roof, carbonization chamber Operation, all useless refractory brick are had bad luck to coke oven machine side direction, the waste material dug out through coke oven machine side with being transported to coke oven machine side track On face, transported to concentrate;
D, it using 2 large excavators, carries out removing coke oven chute and regenerative chamber, waste material from coke oven machine side both ends to coke oven coke side It is discharged from coke oven machine side, excavating depth reserves subject to coke oven horizontal flue bottom;
E, coke oven horizontal flue bottom uses based on manual demolition, and form of construction work is removed supplemented by machinery, avoids machine in demolishing process Tool and other tools destroy the screed-coat and both ends resistance wall of coke oven base platform;
F, coke oven furnace bed board, lower jet pipe are repaired in cleaning, the coke oven furnace bed board that partially there is crackle and expansion joint edge are destroyed, clearly Then the brick slag sundries fallen into the clean seam of reason is reinforced grouting material filling with cement base and is restored, by the burlap in Coke oven lower spray pipe It after taking down, is dredged with high pressure water, tar, sundries is cleaned out, the weight of coking furnace shaft refractory brick is carried out after the completion of cleaning It is new to build work.
The quick method for dismounting of capacity coke oven ontology refractory masonry of the invention can also using technical measures below come into One step is realized.
Method above-mentioned, wherein the protection board is the protection board previously removed.
Method above-mentioned, wherein the wood springboard is with a thickness of >=50mm.
Method above-mentioned, wherein the lifting capacity of the truck crane is >=200t.
After adopting the above technical scheme, the quick method for dismounting of capacity coke oven ontology refractory masonry of the invention is with following excellent Point:
1, the design of coke oven ontology refractory masonry removal step is rationally, linking is proper, links closely step by step, is in good order;
2, projects are safe and reliable, quickly remove refractory masonry, reduce labor intensity, and save the construction period;
3, equipment under effective protection coke oven base platform, resistance wall, furnace lays the foundation to rebuild, and reduces engineering cost.
Detailed description of the invention
Fig. 1 is the capacity coke oven furnace roof floor map of the embodiment of the present invention;
Fig. 2 is that the capacity coke oven ontology of the embodiment of the present invention removes elevational schematic view.
In figure: 1 resistance wall, 2 end stand, 3 long-armed digging machines, 4 furnace roofs, 5 platforms, 6 carbonization chambers, 7 chutes, 8 regenerative chambers, 9 pusher sides Ground, 10 Miniature digging machines, 11 useless bricks take off fortune, 12 pusher sides to pusher side ground.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
The quick method for dismounting construction process of capacity coke oven ontology refractory masonry of the invention: coking furnace shaft cool down → remove coke oven shield Furnace ironware → coke oven coke side, pusher side platform and furnace body opening protection → mini-excavator hang oven top of coke oven end stand, platform → coke Furnace furnace roof, carbonization chamber pusher side refractory masonry remove 10 holes or so → high-front shovel and remove oven top of coke oven, carbonization chamber refractory masonry → coke oven chute, regenerative chamber refractory masonry dismounting → coke oven horizontal flue bottom dismounting → cleaning.
The quick method for dismounting of capacity coke oven ontology refractory masonry of the invention, comprising the following steps:
A, the preparation before coke oven ontology refractory masonry is removed:
(1) coke oven ontology refractory masonry properly protects to coking furnace shaft surrounding before removing, and the gap between furnace body and platform utilizes The protection board removed carries out canopy-protected, to waste gas valve hole on flue using the thick wooden springboard canopy-protected of 50mm, prevents Refractory brick falls to basement;It is blocked at the railing of coke side platform outer using waste and old pallet, prevents the refractory brick tumbled from falling Enter on coke-quenching vehicle track;Burlap is filled up into Coke oven lower spray pipe from basement, prevents brick slag in demolishing process from falling into blocking, it is difficult to Cleaning;
(2) coke oven door is won, firedoor frame, furnace top equipment pipeline, pusher side, coke side platform, furnace retaining ironware are removed;Fig. 1 is this hair The capacity coke oven furnace roof floor map of bright embodiment.
B, oven top structure for coke oven load-bearing is limited, and 2 mini-excavators are hung to oven top of coke oven with 200t lifting capacity truck crane, It is removed using Miniature digging machine from oven top of coke oven end stand and platform pusher side to centre, in end stand 2,5 pusher side of platform to coke oven furnace Top 4 and carbonization chamber 6 are removed, and the refractory brick a part for first removing generation is first filled to coke furnace carbonization chamber, and another part is useless Brick is had bad luck toward coke oven machine side direction, and the brick that gives up after removing 10 hole of coke oven machine side forms slope in coke oven machine side, so as to long-armed excavation Machine 3 is climbed to operation on coke oven chute position.
C, after coke oven machine side forms slope, high-front shovel passes through the useless brick that mini-excavator 10 is excavated at one jiao of pusher side Slope starts to carry out oven top of coke oven, carbonization chamber dismounting operation to running on coke oven chute position, and all useless bricks are toward coke oven machine Side direction is had bad luck, and the waste material dug out is transported on pusher side track ground through coke oven machine side, and concentration is transported.
D, using 2 large-scale digging machines, coke oven chute and regenerative chamber remove from coke oven both ends pusher side to coke side, waste material from Coke oven machine side discharge, excavating depth reserve subject to coke oven horizontal flue bottom.
E, coke oven horizontal flue bottom uses based on manual demolition, form of construction work supplemented by machinery, avoids machinery in demolishing process And other tools destroy the screed-coat and both ends resistance wall of coke oven base platform;Fig. 2 is the capacity coke oven of the embodiment of the present invention Ontology removes elevational schematic view.
F, coke oven furnace bed board, the cleaning of lower jet pipe are repaired: the coke oven furnace bed board that partially there is crackle and expansion joint edge are beaten Fall, clean out the brick slag impurity fallen into seam, then reinforces grouting material filling with cement base and restore, it will be in Coke oven lower spray pipe It after cloth takes down, is dredged with high pressure water, tar, sundries is cleaned out, coking furnace shaft refractory brick is carried out after the completion of cleaning Masonry work again.
The present invention has substantive distinguishing features and significant technological progress, and capacity coke oven ontology refractory masonry of the invention is quick The design of method for dismounting removal step is rationally, linking is proper, it is in good order to link closely step by step, and projects are safe and reliable, quickly remove Refractory masonry reduces labor intensity, and shortens the construction time, saves operating expenses, remarkable in economical benefits.
The 2 coke oven projects of the quick method for dismounting of capacity coke oven ontology refractory masonry of the invention in Baogang coking Factory Middle utilization, construction safety is reliable, and the construction time is short, and effect is obvious, receives the affirmative of relevant departments and unit.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (4)

1. a kind of quick method for dismounting of capacity coke oven ontology refractory masonry, it is characterised in that the following steps are included:
A, the preparation before coke oven ontology refractory masonry is removed:
(1) coke oven ontology refractory masonry properly protects to coking furnace shaft surrounding before removing, the gap between coke oven ontology and platform Canopy-protected is carried out using several protection boards;To waste gas valve hole on flue using the wooden springboard canopy-protected, refractory brick is prevented Fall to basement;It is blocked at the railing of coke side platform outer using waste and old pallet, prevents the refractory brick tumbled from falling into quenching On track road;Burlap is filled up out of basement downward jet pipe, prevents brick slag in demolishing process from falling into blocking;
(2) coke oven door is won, firedoor frame, furnace top equipment pipeline, pusher side and coke side platform, furnace retaining ironware are removed;
B, since oven top structure for coke oven load-bearing is limited, 2 mini-excavators are hung to oven top of coke oven with truck crane, using small-sized digging Pick machine from oven top of coke oven end stand and platform pusher side to coke oven among removed, oven top of coke oven and carbonization chamber are removed, and Make a part filling for the useless refractory brick for first removing generation to coke furnace carbonization chamber, another part gives up refractory brick to coke oven machine side direction It has bad luck, after removing 10 hole of coke oven machine side refractory masonry, so that useless refractory brick is formed slope in coke oven machine side, so as to high-front shovel Climb to operation on coke oven chute position;
C, high-front shovel is run on coke oven chute position by the slope starts to remove oven top of coke oven, carbonization chamber Operation, all useless refractory brick are had bad luck to coke oven machine side direction, and the waste material dug out is transported on pusher side track ground through coke oven machine side, It is transported to concentrate;
D, using 2 large excavators, coke oven chute and regenerative chamber remove from coke oven machine side both ends to coke side, waste material is from coke The discharge of furnace pusher side, excavating depth reserve subject to coke oven horizontal flue bottom;
E, coke oven horizontal flue bottom uses based on manual demolition, and form of construction work is removed supplemented by machinery, avoids machine in demolishing process Tool and other tools destroy the screed-coat and both ends resistance wall of coke oven base platform;
F, coke oven furnace bed board, lower jet pipe are repaired in cleaning, the coke oven furnace bed board that partially there is crackle and expansion joint edge are destroyed, clearly Then the brick slag sundries fallen into the clean seam of reason is reinforced grouting material filling with cement base and is restored, by the burlap in Coke oven lower spray pipe It after taking down, is dredged with high pressure water, tar, sundries is cleaned out, the weight of coking furnace shaft refractory brick is carried out after the completion of cleaning It is new to build work.
2. the quick method for dismounting of capacity coke oven ontology refractory masonry as described in claim 1, which is characterized in that the protection board For the protection board previously removed.
3. the quick method for dismounting of capacity coke oven ontology refractory masonry as described in claim 1, which is characterized in that the wood springboard With a thickness of >=50mm.
4. the quick method for dismounting of capacity coke oven ontology refractory masonry as described in claim 1, which is characterized in that the truck crane Lifting capacity be >=200t.
CN201910226203.5A 2019-03-25 2019-03-25 Method for quickly removing refractory masonry of large coke oven body Active CN109837102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910226203.5A CN109837102B (en) 2019-03-25 2019-03-25 Method for quickly removing refractory masonry of large coke oven body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910226203.5A CN109837102B (en) 2019-03-25 2019-03-25 Method for quickly removing refractory masonry of large coke oven body

Publications (2)

Publication Number Publication Date
CN109837102A true CN109837102A (en) 2019-06-04
CN109837102B CN109837102B (en) 2020-11-03

Family

ID=66886141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910226203.5A Active CN109837102B (en) 2019-03-25 2019-03-25 Method for quickly removing refractory masonry of large coke oven body

Country Status (1)

Country Link
CN (1) CN109837102B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114874787A (en) * 2022-04-23 2022-08-09 中国五冶集团有限公司 Method for mounting clean heat recovery coke oven door

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101081986A (en) * 2007-02-13 2007-12-05 上海五冶冶金建设有限公司 Coke oven masonry construction method employing upright line rod
CN101381607A (en) * 2008-10-06 2009-03-11 中冶宝钢技术服务有限公司 Manual repair technique of coking chamber wall
CN102504837A (en) * 2011-10-28 2012-06-20 马钢(集团)控股有限公司 Synchronous cutting-off and unroofing repair method for coke side oven head of large-scale coke oven machine
CN106753449A (en) * 2016-12-09 2017-05-31 李洪泽 A kind of method for clearing up coke oven chute
JP2018039921A (en) * 2016-09-08 2018-03-15 新日鐵住金株式会社 Demolition method of retaining wall of coke oven
JP2018096072A (en) * 2016-12-12 2018-06-21 株式会社奥村組 System and method for carrying out demolition material of building
CN109181715A (en) * 2018-09-21 2019-01-11 中国冶集团有限公司 The coke oven protective demolition of resistance to material device and method for dismounting

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101081986A (en) * 2007-02-13 2007-12-05 上海五冶冶金建设有限公司 Coke oven masonry construction method employing upright line rod
CN101381607A (en) * 2008-10-06 2009-03-11 中冶宝钢技术服务有限公司 Manual repair technique of coking chamber wall
CN102504837A (en) * 2011-10-28 2012-06-20 马钢(集团)控股有限公司 Synchronous cutting-off and unroofing repair method for coke side oven head of large-scale coke oven machine
JP2018039921A (en) * 2016-09-08 2018-03-15 新日鐵住金株式会社 Demolition method of retaining wall of coke oven
CN106753449A (en) * 2016-12-09 2017-05-31 李洪泽 A kind of method for clearing up coke oven chute
JP2018096072A (en) * 2016-12-12 2018-06-21 株式会社奥村組 System and method for carrying out demolition material of building
CN109181715A (en) * 2018-09-21 2019-01-11 中国冶集团有限公司 The coke oven protective demolition of resistance to material device and method for dismounting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114874787A (en) * 2022-04-23 2022-08-09 中国五冶集团有限公司 Method for mounting clean heat recovery coke oven door

Also Published As

Publication number Publication date
CN109837102B (en) 2020-11-03

Similar Documents

Publication Publication Date Title
CN113833480A (en) Shield initial tunneling and arrival construction method
CN103603676B (en) A kind of scraper laneway support method
CN110079338B (en) Coke oven body dismantling and rebuilding method
CN112160759A (en) Method for starting and trial tunneling of tunnel shield crossing river
CN110158609A (en) A kind of mechanization demolition reduction method of reinforced concrete brace in foundation pit
CN110685459B (en) Breaking hammer dismantling construction method for dismantling hoist bent from lower part
CN111576106A (en) Construction method for rapidly pushing and replacing ballastless track structure of passenger special line
CN109837102A (en) The quick method for dismounting of capacity coke oven ontology refractory masonry
CN101368447A (en) Old wall renovation and construction method
CN109630131B (en) Underground chamber construction method
JP6971170B2 (en) How to build an underground structure
CN112412467B (en) Construction method of ventilation vertical shaft (200-600 m) with extra-long highway tunnel by' well reversing method
CN110066664B (en) Maintenance method for smoke emission of small burner of 7.63-meter coke oven
CN208594308U (en) Waste material clears up system in a kind of large blast furnace overhaul furnace
CN105605924B (en) The method for repairing and mending of fixed anode copper metallurgical furnace bottom brick
CN113982639B (en) Tunnel lining full-ring dismantling and replacing construction method in unfavorable geological region
CN113999946B (en) Dismantling method for ball type hot blast stove
CN111946351B (en) Rapid excavation method for contact channel of hard rock stratum of rail transit
CN112726434B (en) Three-span deck reinforced concrete arch bridge dismantling method
CN108624730A (en) Waste material cleaning system and method for cleaning in a kind of large blast furnace overhaul stove
CN110725220A (en) Construction method for dismantling pier
CN117345250A (en) Construction method for removing hole excavation supporting
CN105735064B (en) A kind of train overhaul tunnel sleeper changing construction method
CN101307652B (en) Blast furnace bottom heat resisting foundation pier dismantling method
CN216446838U (en) Device for improving blasting drilling success rate in burning rock stratum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant