CN109469487A - A kind of quick-fried construction method of complex environment underground engineering Novel drill - Google Patents
A kind of quick-fried construction method of complex environment underground engineering Novel drill Download PDFInfo
- Publication number
- CN109469487A CN109469487A CN201910019868.9A CN201910019868A CN109469487A CN 109469487 A CN109469487 A CN 109469487A CN 201910019868 A CN201910019868 A CN 201910019868A CN 109469487 A CN109469487 A CN 109469487A
- Authority
- CN
- China
- Prior art keywords
- rock mass
- excavated
- quick
- underground engineering
- complex environment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 239000011435 rock Substances 0.000 claims abstract description 52
- 238000005422 blasting Methods 0.000 claims abstract description 13
- 238000005520 cutting process Methods 0.000 claims abstract description 13
- 238000009412 basement excavation Methods 0.000 claims abstract description 12
- 238000000034 method Methods 0.000 claims abstract description 10
- 238000005553 drilling Methods 0.000 claims abstract description 3
- 238000009826 distribution Methods 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 239000004575 stone Substances 0.000 claims 1
- 239000002360 explosive Substances 0.000 abstract description 2
- 238000004880 explosion Methods 0.000 description 6
- 230000009172 bursting Effects 0.000 description 5
- 238000004891 communication Methods 0.000 description 3
- 230000001815 facial effect Effects 0.000 description 3
- 230000035939 shock Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 125000000623 heterocyclic group Chemical group 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
The invention discloses a kind of quick-fried construction methods of complex environment underground engineering Novel drill, it is included in working face to excavate in the horizontal direction, expand working space, wait excavate around rock mass, multiple horixmtal long holes are bored along perpendicular to excavation face direction using L-type drilling technique, short-bore is bored between adjacent long hole, run through it in bottom hole realization, the saw rope for saw of restricting successively is run through into long hole across adjacent, it is cut, free face is formed between rock mass to be excavated and periphery rock, by repeatedly cutting, perforation free face obtains the contour line of pre- excavated section, it treats again and excavates the sinking and blasting that rock mass carries out unglazed blast hole and keyhole.Construction method progress provided by the invention is fast, with small vibration, surrounding constructure influence is reduced, and be conducive to reduce explosive specific charge, out break phenomenon is avoided, secondary construction rate is reduced, it is high-efficient, securely and reliably, economical rationality is provided for ragstone blast working under complicated geological environment and is more preferably selected, and has great practical value and dissemination.
Description
Technical field
The present invention relates to a kind of construction of explosion method, specially a kind of quick-fried construction party of complex environment underground engineering Novel drill
Method belongs to Rock Blasting Technology field.
Background technique
During tunnel excavation, the underground engineering constructions such as construction of subway, if encountering ragstone, the country is generally adopted
It is abolished with the mode of bursting work.
In the prior art, one, limited by complicated geological environment and urban ground building, bursting work blasthole is shallow, quick-fried
Broken efficiency is relatively low, needs to spend more manpower and material resources, secondly, excavation facial contour cannot be pre-formed, therefore will lead to
The out break phenomenon of conventional sinking and blasting increases secondary construction rate, is unfavorable for accelerating construction progress, thirdly, excavating rock mass
When, shock wave vibrates big influence neighboring buildings, influences on surrounding enviroment big in explosion rock mass internal communication.
Summary of the invention
The object of the invention is that it is quick-fried to provide a kind of complex environment underground engineering Novel drill to solve the above-mentioned problems
Construction method.
The present invention is through the following technical solutions to achieve the above objectives: a kind of novel construction of explosion of complex environment underground engineering
Method, including following construction procedure:
Step 1 is excavated in the horizontal direction in working face, expands working space;
Step 2, wait excavate around rock mass, it is multiple horizontal long along being bored perpendicular to excavation face direction using L-type drilling technique
Short-bore is bored between adjacent long hole in hole, runs through it in bottom hole realization;
Step 3, successively by the saw rope for saw of restricting pass through it is adjacent run through long hole, cut, in rock mass to be excavated and week
Free face is formed between the rock of side, by repeatedly cutting, perforation free face obtains the contour line of pre- excavated section;
Step 4 is treated and excavates the sinking and blasting that rock mass carries out unglazed blast hole and keyhole.
Preferably, it in order to which the saw rope for saw of restricting successively is run through long hole across adjacent, and then is convenient for cutting,
In the step 2, multiple long holes realize that the bottom between adjacent long hole is passed through by short-bore along rock mass circumferential distribution to be excavated
It wears.
Preferably, in order to reduce the clipping to rock mass, be conducive to bore quick-fried progress, in the step 3, free face is perpendicular to opening
Digging face, and it is consistent with excavated section profile after perforation.
When preferably, in order to preferably resolve underground engineering hard rock mass drill bursting construction under complex environment, vibration is big
The problem for influencing neighboring buildings, in the step 4, the sinking and blasting of unglazed blast hole and keyhole only includes breaking hole.
The beneficial effects of the present invention are: the quick-fried construction method design of the complex environment underground engineering Novel drill is rationally, step 2
In, multiple long holes realize that the bottom between adjacent long hole is run through by short-bore along rock mass circumferential distribution to be excavated, and make it in hole
Bottom is mutually communicated, and the saw rope for saw of restricting successively is run through long hole across adjacent, and then be convenient for cutting, in step 3, is faced sky
Face is consistent with excavated section profile perpendicular to excavation face, and after penetrating through, and is formed between rock mass to be excavated and periphery rock
Free face reduces the clipping to rock mass, is conducive to bore quick-fried progress, and by repeatedly cutting, perforation free face obtains pre- excavated section
Contour line, avoid the out break phenomenon of conventional sinking and blasting, reduce secondary construction rate, in step 4, unglazed blast hole and keyhole
Sinking and blasting, only include breaking hole, excavate rock mass, make shock wave in explosion rock mass internal communication, preferably resolve multiple
Under heterocycle border when underground engineering hard rock mass drill bursting construction, the big problem for influencing neighboring buildings is vibrated.
Detailed description of the invention
Fig. 1 is schematic diagram of the three-dimensional structure;
Fig. 2 is the steel for shot schematic diagram of the present invention unglazed blast hole and keyhole sinking and blasting cross section.
In figure: 101, rock is whole, 102, rock mass to be excavated, 103,104,105,106,107,108,109, horizontal length
Hole, 201,202,203,204,205,206,207, short-bore, 2-1, breaking hole.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~2, a kind of quick-fried construction method of complex environment underground engineering Novel drill, including following construction procedure:
Step 1 expands work along working face horizontal direction excavation according to mechanical scale, human resources and construction design drawing
Make space;
Step 2, around rock mass 102 to be excavated, according to wishing to get excavation face shape, to cut for arc, along perpendicular to excavation
Horixmtal long hole 103,104,105,106,107,108,109 is beaten in face direction respectively, and bore short-bore 201,202,203,204,
205,206,207, it is mutually communicated adjacent long hole;
Step 3 is each passed through long hole 103, short-bore 201 and long hole 104 using the saw rope of rope saw, and is carried out using rope saw
Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 4 is each passed through long hole 104, short-bore 202 and long hole 105 using the saw rope of rope saw, and is carried out using rope saw
Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 5 is each passed through long hole 105, short-bore 203 and long hole 106 using the saw rope of rope saw, and is carried out using rope saw
Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 6 is each passed through long hole 106, short-bore 204 and long hole 107 using the saw rope of rope saw, and is carried out using rope saw
Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 7 is each passed through long hole 107, short-bore 205 and long hole 108 using the saw rope of rope saw, and is carried out using rope saw
Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 8 is each passed through long hole 108, short-bore 206 and long hole 109 using the saw rope of rope saw, and is carried out using rope saw
Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 9 is each passed through long hole 109, short-bore 207 and long hole 103 using the saw rope of rope saw, and is carried out using rope saw
Cutting excavates band between rock mass 102 and rock whole 101 and forms a free face;
Step 10, short-bore 201,202,203,204,205,206,207, perpendicular to long hole 103,104,105,106,107,
108,109 arrangement.
Step 11 is treated and excavates the sinking and blasting that rock mass 102 carries out unglazed blast hole and keyhole, wishes to get and has excavated facial contour
It is obtained by rope saw, it is only necessary to arrange breaking hole 2-1, eliminate arrangement keyhole and light blast hole carries out the process of explosion, be conducive to
Construction speed since there are free faces to make shock wave in 102 internal communication of rock mass to be excavated, therefore can reduce Blasting Excavation to surrounding
The vibration of building influences, while the increase of free face is conducive to explosion avalanche rock, reduces explosive specific charge.
Working principle: when using the complex environment underground engineering Novel drill quick-fried construction method, make rock mass 102 to be excavated with
Free face is formed between rock whole 101, underground engineering hard rock mass under complex environment is preferably resolved and bores quick-fried vibration pair
The biggish problem of Building Settlement around Foundation, and it has been pre-formed excavation facial contour, avoid the out break of conventional sinking and blasting existing
As reducing secondary construction rate, progress is advantageous to accelerating;The construction method is safe and reliable, economical rationality, is underground under complex environment
Engineering hard rock mass drill bursting construction, which provides, more preferably to be selected, and has great practical value and dissemination.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (4)
1. a kind of quick-fried construction method of complex environment underground engineering Novel drill, it is characterised in that: including following construction procedure:
Step 1 is excavated in the horizontal direction in working face, expands working space;
Step 2, wait excavate around rock mass, multiple horixmtal long holes, phase are bored along perpendicular to excavation face direction using L-type drilling technique
Short-bore is bored between adjacent long hole, runs through it in bottom hole realization;
Step 3, successively by the saw rope for saw of restricting pass through it is adjacent run through long hole, cut, in rock mass to be excavated and periphery rock
Free face is formed between stone, by repeatedly cutting, perforation free face obtains the contour line of pre- excavated section;
Step 4 is treated and excavates the sinking and blasting that rock mass carries out unglazed blast hole and keyhole.
2. a kind of quick-fried construction method of complex environment underground engineering Novel drill according to claim 1, it is characterised in that: described
In step 2, multiple long holes realize that the bottom between adjacent long hole is run through by short-bore along rock mass circumferential distribution to be excavated.
3. a kind of quick-fried construction method of complex environment underground engineering Novel drill according to claim 1, it is characterised in that: described
In step 3, free face is consistent with excavated section profile perpendicular to excavation face, and after penetrating through, on rock mass to be excavated and periphery
Free face is formed between rock.
4. a kind of quick-fried construction method of complex environment underground engineering Novel drill according to claim 1, it is characterised in that: described
In step 4, the sinking and blasting of unglazed blast hole and keyhole only includes avalanche blasthole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910019868.9A CN109469487B (en) | 2019-01-09 | 2019-01-09 | Novel drilling and blasting construction method for complex environment underground engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910019868.9A CN109469487B (en) | 2019-01-09 | 2019-01-09 | Novel drilling and blasting construction method for complex environment underground engineering |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109469487A true CN109469487A (en) | 2019-03-15 |
CN109469487B CN109469487B (en) | 2021-01-12 |
Family
ID=65678323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910019868.9A Active CN109469487B (en) | 2019-01-09 | 2019-01-09 | Novel drilling and blasting construction method for complex environment underground engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109469487B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114909962A (en) * | 2022-05-23 | 2022-08-16 | 中铁二十二局集团第三工程有限公司 | Construction method for damping and controlling explosion during tunnel approach construction |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103615249A (en) * | 2013-12-13 | 2014-03-05 | 中国新型建材设计研究院 | Underground cutting mining method of process ore |
CN103670421A (en) * | 2012-08-30 | 2014-03-26 | 赵兵 | Central inclined hole method parallel tunnel excavation method |
CN106894816A (en) * | 2017-02-23 | 2017-06-27 | 中国矿业大学 | Far field key stratum based on set square structural model cuts top release shield lane method |
CN107023033A (en) * | 2017-03-20 | 2017-08-08 | 深圳市工勘岩土集团有限公司 | Urban Underground piping lane hard rock mass rope saw cut excavation method |
CN206647102U (en) * | 2017-03-13 | 2017-11-17 | 深圳市工勘岩土集团有限公司 | Foundation ditch rock rope saw cut airbag pushing tow abolishes equipment |
CN108678420A (en) * | 2018-05-29 | 2018-10-19 | 深圳市工勘岩土集团有限公司 | A kind of basement bottom board Demolition Construction method |
-
2019
- 2019-01-09 CN CN201910019868.9A patent/CN109469487B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103670421A (en) * | 2012-08-30 | 2014-03-26 | 赵兵 | Central inclined hole method parallel tunnel excavation method |
CN103615249A (en) * | 2013-12-13 | 2014-03-05 | 中国新型建材设计研究院 | Underground cutting mining method of process ore |
CN106894816A (en) * | 2017-02-23 | 2017-06-27 | 中国矿业大学 | Far field key stratum based on set square structural model cuts top release shield lane method |
CN206647102U (en) * | 2017-03-13 | 2017-11-17 | 深圳市工勘岩土集团有限公司 | Foundation ditch rock rope saw cut airbag pushing tow abolishes equipment |
CN107023033A (en) * | 2017-03-20 | 2017-08-08 | 深圳市工勘岩土集团有限公司 | Urban Underground piping lane hard rock mass rope saw cut excavation method |
CN108678420A (en) * | 2018-05-29 | 2018-10-19 | 深圳市工勘岩土集团有限公司 | A kind of basement bottom board Demolition Construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114909962A (en) * | 2022-05-23 | 2022-08-16 | 中铁二十二局集团第三工程有限公司 | Construction method for damping and controlling explosion during tunnel approach construction |
CN114909962B (en) * | 2022-05-23 | 2023-09-08 | 中铁二十二局集团第三工程有限公司 | Construction method for damping and explosion control during tunnel approaching construction |
Also Published As
Publication number | Publication date |
---|---|
CN109469487B (en) | 2021-01-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103234403B (en) | Static blasting construction method for highway tunnel | |
CN107764144B (en) | A kind of tunnel Millisecond Controlled Blasting method | |
CN104314574B (en) | Hard rock tunnel non-blasting digging blocking method and construction method | |
CN107631669B (en) | A kind of Cut Blasting optimum design method under large ground pressure | |
CN104406470B (en) | Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method | |
CN106225618B (en) | A kind of method that semo-infinite rock mass borehole blasting expansion is split | |
KR20080085523A (en) | Blast construction working method for a tunnel | |
CN108151596A (en) | Diversion Tunnel Blasting Excavation out break controls construction method | |
CN204788093U (en) | Shallow blasting system of burying undercut tunnel vibration in control city | |
CN109281672A (en) | A kind of hard rock tunnel excavation method | |
CN108060925A (en) | The steel for shot structure of small section tunnel Cut Blasting | |
CN106194193A (en) | The auxiliary excavation method of a kind of group hole, big cross section vertical shaft non-explosion large aperture | |
CN104482817B (en) | A kind of deep-lying tunnel stress relieving presplit blasting method | |
CN111102892B (en) | Wedge-shaped cut blast hole arrangement method suitable for blasting excavation of deep-buried tunnel | |
CN108204775B (en) | A kind of deep-lying tunnel instant type rock burst active preventing control method | |
CN105065004B (en) | A kind of Shallow Large Span rock tunnel Portal Section weak blast excavation construction method | |
CN109469487A (en) | A kind of quick-fried construction method of complex environment underground engineering Novel drill | |
CN109405688A (en) | Close on the blasting construction method in existing operation tunnel | |
CN107023033A (en) | Urban Underground piping lane hard rock mass rope saw cut excavation method | |
CN108050902A (en) | A kind of tunnel blasting excavation method | |
CN209961089U (en) | Well stroke ization shale geology is bored to explode and is buried medicine structure | |
KR100438028B1 (en) | A tunnel blasting method favorable to the environment,which utilizes pre-splitting and an upper center cut | |
CN206522138U (en) | The steel for shot structure of small section tunnel Cut Blasting | |
CN104792237A (en) | Tunnel blasting method | |
CN209672960U (en) | Close on the blasting arrangement in existing operation tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |