CN109558606A - BIM Tender System - Google Patents

BIM Tender System Download PDF

Info

Publication number
CN109558606A
CN109558606A CN201710871729.XA CN201710871729A CN109558606A CN 109558606 A CN109558606 A CN 109558606A CN 201710871729 A CN201710871729 A CN 201710871729A CN 109558606 A CN109558606 A CN 109558606A
Authority
CN
China
Prior art keywords
model
bim
component
classification
conversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710871729.XA
Other languages
Chinese (zh)
Inventor
姚永福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Shenzhou Good Information Development Ltd By Share Ltd
Original Assignee
Ningxia Shenzhou Good Information Development Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Shenzhou Good Information Development Ltd By Share Ltd filed Critical Ningxia Shenzhou Good Information Development Ltd By Share Ltd
Priority to CN201710871729.XA priority Critical patent/CN109558606A/en
Publication of CN109558606A publication Critical patent/CN109558606A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Geometry (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Instructional Devices (AREA)

Abstract

The invention discloses a kind of BIM Tender Systems, comprising the following steps: the following steps are included: (1) creates Revit model;(2) BIM buildings model is established;(3) adjustment of model is checked;(4) classification and calculation amount of component;(5) data generation table will be calculated and summarized and exported again, and establish 5D relational database in BIM buildings model, pass through contract, the analysis of plan and practice of construction data, realize more calculation comparisons.Operation of the present invention is simple and convenient, more intelligence and efficiently will the specialized engineerings such as building, structure, decoration, reinforcing bar, plumbing, electromechanical equipment integrate a BIM model, be enterprise realization construction project Life cycle project cost coordinated management, data accumulation and depth analysis integrated management.

Description

BIM Tender System
Technical field
The present invention relates to a kind of BIM Tender Systems.
Background technique
BIM Building Information Model (Building Information Modeling) is the items with construction-engineering project Basis of the relevant information data as model, carries out the foundation of buildings model.It has visualization, harmony, simulation, optimization Property and the big feature of figure five can be gone out.It allows design, construction, management to be unified under a platform and work, and is the integrated of architectural engineering Management environment can make architectural engineering significantly improve efficiency throughout its entire process, largely reduce risk.Because in Earlier designs Stage can find the various problems that will appear the real construction stage in later period, carry out advanced processing, lay for later period activity firm Basis.It can also be instructed as feasibility, as the practical guidance of construction to provide reasonable construction party in construction in later period Case and personnel, the reasonable disposition of materials'use, to realize resource reasonable utilization in maximum magnitude.
Summary of the invention
The object of the present invention is to provide a kind of simple to operate, more intelligence and efficiently by building, structure, decoration, The specialized engineerings such as reinforcing bar, plumbing, electromechanical equipment integrate a BIM model, realize construction project Life cycle for enterprise The BIM Tender System of project cost coordinated management, data accumulation and depth analysis integrated management.
A kind of technical solution: BIM Tender System of the present invention, comprising the following steps:
(1) create Revit model: link CAD diagram paper converts CAD diagram paper directly on Revit platform, can be in CAD Revit model is created on the original position of drawing;
(2) establish BIM buildings model: each professional CAD drawing converted on Revit platform, by two secondary members into Row intelligent layout establishes BIM buildings model;
(3) adjustment of model is checked: by auxiliary tool, the BIM buildings model of foundation is adjusted and is checked, backman Tool includes that attribute is checked and component editor;
(4) classification and calculation amount of component: the calculation amount software based on BIM obtains each directly from the BIM buildings model of foundation Various components are divided into rebar model component classification, the classification of civil engineering model component and electromechanical model component classification by kind component information, Rebar model component classification, the classification of civil engineering model component and electromechanical model component classification according to respective computation rule and Classification carries out calculation amount;
(5) data generation table will be calculated and summarized and exported again, and establish 5D relation data in BIM buildings model Realize that calculate compares more by contract, the analysis of plan and practice of construction data in library.
Further, in step (1) on Revit platform convert CAD diagram paper include axis net conversion, column conversion, beam conversion, Isolated footing conversion, foundation beam conversion and wall conversion.
Further, two secondary members are carried out intelligent layout in step (2) includes intelligent layout, decoration, thermal-insulating waterproof, zero Star component and basis.
Further, it includes to set to building, structure, plumbing and ventilation, electromechanics that BIM buildings model is established in step (2) The modeling of standby, reinforcing bar and decoration.
Further, component editor includes intersection in Liang Zhu, height adjustment, floor segmentation, region three in step (3) Dimension, floor are three-dimensional, view cuts off, component screens, component is matched colors, component shows hidden, cancel connection, mark option and single-beam setting.
Further, the calculation amount of rebar model component classification includes system parameter, reinforcing bar attribute, reinforcing bar cloth in step (4) It sets, accounting report, reinforcing bar define and work arrangement.
Compared with the prior art, the present invention has the following advantages: it is simple to operate, more will intelligently and efficiently build, The specialized engineerings such as structure, decoration, reinforcing bar, plumbing, electromechanical equipment integrate a BIM model, realize that construction project is complete for enterprise Project cost coordinated management, data accumulation and the depth analysis integrated management of life cycle;Civil engineering, reinforcing bar and each profession of installation A model is shared, the repetition typing of data is avoided, it is ensured that data are unified, realize resource-sharing, coordinated management;Based on BIM Calculation amount software, directly obtain various component informations from the BIM buildings model of foundation, various components be divided into rebar model structure Part classification, the classification of civil engineering model component and electromechanical model component classification are automatically performed quantities calculation in conjunction with various regions computation rule And inventory, quota project are applied;Can be according to construction flowing water section, plan, time, floor, component isotype, number needed for extracting According to realization Dynamic Cost Control.
Specific embodiment
In order to deepen understanding of the invention, below we the invention will be further described, which is only used for solving The present invention is released, is not intended to limit the scope of the present invention..
The present invention is a kind of BIM Tender System, comprising the following steps:
(1) create Revit model: link CAD diagram paper converts CAD diagram paper, in Revit platform directly on Revit platform Upper conversion CAD diagram paper includes the conversion of axis net, column conversion, beam conversion, isolated footing conversion, foundation beam conversion and wall conversion Revit model is created on the original position of CAD diagram paper;
(2) establish BIM buildings model: each professional CAD drawing converted on Revit platform, by two secondary members into Row intelligent layout, it includes intelligent layout, decoration, thermal-insulating waterproof, fragmentary component and basis that two secondary members, which are carried out intelligent layout, is built Vertical BIM buildings model, establishing BIM buildings model includes to building, structure, plumbing and ventilation, electromechanical equipment, reinforcing bar and decoration Modeling;
(3) adjustment of model is checked: by auxiliary tool, the BIM buildings model of foundation is adjusted and is checked, backman Tool include attribute check with component editor, component editor include Liang Zhu in intersection, height adjustment, floor segmentation, area three-dimensional, Floor is three-dimensional, view cuts off, component screens, component is matched colors, component shows hidden, cancel connection, label option and single-beam are arranged;
(4) classification and calculation amount of component: the calculation amount software based on BIM obtains each directly from the BIM buildings model of foundation Various components are divided into rebar model component classification, the classification of civil engineering model component and electromechanical model component classification by kind component information, Rebar model component classification, the classification of civil engineering model component and electromechanical model component classification according to respective computation rule and Classification carries out calculation amount, wherein the calculation amount of rebar model component classification includes system parameter, reinforcing bar attribute, steel bar arrangement, calculates report Table, reinforcing bar definition and work arrangement, inventory quota is applied according to embedded software automatically, and calculation amount data and design data is made to implement to join It is dynamic, it completes engineering metering and works and be applied to the Life cycle data sharing of architectural engineering;
(5) data generation table will be calculated and summarized and exported again, and establish 5D relation data in BIM buildings model Realize that calculate compares more by contract, the analysis of plan and practice of construction data in library.
Above-mentioned specific embodiment, only technical concept and structure feature to illustrate the invention, it is therefore intended that allow and be familiar with this The stakeholder of item technology can implement accordingly, but the above content is not intended to limit protection scope of the present invention, all according to this hair Any equivalent change or modification made by bright Spirit Essence, should all fall under the scope of the present invention.

Claims (6)

1. a kind of BIM Tender System, it is characterised in that: the following steps are included:
(1) create Revit model: link CAD diagram paper converts CAD diagram paper directly on Revit platform, can be former in CAD diagram paper There is creation Revit model on position;
(2) it establishes BIM buildings model: each professional CAD drawing is converted on Revit platform, two secondary members are subjected to intelligence It can arrange, establish BIM buildings model;
(3) adjustment of model is checked: by auxiliary tool, the BIM buildings model of foundation is adjusted and is checked, auxiliary tool packet Attribute is included to check and component editor;
(4) classification and calculation amount of component: the calculation amount software based on BIM directly obtains various structures from the BIM buildings model of foundation Various components are divided into rebar model component classification, the classification of civil engineering model component and electromechanical model component classification, reinforcing bar by part information Model component classification, the classification of civil engineering model component and electromechanical model component classification are according to respective computation rule and classification Carry out calculation amount;
(5) data generation table will be calculated and summarized and exported again, and establish 5D relational database in BIM buildings model, By contract, the analysis of plan and practice of construction data, realize that calculate compares more.
2. BIM Tender System according to claim 1, it is characterised in that: step is converted on Revit platform in (1) CAD diagram paper includes the conversion of axis net, column conversion, beam conversion, isolated footing conversion, foundation beam conversion and wall conversion.
3. BIM Tender System according to claim 1, it is characterised in that: two secondary members are carried out intelligence in step (2) Arrangement includes intelligent layout, decoration, thermal-insulating waterproof, fragmentary component and basis.
4. BIM Tender System according to claim 1 or 3, it is characterised in that: step establishes BIM buildings model in (2) Include the modeling to building, structure, plumbing and ventilation, electromechanical equipment, reinforcing bar and decoration.
5. BIM Tender System according to claim 1, it is characterised in that: component editor includes Liang Zhu in step (3) Interior intersection, height adjustment, floor segmentation, area three-dimensional, floor is three-dimensional, view cuts off, component screens, component is matched colors, component is shown Hidden, cancellation connection, label option and single-beam setting.
6. BIM Tender System according to claim 1, it is characterised in that: rebar model component classification in step (4) Calculation amount includes system parameter, reinforcing bar attribute, steel bar arrangement, accounting report, reinforcing bar definition and work arrangement.
CN201710871729.XA 2017-09-25 2017-09-25 BIM Tender System Pending CN109558606A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710871729.XA CN109558606A (en) 2017-09-25 2017-09-25 BIM Tender System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710871729.XA CN109558606A (en) 2017-09-25 2017-09-25 BIM Tender System

Publications (1)

Publication Number Publication Date
CN109558606A true CN109558606A (en) 2019-04-02

Family

ID=65862411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710871729.XA Pending CN109558606A (en) 2017-09-25 2017-09-25 BIM Tender System

Country Status (1)

Country Link
CN (1) CN109558606A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110096800A (en) * 2019-04-30 2019-08-06 中国二十冶集团有限公司 PC rectangular beam and Cast-in-situ Beam realize the method that materials are estimated by BIM
CN110968907A (en) * 2019-12-04 2020-04-07 北京建都设计研究院有限责任公司 BIM-based implementation method of group real estate construction project
CN112001012A (en) * 2020-08-17 2020-11-27 宇构科技(上海)有限公司 Building system based on BIM technology preset model

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110054652A1 (en) * 2009-08-27 2011-03-03 Heil Duane A Building Construction Software and System
CN103246951A (en) * 2012-12-11 2013-08-14 中建三局第一建设工程有限责任公司 Intelligent electromechanical equipment management system and method based on BIM (building information modeling)
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method
CN106682257A (en) * 2016-11-16 2017-05-17 上海建工集团股份有限公司 Construction facility BIM component library construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110054652A1 (en) * 2009-08-27 2011-03-03 Heil Duane A Building Construction Software and System
CN103246951A (en) * 2012-12-11 2013-08-14 中建三局第一建设工程有限责任公司 Intelligent electromechanical equipment management system and method based on BIM (building information modeling)
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method
CN106682257A (en) * 2016-11-16 2017-05-17 上海建工集团股份有限公司 Construction facility BIM component library construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王淑嫱;周启慧;: "基于BIM软件的工程量计算方法研究" *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110096800A (en) * 2019-04-30 2019-08-06 中国二十冶集团有限公司 PC rectangular beam and Cast-in-situ Beam realize the method that materials are estimated by BIM
CN110968907A (en) * 2019-12-04 2020-04-07 北京建都设计研究院有限责任公司 BIM-based implementation method of group real estate construction project
CN112001012A (en) * 2020-08-17 2020-11-27 宇构科技(上海)有限公司 Building system based on BIM technology preset model

Similar Documents

Publication Publication Date Title
CN106709660B (en) BIM-based building design method
Zhang et al. Optimal machine operation planning for construction by Contour Crafting
CN106156408A (en) The building of the classification of a kind of Component-Based Development and combination works in coordination with constructing system and method
KR20130016620A (en) 3d process management method for bim(building information modeling)
CN109544051A (en) A kind of construction management application platform based on BIM technology application
CN109558606A (en) BIM Tender System
CN107256310B (en) Three-dimensional design method for water collecting device of high-level water collecting cooling tower
Ji et al. Integration of parametric geometry into IFC-Bridge
Kim et al. Construction-specific spatial information reasoning in building information models
CN109583149A (en) Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management
CN109086490A (en) A kind of tower crane type selecting method for arranging of the assembled engineering based on BIM technology
CN108133107A (en) A kind of FRP- concrete assembly methods based on BIM models
CN209486723U (en) A kind of construction management application platform based on BIM technology application
Marx et al. Modeling and simulating spatial requirements of construction activities
Han et al. Simulation of mobile crane operations in 3D space
CN101736925A (en) Modular construction method for nuclear island of nuclear power station
Lee et al. Conceptual design algorithm configuration using generative design techniques
CN101748915B (en) Modularization construction method for nuclear power station nuclear island
CN105844016B (en) A method of the proposed building quantity of acquisition based on buildings model cutting
Baran et al. Structural Engineering by way of BIM
KR20030061175A (en) 3-dimensional graphic data producing system and the method using 2-dimensional graphic drawings
KR20220164193A (en) Automatic segmentation design system and method for modular construction using parametric design, and a recording medium recording a computer readable program for executing the method
Xie et al. Incorporating building information modeling (BIM) into the super high-rise industrialized housing project: A case study
Mocerino Digital revolution in efficient self-organization of buildings: towards intelligent robotics
Kubicki et al. A master model approach for design and analysis of roof trusses

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190402

WD01 Invention patent application deemed withdrawn after publication