CN109636906A - Concrete filling pile construction method and system based on BIM technology - Google Patents

Concrete filling pile construction method and system based on BIM technology Download PDF

Info

Publication number
CN109636906A
CN109636906A CN201811509002.8A CN201811509002A CN109636906A CN 109636906 A CN109636906 A CN 109636906A CN 201811509002 A CN201811509002 A CN 201811509002A CN 109636906 A CN109636906 A CN 109636906A
Authority
CN
China
Prior art keywords
cast
model
construction
place concrete
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811509002.8A
Other languages
Chinese (zh)
Inventor
吕阳洋
薛聪
刘海平
赵志阳
杨槐
饶猛
金忠良
梁正峰
王松平
金仁祥
齐洋
李华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd
Original Assignee
ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd filed Critical ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd
Priority to CN201811509002.8A priority Critical patent/CN109636906A/en
Publication of CN109636906A publication Critical patent/CN109636906A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2210/00Indexing scheme for image generation or computer graphics
    • G06T2210/04Architectural design, interior design

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Structural Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Software Systems (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Architecture (AREA)
  • Computational Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Computer Graphics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of concrete filling pile construction method and system based on BIM technology.The object of the present invention is to provide a kind of intuitive efficiently concrete filling pile construction methods and system based on BIM technology, to ensure construction quality, less project cost.The technical scheme is that a kind of concrete filling pile construction method based on BIM technology, it is characterised in that steps are as follows: establishing three-dimensional geological model;Establish cast-in-place concrete pile threedimensional model;The cast-in-place concrete pile threedimensional model is imported into the three-dimensional geological model, is overlapped further according to basic point and overlaps the two, completes the foundation of cast-in-place concrete pile engineering BIM construction model;Drawing joint examination, driving depth control, arrangement and method for construction determination, technical annotation in construction, information extraction, the update of cast-in-place concrete pile data information, project cost and the simulation of 4D progress are carried out using the cast-in-place concrete pile engineering BIM construction model.The present invention is suitable for Concrete Grouting Pale technical field.

Description

Concrete filling pile construction method and system based on BIM technology
Technical field
The present invention relates to a kind of concrete filling pile construction method and system based on BIM technology.It is filled suitable for concrete Infuse pile construction technology field.
Background technique
BIM (Building Information Modeling) technology is that autodesk, inc. took the lead in proposing in 2002, Being widely recognized as industry is obtained in the world at present, it can help to realize the integrated of architecture information, from building Until building the termination of life cycle management, various information are integrated and a three-dimensional model information data always for design, construction, operation In library, all parties such as design team, unit in charge of construction, installation fishery department and owner can be cooperated based on BIM, be had Effect improves working efficiency, saves resource, reduces cost, to realize sustainable development.
The core of BIM is, using digitizing technique, to be mentioned by establishing virtual architectural engineering threedimensional model for this model For the complete and consistent architectural engineering information bank of actual conditions.The information bank not only includes the geometry for describing building member Information, professional attributes and status information further comprise the status information in non-component object (such as space, motor behavior).By this A threedimensional model comprising architectural engineering information, substantially increases the Information Integration degree of architectural engineering, thus for building work Journey item purpose relevant benefit side provides an engineering information exchange and shared platform.
BIM technology is to be integrated project Various types of data information by cast-in-place concrete pile engineering threedimensional model at present, in turn Pile concrete is simulated by data information again, real information possessed by engineering is perfused.But still remain cast-in-place concrete pile work The problems such as journey scale is often larger, stake type, large number of, and design technical parameter is different, and construction information amount is big.
Summary of the invention
The technical problem to be solved by the present invention is in view of the above problems, providing a kind of intuitive efficiently based on BIM The concrete filling pile construction method and system of technology, to ensure construction quality, less project cost.
The technical scheme adopted by the invention is that: a kind of concrete filling pile construction method based on BIM technology, feature It is that steps are as follows:
Establish three-dimensional geological model;
Establish cast-in-place concrete pile threedimensional model;
The cast-in-place concrete pile threedimensional model is imported into the three-dimensional geological model, is overlapped further according to basic point and folds the two It closes, completes the foundation of cast-in-place concrete pile engineering BIM construction model;
It is true using cast-in-place concrete pile engineering BIM construction model progress drawing joint examination, driving depth control, arrangement and method for construction Fixed, technical annotation in construction, information extraction, cast-in-place concrete pile data information updates, project cost and 4D progress are simulated.
The three-dimensional geological model of establishing includes:
Two-dimentional graph will be reconnoitred and import GeoStation for city (ground version) software;
By to two-dimentional graph differently the tracing of matter attribute, referring to split complete geology three dimensional microscopy;
Same geological property lines in wire-frame model are fitted to form geological interface;
Landform is stretched to design altitude with forming construction area layer entity downwards, it is divided with ground bed boundary and is obtained Each rock-soil layer element entity model is obtained, i.e. completion geologic three-dimensional model.
The cast-in-place concrete pile threedimensional model of establishing includes:
Engineering monomer stake bit plane layout drawing is imported in Restation software;
Further according to the technical requirement on design of arrangement of reinforcement in Shop Drawing Design Document IT Application, the steel reinforcement cage of stake and dimension is drawn, is built Vertical cast-in-place concrete pile threedimensional model.
The driving depth control includes according to the cast-in-place concrete pile engineering BIM construction model using navisworks software Collision detection is carried out to cast-in-place concrete pile and holding force layer model, an end is calculated and enters bearing stratum depth, according to collision result It is long that stake is adjusted again.
The information extraction includes exporting cast-in-place concrete pile by the cast-in-place concrete pile engineering BIM construction model Geologic data, additional concrete bored concrete pile design data information, rear formed fill for the concrete of mobile phone mobile terminal scanning recognition Infuse pile driving construction job instruction two dimensional code.
The project cost includes:
Project amount is automatically extracted by the cast-in-place concrete pile engineering BIM construction model;
According to time, region, various main material specifications and consumption are carried out with statistical form and corresponding information sifting It estimates, works out consumption of materials inventory, exported with Microsoft Excel;
People, machine consumption are calculated in conjunction with Design of Construction Organization, then is aggregated to form part-to-item project amount inventory.
The 4D progress is simulated
The cast-in-place concrete pile engineering BIM construction model and microsoft the project humidometer worked out are divided Construction simulation Dao Ru not be carried out along with time dimension after interrelated in navisworks software.
A kind of Concrete Grouting Pale system based on BIM technology characterized by comprising
Three-dimensional geological model establishes module, for establishing three-dimensional geological model;
Cast-in-place concrete pile three-dimension modeling module, for establishing cast-in-place concrete pile threedimensional model;
Cast-in-place concrete pile engineering BIM construction model establishes module, for leading the cast-in-place concrete pile threedimensional model Enter the three-dimensional geological model, be overlapped further according to basic point and overlap the two, completes cast-in-place concrete pile engineering BIM construction model It establishes;
Cast-in-place concrete pile engineering BIM construction model application module, for being applied using the cast-in-place concrete pile engineering BIM Work model carries out drawing joint examination, driving depth control, arrangement and method for construction determination, technical annotation in construction, information extraction, cast-in-place concrete pile number It is simulated according to information update, project cost and 4D progress.
The beneficial effects of the present invention are:
Detailed description of the invention
Fig. 1 is the flow chart of embodiment.
Fig. 2 is the system block diagram of embodiment.
Specific embodiment
As shown in Figure 1, the present embodiment is a kind of concrete filling pile construction method based on BIM technology, including following step It is rapid:
S1, collect prospecting, design data, including engineering geology flat sectional drawing, log sheet (advanced exploration surveys the stage in detail), Detail of construction design data etc.;
S2, it establishes geologic three-dimensional model: two-dimentional graph will be reconnoitred respectively and import GeoStation for city (ground version) Software, first pass through to two-dimentional graph differently the tracing of matter attribute, referring to split complete geology three dimensional microscopy, after by line Same geological property lines in frame model are fitted to form geological interface, as landform face, ground bed boundary, weathering face, Tomography interface, solution cavity etc., finally, landform is stretched to design altitude downwards forms construction area entity, with ground bed boundary pair It is divided and obtains each rock-soil layer element entity model, i.e. completion geologic three-dimensional model, and model accuracy is " one one spy ";
S3, it establishes cast-in-place concrete pile threedimensional model: importing engineering monomer stake bit plane arrangement in Restation software Figure, further according to the technical requirement on design (stake diameter, stake top absolute altitude, effective length, arrangement of reinforcement etc.) of arrangement of reinforcement in Shop Drawing Design Document IT Application, draws The steel reinforcement cage of single pile and dimension processed, establishes cast-in-place concrete pile threedimensional model;
S4, establish cast-in-place concrete pile engineering BIM construction model: it is three-dimensional that cast-in-place concrete pile threedimensional model is imported geology Model simultaneously replicates, and is overlapped further according to basic point and overlaps the two, completes the foundation of cast-in-place concrete pile engineering BIM construction model, if When change in the work occurs, BIM construction model can be modified accordingly;
S5, BIM construction model can clearly show that each rock-soil layer, rate of decay, solution cavity position and cast-in-place concrete pile Three-dimensional relationship, it is possible to provide all kinds of geologic data information of cast-in-place concrete pile present position, concrete application are as follows: drawing Joint examination, driving depth control, arrangement and method for construction determination, technical annotation in construction, information extraction, the update of cast-in-place concrete pile data information, work Journey cost and the simulation of 4D progress.
It is based on BIM construction model in the present embodiment, drawing joint examination can be carried out.BIM model can exempt from intuitively to reflect drawing exposure The problem of, convenient for linking up and feeding back, effectively avoids the work holdup at scene, does over again.
Driving depth control includes judging setting for the cast-in-place concrete pile by BIM model according to technical requirement on design in this example It is long whether rationally to count stake, it, can appropriate adjustment designing pile length if unreasonable;Concrete can also be filled using navisworks software It infuses stake and holding force layer model carries out collision detection, an end can be calculated and enter bearing stratum depth, adjusted again according to collision result Stake is long, under the premise of guaranteeing to meet design requirement, it is ensured that bearing capacity of single pile, optimizing design scheme reduce project cost.
Arrangement and method for construction determine: constructing aims, economical rationality principle under, according to cast-in-place concrete pile geological information, mention Priority and difficulty in preceding discovery work progress reasonably selects construction technology, and comparative analysis determines optimal arrangement and method for construction, improves pipe Manage effect.
Technical annotation in construction: utilizing BIM construction model, confide a technological secret before going into operation to site operation person, operating personnel, Construction key points and difficulties are shown in three-dimensional form, make it easier to understand design idea and construction technical requirement, it is ensured that engineering Quality.
Information extraction includes the geologic data that cast-in-place concrete pile is exported by BIM construction model in this example, adds coagulation Native bored concrete pile design data information, it is rear to form Concrete Grouting Pale job instruction two dimensional code, operating personnel's available handsets Mobile terminal scans the two-dimensional code technology to its automatic identification by APP, reduces mistake with this.
Cast-in-place concrete pile data information updates: when Concrete Grouting Pale, site operation person can be by on-site concrete Filling pile construction data information (practical stake is long, practical filling concrete amount etc.) typing BIM construction model, with alternative design data It completes to update, by the way that updated data information is combed and collected, realizes information system management, be cast-in-place concrete pile engineering The foundation of BIM completion model provides data information and supports.
Project cost: automatically extracting project amount by BIM construction model, can be according to projects such as time, regions, with statistics Table and corresponding information sifting carry out estimating for various main material (concrete, reinforcing bar etc.) specifications and consumption, work out material Consumption inventory, is exported with Microsoft Excel;People, machine consumption are calculated in conjunction with Design of Construction Organization, then is aggregated to form branch's subitem Bill of quantities;
The simulation of 4D progress: BIM construction model and microsoft the project schedule worked out are directed respectively into In navisworks software, time dimension is added after interrelated and carries out construction simulation.
Fig. 2 is the system block diagram of the Concrete Grouting Pale system based on BIM technology in embodiment, including three-dimensional geological Model building module 1, cast-in-place concrete pile three-dimension modeling module 2, cast-in-place concrete pile engineering BIM construction model establish mould Block 3 and cast-in-place concrete pile engineering BIM construction model application module 4, wherein three-dimensional geological model establishes module 1 for establishing three Tie up geological model;Cast-in-place concrete pile three-dimension modeling module 2 is for establishing cast-in-place concrete pile threedimensional model;Concrete fills Note stake engineering BIM construction model establishes module 3 for the cast-in-place concrete pile threedimensional model to be imported the three-dimensional geological mould Type is overlapped further according to basic point and overlaps the two, completes the foundation of cast-in-place concrete pile engineering BIM construction model;Filling concrete Stake engineering BIM construction model application module 4 carries out drawing meeting for the application cast-in-place concrete pile engineering BIM construction model It examines, the determination of driving depth control, arrangement and method for construction, technical annotation in construction, information extraction, the update of cast-in-place concrete pile data information, engineering Cost and the simulation of 4D progress.

Claims (8)

1. a kind of concrete filling pile construction method based on BIM technology, it is characterised in that steps are as follows:
Establish three-dimensional geological model;
Establish cast-in-place concrete pile threedimensional model;
The cast-in-place concrete pile threedimensional model is imported into the three-dimensional geological model, is overlapped further according to basic point and overlaps the two, Complete the foundation of cast-in-place concrete pile engineering BIM construction model;
Drawing joint examination is carried out using the cast-in-place concrete pile engineering BIM construction model, driving depth control, arrangement and method for construction determination, is applied Work is confided a technological secret, information extraction, cast-in-place concrete pile data information updates, project cost and 4D progress are simulated.
2. the concrete filling pile construction method according to claim 1 based on BIM technology, it is characterised in that: described to build Vertical three-dimensional geological model includes:
Two-dimentional graph will be reconnoitred and import GeoStation for city (ground version) software;
By to two-dimentional graph differently the tracing of matter attribute, referring to split complete geology three dimensional microscopy;
Same geological property lines in wire-frame model are fitted to form geological interface;
Landform is stretched to design altitude with forming construction area layer entity downwards, it is divided with ground bed boundary and is obtained each Rock-soil layer element entity model, i.e. completion geologic three-dimensional model.
3. the concrete filling pile construction method according to claim 1 based on BIM technology, it is characterised in that: described to build Founding cast-in-place concrete pile threedimensional model includes:
Engineering monomer stake bit plane layout drawing is imported in Restation software;
Further according to the technical requirement on design of arrangement of reinforcement in Shop Drawing Design Document IT Application, the steel reinforcement cage of stake and dimension is drawn, is established mixed Solidifying soil bored concrete pile threedimensional model.
4. the concrete filling pile construction method according to claim 1 based on BIM technology, it is characterised in that: the stake Long control includes using navisworks software according to the cast-in-place concrete pile engineering BIM construction model to cast-in-place concrete pile Collision detection is carried out with holding force layer model, an end is calculated and enters bearing stratum depth, it is long to adjust stake again according to collision result.
5. the concrete filling pile construction method according to claim 1 based on BIM technology, it is characterised in that: the letter It includes the geologic data that cast-in-place concrete pile is exported by the cast-in-place concrete pile engineering BIM construction model that breath, which extracts, is added Cast-in-place concrete pile design data information, rear formed refer to for the Concrete Grouting Pale operation of mobile phone mobile terminal scanning recognition Lead book two dimensional code.
6. the concrete filling pile construction method according to claim 1 based on BIM technology, it is characterised in that: the work Journey cost includes:
Project amount is automatically extracted by the cast-in-place concrete pile engineering BIM construction model;
According to time, region, estimating for various main material specifications and consumption is carried out with statistical form and corresponding information sifting, Consumption of materials inventory is worked out, is exported with Microsoft Excel;
People, machine consumption are calculated in conjunction with Design of Construction Organization, then is aggregated to form part-to-item project amount inventory.
7. the concrete filling pile construction method according to claim 1 based on BIM technology, it is characterised in that: the 4D Progress is simulated
The cast-in-place concrete pile engineering BIM construction model and microsoft the project schedule worked out are led respectively Enter in navisworks software, adds time dimension after interrelated and carry out construction simulation.
8. a kind of Concrete Grouting Pale system based on BIM technology characterized by comprising
Three-dimensional geological model establishes module (1), for establishing three-dimensional geological model;
Cast-in-place concrete pile three-dimension modeling module (2), for establishing cast-in-place concrete pile threedimensional model;
Cast-in-place concrete pile engineering BIM construction model establishes module (3), for importing the cast-in-place concrete pile threedimensional model The three-dimensional geological model is overlapped further according to basic point and overlaps the two, completes building for cast-in-place concrete pile engineering BIM construction model It is vertical;
Cast-in-place concrete pile engineering BIM construction model application module (4), for being applied using the cast-in-place concrete pile engineering BIM Work model carries out drawing joint examination, driving depth control, arrangement and method for construction determination, technical annotation in construction, information extraction, cast-in-place concrete pile number It is simulated according to information update, project cost and 4D progress.
CN201811509002.8A 2018-12-11 2018-12-11 Concrete filling pile construction method and system based on BIM technology Pending CN109636906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811509002.8A CN109636906A (en) 2018-12-11 2018-12-11 Concrete filling pile construction method and system based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811509002.8A CN109636906A (en) 2018-12-11 2018-12-11 Concrete filling pile construction method and system based on BIM technology

Publications (1)

Publication Number Publication Date
CN109636906A true CN109636906A (en) 2019-04-16

Family

ID=66072679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811509002.8A Pending CN109636906A (en) 2018-12-11 2018-12-11 Concrete filling pile construction method and system based on BIM technology

Country Status (1)

Country Link
CN (1) CN109636906A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110287511A (en) * 2019-04-30 2019-09-27 中国二十冶集团有限公司 Pile Type and Construction Quality Control Method based on BIM technology
CN110704916A (en) * 2019-09-24 2020-01-17 中水北方勘测设计研究有限责任公司 BIM technology-based large complex three-dimensional geological model grid coarsening method
CN111046474A (en) * 2019-12-19 2020-04-21 长江勘测规划设计研究有限责任公司 Grouting process data multidimensional integration analysis method based on BIM technology
CN111287185A (en) * 2020-04-03 2020-06-16 中国十七冶集团有限公司 Cast-in-place pile head breaking method based on BIM
CN112465972A (en) * 2020-12-04 2021-03-09 中国电建集团昆明勘测设计研究院有限公司 Geological study and judgment method based on BIM model and pile foundation modeling
CN112632657A (en) * 2020-11-30 2021-04-09 四川建筑职业技术学院 Prestressed pipe pile matching system and method based on BIM technology
CN113360963A (en) * 2021-06-03 2021-09-07 中国建筑第八工程局有限公司 Engineering pile length batch prejudging method based on BIM technology
CN114139252A (en) * 2021-11-15 2022-03-04 中交第三航务工程局有限公司 Construction method of rotary digging cast-in-place pile in karst area based on BIM three-dimensional geological model
WO2022052437A1 (en) * 2020-09-09 2022-03-17 中国五冶集团有限公司 Informatization technology-based pile pouring structure and pile structure
CN114934504A (en) * 2022-04-24 2022-08-23 珠海华发人居生活研究院有限公司 One-column one-pile construction method for super-large cross section
CN115982975A (en) * 2022-12-17 2023-04-18 中交建筑集团有限公司 Method for simultaneously operating adjacent cast-in-situ bored piles
CN116484486A (en) * 2023-06-25 2023-07-25 北京建工四建工程建设有限公司 New and old engineering pile foundation comprehensive treatment method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108537890A (en) * 2018-04-04 2018-09-14 悉地(苏州)勘察设计顾问有限公司 A kind of panoramic pictures mobile terminal methods of exhibiting of fusion BIM modelings and outdoor scene modeling
CN108681879A (en) * 2018-05-24 2018-10-19 广州市建筑科学研究院有限公司 A kind of filling pile construction management method and system based on BIM technology

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108537890A (en) * 2018-04-04 2018-09-14 悉地(苏州)勘察设计顾问有限公司 A kind of panoramic pictures mobile terminal methods of exhibiting of fusion BIM modelings and outdoor scene modeling
CN108681879A (en) * 2018-05-24 2018-10-19 广州市建筑科学研究院有限公司 A kind of filling pile construction management method and system based on BIM technology

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《上海水安全 水管理学术文选 上海市水利优秀科技论文集》: "《上海水安全 水管理学术文选 上海市水利优秀科技论文集》", 上海科学技术出版社, article 住建BIM数据库: "基于BIM的三维地质模型与桩长校核的应用分析", pages: 130 - 131 *
住建BIM数据库: "基于BIM的三维地质模型与桩长校核的应用分析", 《HTTPS://MP.WEIXIN.QQ.COM/S/EVMBWVCR78V03ZF0DTYTKQ》, 21 June 2018 (2018-06-21), pages 1 - 3 *
王金锋 等: "水利水电工程三维数字化设计平台建设与应用", 《水力发电》 *
王金锋 等: "水利水电工程三维数字化设计平台建设与应用", 《水力发电》, vol. 40, no. 8, 31 August 2014 (2014-08-31), pages 1 - 4 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110287511B (en) * 2019-04-30 2023-01-31 中国二十冶集团有限公司 Pile foundation type selection and construction quality control method based on BIM technology
CN110287511A (en) * 2019-04-30 2019-09-27 中国二十冶集团有限公司 Pile Type and Construction Quality Control Method based on BIM technology
CN110704916A (en) * 2019-09-24 2020-01-17 中水北方勘测设计研究有限责任公司 BIM technology-based large complex three-dimensional geological model grid coarsening method
CN110704916B (en) * 2019-09-24 2023-06-16 中水北方勘测设计研究有限责任公司 BIM technology-based large complex three-dimensional geological model grid coarsening method
CN111046474A (en) * 2019-12-19 2020-04-21 长江勘测规划设计研究有限责任公司 Grouting process data multidimensional integration analysis method based on BIM technology
CN111287185A (en) * 2020-04-03 2020-06-16 中国十七冶集团有限公司 Cast-in-place pile head breaking method based on BIM
US12006650B2 (en) 2020-09-09 2024-06-11 China Mcc5 Group Corp. Ltd Pile pouring structure based on informatization technology and pile structure
WO2022052437A1 (en) * 2020-09-09 2022-03-17 中国五冶集团有限公司 Informatization technology-based pile pouring structure and pile structure
CN112632657A (en) * 2020-11-30 2021-04-09 四川建筑职业技术学院 Prestressed pipe pile matching system and method based on BIM technology
CN112632657B (en) * 2020-11-30 2023-04-21 四川建筑职业技术学院 BIM technology-based prestressed pipe pile matching system and pile matching method
CN112465972A (en) * 2020-12-04 2021-03-09 中国电建集团昆明勘测设计研究院有限公司 Geological study and judgment method based on BIM model and pile foundation modeling
CN112465972B (en) * 2020-12-04 2022-04-15 中国电建集团昆明勘测设计研究院有限公司 Geological study and judgment method based on BIM model and pile foundation modeling
CN113360963B (en) * 2021-06-03 2023-11-21 中国建筑第八工程局有限公司 Engineering pile length batch pre-judging method based on BIM technology
CN113360963A (en) * 2021-06-03 2021-09-07 中国建筑第八工程局有限公司 Engineering pile length batch prejudging method based on BIM technology
CN114139252A (en) * 2021-11-15 2022-03-04 中交第三航务工程局有限公司 Construction method of rotary digging cast-in-place pile in karst area based on BIM three-dimensional geological model
CN114934504A (en) * 2022-04-24 2022-08-23 珠海华发人居生活研究院有限公司 One-column one-pile construction method for super-large cross section
CN115982975A (en) * 2022-12-17 2023-04-18 中交建筑集团有限公司 Method for simultaneously operating adjacent cast-in-situ bored piles
CN116484486A (en) * 2023-06-25 2023-07-25 北京建工四建工程建设有限公司 New and old engineering pile foundation comprehensive treatment method
CN116484486B (en) * 2023-06-25 2023-09-22 北京建工四建工程建设有限公司 New and old engineering pile foundation comprehensive treatment method

Similar Documents

Publication Publication Date Title
CN109636906A (en) Concrete filling pile construction method and system based on BIM technology
CN111899341B (en) Three-dimensional geological rapid modeling method for long and large banded linear engineering
CN104778753B (en) The three-dimensional modeling implementation method of bridge reinforcement
CN107292038B (en) Parametric modeling production method of laminated slab prefabricated part
CN109800536A (en) One kind parameterizing tunnel model fast modeling method based on Revit and Dynamo
CN111062081A (en) Underground continuous wall construction method based on BIM technology
CN110080114A (en) A kind of visualization prefabricated stand column construction method based on BIM technology
CN107730585A (en) A kind of landform threedimensional model generation method and system
CN105930600A (en) Masonry configuration method and masonry configuration system
CN113779663B (en) BIM-based subway station enclosure structure three-dimensional modeling method, system and medium
CN115017569A (en) Two-dimensional and three-dimensional linked bridge parametric modeling and plotting method, device, equipment and medium
CN116502317B (en) Water conservancy and hydropower engineering multisource data fusion method and terminal equipment
CN109684669A (en) Method for three-dimensional reinforcing bar editing and updating
CN107012860A (en) A kind of construction method of the post Single Pile joint bar positioner based on BIM technology
CN109558639A (en) A kind of two three-dimensional borehole design methods and system combined based on WebGL
CN114580056A (en) BIM-based comprehensive pipe gallery main body structure parametric design method
CN112906096A (en) Highway engineering design data reconstruction and analysis method and system
CN104978466A (en) Three-dimensional definite-number bar arrangement method used for multiple guide wires
CN109712241A (en) A kind of method for building up of the three-dimensional mine physical model comprising goaf
CN110399631A (en) The design method and system of ground leaching mine well site drawing platform
CN111985037B (en) Three-dimensional roadway editing method based on terminal equipment
CN117035700A (en) BIM-based hydraulic and hydroelectric engineering forward collaborative design method
CN114936396B (en) Automatic dredging engineering quantity generation method based on Civil3D
CN112016146A (en) Hydraulic model modeling system based on Revit
CN110222457B (en) Construction method of existing structure and newly-built primary support structure with existing structure closely attached

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190416