CN109723094A - A kind of foundation platform beam reinforcement means - Google Patents

A kind of foundation platform beam reinforcement means Download PDF

Info

Publication number
CN109723094A
CN109723094A CN201711036913.9A CN201711036913A CN109723094A CN 109723094 A CN109723094 A CN 109723094A CN 201711036913 A CN201711036913 A CN 201711036913A CN 109723094 A CN109723094 A CN 109723094A
Authority
CN
China
Prior art keywords
foundation
reinforcing bar
construction
hole
casting concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711036913.9A
Other languages
Chinese (zh)
Inventor
陈胜强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hongshi Construction Technology Development Engineering Co Ltd
Original Assignee
Guangdong Hongshi Construction Technology Development Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hongshi Construction Technology Development Engineering Co Ltd filed Critical Guangdong Hongshi Construction Technology Development Engineering Co Ltd
Priority to CN201711036913.9A priority Critical patent/CN109723094A/en
Publication of CN109723094A publication Critical patent/CN109723094A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to a kind of foundation platform beam reinforcement means, comprising the following steps: Step 1: positioning earth excavation to the bottom of foundation;Step 2: casting concrete bed course and smoothing out, the earthwork is hardened, is convenient for construction operation;Step 3: plant anchor;Step 4: reinforcing bar binding, system peace: being made by design diameter, reinforcing bar binding, system peace;Step 5: formwork supporting plate: pressing construction requirement sawing sheet, carry out template peace;Step 6: casting concrete foundation beam: strengthening of foundation foundation construction is completed in the molding of casting concrete reinforcement.The method of the present invention mainly handles the problem of low layer civil buildings red line is closer, and house periphery can not construct using foundation platform beam reinforcing mode, constructs in Indoor environment, solve the problems, such as that construction site is narrow, difficulty of construction is greatly reduced, and materials are easy, structure is simple, quality controllable.

Description

A kind of foundation platform beam reinforcement means
Technical field
The invention belongs to the processing method fields in building pathology accident, and in particular to a kind of foundation platform beam reinforcing side Method.
Background technique
In house because in foundation differential settlement pathology accident, existing strengthening of foundation method has a three categories: first Class is that foundation cushion cap increases reinforcing, and the second class is foundation Pressure pile strengthening, third class foundation consolidation by grouting.For The features such as existing building is reinforced, and is built than comparatively dense, and construction site is narrow, current method is for construction site Very big requirement, therefore, these three types of methods implement relatively difficult, and difficulty of construction is big, and construction site is narrow, or even will affect The building etc. on side.
Foundation platform beam reinforcement means of the present invention exactly solves above-mentioned problem, in order to not influence building outside variation, Take and reinforced in Indoor environment, but for the residential house of the nineties, mostly use greatly be all structural system be strip footing With brick setting basis, it can not summarize and improve by many years of experience, be for low layer foundation structure using basic section-increased method Strip footing and brick setting basis are reinforced using foundation platform beam, are made whole building stable structure, can be constructed in Indoor environment, It is easy to operate.
Summary of the invention
Object of the present invention is to aiming at the shortcomings of the prior art, propose a kind of foundation platform beam reinforcement means.The present invention is to build It builds object foundation platform beam method for strengthening to administer in existing building structure pathology accident, mainly for building for foundation differential settlement Build the narrow a kind of novel construction method used of object and construction site.It facilitates operation to construct, suitable for causing because of uneven settlement of foundation The fast and stable of inclined building pathology accident simultaneously restores safe normal use.
In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical scheme:
A kind of foundation platform beam reinforcement means, comprising the following steps:
Step 1: positioning earth excavation is to the bottom of foundation: according to site inspection and combine design requirement, using theodolite, Level, Sopwith staff, steel tape carry out construction positioning in building, carry out repetition measurement after positioning, to guarantee accuracy, secondly, right Localization region carries out earth excavation to the bottom of foundation;
Step 2: casting concrete bed course and smoothing out, the earthwork is hardened, is convenient for construction operation;
Step 3: plant anchor;
Step 4: reinforcing bar binding, system peace: being made by design diameter, reinforcing bar binding, system peace;
Step 5: formwork supporting plate: pressing construction requirement sawing sheet, carry out template peace;
Step 6: casting concrete foundation beam: strengthening of foundation foundation construction is completed in the molding of casting concrete reinforcement.
Compared with prior art, the invention has the following advantages that
The method of the present invention uses foundation platform beam reinforcing mode mainly to handle, and low layer civil buildings red line is closer, and house is peripheral The problem of can not constructing, constructs in Indoor environment, solves the problems, such as that construction site is narrow, difficulty of construction is greatly reduced, and is taken Material is easy, and structure is simple, quality controllable.
Detailed description of the invention
Fig. 1 is foundation platform reinforcement means flow chart of the present invention.
Specific embodiment
Present invention will now be described in detail with reference to the accompanying drawings., the description of this part be only it is exemplary and explanatory, do not answer There is any restriction effect to protection scope of the present invention.
As shown in Figure 1, a kind of foundation platform beam reinforcement means, comprising the following steps:
Step 1: positioning earth excavation is to the bottom of foundation: according to site inspection and combine design requirement, using theodolite, Level, Sopwith staff, steel tape carry out construction positioning in building, carry out repetition measurement after positioning, to guarantee accuracy, secondly, right Localization region carries out earth excavation to the bottom of foundation;
Step 2: casting concrete bed course and smoothing out, the earthwork is hardened, is convenient for construction operation;
Step 3: plant anchor;
Step 4: reinforcing bar binding, system peace: being made by design diameter, reinforcing bar binding, system peace;
Step 5: formwork supporting plate: pressing construction requirement sawing sheet, carry out template peace;
Step 6: casting concrete foundation beam: strengthening of foundation foundation construction is completed in the molding of casting concrete reinforcement.
Specific step is as follows for the step 3:
1) positioning drilling: checking concrete members intensity, and the strength grade of concrete must not be lower than C15;It drills by positioning Position, depth, aperture must change hole location if any trembleing or meeting the intensive clearence degree deficiency structure of original reinforcing bar again;To guarantee to fill The effect anchored is waved in distribution, and the buried depth of reinforcing bar should not be less than 15 times of bar diameters, and boring aperture should be greater than bar diameter 4- 6mm, the width between lateral wall and concrete Member Lip should be no less than 5cm;
2) pore-forming is cleared up: should clear up immediately after pore-forming, the dust of hole wall is removed using steel brush, be portalled with electronic blowing interior Dust, ponding should keep drying in hole, dip acetone using cotton yarn or dimethylbenzene wipes hole wall one time;As after borehole cleaning cannot and When anchor plant, it is necessary to temporary plugging aperture prevents dust, sand grains etc. from falling into hole;
3) rebar surface is handled: being planted reinforcing bar or stud by anchor, must be used acetone clean the surface;Remove removing rust and oxide layer and oil Dirty, sweat stain, processed reinforcing bar should avoid rust of living again in implant holes as early as possible;
4) match glue: building structure adhesive is two-component, and the mixing ratio by weight of the first and second components is 4:1, respectively accurate metering After stir evenly;Allotment glue dosage should should not once be adjusted more depending on needed for scene, otherwise within the defined operating time not Timely injection hole interplantation anchor, adhesive, which loses flowability, will will cause the waste of material;Forbid using any solvent to adhesive It is diluted;
5) injecting glue, bar planting: deployed adhesive should be injected into hole as early as possible, and injecting glue amount is 1/2 to the 2/3 of hole depth;It is vertical Reinforcing bar is inserted in the hole the bottom of to, is carried under rotation number up and down, bubble is discharged, guarantees that glue-line is full;The potting compound of lateral aperture, is answered Glue is sent into the most deep in hole using proper implements, air is gradually discharged from inside to outside, reinforcing bar is inserted into;Reinforcing bar buries Afterwards, the surrounding for positioning and blocking in time using early strong material aperture reinforcing bar, prevents adhesive outflow from influencing plumpness;
6) curing: the reinforcing bar in implant holes should conserve at normal temperature, must not disturbance;After being carried out again after 24 hours Continuous construction operation;General room temperature was fully cured in 20 DEG C of adhesives at 3-5 days, and live sampling inspection should carry out after 5 days.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the principle of the present invention, several improvement can also be made, these improvement also should be regarded as guarantor of the present invention Protect range.

Claims (2)

1. a kind of foundation platform beam reinforcement means, which comprises the following steps:
Step 1: positioning earth excavation is to the bottom of foundation: according to site inspection and combining design requirement, use theodolite, level Instrument, Sopwith staff, steel tape carry out construction positioning in building, carry out repetition measurement after positioning, to guarantee accuracy, secondly, to positioning Region carries out earth excavation to the bottom of foundation;
Step 2: casting concrete bed course and smoothing out, the earthwork is hardened, is convenient for construction operation;
Step 3: plant anchor;
Step 4: reinforcing bar binding, system peace: being made by design diameter, reinforcing bar binding, system peace;
Step 5: formwork supporting plate: pressing construction requirement sawing sheet, carry out template peace;
Step 6: casting concrete foundation beam: strengthening of foundation foundation construction is completed in the molding of casting concrete reinforcement.
2. foundation platform beam reinforcement means according to claim 1, which is characterized in that the specific steps of the step 3 are such as Under:
1) positioning drilling: checking concrete members intensity, and the strength grade of concrete must not be lower than C15;By positioning bore position, Depth, aperture must change hole location if any trembleing or meeting the intensive clearence degree deficiency structure of original reinforcing bar again;To guarantee sufficiently hair The effect anchored is waved, the buried depth of reinforcing bar should not be less than 15 times of bar diameters, and boring aperture should be greater than bar diameter 4-6mm, outside Width between side wall and concrete Member Lip should be no less than 5cm;
2) pore-forming is cleared up: should clear up immediately after pore-forming, the dust of hole wall is removed using steel brush, be portalled inner powder with electronic blowing Dirt, ponding should keep drying in hole, dip acetone using cotton yarn or dimethylbenzene wipes hole wall one time;As cannot be timely after borehole cleaning Anchor is planted, it is necessary to which temporary plugging aperture prevents dust, sand grains etc. from falling into hole;
3) rebar surface is handled: being planted reinforcing bar or stud by anchor, must be used acetone clean the surface;Go removing rust and oxide layer and greasy dirt, Sweat stain, processed reinforcing bar should avoid rust of living again in implant holes as early as possible;
4) match glue: building structure adhesive is two-component, and the mixing ratio by weight of the first and second components is 4:1, is stirred after accurate metering respectively It mixes uniformly;Allotment glue dosage should should not once be adjusted more depending on needed for scene, otherwise within the defined operating time not in time Injection hole interplantation anchor, adhesive, which loses flowability, will will cause the waste of material;Forbid to carry out adhesive using any solvent Dilution;
5) injecting glue, bar planting: deployed adhesive should be injected into hole as early as possible, and injecting glue amount is 1/2 to the 2/3 of hole depth;Immediately will Reinforcing bar inserts in the hole the bottom of to, carries under rotation number up and down, and bubble is discharged, and guarantees that glue-line is full;The potting compound of lateral aperture should use Glue is sent into the most deep in hole by proper implements, and air is gradually discharged from inside to outside, reinforcing bar is inserted into;It is fixed after reinforcing bar buries Position and the surrounding for blocking aperture reinforcing bar in time using early strong material, prevent adhesive outflow from influencing plumpness;
6) curing: the reinforcing bar in implant holes should conserve at normal temperature, must not disturbance;Subsequent apply is carried out after 24 hours again It works industry (such as tie up, weld, formwork, casting concrete);General room temperature was fully cured in 20 DEG C of adhesives at 3-5 days, and scene is taken out Sample inspection should carry out after 5 days.
CN201711036913.9A 2017-10-31 2017-10-31 A kind of foundation platform beam reinforcement means Pending CN109723094A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711036913.9A CN109723094A (en) 2017-10-31 2017-10-31 A kind of foundation platform beam reinforcement means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711036913.9A CN109723094A (en) 2017-10-31 2017-10-31 A kind of foundation platform beam reinforcement means

Publications (1)

Publication Number Publication Date
CN109723094A true CN109723094A (en) 2019-05-07

Family

ID=66291874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711036913.9A Pending CN109723094A (en) 2017-10-31 2017-10-31 A kind of foundation platform beam reinforcement means

Country Status (1)

Country Link
CN (1) CN109723094A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113863705A (en) * 2021-09-14 2021-12-31 建研地基基础工程有限责任公司 Method for underpinning and reinforcing existing building based on static pressure jet grouting steel pipe pile and application device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3808754A1 (en) * 1987-09-05 1989-03-16 Erka Pfahl Gmbh & Co Kg Method of placing pressure piles and sheet-pile planks
CN102444142B (en) * 2011-09-20 2014-01-15 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN104594640A (en) * 2014-12-01 2015-05-06 中建七局第四建筑有限公司 High-rise building secondary structure foam concrete cast-in-situ bar planting technology and construction method thereof
CN107190764A (en) * 2017-04-29 2017-09-22 中国能源建设集团安徽电力建设第工程有限公司 A kind of booster stations building foundation construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3808754A1 (en) * 1987-09-05 1989-03-16 Erka Pfahl Gmbh & Co Kg Method of placing pressure piles and sheet-pile planks
CN102444142B (en) * 2011-09-20 2014-01-15 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN104594640A (en) * 2014-12-01 2015-05-06 中建七局第四建筑有限公司 High-rise building secondary structure foam concrete cast-in-situ bar planting technology and construction method thereof
CN107190764A (en) * 2017-04-29 2017-09-22 中国能源建设集团安徽电力建设第工程有限公司 A kind of booster stations building foundation construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
毛桂平: "桩梁托换与断柱顶升建筑物综合纠偏技术", 《工程建设与设计》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113863705A (en) * 2021-09-14 2021-12-31 建研地基基础工程有限责任公司 Method for underpinning and reinforcing existing building based on static pressure jet grouting steel pipe pile and application device

Similar Documents

Publication Publication Date Title
CN101864765B (en) Two-way stirring based SMW construction method and tri-axial stirring equipment
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN106894422B (en) Complex environment deep foundation pit supporting construction method
CN101550692B (en) Constructing method for reinforcing mixing stake around built shield tunnel
CN108612096A (en) A kind of cement mixing method reinforces the construction method of spiral-digging pore
CN102644286B (en) Deep foundation pit supporting structure
JP6197571B2 (en) Method for estimating compressive strength of soil cement
CN102146672A (en) Method for constructing pile foundation in karst area
CN107675704A (en) A kind of artificial digging pile assembled retaining wall and its construction technology
CN102912798A (en) Compound soil nail wall foundation pit supporting method
CN109457694A (en) A kind of variable diameters steel reinforcement cage enlarged footing anti-floating or pressure bearing pile and construction in conjunction with mixing pile or rotary churning pile
CN103603508A (en) Blocking, pouring and reinforcing construction method for building with pile foundations in underground bomb shelter
CN110424460A (en) A kind of tunnel open excavation construction technology
USRE48610E1 (en) System and method of stabilizing soil
CN109208592A (en) A kind of anchor rod construction method
CN103015431A (en) Foundation pit supporting method for manual dig-hole cement-soil steel pile
CN207331739U (en) A kind of heightening and consolidation structure of in-service reinforced concrete retaining wall
CN107100160B (en) A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column
CN107905609A (en) Underground people's air defense construction method
CN108755696A (en) A kind of rapid construction of pit earthwork at raining season method
CN109723094A (en) A kind of foundation platform beam reinforcement means
CN109281239A (en) Ribbed abutments in road operation state bore slope cutting method
CN110762286B (en) Drainage pipe network artificial pipe jacking construction process
KR102028182B1 (en) Construction method of pillar type underground structure using excavation system for structural casing burial
CN209669857U (en) A kind of variable diameters steel reinforcement cage enlarged footing anchor pole anti-floating or pressure bearing pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190507

RJ01 Rejection of invention patent application after publication