CN209486723U - A kind of construction management application platform based on BIM technology application - Google Patents

A kind of construction management application platform based on BIM technology application Download PDF

Info

Publication number
CN209486723U
CN209486723U CN201920133259.1U CN201920133259U CN209486723U CN 209486723 U CN209486723 U CN 209486723U CN 201920133259 U CN201920133259 U CN 201920133259U CN 209486723 U CN209486723 U CN 209486723U
Authority
CN
China
Prior art keywords
construction
management
model
platform based
bim technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920133259.1U
Other languages
Chinese (zh)
Inventor
耿少鹏
连双伟
***
郭振方
李俊杰
李子华
田勇欣
张天
兰平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Guangdong Construction Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201920133259.1U priority Critical patent/CN209486723U/en
Application granted granted Critical
Publication of CN209486723U publication Critical patent/CN209486723U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to a kind of construction management systems, espespecially a kind of construction management application platform based on BIM technology application, it include: that work station, server connect to form wireless communication transmission control with construction equipment by wireless router, construction equipment mainly includes mobile terminal device, suspension and support, folding ladder, detachable protective fence, transtainer, striping machine, plumbing installation and positioning member;Wherein positioning member is the steel bar framework component of quantity Matching architecture information;Suspension and support is fixedly mounted between two wall bodies of adjacent spaces;Folding ladder and detachable protective fence are arranged in architecture information outer periphery;At the movable passageway that the architecture information being spaced apart from each other is set of transtainer, striping machine, plumbing installation;The utility model is by management system and modeling software, is that the critical process such as progress control, on-site coordination in work progress provide the guidance such as accurate component geometric position, project amount in time, side item controlled cost promotes quality in conjunction with construction equipment.

Description

A kind of construction management application platform based on BIM technology application
Technical field
The utility model relates to a kind of construction management system, espespecially a kind of construction management application based on BIM technology application Platform.
Background technique
With industrial scale and specialization, it is seen that scientific and technical development level is continuously jumped In property progress, and now construction-engineering project in, the management of the progress of architectural engineering, quality, safety, environment etc. is just from right The management of original personnel is gradually transformed into the management to guiding building;When in super large lid rolling stock section environment, the environment Belong to Large Infrastructure Projects, there are the civil engineering scale of construction is big in construction management, electromechanical installation is complicated, multi-process, intersect, the duration Nervous feature, there are many urgent problems to be solved, such as environmental protection, quality, safety, cost, the controls of progress etc.;But mesh Technical staff is generally young in preceding project, and construction experience is insufficient, causes site operation field management level lower, and no forensic science closes Allotment talent's machine resource of reason;Measure common at present is to be participated in using BIM technology into construction, and BIM technology can be in certain journey It makes up the shortcoming of experience on degree, and Optimizing Construction Scheme can be shifted to an earlier date using BIM technology, by construction simulation optimized construction procedure, Construction speed is presented in real time with three-dimensional visualization;But specific in super large lid rolling stock section, it is reasonable to be still short of a system Management operation.
In super large lid rolling stock section environment, do mechanization operation is gradually realized, but do mechanization operation can not avoid completely Unpredictalbe safety accident occurs, cause the accident it is mostly be since operator inadvertently operates against regulations, accident occurs When, not only delay construction quality and progress, but also cause construction personnel's injury, the even more serious life for influencing whether construction personnel Life safety or the huge property loss for causing engineering, and causing the main reason for operating against regulations is due to not preferable safety prison Control measure, and without multifarious ancillary equipment, such as work can be cooperated in conjunction with the stable construction equipment of monitoring technology and scene Make, form a reasonable management system, extent of injury can be reduced, but lack the high managing and control system of fitness at present, therefore Build the quality of engineering, the construction speed of architectural engineering, architectural engineering construction safety temporarily fail to improve control ability.
Summary of the invention
To solve the above problems, the utility model is intended to disclose a kind of construction management system, it is espespecially a kind of to be based on BIM technology The construction management application platform of application.
In order to achieve the above purposes, the technical solution adopted by the utility model is: it is a kind of based on BIM technology application construction pipe Application platform is managed, is applied to construct in super large lid rolling stock section, main includes the work station, server, pipe that control room is arranged in Reason system, wireless router and setting construction equipment on construction ground, it is characterised in that: the construction equipment mainly includes Mobile terminal device, suspension and support, folding ladder, detachable protective fence, transtainer, striping machine, plumbing installation and positioning structure Part;Wherein mobile terminal device is set as setting with the application terminal hand-held mobile APP that management system carries out data transmission exchanging It is standby;Positioning member is the steel bar framework component of quantity Matching architecture information, and fixed-point type is vertically-mounted interior with positioning on construction ground Mark architecture information;Suspension and support is fixedly mounted between two wall bodies of adjacent spaces, and is penetrated through from construction site bottom to top; Folding ladder and detachable protective fence are arranged in architecture information outer periphery;Transtainer, striping machine, plumbing installation are movable to be set It sets at the passageway for the architecture information being spaced apart from each other.
Preferably, the work station is provided with starting management system and reads the large screen work station of LAN computer, Network associate is carried out to read the instant messages of mobile terminal device upload by server with mobile terminal device.
Preferably, the suspension and support of the construction equipment mainly includes a cube frame, lifting motion device and boom hoisting, cube Frame is vertically fixed between two wall bodies, and highly to extend to top from construction site bottom, a cube frame inner wall is provided with vertical rail Road, lifting motion device are movably arranged on vertical rail to go up and down activity along the longitudinal direction, and boom hoisting includes chain and circle Ring metal hanging ring is connected to below lifting motion device to convey lifting object by lifting motion device.
Preferably, the detachable protective fence of the construction equipment be can be laterally folded rod member structure, rod member Bottom is provided with Universal pulley, and the folding or tensile elongation of hinge bar are adjusted by moveable roller;
Preferably, the transtainer of the construction equipment, striping machine, plumbing installation are movable part, wherein transport is dragged Vehicle is run along the track that striping machine is arranged, and plumbing installation may be provided on transtainer and move to operating position.
Preferably, the work station, server are connect with construction equipment by wireless router to form wireless telecommunications Transmission control, the management system are WEB terminal BIM cooperating management platform, are mounted in work station, provide data by server Transmission service.
The beneficial effects of the utility model are embodied in: the utility model is docked by management system and modeling software, and In conjunction with construction site situation and construction equipment, by the three-dimensional modeling data Interface integration civil engineering of management system, steel structure, electromechanics, curtain Multiple Professional Models such as wall, and using BIM integrated model as carrier, by progress, contract, cost, technique, the matter in work progress The information integrations such as amount, safety, drawing, material, labour are to identical platform, while site administrator cooperates control room simultaneously Monitoring work, the equipment operation of observation site and construction speed, field condition record is uploaded in system, utilize BIM immediately Visual in image, computable analysis the characteristic of model, be work progress in progress control, on-site coordination, contract cost management, The critical process such as store keeping provide accurate component geometric position, project amount, stock number, planned time etc. in time, help to manage Reason personnel carry out effective decision-making and precision management, reduce construction change, shorten project duration, item controlled cost, promote quality.
The utility model carries out construction simulation first, is redefined to construction simulation, can allow project manager Construction site arrangement, big machinery and the measure cloth of member's each key node in look-ahead project building course before construction Scheme is set, can also predict every month, the fund of each Zhou Suoxu, material, labour's situation, finds the problem and carries out excellent in advance Change;Secondly the utility model is provided with progress and cost supervision, one side progress monitoring: the virtual construction technology based on BIM Progress control by construction simulation analysis repeatedly, the problem of allowing the construction stage to be likely to occur, is sent out in advance in the environment of simulation It is raw, it modifies one by one, and formulate counter-measure in advance, keeps schedule and arrangement and method for construction optimal, then be used to instruct actual project Construction, to guarantee smoothly completing for project construction;Another aspect cost control: by the dimensions such as floor, progress, specifications and models system Count goods and materials amount, guidance establishment material supply and procurement plan;The industry data of many years accumulates, and project amount is more acurrate;Demander can Data are recalled at any time realizes the multidisciplinary shared of the data such as project amount;Project management department member accesses section chief at any time and counts dosage, makes to examine Core process is effectively reliable, is truly realized limit neck material;It is easy to implement the real-time three ways of calculating comparison of Project Process management.
There are also full Professional Models to integrate for the utility model: the models such as integrated morphology, electromechanics, steel structure, curtain wall realize full profession Model browsing, convenient for communication, guiding construction;Seamless interfacing extensively joins up to each professional calculation amount software, supports world IFC standard, imports The models such as Revit, MagiCAD, Tekla avoid repeating to model, reduce cost;The key messages such as integrated progress, budget simultaneously, It is checked by vivid progress, adjusts fund and resource planning, reached fund and resource and use balance.
Animation mechanism is provided in the utility model operating process, realizes that big operating condition is interspersed, complex node is constructed, technical solution Simulation, Optimizing Construction Scheme instructs site operation;Use mobile terminal device, i.e. mobile phone terminal APP application: at the construction field (site) The photo information of the progress that acquires in tour, quality, safety etc. can be handled with timely sharing and analysis;And in management system WEB terminal BIM cooperating management platform can be conducive to company management level leader can long-range strange land, easily and intuitively check item at any time Purpose latest tendency, comprising: project process, cost, quality, the relevant information of safety etc..
Detailed description of the invention
Fig. 1 is the system logic connection figure of the utility model.
Fig. 2 is the plan structure schematic diagram of the construction equipment mounting arrangement of the utility model.
Attached drawing mark explanation: 1- architecture information, 2- suspension and support, 3- folding ladder, the detachable protective fence of 4-, 5- transtainer, 6- striping machine, 7- plumbing installation, 8- positioning member, the construction site 9-.
Specific embodiment
The specific embodiment that according to the present invention will be described in detail below with reference to the accompanying drawings:
A kind of construction management application platform based on BIM technology application is applied to construct in super large lid rolling stock section, mainly It is set including the work station of control room, server, management system, wireless router and the construction of setting on construction ground is arranged in Standby, the work station, server are connect with construction equipment by wireless router to form wireless communication transmission control, described Management system is WEB terminal BIM cooperating management platform, is mounted in work station, provides data transport service by server;Wherein The main operational module of management system includes the database of logic operation, model AM access module, simulates and build module, collision It corrects module and module is instructed in construction;Database is used to store modeling information, the mobile terminal device of super large lid rolling stock section The recall info that information is read in the construction site of biography, operational management process occurs;Model AM access module is used to assist from WEB terminal BIM With the modeling information that the docking of management platform end imports, and format is converted into platform end and requires format, modeling tool is measured by calculation Statistical modeling attribute, and pass through the property content of database storage access;Simulation builds module on the basis of modeling information Operation equipment and operating procedure needed for construction is built in simulation;Collision corrects module for detecting the operation equipment built, and determines Whether there is information collision problem and reminded, then sets correction approach;Base of the module for correcting in collision is instructed in construction On plinth, correct guidance and planning again are carried out;The work station is provided with starting management system and reads local area network calculating The large screen work station of machine carries out network associate by server with mobile terminal device to read mobile terminal device upload Instant messages;
The construction equipment mainly includes mobile terminal device, suspension and support, folding ladder, detachable protective fence, transports and drag Vehicle, striping machine, plumbing installation and positioning member;Wherein mobile terminal device is set as carrying out data transmission with management system The application terminal the hand-held mobile APP equipment of exchange;Positioning member is the steel bar framework component of quantity Matching architecture information, fixed point Formula is vertically-mounted interior with positioning mark architecture information on construction ground;Suspension and support be fixedly mounted on adjacent spaces two wall bodies it Between, and penetrate through from construction site bottom to top;Folding ladder and detachable protective fence are arranged in architecture information outer periphery;Transport is dragged At the movable passageway that the architecture information being spaced apart from each other is set of vehicle, striping machine, plumbing installation;The wherein construction equipment Suspension and support mainly include a cube frame, lifting motion device and boom hoisting, a cube frame is vertically fixed between two wall bodies, height To extend to top from construction site bottom, a cube frame inner wall is provided with vertical rail, and lifting motion device is movably arranged on perpendicular To go up and down activity along the longitudinal direction on straight rail, boom hoisting includes chain and annulus metal hanging ring, is connected to lifting motion dress Lower section is set to convey lifting object by lifting motion device;The detachable protective fence of construction equipment is hinge bar that can be laterally folded Part structure, rod member bottom are provided with Universal pulley, and the folding or tensile elongation of hinge bar are adjusted by moveable roller;Construction Transtainer, striping machine, the plumbing installation of equipment are movable part, and wherein transtainer is transported along the track that striping machine is arranged Row, plumbing installation may be provided on transtainer and move to operating position;Plumbing installation by pipeline and its Installation tool composition.
A kind of management method of the construction management application platform based on BIM technology application, the management method are mainly wrapped Include following steps:
S1, modeling: by Revit civil engineering, MagiCAD is electromechanical, Tekla steel structure software is to the construction of super large lid rolling stock section Information carries out three-dimensional modeling;
S2, it imports model: importing the modeler model of super large lid rolling stock section in WEB terminal BIM cooperating management platform, pass through The modeling information of BIM calculation amount modeling tool docking super large lid rolling stock section;The BIM calculation amount modeling tool includes figure calculation amount Tool, reinforcing bar calculation amount tool and installation calculation amount tool;Simultaneously management system based on cloud engineering data upload, engineering data with The association of model, the Classification Management of engineering data and shared, realize classification, the orientation management of engineering data;
S3, record modeling data: reading the modeling information of super large lid rolling stock section, geometric position, modeling essence to model Degree and depth, element attribute are recorded, and a database is formed;
The step S3 further includes specific steps:
1) model integration and data exchange determine and software unprocessed form model, BIM link model are submitted to require, browse mould Type requires, BIM model exports data standard specification;
2) unified Modeling public information mainly includes unified model origin, uniform units, measurement system, unified model coordinate System, unified floor absolute altitude;
3) model file is named, model file is divided into Working mould according to the disassembly principle of designing system by model Type and Integrated Models two major classes, working model refer to that model file of designer's input comprising building content, Integrated Models refer to root Working model is integrated to the model (achievement model format or browsing model format) as building system according to certain rule;
4) model component color is provided, with sieving element type
S4, setting attribute: to the generic term for a building, e. g. Apartment, store, a movie theater, etc. of model, floor number, flowing water section, each component on WEB terminal BIM cooperating management platform The information setting static attribute of type sets the information of reserved Construction Arrangement, construction equipment operation, construction technology and construction speed Dynamic attribute is determined, while the attribute of each component is associated with construction speed attribute, to obtain actual progress information;Each component Construction speed information mainly includes planned time, actual finish time, construction daily sheet and live photographs of progress information;
S5, initialization: successively working according to floor number sequence, installs after selecting floor to selection civil construction or electromechanics Construction is made in construction or steel building, then carries out simulated crash test, is exported wrong structure and is carried out correction guidance;Intelligence is automatic Calculate temporary engineering amount, for face set cost control, subpackage clearing reference frame is provided;In conjunction with management system, look-ahead project The construction site arrangement of each key node, big machinery and measure arrangement in building course, can also predict every month, Fund, material, the labour's situation of each Zhou Suoxu, finds the problem in advance and optimizes;
S6, progress chasing: recording live progress in real time by mobile terminal device and be uploaded in management system in real time, And it is associated with the model of management system;In making an inspection tour at the scene, engineer in field is right by mobile terminal device (such as mobile phone) The problem of progress, quality, safety etc., is taken pictures, is recorded and writing record, and correlation model;Management system is based on service Device is synchronous with station data in eastern automatic realization mobile terminal device, is showed in a model in the form of document drawing pin, is assisted Production and supervisory engineering staff are managed progress, quality, security problems;
S7, arrangement suspension and support: according to the site planning in construction site, suspension and support load-bearing checking computations is calculated, plan suspension and support Installation space and the generation bill of materials, and export arrangement report;It is arranged using the quick key of MagiCAD software realization suspension and support, Suspension and support installation space is considered before arrangement in advance, and avoids the collision with other pipelines;Management system supports suspension and support load-bearing Checking computations, and special calculated description is automatically generated, allow the design and installation of suspension and support more to have safety guarantee;Suspension and support can Mass production material Expect inventory, detail drawing of installation and automatic numbering, convenient for the unified purchase of suspension and support material, the prefabricated and accurate installation of batch machining is fixed Position;
S8, planning safe trajectory: safe construction region delimited according to original modeling information, then constructed using striping machine Scene carries out trajectory planning, can be moved along track with subsequent;
S9, construction plan: first combine construction site and management system, the installation site of planning position component, according to Construction site is installed by the positioning member of back work as desired;Then automatic row's brick rule are carried out to positioning member present position It draws;Auxiliary type folding ladder, detachable protective fence can be installed in outer periphery after most heel row brick;It arranges the requirement of brick arrangement and step includes building Body brick, the size of stuff up a crack brick and material setting;Lead wall height, thickness of mortarat bed joint, the setting of vertical mortar joint thickness;Constructional column and Circle, lintel arrangement;Hole, tube seat arrangement;Automatic row's brick, export row's brick figure;Maximum loss calculates;It is interior representated by positioning member Portion's component includes more than the 100 kinds of construction site components such as road, board house, processing space, stock ground, fence;It is entirely built applied to project Stage really accomplishes that guiding construction early period, the construction of process control, result check construction, realizes the fine-grained management of project;
S10, flowing water segment management: by model partition being the working face that can be managed in such a way that flowing water section divides, and The information such as schedule, project amount, resource are subjected to tissue and management according to working face, thus by transporting needed for construction equipment Row equipment arranges to participate in construction in due course, and completes specific constructing operation by planning;Flowing water segment management process can be clear The progression time for seeing each flowing water section, project amount, drawing, inventory, required goods and materials amount etc.;Production management personnel are helped to close The problems such as managing the plan of arranging production, evading working face conflict and resource distribution in advance;The setting of comprehensive statistics period, according to plan duration It generates scheduled completion amount, generate practical completion amount, the practical completion amount of preference pattern primitive generating by the actual construction time.
The utility model carries out construction simulation first, is redefined to construction simulation, can allow project manager Construction site arrangement, big machinery and the measure cloth of member's each key node in look-ahead project building course before construction Scheme is set, can also predict every month, the fund of each Zhou Suoxu, material, labour's situation, finds the problem and carries out excellent in advance Change;Secondly the utility model is provided with progress and cost supervision, one side progress monitoring: the virtual construction technology based on BIM Progress control by construction simulation analysis repeatedly, the problem of allowing the construction stage to be likely to occur, is sent out in advance in the environment of simulation It is raw, it modifies one by one, and formulate counter-measure in advance, keeps schedule and arrangement and method for construction optimal, then be used to instruct actual project Construction, to guarantee smoothly completing for project construction;Another aspect cost control: by the dimensions such as floor, progress, specifications and models system Count goods and materials amount, guidance establishment material supply and procurement plan;The industry data of many years accumulates, and project amount is more acurrate;Demander can Data are recalled at any time realizes the multidisciplinary shared of the data such as project amount;Project management department member accesses section chief at any time and counts dosage, makes to examine Core process is effectively reliable, is truly realized limit neck material;It is easy to implement the real-time three ways of calculating comparison of Project Process management.The utility model So that entire engineering system can remotely concerned item purpose latest tendency, comprising: project process, cost, quality, safety etc. Relevant information, by management system obtain quality, Security Problem Analysis, progress follow-up analysis, model and attribute information browsing, The information such as cost analysis;The system of the utility model is that have uniqueness using two dimensional code as tie, reduces raw material transportational process In switch, omission, misloading etc., the integrated system which is made of BIM model, background server and mobile terminal;It is existing Field personnel are scanned the two-dimensional code by mobile terminal device, information are uploaded to server automatically, then according to demand from server Middle extraction, statistics, analysis and management related information take data band to carry out convenience for project;Scene has been uploaded to cloud platform Information, administrative staff having permission etc. can synchronize the dynamic change situation for seeing project field data, have simultaneity.
The above is only the preferred embodiment of the utility model, is not made to the technical scope of the utility model any Limitation, the technical staff of the industry can make some deformations and modification under the inspiration of the technical program, all according to this The technical spirit of utility model still falls within practical any modification, equivalent variations and modification made by above embodiment In the range of new technique scheme.

Claims (6)

1. a kind of construction management application platform based on BIM technology application is applied to construct in super large lid rolling stock section, main to wrap The work station that control room is set, server, management system, the construction equipment of wireless router and setting on construction ground are included, It is characterized by: the construction equipment mainly includes mobile terminal device, suspension and support, folding ladder, detachable protective fence, transport Trailer, striping machine, plumbing installation and positioning member;Wherein mobile terminal device is set as carrying out data biography with management system The application terminal the hand-held mobile APP equipment of defeated exchange;Positioning member is the steel bar framework component of quantity Matching architecture information, fixed Point type is vertically-mounted interior with positioning mark architecture information on construction ground;Suspension and support be fixedly mounted on adjacent spaces two wall bodies it Between, and penetrate through from construction site bottom to top;Folding ladder and detachable protective fence are arranged in architecture information outer periphery;Transport is dragged At the movable passageway that the architecture information being spaced apart from each other is set of vehicle, striping machine, plumbing installation.
2. a kind of construction management application platform based on BIM technology application according to claim 1, which is characterized in that institute It states work station to be provided with starting management system and read the large screen work station of LAN computer, pass through with mobile terminal device Server carries out network associate to read the instant messages of mobile terminal device upload.
3. a kind of construction management application platform based on BIM technology application according to claim 1, which is characterized in that institute The suspension and support for stating construction equipment mainly includes a cube frame, lifting motion device and boom hoisting, and a cube frame is vertically fixed in two walls Between body, highly to extend to top from construction site bottom, a cube frame inner wall is provided with vertical rail, and lifting motion device is living Dynamic to be mounted on vertical rail to go up and down activity along the longitudinal direction, boom hoisting includes chain and annulus metal hanging ring, is connected to To convey lifting object by lifting motion device below lifting motion device.
4. a kind of construction management application platform based on BIM technology application according to claim 1, which is characterized in that institute The detachable protective fence of construction equipment is stated as rod member structure that can be laterally folded, rod member bottom is provided with universal cunning Wheel adjusts the folding or tensile elongation of hinge bar by moveable roller.
5. a kind of construction management application platform based on BIM technology application according to claim 1, which is characterized in that institute The transtainer, striping machine, plumbing installation for stating construction equipment are movable part, the rail that wherein transtainer is arranged along striping machine Mark operation, plumbing installation may be provided on transtainer and move to operating position.
6. a kind of construction management application platform based on BIM technology application according to claim 1, which is characterized in that institute Work station, the server stated are connect with construction equipment by wireless router to form wireless communication transmission control, the management System is WEB terminal BIM cooperating management platform, is mounted in work station, provides data transport service by server.
CN201920133259.1U 2019-01-25 2019-01-25 A kind of construction management application platform based on BIM technology application Active CN209486723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920133259.1U CN209486723U (en) 2019-01-25 2019-01-25 A kind of construction management application platform based on BIM technology application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920133259.1U CN209486723U (en) 2019-01-25 2019-01-25 A kind of construction management application platform based on BIM technology application

Publications (1)

Publication Number Publication Date
CN209486723U true CN209486723U (en) 2019-10-11

Family

ID=68132755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920133259.1U Active CN209486723U (en) 2019-01-25 2019-01-25 A kind of construction management application platform based on BIM technology application

Country Status (1)

Country Link
CN (1) CN209486723U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109544051A (en) * 2019-01-25 2019-03-29 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application
CN112081237A (en) * 2020-09-21 2020-12-15 重庆建工第一市政工程有限责任公司 Construction method of composite support and hanger of comprehensive overhead pipe gallery based on BIM technology
CN113293856A (en) * 2021-06-07 2021-08-24 上海恪耐新材料科技有限公司 Construction method of fabricated building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109544051A (en) * 2019-01-25 2019-03-29 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application
CN112081237A (en) * 2020-09-21 2020-12-15 重庆建工第一市政工程有限责任公司 Construction method of composite support and hanger of comprehensive overhead pipe gallery based on BIM technology
CN113293856A (en) * 2021-06-07 2021-08-24 上海恪耐新材料科技有限公司 Construction method of fabricated building

Similar Documents

Publication Publication Date Title
CN109544051A (en) A kind of construction management application platform based on BIM technology application
WO2021128675A1 (en) Bim technology-based method for constructing underground continuous wall
CN110909972B (en) BIM-based steel structure full life cycle management system and method
CN209486723U (en) A kind of construction management application platform based on BIM technology application
CN107958101A (en) A kind of assembled architecture Information Management System and method based on BIM
CN109801038A (en) A kind of versatility engineering construction method based on BIM technology application
CN106202723A (en) A kind of BIM subway work method
CN111199066B (en) Construction site virtual construction restoration method based on BIM+GIS
CN108875273B (en) BIM-based foundation pit engineering forward design and operation and maintenance management system
CN106997511A (en) Railway beam course management system and railway beam a management method based on BIM technology
Yu et al. Smarter construction site management using the latest information technology.
CN109191577B (en) Distributed BIM cooperative platform
CN108446889A (en) A kind of exchange method of construction site and construction speed platform
CN110008591A (en) A kind of continuous rigid frame bridge construction management control method based on BIM
CN112884290A (en) BIM-based field construction management method
CN113722797A (en) Lightweight BIM prefabricated part full life cycle comprehensive information management system
CN115456814A (en) Tunnel management platform taking construction organization as core
CN111125820A (en) BIM + GIS-based construction site space virtual construction method
CN116561871A (en) Deep construction method for mounting embedded part of bridge bearing platform
CN112464494A (en) Construction system is built to wisdom
CN210072621U (en) BIM management-based deepened transformation system for vehicle section with ultra-large cover body
CN112465390A (en) BIM-based subway station construction progress management method
Laurini et al. Technology 4.0 for buildings management: from building site to the interactive building book
Yamazaki et al. 3D/BIM applications to large-scale complex building projects in Japan
KR101476909B1 (en) Real-time Process Monitoring System using Block Image

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant