CN109778720A - 基于挂篮施工的桥梁建设施工方法 - Google Patents

基于挂篮施工的桥梁建设施工方法 Download PDF

Info

Publication number
CN109778720A
CN109778720A CN201910203445.2A CN201910203445A CN109778720A CN 109778720 A CN109778720 A CN 109778720A CN 201910203445 A CN201910203445 A CN 201910203445A CN 109778720 A CN109778720 A CN 109778720A
Authority
CN
China
Prior art keywords
construction
hanging basket
hanging
box beam
cradle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910203445.2A
Other languages
English (en)
Other versions
CN109778720B (zh
Inventor
胡月明
孙有竹
汪乐晨
伏浩浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co Ltd filed Critical ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201910203445.2A priority Critical patent/CN109778720B/zh
Publication of CN109778720A publication Critical patent/CN109778720A/zh
Application granted granted Critical
Publication of CN109778720B publication Critical patent/CN109778720B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

基于挂篮施工的桥梁建设施工方法,桥梁建设施工场地设有两挂篮,两挂篮背靠背设置,两挂篮施工前进的方向是相背离,所述挂篮包括菱形桁架,包括如下步骤,选用挂篮前先确定本次施工中需要起吊的箱梁的重量;根据箱梁的重量选择挂篮,选择挂篮时,两个挂篮的载荷力小于箱梁的重量,四个挂篮的载荷力大于箱梁的重量。

Description

基于挂篮施工的桥梁建设施工方法
技术领域
本发明涉及基于挂篮施工的桥梁建设施工方法。
背景技术
桥梁建设中要不断地寻找技术新、速度快、施工方便和经济的施工方法。箱梁在工厂预制后再到施工现场拼装的施工方法随之被广泛采用,这种施工工艺降低了桥梁施工对城市交通的影响,提升了高架桥工程的技术水平。该桥梁建设施工方法需要借助桥面吊机,需要在施工场地搭建桥面吊机,吊装完成后再拆除。
大跨径的预应力混凝土连续梁广泛采用挂篮进行悬臂浇筑施工。所谓挂篮施工,是指浇筑悬臂梁桥时,采用吊篮方法,就地分段悬臂作业。它不需要架设支架和不使用大型吊机。挂篮施工较其他方法,具有结构轻、拼制简单方便、无压重等优点。
当上述施工方式同时出现时,需要先拆挂篮在拼装桥面吊机,需要两套设备,且来回拆装较为繁琐。
发明内容
本发明的目的在于克服现有技术存在的不足,提供一种可有效利用挂篮实现吊装的基于挂篮施工的桥梁建设施工方法。
本发明所述基于挂篮施工的桥梁建设施工方法,桥梁建设施工场地设有两挂篮,两挂篮背靠背设置,两挂篮施工前进的方向是相背离,所述挂篮包括菱形桁架,包括如下步骤,选用挂篮前先确定本次施工中需要起吊的箱梁的重量;根据箱梁的重量选择挂篮,选择挂篮时,两个挂篮的载荷力小于箱梁的重量,四个挂篮的载荷力大于箱梁的重量。
其中,需要起吊箱梁时,位于同一施工区的其中一侧挂篮与另一侧挂篮相组合,两挂篮的菱形桁架叠合设置;另一施工区的其中一侧挂篮与另一侧挂篮相组合,两挂篮的菱形桁架叠合设置;重组后的挂篮起吊位于相邻两施工区之间的箱梁。
其中,菱形桁架侧方设有一安装盘,安装盘上设有透孔,两菱形桁架组合时,两菱形桁架上的安装盘叠合并采用紧固件固定。
相比于现有技术中的解决方案,本发明优点是:本发明在实施时可免去桥面吊机设备,可将挂篮设备作为桥面吊机设备使用,从而降低施工设备开支,可充分利用原有挂篮,提高施工效率。
附图说明
图1是本发明所述挂篮常规使用状态的结构示意图。
图2是本发明所述挂篮作为桥面吊机使用时的结构示意图。
具体实施方式
下面结合附图并通过实施例对本发明作进一步说明。
参见图1至图2,本实施例所述基于挂篮施工的桥梁建设施工方法,桥梁建设施工场地设有两挂篮1,两挂篮1背靠背设置,两挂篮1施工前进的方向是相背离,所述挂篮1包括菱形桁架,还包括如下步骤,选用挂篮1前先确定本次施工中需要起吊的箱梁2的重量,箱梁2是桥梁建设的预制件;根据箱梁2的重量选择挂篮1,选择挂篮1时,两个挂篮1的载荷力小于箱梁2的重量,四个挂篮1的载荷力大于箱梁2的重量。该机构中原有的挂篮1虽然无法吊起箱梁2,但组合后的挂篮1’可作为桥面吊机使用可吊起箱梁2,该方法相比传统施工方式更方便。
需要起吊箱梁2时,位于同一施工区的其中一侧挂篮1与另一侧挂篮1相组合,两挂篮1的菱形桁架叠合设置;另一施工区的其中一侧挂篮1与另一侧挂篮1相组合,两挂篮1的菱形桁架叠合设置;组合后的挂篮1’起吊位于相邻两施工区之间的箱梁2。
本实施例在具体实施时,挂篮1施工通常是从桥墩中心出发向两侧延伸施工,挂篮1悬浇施工一定距离后,拆除同一桥墩上的一侧挂篮1,将拆除的挂篮1部件与另一侧的挂篮1拼合,原挂篮1的载荷力增强,另一桥墩上的挂篮1做同样处理,拼合后的挂篮1作为桥面吊机实用将预制的箱梁2吊起完成桥面合拢。
菱形桁架侧方设有一安装盘,安装盘上设有透孔,两菱形桁架组合时,两菱形桁架上的安装盘叠合并采用紧固件固定。螺栓对穿透孔采用螺母拧紧。
以上所述仅是本发明的优选实施方式,应当理解,对于本技术领域的普通技术人员来说,在不脱离本发明的原理前提下,还可以做出其他改进和修饰,皆应在由权利要求书所确定的保护范围内。

Claims (3)

1.基于挂篮施工的桥梁建设施工方法,桥梁建设施工场地设有两挂篮,两挂篮背靠背设置,两挂篮施工前进的方向是相背离,所述挂篮包括菱形桁架,其特征是,包括如下步骤,选用挂篮前先确定本次施工中需要起吊的箱梁的重量;根据箱梁的重量选择挂篮,选择挂篮时,两个挂篮的载荷力小于箱梁的重量,四个挂篮的载荷力大于箱梁的重量。
2.如权利要求1所述的基于挂篮施工的桥梁建设施工方法,其特征是,需要起吊箱梁时,位于同一施工区的其中一侧挂篮与另一侧挂篮相组合,两挂篮的菱形桁架叠合设置;另一施工区的其中一侧挂篮与另一侧挂篮相组合,两挂篮的菱形桁架叠合设置;重组后的挂篮起吊位于相邻两施工区之间的箱梁。
3.如权利要求2所述的基于挂篮施工的桥梁建设施工方法,其特征是,菱形桁架侧方设有一安装盘,安装盘上设有透孔,两菱形桁架组合时,两菱形桁架上的安装盘叠合并采用紧固件固定。
CN201910203445.2A 2019-03-18 2019-03-18 基于挂篮施工的桥梁建设施工方法 Active CN109778720B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910203445.2A CN109778720B (zh) 2019-03-18 2019-03-18 基于挂篮施工的桥梁建设施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910203445.2A CN109778720B (zh) 2019-03-18 2019-03-18 基于挂篮施工的桥梁建设施工方法

Publications (2)

Publication Number Publication Date
CN109778720A true CN109778720A (zh) 2019-05-21
CN109778720B CN109778720B (zh) 2020-11-06

Family

ID=66488365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910203445.2A Active CN109778720B (zh) 2019-03-18 2019-03-18 基于挂篮施工的桥梁建设施工方法

Country Status (1)

Country Link
CN (1) CN109778720B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609577A (zh) * 2020-11-23 2021-04-06 中国水利水电第四工程局有限公司 一种连续梁节段预制拼装方法
CN113957810A (zh) * 2021-11-01 2022-01-21 刘忆江 一种桥梁施工用的悬臂拉力支撑装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013149771A1 (en) * 2012-04-02 2013-10-10 Ulma C Y E, S. Coop Movable structure suitable for supporting a formwork of a new bridge section in cantilever
CN104074145A (zh) * 2014-06-30 2014-10-01 广东省基础工程公司 一种合拢段挂篮改装施工方法
CN105088971A (zh) * 2015-09-09 2015-11-25 上海城建市政工程(集团)有限公司 一种波形钢腹板pc箱梁斜拉桥中跨合龙施工方法
CN204940131U (zh) * 2015-09-09 2016-01-06 上海城建市政工程(集团)有限公司 一种波形钢腹板部件的挂篮装置
WO2018133045A1 (zh) * 2017-01-20 2018-07-26 中国铁建大桥工程局集团有限公司 一种自锚式悬索桥安装方法
CN108547223A (zh) * 2018-03-12 2018-09-18 中交第二航务工程局有限公司 钢混叠合的混合梁桥施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013149771A1 (en) * 2012-04-02 2013-10-10 Ulma C Y E, S. Coop Movable structure suitable for supporting a formwork of a new bridge section in cantilever
CN104074145A (zh) * 2014-06-30 2014-10-01 广东省基础工程公司 一种合拢段挂篮改装施工方法
CN105088971A (zh) * 2015-09-09 2015-11-25 上海城建市政工程(集团)有限公司 一种波形钢腹板pc箱梁斜拉桥中跨合龙施工方法
CN204940131U (zh) * 2015-09-09 2016-01-06 上海城建市政工程(集团)有限公司 一种波形钢腹板部件的挂篮装置
WO2018133045A1 (zh) * 2017-01-20 2018-07-26 中国铁建大桥工程局集团有限公司 一种自锚式悬索桥安装方法
CN108547223A (zh) * 2018-03-12 2018-09-18 中交第二航务工程局有限公司 钢混叠合的混合梁桥施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609577A (zh) * 2020-11-23 2021-04-06 中国水利水电第四工程局有限公司 一种连续梁节段预制拼装方法
CN113957810A (zh) * 2021-11-01 2022-01-21 刘忆江 一种桥梁施工用的悬臂拉力支撑装置

Also Published As

Publication number Publication date
CN109778720B (zh) 2020-11-06

Similar Documents

Publication Publication Date Title
CN100543235C (zh) 斜拉索辅助全悬臂架设钢桁梁的方法及***
CN103911956B (zh) 一种大跨度斜拉桥钢桁梁安装方法
CN201943007U (zh) 活动支架不变幅架梁吊机
CN108547223A (zh) 钢混叠合的混合梁桥施工方法
CN105604334A (zh) 一种用于大跨度钢桁架整体安装的快速施工方法
CN102561191A (zh) 一种拱桥拱肋的整体提升***及施工方法
CN103882812B (zh) 斜拉索桥中跨主梁的施工方法
CN102154990B (zh) 一种边跨悬吊-中跨斜拉三塔自锚式组合索桥的架设方法
CN205772984U (zh) 一种单片钢桁架的吊装装置
CN206692235U (zh) 一种钢结构穹顶起吊安装装置
CN105200923B (zh) 一种钢桁梁斜拉桥钢桁梁节段吊运装置及其吊运方法
CN110042768A (zh) 一种组合梁斜拉桥主梁双节段循环施工方法
CN203296361U (zh) 大跨度钢结构跨外组对吊装平台
CN208088097U (zh) 一种三塔悬索桥主梁安装施工结构
CN109778720A (zh) 基于挂篮施工的桥梁建设施工方法
CN107761573B (zh) 跨河桥梁底部贝雷梁临时支架顶升浮运拆除方法
CN106759909B (zh) 一种下挂上承结构体系及其施工方法
CN103216103A (zh) 环形屋盖的斜弧形组合钢结构柱安装预变形施工方法
CN109083008A (zh) 一种行走式盖梁施工作业平台及其组装工艺
CN208932821U (zh) 一种架梁施工用高低腿龙门吊
CN202658590U (zh) 整体装配式钻孔平台
CN110182682A (zh) 一种用于大节段钢桁梁吊装的吊具
CN104775363B (zh) 上塔柱钢筋节段的组拼方法
CN204126297U (zh) 一种钢桁架屋顶的临时支撑架
CN205171343U (zh) 组合梁自锚式悬索桥

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant