CN105930600A - Masonry configuration method and masonry configuration system - Google Patents

Masonry configuration method and masonry configuration system Download PDF

Info

Publication number
CN105930600A
CN105930600A CN201610274221.7A CN201610274221A CN105930600A CN 105930600 A CN105930600 A CN 105930600A CN 201610274221 A CN201610274221 A CN 201610274221A CN 105930600 A CN105930600 A CN 105930600A
Authority
CN
China
Prior art keywords
masonry
parameter information
user
wall model
arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610274221.7A
Other languages
Chinese (zh)
Other versions
CN105930600B (en
Inventor
王鹏翊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GLODON SOFTWARE Co Ltd
Original Assignee
GLODON SOFTWARE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GLODON SOFTWARE Co Ltd filed Critical GLODON SOFTWARE Co Ltd
Priority to CN201610274221.7A priority Critical patent/CN105930600B/en
Publication of CN105930600A publication Critical patent/CN105930600A/en
Application granted granted Critical
Publication of CN105930600B publication Critical patent/CN105930600B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a masonry configuration method and a masonry configuration system. The masonry configuration method comprises the following steps: acquiring a wall model, wherein masonry configuration of the wall model is to be performed; acquiring original parameter information required in the process of performing the masonry configuration on the wall model; and forming a masonry configuration diagram on the wall model according to the acquired original parameter information. Through the technical scheme of the masonry configuration method and the masonry configuration system, automatic configuration of masonry can be realized, the disadvantage of manual masonry configuration can be overcome, the manual workload of a user can be greatly reduced, and the masonry configuration efficiency can be improved, so that the user experience of the user can be improved.

Description

Masonry arrangement method and masonry arranging system
Technical field
The present invention relates to field of computer technology, in particular to a kind of masonry arrangement method and Plant masonry arranging system.
Background technology
Secondary structure in architectural engineering, its detail treatment is various, owing to being difficult in work progress Minute design, so that job site is relatively big to the randomness of the raw material cuttings such as masonry, universal There is the phenomenon of serious waste, loss.
At present, the secondary structure minute design of the project management department that management is preferably, technical capability is stronger is general Use the instruments such as CAD (Computer Aided Design, computer-aided design), rely on user Manually carry out the desk-top publishing of the materials such as building block in the plane, in use present manual work amount Greatly, easily make mistakes, the shortcoming such as efficiency is low, the design optimization being difficult to secondary structure.
Therefore, how to be capable of the automatic placement of masonry, with overcome manually carry out masonry arrangement deposited Shortcoming become technical problem urgently to be resolved hurrily.
Summary of the invention
The present invention is based at least one above-mentioned technical problem, it is proposed that a kind of new masonry arrangement side Case, it is possible to realize the automatic placement of masonry, overcomes the shortcoming manually carried out existing for masonry arrangement, Greatly reduce the manual work amount of user, improve masonry arrangement efficiency, thus improve user's Experience.
In view of this, the present invention proposes a kind of masonry arrangement method, including: obtain pending masonry The Wall model of arrangement;Obtain during described Wall model is carried out masonry arrangement required initial Parameter information;According to the described initial parameter information got, described Wall model forms masonry Layout viewing.
In this technical scheme, when user needs to carry out masonry arrangement, system can be treated by acquisition Carry out the Wall model of masonry arrangement, and obtain institute during Wall model is carried out masonry arrangement The initial parameter information needed, and according to the initial parameter information got, Wall model is formed and builds Body layout viewing, thus realize the automatic placement of masonry, whole masonry arrangement process operation is simple, overcomes Manually carry out the shortcoming existing for masonry arrangement, greatly reduce the manual work amount of user, improve Masonry arrangement efficiency, thus improve the experience of user, simultaneously because whole masonry was arranged Journey is independent of user's manual layout, greatly reduces error rate, it is ensured that referring to of masonry layout viewing Property.
In technique scheme, it is preferable that obtain the step of the Wall model of pending masonry arrangement Suddenly, specifically include: from the BIM that user selectes, extract described Wall model.
In this technical scheme, BIM (Building Information Modeling, architecture information mould Type) it is the basis using every relevant information data of construction-engineering project as model, carry out building mould The foundation of type, can the real information that had of analogue simulation building, when carrying out masonry arrangement, logical Cross and extract Wall model from the BIM that user selectes, specifically, user can be specified BIM model import in system, system according to the primitive attribute in BIM model by Wall model Extract from block mold and screen, and carry out some data prediction, due to from BIM model In the Wall model that extracts higher with actual body of wall compatible degree, it is ensured that follow-up formed at Wall model The reasonability of masonry layout viewing, certainly, user can also obtain from other approach according to the actual requirements Wall model.
In any of the above-described technical scheme, it is preferable that described initial parameter information at least includes described The parameter information of the measure component of the parameter information of masonry and described Wall model needed for Wall model.
In this technical scheme, initial parameter information includes but not limited to the ginseng of masonry needed for Wall model The parameter information of the measure component of number information and Wall model, wherein, the parameter information of masonry includes Material, specification (i.e. size), gray seam thickness etc., the parameter information bag of the measure component of Wall model Include collar tie beam, constructional column, lead the parameter information of the measure components such as wall, dome brick, door-window opening and lintel (positional information etc. as on Wall model).
In any of the above-described technical scheme, it is preferable that according to the described initial parameter letter got Breath, forms the step of masonry layout viewing on described Wall model, specifically includes: according to described masonry Parameter information and the parameter information of described measure component, determine required masonry during masonry arrangement Size, quantity and installation position;The required size of masonry, number during arranging based on described masonry Amount and installation position, form described masonry layout viewing.
In this technical scheme, by the parameter information according to masonry and the parameter information of measure component, The required size of masonry, quantity and installation position during determining masonry arrangement, with based on required block The size of body, quantity and installation position form masonry layout viewing so that in the process of masonry arrangement In, fully take into account impact that masonry arranged by measure component (as during arrangement, due to door and window Hole location may need to cut masonry, and may affect the integral layout of masonry Deng), further ensure the reasonability of masonry layout viewing.
In any of the above-described technical scheme, it is preferable that also include: detecting that user is to described block When the adjustment of body layout viewing operates, according to described adjustment operation, described masonry layout viewing is adjusted.
In this technical scheme, it is contemplated that during actual masonry arrangement, it is right that user may need Established masonry layout viewing is optimized adjustment, so by detecting that user is to masonry layout viewing Adjustment operation time, can according to adjust operation masonry layout viewing is adjusted, specifically, Yong Huke Having readjusted part initial parameter information, system is according to the initial parameter information after adjusting, the most right Masonry layout viewing is adjusted, or user also directly optimizes tune on masonry layout viewing partly Whole, meet the actual demand of user, improve the experience of user further.
In any of the above-described technical scheme, it is preferable that obtain and described Wall model is being carried out masonry The step of initial parameter information required during arrangement, the most also includes: display comprises multiple presetting The selection interface of parameter information, and the default ginseng that the user got is selected on described selection interface Number information is as described initial parameter information;And/or receive the custom parameter information that user inputs, Using custom parameter information that described user is inputted as described initial parameter information.
In this technical scheme, initial parameter information can be obtained in several ways: as user can Selecting selection parameter preset information on interface between with, system can obtain user and select choosing on interface Fixed parameter preset information, or user have input custom parameter information, and it is defeated that system will receive user The custom parameter information entered is as initial parameter information, or user both have selected parameter preset letter Breath have input again custom parameter information, parameter preset information that user can be selected by system and input Self-defined information, as initial parameter information, meets the different demands of user.
In any of the above-described technical scheme, it is preferable that also include: according to the default finger received Order, derives described masonry layout viewing, and generates the bill of material that described masonry layout viewing is corresponding.
In this technical scheme, after forming masonry layout viewing, can lead according to the actual demand of user Go out masonry layout viewing, and generate the bill of material that masonry layout viewing is corresponding so that in actual construction During, construction party can position and statistics according to masonry layout viewing and bill of material well in advance, will Factory's formula processing carried out in advance by non-standard material, before formally building by laying bricks or stones by material requested targetedly Transport in advance to respective regions, be greatly saved construction material coefficient of losses, reduce construction cost.
According to the second aspect of the invention, it is proposed that a kind of masonry arranging system, including: first obtains Unit, for obtaining the Wall model of pending masonry arrangement;Second acquisition unit, for obtaining Initial parameter information required during described Wall model is carried out masonry arrangement;Processing unit, uses According to the described initial parameter information got, described Wall model forms masonry layout viewing.
In this technical scheme, when user needs to carry out masonry arrangement, system can be treated by acquisition Carry out the Wall model of masonry arrangement, and obtain institute during Wall model is carried out masonry arrangement The initial parameter information needed, and according to the initial parameter information got, Wall model is formed and builds Body layout viewing, thus realize the automatic placement of masonry, whole masonry arrangement process operation is simple, overcomes Manually carry out the shortcoming existing for masonry arrangement, greatly reduce the manual work amount of user, improve Masonry arrangement efficiency, thus improve the experience of user, simultaneously because whole masonry was arranged Journey is independent of user's manual layout, greatly reduces error rate, it is ensured that referring to of masonry layout viewing Property.
In technique scheme, it is preferable that described first acquiring unit specifically for: from user select Fixed BIM extracts described Wall model.
In this technical scheme, BIM (i.e. BIM) is every with construction-engineering project Relevant information data, as the basis of model, carries out the foundation of BUILDINGS MODELS, can analogue simulation building The real information being had, when carrying out masonry arrangement, by the BIM selected from user In extract Wall model, specifically, the BIM model that can user be specified imports in system, Wall model is extracted from block mold according to the primitive attribute in BIM model and filters out by system Come, and carry out some data prediction, due to the Wall model extracted from BIM model and reality Border body of wall compatible degree is higher, it is ensured that the reasonability of the follow-up masonry layout viewing formed at Wall model, Certainly, user can also obtain Wall model from other approach according to the actual requirements.
In any of the above-described technical scheme, it is preferable that described initial parameter information at least includes described The parameter information of the measure component of the parameter information of masonry and described Wall model needed for Wall model.
In this technical scheme, initial parameter information includes but not limited to the ginseng of masonry needed for Wall model The parameter information of the measure component of number information and Wall model, wherein, the parameter information of masonry includes Material, specification (i.e. size), gray seam thickness etc., the parameter information bag of the measure component of Wall model Include collar tie beam, constructional column, lead the parameter information of the measure components such as wall, dome brick, door-window opening and lintel (positional information etc. as on Wall model).
In any of the above-described technical scheme, it is preferable that described processing unit specifically for: according to institute State parameter information and the parameter information of described measure component of masonry, required during determining masonry arrangement The size of masonry, quantity and installation position;The chi of required masonry during arranging based on described masonry Very little, quantity and installation position, form described masonry layout viewing.
In this technical scheme, by the parameter information according to masonry and the parameter information of measure component, The required size of masonry, quantity and installation position during determining masonry arrangement, with based on required block The size of body, quantity and installation position form masonry layout viewing so that in the process of masonry arrangement In, fully take into account impact that masonry arranged by measure component (as during arrangement, due to door and window Hole location may need to cut masonry, and may affect the integral layout of masonry Deng), further ensure the reasonability of masonry layout viewing.
In any of the above-described technical scheme, it is preferable that also include: adjustment unit, in detection To user the adjustment of described masonry layout viewing is operated time, adjust operation according to described described masonry arranged Butut is adjusted.
In this technical scheme, it is contemplated that during actual masonry arrangement, it is right that user may need Established masonry layout viewing is optimized adjustment, so by detecting that user is to masonry layout viewing Adjustment operation time, can according to adjust operation masonry layout viewing is adjusted, specifically, Yong Huke Having readjusted part initial parameter information, system is according to the initial parameter information after adjusting, the most right Masonry layout viewing is adjusted, or user also directly optimizes tune on masonry layout viewing partly Whole, meet the actual demand of user, improve the experience of user further.
In any of the above-described technical scheme, it is preferable that described second acquisition unit specifically for: aobvious Show the selection interface comprising multiple parameter preset information, and by the user that gets at described selection interface Upper selected parameter preset information is as described initial parameter information;And/or receive user input from Defined parameters information, believes using the custom parameter information described user inputted as described initial parameter Breath.
In this technical scheme, initial parameter information can be obtained in several ways: as user can Selecting selection parameter preset information on interface between with, system can obtain user and select choosing on interface Fixed parameter preset information, or user have input custom parameter information, and it is defeated that system will receive user The custom parameter information entered is as initial parameter information, or user both have selected parameter preset letter Breath have input again custom parameter information, parameter preset information that user can be selected by system and input Self-defined information, as initial parameter information, meets the different demands of user.
In any of the above-described technical scheme, it is preferable that also include: output unit, for according to connecing The preset instructions received, derives described masonry layout viewing, and generates the thing that described masonry layout viewing is corresponding Money inventory.
In this technical scheme, after forming masonry layout viewing, can lead according to the actual demand of user Go out masonry layout viewing, and generate the bill of material that masonry layout viewing is corresponding so that in actual construction During, construction party can position and statistics according to masonry layout viewing and bill of material well in advance, will Factory's formula processing carried out in advance by non-standard material, before formally building by laying bricks or stones by material requested targetedly Transport in advance to respective regions, be greatly saved construction material coefficient of losses, reduce construction cost, wherein, But masonry layout viewing CAD diagram or represent in a tabular form.
By above technical scheme, it is possible to realize the automatic placement of masonry, overcome and manually carry out masonry Shortcoming existing for arrangement, greatly reduces the manual work amount of user, improves masonry arrangement effect Rate, thus improve the experience of user, make in actual work progress, construction party simultaneously Can position and statistics according to masonry layout viewing and bill of material well in advance, non-standard material is shifted to an earlier date Carry out factory's formula processing, before formally building by laying bricks or stones, material requested is transported the most in advance to accordingly Region, is greatly saved construction material coefficient of losses, reduces construction cost.
Accompanying drawing explanation
Fig. 1 shows the schematic flow diagram of masonry arrangement method according to an embodiment of the invention;
Fig. 2 shows the schematic block diagram of masonry arranging system according to an embodiment of the invention;
Fig. 3 A to Fig. 3 C shows the interface schematic block of masonry arrangement according to an embodiment of the invention Figure.
Detailed description of the invention
In order to be more clearly understood that the above-mentioned purpose of the present invention, feature and advantage, below in conjunction with attached The present invention is further described in detail by figure and detailed description of the invention.It should be noted that not In the case of conflict, the feature in embodiments herein and embodiment can be mutually combined.
Elaborate a lot of detail in the following description so that fully understanding the present invention, but, The present invention can implement to use other to be different from other modes described here, therefore, and the present invention Protection domain do not limited by following public specific embodiment.
Fig. 1 shows the schematic flow diagram of masonry arrangement method according to an embodiment of the invention.
As it is shown in figure 1, masonry arrangement method according to an embodiment of the invention, including:
Step 102, obtains the Wall model of pending masonry arrangement.Wherein it is preferred to, from user Selected BIM extracts described Wall model, BIM (i.e. BIM) It is using every relevant information data of construction-engineering project as the basis of model, carries out BUILDINGS MODELS Set up, can the real information that had of analogue simulation building, when carrying out masonry arrangement, by from The BIM that user selectes extracts Wall model, specifically, user can be specified BIM model imports in system, system according to the primitive attribute in BIM model by Wall model from Block mold extracts and screens, and carry out some data prediction, due to from BIM model The Wall model extracted is higher with actual body of wall compatible degree, it is ensured that follow-up Wall model formed The reasonability of masonry layout viewing, certainly, user can also obtain wall from other approach according to the actual requirements Body Model.
Step 104, obtains initial ginseng required during described Wall model carries out masonry arrangement Number information.Described initial parameter information at least include needed for described Wall model the parameter information of masonry with And the parameter information of the measure component of described Wall model.Wherein, the parameter information of masonry includes material Matter, specification (i.e. size), gray seam thickness etc., the parameter information of the measure component of Wall model includes Collar tie beam, constructional column, lead the measure components such as wall, dome brick, door-window opening and lintel parameter information (as Positional information etc. on Wall model).
Step 106, according to the described initial parameter information got, is formed on described Wall model Masonry layout viewing.Specifically, can be according to the parameter information of described masonry and the parameter of described measure component Information, the required size of masonry, quantity and installation position during determining masonry arrangement;Based on institute The required size of masonry, quantity and installation position during stating masonry arrangement, form described masonry row Butut so that during masonry is arranged, fully take into account the impact that masonry is arranged by measure component (as arrangement during, owing to door-window opening location may need to cut masonry, And the integral layout etc. of masonry may be affected), further ensure the reasonability of masonry layout viewing.
In this technical scheme, when user needs to carry out masonry arrangement, system can be treated by acquisition Carry out the Wall model of masonry arrangement, and obtain institute during Wall model is carried out masonry arrangement The initial parameter information needed, and according to the initial parameter information got, Wall model is formed and builds Body layout viewing, thus realize the automatic placement of masonry, whole masonry arrangement process operation is simple, overcomes Manually carry out the shortcoming existing for masonry arrangement, greatly reduce the manual work amount of user, improve Masonry arrangement efficiency, thus improve the experience of user, simultaneously because whole masonry was arranged Journey is independent of user's manual layout, greatly reduces error rate, it is ensured that referring to of masonry layout viewing Property.
In technique scheme, it is preferable that also include: detecting that described masonry is arranged by user When the adjustment of figure operates, according to described adjustment operation, described masonry layout viewing is adjusted.
In this technical scheme, it is contemplated that during actual masonry arrangement, it is right that user may need Established masonry layout viewing is optimized adjustment, so by detecting that user is to masonry layout viewing Adjustment operation time, can according to adjust operation masonry layout viewing is adjusted, specifically, Yong Huke Having readjusted part initial parameter information, system is according to the initial parameter information after adjusting, the most right Masonry layout viewing is adjusted, or user also directly optimizes tune on masonry layout viewing partly Whole, meet the actual demand of user, improve the experience of user further.
In any of the above-described technical scheme, it is preferable that obtain and described Wall model is being carried out masonry The step of initial parameter information required during arrangement, the most also includes: display comprises multiple presetting The selection interface of parameter information, and the default ginseng that the user got is selected on described selection interface Number information is as described initial parameter information;And/or receive the custom parameter information that user inputs, Using custom parameter information that described user is inputted as described initial parameter information.
In this technical scheme, initial parameter information can be obtained in several ways: as user can Selecting selection parameter preset information on interface between with, system can obtain user and select choosing on interface Fixed parameter preset information, or user have input custom parameter information, and it is defeated that system will receive user The custom parameter information entered is as initial parameter information, or user both have selected parameter preset letter Breath have input again custom parameter information, parameter preset information that user can be selected by system and input Self-defined information, as initial parameter information, meets the different demands of user.
In any of the above-described technical scheme, it is preferable that also include: according to the default finger received Order, derives described masonry layout viewing, and generates the bill of material that described masonry layout viewing is corresponding.
In this technical scheme, after forming masonry layout viewing, can lead according to the actual demand of user Go out masonry layout viewing, and generate the bill of material that masonry layout viewing is corresponding so that in actual construction During, construction party can position and statistics according to masonry layout viewing and bill of material well in advance, will Factory's formula processing carried out in advance by non-standard material, before formally building by laying bricks or stones by material requested targetedly Transport in advance to respective regions, be greatly saved construction material coefficient of losses, reduce construction cost.
Fig. 2 shows the schematic block diagram of masonry arranging system according to an embodiment of the invention.
As in figure 2 it is shown, masonry arranging system 200 according to an embodiment of the invention, including: first Acquiring unit 202, second acquisition unit 204 and processing unit 206.
Wherein, the first acquiring unit 202, for obtaining the Wall model of pending masonry arrangement.Excellent Selection of land, the first acquiring unit 202 can extract described body of wall from the BIM that user selectes Model.BIM (i.e. BIM) is to make with every relevant information data of construction-engineering project For the basis of model, carry out the foundation of BUILDINGS MODELS, can the true letter that had of analogue simulation building Breath, when carrying out masonry arrangement, extracts body of wall mould by the BIM selected from user Type, specifically, the BIM model that can user be specified imports in system, and system is according to BIM mould Wall model is extracted from block mold and screens by the primitive attribute in type, and carries out some data Pretreatment, owing to the Wall model extracted from BIM model is higher with actual body of wall compatible degree, Ensure that the reasonability of the follow-up masonry layout viewing formed at Wall model, certainly, user can also root Wall model is obtained from other approach according to actual demand.
Second acquisition unit 204, for obtaining during described Wall model is carried out masonry arrangement Required initial parameter information.Described initial parameter information at least includes masonry needed for described Wall model Parameter information and the parameter information of measure component of described Wall model.Wherein, the parameter of masonry Information includes material, specification (i.e. size), gray seam thickness etc., the ginseng of the measure component of Wall model Number information include collar tie beam, constructional column, lead the ginseng of the measure components such as wall, dome brick, door-window opening and lintel Number information (positional information etc. as on Wall model).
Processing unit 206, for according to the described initial parameter information got, at described body of wall mould Masonry layout viewing is formed in type.Described processing unit 206 specifically for: according to the parameter of described masonry Information and the parameter information of described measure component, determine the size of required masonry during masonry arrangement, Quantity and installation position;The required size of masonry during arranging based on described masonry, quantity and Installation position, forms described masonry layout viewing so that during masonry is arranged, fully take into account Impact that masonry is arranged by measure component is (as during arrangement, due to door-window opening location May need to cut masonry, and the integral layout etc. of masonry may be affected), protect further Demonstrate,prove the reasonability of masonry layout viewing.
In this technical scheme, when user needs to carry out masonry arrangement, system can be treated by acquisition Carry out the Wall model of masonry arrangement, and obtain institute during Wall model is carried out masonry arrangement The initial parameter information needed, and according to the initial parameter information got, Wall model is formed and builds Body layout viewing, thus realize the automatic placement of masonry, whole masonry arrangement process operation is simple, overcomes Manually carry out the shortcoming existing for masonry arrangement, greatly reduce the manual work amount of user, improve Masonry arrangement efficiency, thus improve the experience of user, simultaneously because whole masonry was arranged Journey is independent of user's manual layout, greatly reduces error rate, it is ensured that referring to of masonry layout viewing Property.
In technique scheme, it is preferable that also include: adjustment unit 208, for detecting When the adjustment of described masonry layout viewing is operated by user, according to described adjustment operation, described masonry is arranged Figure is adjusted.
In this technical scheme, it is contemplated that during actual masonry arrangement, it is right that user may need Established masonry layout viewing is optimized adjustment, so by detecting that user is to masonry layout viewing Adjustment operation time, can according to adjust operation masonry layout viewing is adjusted, specifically, Yong Huke Having readjusted part initial parameter information, system is according to the initial parameter information after adjusting, the most right Masonry layout viewing is adjusted, or user also directly optimizes tune on masonry layout viewing partly Whole, meet the actual demand of user, improve the experience of user further.
In any of the above-described technical scheme, it is preferable that described second acquisition unit 204 is specifically used The selection interface of multiple parameter preset information is comprised in: display, and by the user that gets in described choosing Select parameter preset information selected on interface as described initial parameter information;And/or it is defeated to receive user The custom parameter information entered, using custom parameter information that described user is inputted as described initially Parameter information.
In this technical scheme, initial parameter information can be obtained in several ways: as user can Selecting selection parameter preset information on interface between with, system can obtain user and select choosing on interface Fixed parameter preset information, or user have input custom parameter information, and it is defeated that system will receive user The custom parameter information entered is as initial parameter information, or user both have selected parameter preset letter Breath have input again custom parameter information, parameter preset information that user can be selected by system and input Self-defined information, as initial parameter information, meets the different demands of user.
In any of the above-described technical scheme, it is preferable that also include: output unit 210, for root According to the preset instructions received, derive described masonry layout viewing, and it is corresponding to generate described masonry layout viewing Bill of material.
In this technical scheme, after forming masonry layout viewing, can lead according to the actual demand of user Go out masonry layout viewing, and generate the bill of material that masonry layout viewing is corresponding so that in actual construction During, construction party can position and statistics according to masonry layout viewing and bill of material well in advance, will Factory's formula processing carried out in advance by non-standard material, before formally building by laying bricks or stones by material requested targetedly Transport in advance to respective regions, be greatly saved construction material coefficient of losses, reduce construction cost.
Below in conjunction with Fig. 3 A to Fig. 3 C, technical scheme is described further.
In the present embodiment, on the basis of BIM theory, mainly carry out secondary structure intelligence arrangement skill The applied research of art, i.e. carries out three-dimensional simulation being arranged on computer of secondary structure building block.Mainly By use wide connection reach calculation amount GCL, C++ programming language, Revit, Qt platform, Relevant D modeling tool and the development platforms such as AutoCAD API, on the basis setting up BIM model On carry out the applied research of secondary structure intelligence alignment technology.
By the visualization characteristic directly perceived of BIM model, wide connection is utilized to reach calculation amount GCL software creation work Journey soil established model carries out the three-dimensional simulation of secondary structure building block arrangement.First, computer language is utilized to beat Make BIM application platform, it is achieved the undertaking work of engineering soil established model;Secondly, applied by BIM Platform, based on engineering masonry arrangement related specifications and design requirement, arranges masonry arranging rule, to realize Building block, collar tie beam, constructional column, lead the locus of wall, dome brick, door-window opening and lintel arrangement and The statistical work of related data;Finally, it is achieved the vision arranging effect is intuitively shown and result output. Concrete research and development approach is as follows:
1, three-dimensional graphics is utilized to calculate the arrangement of secondary structure, reducing and the row of brick of body of wall Cloth;
2, C++ is selected to realize all algorithms involved by row's brick as the language of programming;
3, Qt platform is used to build user interface, it is provided that connecing of interactive operation can be carried out with user Mouthful;
4, before utilizing OpenGL to present row's brick, during, display result and various after row's brick Mark;
5, realize row's brick result based on AutoCAD API and export to cad file.
The built-in each department of system build standard parameter by laying bricks or stones, build parameter by laying bricks or stones in conjunction with the fine setting of actual items data, from The dynamic masonry wall that generates is arranged brick figure and builds goods and materials expense by laying bricks or stones, with confiding a technological secret and existing before this guiding construction Field workman's construction.
Automatically row's brick flow process:
One key generates: the parameterized template selecting this area to build specification by laying bricks or stones requires fine setting according to project specification Parameter arranges the measure construction system automatic batch row's brick output row's brick figure on masonry wall and goods and materials Expense.
Manual setting a: key generates row's brick figure and the expense manual fine setting fissure of displacement, overlap joint, pipeline are walked Meet construction enterprises' technical scheme to row's brick generation optimum row brick scheme derivation in batches to achieve .dwg format file or the document of .xlsx form.
Concrete masonry arrangement process illustrates:
1, when user needs to carry out arranging brick, relevant BIM model is imported in software, click on boundary " row's brick " button on face, software by according to the primitive attribute in BIM model by Wall model from Block mold screens, and carries out some data prediction.
2, after user needs to carry out the body of wall of masonry arrangement in the model filtered out, such as Fig. 3 A institute Showing, user can be at the parameter information that row brick interface selects or input is relevant ejected: such as the chi of masonry Very little, gray seam thickness, constructional column parameter, lintel parameter etc..
3, user is after arrangement button is pressed at interface, row's brick parameter that software will input according to user, Calculate arrangement position and the cutting situation of masonry during masonry is arranged, thus draw required masonry Size, quantity and masonry installation position, and by computer will row's brick result by picture and form Form presents, masonry layout viewing the most as shown in Figure 3 B, and goods and materials as shown in Figure 3 C Inventory.
4, user is after drawing arrangement result, and result can be derived by user according to the needs of oneself, or As arrangement result is unsatisfied with, finer perpend wall arrangement interface can be entered and carry out small parameter perturbations, repair Only need to again tap on arrangement button after having changed and can calculate and present amended result.
On-the-spot application flow:
Before extensive construction, first carry out model construction, secondary masonry panel carried out arranges brick and arranges, The row's of providing brick figure (i.e. masonry layout viewing), auxiliary provide block material need to plan (i.e. goods and materials are clear Single), guiding material is purchased and is accurately thrown in, and reduces waste of material, it is to avoid rehandling.
By above-described embodiment, can construction before in computer by all building blocks, collar tie beam, structure Post, the well in advance location, locus leading wall, dome brick, door-window opening and lintel and statistics, by non- Standard block, non-standard structural element carry out factory's formula processing in advance, by required structure before formally building by laying bricks or stones Part, material transport the most in advance to respective regions, it will be greatly saved construction material consume Rate, reduces construction cost.Specifically, techniques below effect can be realized:
(1), can realize quickly forming layout viewing, the work greatly reducing masonry arrangement drafting is strong Degree;
(2), BIM threedimensional model is utilized, displaying masonry arrangement directly perceived, it is to avoid because of technology Scheme is told somebody what one's real intentions are the unclear loss caused;
(3) the concrete size of each building block, arrangement position, quantity required, constructor are indicated, in detail Member can cut in advance, for the fine-grained management of job site, fundamentally solves on-the-spot masonry material The wasting phenomenon etc. of material provides data supporting accurately;
(4), for every face wall, can quickly go out according to data parameters to overlap arrangement more, have The optimization of the scheme of being beneficial to.
Technical scheme being described in detail above in association with accompanying drawing, technical scheme proposes A kind of new masonry arrangement, it is possible to realize the automatic placement of masonry, overcome and manually build Shortcoming existing for body arrangement, greatly reduces the manual work amount of user, improves masonry arrangement effect Rate, thus improve the experience of user, make in actual work progress, construction party simultaneously Can position and statistics according to masonry layout viewing and bill of material well in advance, non-standard material is shifted to an earlier date Carry out factory's formula processing, before formally building by laying bricks or stones, material requested is transported the most in advance to accordingly Region, is greatly saved construction material coefficient of losses, reduces construction cost.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for For those skilled in the art, the present invention can have various modifications and variations.All essences in the present invention Within god and principle, any modification, equivalent substitution and improvement etc. made, should be included in the present invention Protection domain within.

Claims (14)

1. a masonry arrangement method, it is characterised in that including:
Obtain the Wall model of pending masonry arrangement;
Obtain initial parameter information required during described Wall model is carried out masonry arrangement;
According to the described initial parameter information got, described Wall model forms masonry arrangement Figure.
Masonry arrangement method the most according to claim 1, it is characterised in that obtain pending The step of the Wall model of masonry arrangement, specifically includes:
Described Wall model is extracted from the BIM that user selectes.
Masonry arrangement method the most according to claim 1, it is characterised in that described initial ginseng Number information at least include described Wall model needed for the parameter information of masonry and arranging of described Wall model Execute the parameter information of component.
Masonry arrangement method the most according to claim 3, it is characterised in that according to getting Described initial parameter information, on described Wall model formed masonry layout viewing step, specifically wrap Include:
Parameter information according to described masonry and the parameter information of described measure component, determine that masonry is arranged The size of masonry, quantity and installation position needed for during;
During arranging based on described masonry, the required size of masonry, quantity and installation position, formed Described masonry layout viewing.
Masonry arrangement method the most according to claim 1, it is characterised in that also include:
When detecting that the adjustment of described masonry layout viewing is operated by user, right according to described adjustment operation Described masonry layout viewing is adjusted.
Masonry arrangement method the most according to any one of claim 1 to 5, its feature exists In, obtain the step of initial parameter information required during described Wall model is carried out masonry arrangement Suddenly, the most also include:
Display comprises the selection interface of multiple parameter preset information, and by the user that gets in described choosing Select parameter preset information selected on interface as described initial parameter information;And/or
Receive the custom parameter information of user's input, with the custom parameter letter described user inputted Breath is as described initial parameter information.
Masonry arrangement method the most according to any one of claim 1 to 5, its feature exists In, also include:
According to the preset instructions received, derive described masonry layout viewing, and generate the arrangement of described masonry The bill of material that figure is corresponding.
8. a masonry arranging system, it is characterised in that including:
First acquiring unit, for obtaining the Wall model of pending masonry arrangement;
Second acquisition unit, required for obtaining during described Wall model is carried out masonry arrangement Initial parameter information;
Processing unit, for according to the described initial parameter information got, on described Wall model Form masonry layout viewing.
Masonry arranging system the most according to claim 8, it is characterised in that described first obtains Take unit specifically for: from the BIM that user selectes, extract described Wall model.
Masonry arranging system the most according to claim 8, it is characterised in that described initial ginseng Number information at least include described Wall model needed for the parameter information of masonry and arranging of described Wall model Execute the parameter information of component.
11. masonry arranging systems according to claim 10, it is characterised in that described process Unit specifically for:
Parameter information according to described masonry and the parameter information of described measure component, determine that masonry is arranged The size of masonry, quantity and installation position needed for during;
During arranging based on described masonry, the required size of masonry, quantity and installation position, formed Described masonry layout viewing.
12. masonry arranging systems according to claim 8, it is characterised in that also include:
Adjustment unit, is used for when detecting that the adjustment of described masonry layout viewing is operated by user, according to Described masonry layout viewing is adjusted by described adjustment operation.
13. according to Claim 8 to the masonry arranging system according to any one of 12, and its feature exists In, described second acquisition unit specifically for:
Display comprises the selection interface of multiple parameter preset information, and by the user that gets in described choosing Select parameter preset information selected on interface as described initial parameter information;And/or
Receive the custom parameter information of user's input, with the custom parameter letter described user inputted Breath is as described initial parameter information.
14. according to Claim 8 to the masonry arranging system according to any one of 12, and its feature exists In, also include:
Output unit, for according to the preset instructions received, derives described masonry layout viewing, and raw Become the bill of material that described masonry layout viewing is corresponding.
CN201610274221.7A 2016-04-28 2016-04-28 Masonry arrangement method and masonry arranging system Active CN105930600B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610274221.7A CN105930600B (en) 2016-04-28 2016-04-28 Masonry arrangement method and masonry arranging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610274221.7A CN105930600B (en) 2016-04-28 2016-04-28 Masonry arrangement method and masonry arranging system

Publications (2)

Publication Number Publication Date
CN105930600A true CN105930600A (en) 2016-09-07
CN105930600B CN105930600B (en) 2019-09-24

Family

ID=56837455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610274221.7A Active CN105930600B (en) 2016-04-28 2016-04-28 Masonry arrangement method and masonry arranging system

Country Status (1)

Country Link
CN (1) CN105930600B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268832A (en) * 2017-07-14 2017-10-20 上海嘉实(集团)有限公司 Landscape layout method, system and the storage medium and terminal of building block
CN107451356A (en) * 2017-07-28 2017-12-08 成都智建新业建筑设计咨询有限公司 A kind of outer-wall building method based on BIM
CN107654077A (en) * 2017-10-19 2018-02-02 厦门华蔚物联网科技有限公司 Consider the bricklaying robot straight line wall of mortar plasticity builds algorithm by laying bricks or stones
CN107704666A (en) * 2017-09-18 2018-02-16 巧夺天宫(深圳)科技有限公司 Metope paving designs composing system and its design composition method
CN107905512A (en) * 2017-10-25 2018-04-13 重庆建工第三建设有限责任公司 A kind of Wall or floor tile based on BIM becomes more meticulous construction
CN108061551A (en) * 2017-12-07 2018-05-22 中机国际工程设计研究院有限责任公司 Automatically build the alignment system of device by laying bricks or stones and build device by laying bricks or stones automatically
CN108629058A (en) * 2017-03-20 2018-10-09 巧夺天宫(深圳)科技有限公司 A kind of construction method and system of dry-hang stone model
CN108664674A (en) * 2017-03-31 2018-10-16 大连万达集团股份有限公司 Method and its device for reducing inspection in engineering to component in BIM models
CN110414181A (en) * 2019-08-08 2019-11-05 苏州宜特加建筑工程有限公司 A kind of design method of the heat insulating decorative board exterior wall based on BIM
CN111428286A (en) * 2018-12-20 2020-07-17 汉能移动能源控股集团有限公司 Building component model arrangement method and system
CN112598786A (en) * 2020-12-28 2021-04-02 深圳须弥云图空间科技有限公司 Parameterized wall cutting method and device
CN112861240A (en) * 2021-03-05 2021-05-28 广联达科技股份有限公司 Method and device for calculating secondary component, computer equipment and readable storage medium
CN113553640A (en) * 2021-06-30 2021-10-26 广联达科技股份有限公司 Masonry arrangement method and device, electronic equipment and readable storage medium
CN113673017A (en) * 2021-08-31 2021-11-19 中建七局总承包有限公司 Automatic ceramic tile arrangement method and automatic ceramic tile arrangement system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060075718A1 (en) * 2004-10-13 2006-04-13 Inhabitable Art, Inc. Systems and methods for manufacturing customized prefabricated buildings
CN103774859A (en) * 2014-01-17 2014-05-07 华中科技大学 Automatic construction device of BIM (Building Information Model)-based cement mortar masonry and working method of automatic construction device
CN103827410A (en) * 2011-07-26 2014-05-28 旭化成住宅株式会社 Masonry building and method for constructing masonry building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060075718A1 (en) * 2004-10-13 2006-04-13 Inhabitable Art, Inc. Systems and methods for manufacturing customized prefabricated buildings
CN103827410A (en) * 2011-07-26 2014-05-28 旭化成住宅株式会社 Masonry building and method for constructing masonry building
CN103774859A (en) * 2014-01-17 2014-05-07 华中科技大学 Automatic construction device of BIM (Building Information Model)-based cement mortar masonry and working method of automatic construction device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王志珑 等: "利用BIM技术进行二次结构深化设计", 《施工技术》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108629058A (en) * 2017-03-20 2018-10-09 巧夺天宫(深圳)科技有限公司 A kind of construction method and system of dry-hang stone model
CN108664674A (en) * 2017-03-31 2018-10-16 大连万达集团股份有限公司 Method and its device for reducing inspection in engineering to component in BIM models
CN107268832A (en) * 2017-07-14 2017-10-20 上海嘉实(集团)有限公司 Landscape layout method, system and the storage medium and terminal of building block
CN107268832B (en) * 2017-07-14 2020-02-11 上海嘉实(集团)有限公司 Transverse layout method and system of building blocks, storage medium and terminal
CN107451356A (en) * 2017-07-28 2017-12-08 成都智建新业建筑设计咨询有限公司 A kind of outer-wall building method based on BIM
CN107704666A (en) * 2017-09-18 2018-02-16 巧夺天宫(深圳)科技有限公司 Metope paving designs composing system and its design composition method
CN107654077A (en) * 2017-10-19 2018-02-02 厦门华蔚物联网科技有限公司 Consider the bricklaying robot straight line wall of mortar plasticity builds algorithm by laying bricks or stones
CN107905512A (en) * 2017-10-25 2018-04-13 重庆建工第三建设有限责任公司 A kind of Wall or floor tile based on BIM becomes more meticulous construction
CN108061551A (en) * 2017-12-07 2018-05-22 中机国际工程设计研究院有限责任公司 Automatically build the alignment system of device by laying bricks or stones and build device by laying bricks or stones automatically
CN108061551B (en) * 2017-12-07 2020-01-31 中机国际工程设计研究院有限责任公司 Positioning system of automatic masonry device and automatic masonry device
CN111428286A (en) * 2018-12-20 2020-07-17 汉能移动能源控股集团有限公司 Building component model arrangement method and system
CN110414181A (en) * 2019-08-08 2019-11-05 苏州宜特加建筑工程有限公司 A kind of design method of the heat insulating decorative board exterior wall based on BIM
CN112598786A (en) * 2020-12-28 2021-04-02 深圳须弥云图空间科技有限公司 Parameterized wall cutting method and device
CN112861240A (en) * 2021-03-05 2021-05-28 广联达科技股份有限公司 Method and device for calculating secondary component, computer equipment and readable storage medium
CN113553640A (en) * 2021-06-30 2021-10-26 广联达科技股份有限公司 Masonry arrangement method and device, electronic equipment and readable storage medium
CN113673017A (en) * 2021-08-31 2021-11-19 中建七局总承包有限公司 Automatic ceramic tile arrangement method and automatic ceramic tile arrangement system

Also Published As

Publication number Publication date
CN105930600B (en) 2019-09-24

Similar Documents

Publication Publication Date Title
CN105930600A (en) Masonry configuration method and masonry configuration system
CN107315876B (en) Parameterized modeling production method of precast beam
CN107145695B (en) Parametric modeling production method of prefabricated external wall panel with assembled shear wall structure
US9020783B2 (en) Direct manipulation of composite terrain objects with intuitive user interaction
CN105488301B (en) Three-dimensional steel version of tendon and muscle quadrat method
CN104778753B (en) The three-dimensional modeling implementation method of bridge reinforcement
EP1154342A2 (en) System and method for take-off of materials using two-dimensional cad interface
CN109636906A (en) Concrete filling pile construction method and system based on BIM technology
CN107918831A (en) BIM Schedule managements method and its system based on browser
US8825458B2 (en) Method, computer program product and apparatus for providing a model map for workflow integration
CN107016625A (en) A kind of total bag enterprise B IM authorizing standard methods of architectural engineering
US9196085B2 (en) Interactively shaping terrain through composable operations
CN110750823A (en) BIM visual display method
CN113673017A (en) Automatic ceramic tile arrangement method and automatic ceramic tile arrangement system
CN107704666A (en) Metope paving designs composing system and its design composition method
CN110378039A (en) A kind of aluminum alloy pattern plate design method and system based on Revit
KR20010007818A (en) System And Method For Estimate Bill Of Materials Using Two Dimensional CAD Interface
JP6966674B2 (en) Road data creation method, road data creation device and program
Abd ElWahab et al. Towards a parametric plug-in for conservation of built heritage
US6492993B1 (en) Method and system for generating railing objects
CN114266145A (en) Intelligent construction-oriented process flow digitization method
EP3765814A1 (en) Design and construction of fence panels and fence panel components
Yun et al. Basic research on BIM-based quantity take-off guidelines
US8676546B2 (en) Grading method utilizing flow grade solution
CN116628798A (en) Dynamic visualization method for concrete dam construction simulation progress based on same data source

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100193 Building 13, East Yard, No. 10 Wangdong Road, Northwest Haidian District, Beijing

Applicant after: Glodon Polytron Technologies Inc

Address before: 100193 No. 18 Building, No. 8 Hospital, Wangxi Road, Haidian District, Beijing

Applicant before: Glodon Software Company Limited

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Pengyi

Inventor after: Liu Qian

Inventor before: Wang Pengyi

GR01 Patent grant
GR01 Patent grant