CN101381607A - Manual repair technique of coking chamber wall - Google Patents

Manual repair technique of coking chamber wall Download PDF

Info

Publication number
CN101381607A
CN101381607A CNA200810200796XA CN200810200796A CN101381607A CN 101381607 A CN101381607 A CN 101381607A CN A200810200796X A CNA200810200796X A CN A200810200796XA CN 200810200796 A CN200810200796 A CN 200810200796A CN 101381607 A CN101381607 A CN 101381607A
Authority
CN
China
Prior art keywords
heat
coking chamber
heat isolation
furnace
repair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200810200796XA
Other languages
Chinese (zh)
Other versions
CN101381607B (en
Inventor
马汉林
王进忠
陈义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Baosteel Technology Services Co Ltd
Original Assignee
MCC Baosteel Technology Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Baosteel Technology Services Co Ltd filed Critical MCC Baosteel Technology Services Co Ltd
Priority to CN200810200796A priority Critical patent/CN101381607B/en
Publication of CN101381607A publication Critical patent/CN101381607A/en
Application granted granted Critical
Publication of CN101381607B publication Critical patent/CN101381607B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention discloses a process for manually mending the furnace wall of a carbonization chamber. The process comprises the following: (1) a step of fixing a heat isolation rack: according to a mending part, the heat isolation rack is manufactured; the surface of the heat isolation rack is coated by a heat isolation blanket; the heat isolation rack is pushed to the part of the furnace wall needing mending in the carbonization chamber; and the top of the heat isolation rack is fixed on a furnace frame; (2) a step of paving the heat isolation blanket; graphite and impurities on the bottom of the furnace are cleaned up; the heat isolation blanket and a passage plate are paved; and the heat isolation blanket is stuck on the furnace wall to be treated mended and the furnace wall on the periphery of the heat isolation rack; (3) a step of constructing the inside of the furnace of the carbonization chamber: after the furnace walls at two sides are stuck with the heat isolation blanket, no naked fire is determined to eject; and the mending construction is carried out; and (4) a step of detaching and mending a melting loss part. The mending process can carry out mending in the carbonization chamber under the environment of high temperature of 1,000 DEG C around, reduce cost, improve the service life of the coke furnace, does not influence production and is a feasible and effective method.

Description

Manual repair technique of coking chamber wall
Technical field
The invention belongs to the coking technology field, relate in particular to a kind of manual repair technique of coking chamber wall that is used for coke furnace carbonization chamber.
Background technology
Coke oven construction partly is made up of furnace roof, combustion chamber, coking chamber and flue etc.Temperature is about 1300 degrees centigrade, based on coking in the coking chamber stove.Coking chamber mainly is to deposit coal, in process of coking, tar that produces and graphite are attached on the charing locular wall, accumulation will be touched with the discrepancy of coke pusher for a long time, and the unavoidable error that in the temperature adjustment process, occurs of the quality problems of charing locular wall silica brick own and operative employee, cause the serious melting loss of charing locular wall silica brick.Because the characteristic of silica brick material must be repaired under the environment of about 1000 degrees centigrade of high temperature.The main in the past method that adopts is to the mould material spray repair of the position of silica brick melting loss, and after use for some time, coming off of mould material will similar disrepair phenomenon can occur again, and spray repair is more frequent.If the blowing out overhaul is very expensive not only, also influence is produced.
Summary of the invention
Technical problem to be solved by this invention provides carries out the manual repair technique of coking chamber wall that repair artificial furnace wall under a kind of hot environment, to improve the work-ing life of coking chamber, satisfy the needs of ordinary production.
The technical scheme of technical solution problem of the present invention is as follows:
A kind of manual repair technique of coking chamber wall is characterized in that, comprises the steps:
(1), fixing heat insulation: make heat insulation according to repairing the position, wrap up with heat-insulation blanket on heat insulation surface, pushes eligible for repair position in the coking chamber with heat insulation, and heat insulation top of the trellis is fixed on the stove frame;
(2), shop heat-insulation blanket: clear up furnace bottom graphite, foreign material, spread heat-insulation blanket and walk guidance tape, heat-insulation blanket is attached to waits to repair on furnace wall and the heat insulation frame peripheral furnace wall then;
(3), construction in the stove: wait post heat-insulation blanket on the furnace wall of both sides after, confirm not have the naked light ejection, carry out reparation construction then;
(4), remove the melting loss position, repair.
Beneficial effect of the present invention is as follows: adopt repair technology of the present invention can carry out coking chamber under the environment of about 1000 degrees centigrade of high temperature and repair, not only reduced cost, and the work-ing life of having improved coke oven, do not influence production, be a kind of desirable and effective means.And repair technology of the present invention is practical, according to the situation that occurred coking chamber wall silica brick melting loss in the past, if what occur is slight melting loss, repair with regard to adopting common gunning technology, if bigger serious melting loss occurs, just take the method for landfill, stop the use of this part, so not only influence is produced, and has also wasted the utilization of resource.And adopt this scheme, and neither wasting resource, can reduce cost again, according to statistics, after the repairing, can more than the method that occurred this situation employing landfill in the past and produce 2000 stove left and right sides coke (under normal circumstances, annual coking chamber can be produced about 360 stoves).Be worth considerable, and easy to use.
Description of drawings
Fig. 1 is the coking chamber wall synoptic diagram of melting loss;
Fig. 2 lays heat insulation coking chamber wall synoptic diagram;
Fig. 3 is the coking chamber wall synoptic diagram that sticks heat-insulation blanket;
Fig. 4 is for removing the coking chamber wall synoptic diagram that digs the melting loss position;
Fig. 5 is for repairing the coking chamber wall synoptic diagram of finishing.
Embodiment
Further specify the present invention below in conjunction with accompanying drawing and specific embodiment.
Coking chamber wall 1 for melting loss position 2 shown in Figure 1 can adopt following steps to repair:
At first, as shown in Figure 1, the repairing personnel have dressed proximity suit, proximity gloves and face shield, with pushing machine the coking chamber door is removed then, make the bottom according to the size of repairing the position and be heat insulation 4 of inverted " L " type, heat insulation 4 one-tenth vertical shapes are pushed the position that the coking chamber domestic demand is repaired, heat insulation top of the trellis is fixed on the stove frame 5, position to be repaired is enclosed in 90 inverted "L" shaped heat insulation of spending;
Secondly, as shown in Figure 2, cleaning furnace bottom graphite, foreign material are spread heat-insulation blanket 3 and are walked guidance tape, heat-insulation blanket is attached to successively waits to repair on furnace wall and the heat insulation frame peripheral furnace wall 1 then, note preventing the high temperature scald; After posting heat-insulation blanket on the furnace wall of both sides, confirm not have the naked light ejection, construct then.
Remove the melting loss position, repair: at first will repair the position and sever with pneumatic special-purpose brick cutting machine, as shown in Figure 4, the anti-material of melting loss is removed cleaning totally successively along slot, successively repair then, attention can not be fallen into rubbish in the combustion chamber, and the furnace wall that repairing is finished as shown in Figure 5.
Adopt above-mentioned repair technology, improved the work-ing life of coking chamber greatly, reduced production cost, guaranteed the stable smooth operation of producing.

Claims (4)

1. a manual repair technique of coking chamber wall is characterized in that, comprises the steps:
(1), fixing heat insulation: make heat insulation according to repairing the position, wrap up with heat-insulation blanket on heat insulation surface, pushes eligible for repair position in the coking chamber with heat insulation, and heat insulation top of the trellis is fixed on the stove frame;
(2), shop heat-insulation blanket: clear up furnace bottom graphite, foreign material, spread heat-insulation blanket and walk guidance tape, heat-insulation blanket is attached to waits to repair on furnace wall and the heat insulation frame peripheral furnace wall then;
(3), construction in the stove: wait post heat-insulation blanket on the furnace wall of both sides after, confirm not have the naked light ejection, carry out reparation construction then;
(4), remove the melting loss position, repair.
2. manual repair technique of coking chamber wall according to claim 1 is characterized in that, described heat insulation bottom is in inverted " L " type will position be repaired be enclosed in.
3. manual repair technique of coking chamber wall according to claim 2, it is characterized in that, said step (1) comprising: the repairing personnel have dressed proximity suit, proximity gloves and face shield, with pushing machine the coking chamber door is removed then, according to repairing the position, heat insulation with making pushes coking chamber, ready heat-insulation blanket is attached on the heat insulation frame peripheral furnace wall successively.
4. manual repair technique of coking chamber wall according to claim 1, it is characterized in that, said step (4) comprising: at first will wait to repair the position and sever with pneumatic special-purpose brick cutting machine, the anti-material of melting loss is removed cleaning totally successively along slot, and successively repair then.
CN200810200796A 2008-10-06 2008-10-06 Manual repair technique of coking chamber wall Active CN101381607B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810200796A CN101381607B (en) 2008-10-06 2008-10-06 Manual repair technique of coking chamber wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810200796A CN101381607B (en) 2008-10-06 2008-10-06 Manual repair technique of coking chamber wall

Publications (2)

Publication Number Publication Date
CN101381607A true CN101381607A (en) 2009-03-11
CN101381607B CN101381607B (en) 2012-10-03

Family

ID=40461665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810200796A Active CN101381607B (en) 2008-10-06 2008-10-06 Manual repair technique of coking chamber wall

Country Status (1)

Country Link
CN (1) CN101381607B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101805622A (en) * 2010-04-15 2010-08-18 南京钢铁股份有限公司 Hot patching process for bottom brick of carbonization chamber of coke oven
CN101974339A (en) * 2010-11-03 2011-02-16 芜湖新兴铸管有限责任公司 Repairing method of coking chamber of coke oven by using silica bricks
CN102925167A (en) * 2012-11-05 2013-02-13 中国一冶集团有限公司 Coking furnace hot repair carbonization chamber bottom brick masonry device
CN109423312A (en) * 2017-08-23 2019-03-05 中冶宝钢技术服务有限公司 A kind of carbonizing chamber of coke oven depth quirk hot-state repair method
CN109837102A (en) * 2019-03-25 2019-06-04 五冶集团上海有限公司 The quick method for dismounting of capacity coke oven ontology refractory masonry
CN110079338A (en) * 2019-04-30 2019-08-02 五冶集团上海有限公司 A kind of coking furnace shaft dismounting method for reconstructing

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1283752C (en) * 2003-11-07 2006-11-08 酒泉钢铁(集团)有限责任公司 Process for heat maintaining whole walls of coke carbonating chamber
CN1978590A (en) * 2005-12-10 2007-06-13 攀枝花新钢钒股份有限公司 Hot-state repair method of bottom refractory brick for coke furnace carbonization chamber

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101805622A (en) * 2010-04-15 2010-08-18 南京钢铁股份有限公司 Hot patching process for bottom brick of carbonization chamber of coke oven
CN101805622B (en) * 2010-04-15 2013-01-02 南京钢铁股份有限公司 Hot patching process for bottom brick of carbonization chamber of coke oven
CN101974339A (en) * 2010-11-03 2011-02-16 芜湖新兴铸管有限责任公司 Repairing method of coking chamber of coke oven by using silica bricks
CN101974339B (en) * 2010-11-03 2013-04-03 芜湖新兴铸管有限责任公司 Repairing method of coking chamber of coke oven by using silica bricks
CN102925167A (en) * 2012-11-05 2013-02-13 中国一冶集团有限公司 Coking furnace hot repair carbonization chamber bottom brick masonry device
CN109423312A (en) * 2017-08-23 2019-03-05 中冶宝钢技术服务有限公司 A kind of carbonizing chamber of coke oven depth quirk hot-state repair method
CN109837102A (en) * 2019-03-25 2019-06-04 五冶集团上海有限公司 The quick method for dismounting of capacity coke oven ontology refractory masonry
CN109837102B (en) * 2019-03-25 2020-11-03 五冶集团上海有限公司 Method for quickly removing refractory masonry of large coke oven body
CN110079338A (en) * 2019-04-30 2019-08-02 五冶集团上海有限公司 A kind of coking furnace shaft dismounting method for reconstructing

Also Published As

Publication number Publication date
CN101381607B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN101381607B (en) Manual repair technique of coking chamber wall
CN101974339B (en) Repairing method of coking chamber of coke oven by using silica bricks
CN102504837B (en) Synchronous cutting-off and unroofing repair method for coke side oven head of large-scale coke oven machine
CN102424753B (en) Method for repairing bricks at bottom of carbonization chamber of large coke oven
CN204779338U (en) Wire drawing stove is system of cleaning on line
CN103145328B (en) A kind of method of basalt blast furnace slag in preparation of rock wool board comprehensive utilization
CN1978590A (en) Hot-state repair method of bottom refractory brick for coke furnace carbonization chamber
CN104357067A (en) Coke oven maintenance method
CN101032829A (en) Method of producing rock wool lath
CN204404774U (en) All steel cotton modular can uncover furnace roof
CN101805622B (en) Hot patching process for bottom brick of carbonization chamber of coke oven
CN110330986B (en) Method for replacing bottom bricks of carbonization chamber of coke oven
CN201406405Y (en) Heat insulation and protection structure for coke oven on-line hot repair
CN206543882U (en) A kind of gas type twin containers zinc powder furnace
CN102838274A (en) Method for producing solidified slag rock wool by smoke afterheat and slag of cupola furnace
CN103740380A (en) Coke oven drying process
CN203875275U (en) Heating device of thermal reclamation process of used casting sand
CN201553699U (en) Thermal insulation device for maintaining bottom of coke oven
CN103695006B (en) Method for repairing surface fireproofing layer of lining of coke oven door
CN202379941U (en) Repairing hanger basket of expansion joints at inlet and outlet of coke dry quenching (CDQ) primary deduster
CN201873535U (en) Device for reducing loss in titanium tetrachloride producing process
CN210367522U (en) Coke oven brick gas duct mud jacking sealing tube
CN204434458U (en) Glass burning exchange system
CN204569891U (en) Novel Niang Cu Smoked unstrained spirits combustion gas roaster
CN104001853A (en) Heating device for casting used sand hot method regeneration technology and heating mode of heating device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant