CN109469487A - A kind of quick-fried construction method of complex environment underground engineering Novel drill - Google Patents

A kind of quick-fried construction method of complex environment underground engineering Novel drill Download PDF

Info

Publication number
CN109469487A
CN109469487A CN201910019868.9A CN201910019868A CN109469487A CN 109469487 A CN109469487 A CN 109469487A CN 201910019868 A CN201910019868 A CN 201910019868A CN 109469487 A CN109469487 A CN 109469487A
Authority
CN
China
Prior art keywords
rock mass
excavated
quick
underground engineering
complex environment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910019868.9A
Other languages
Chinese (zh)
Other versions
CN109469487B (en
Inventor
汪海波
吕闹
王松青
张全峰
宗琦
杨明
徐颖
吴孝勇
王梦想
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Third Construction (group) Co Ltd Urban Transportation Construction Branch
Anhui University of Science and Technology
China Coal No 3 Construction Group Co Ltd
Original Assignee
China Coal Third Construction (group) Co Ltd Urban Transportation Construction Branch
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Third Construction (group) Co Ltd Urban Transportation Construction Branch, Anhui University of Science and Technology filed Critical China Coal Third Construction (group) Co Ltd Urban Transportation Construction Branch
Priority to CN201910019868.9A priority Critical patent/CN109469487B/en
Publication of CN109469487A publication Critical patent/CN109469487A/en
Application granted granted Critical
Publication of CN109469487B publication Critical patent/CN109469487B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a kind of quick-fried construction methods of complex environment underground engineering Novel drill, it is included in working face to excavate in the horizontal direction, expand working space, wait excavate around rock mass, multiple horixmtal long holes are bored along perpendicular to excavation face direction using L-type drilling technique, short-bore is bored between adjacent long hole, run through it in bottom hole realization, the saw rope for saw of restricting successively is run through into long hole across adjacent, it is cut, free face is formed between rock mass to be excavated and periphery rock, by repeatedly cutting, perforation free face obtains the contour line of pre- excavated section, it treats again and excavates the sinking and blasting that rock mass carries out unglazed blast hole and keyhole.Construction method progress provided by the invention is fast, with small vibration, surrounding constructure influence is reduced, and be conducive to reduce explosive specific charge, out break phenomenon is avoided, secondary construction rate is reduced, it is high-efficient, securely and reliably, economical rationality is provided for ragstone blast working under complicated geological environment and is more preferably selected, and has great practical value and dissemination.

Description

A kind of quick-fried construction method of complex environment underground engineering Novel drill
Technical field
The present invention relates to a kind of construction of explosion method, specially a kind of quick-fried construction party of complex environment underground engineering Novel drill Method belongs to Rock Blasting Technology field.
Background technique
During tunnel excavation, the underground engineering constructions such as construction of subway, if encountering ragstone, the country is generally adopted It is abolished with the mode of bursting work.
In the prior art, one, limited by complicated geological environment and urban ground building, bursting work blasthole is shallow, quick-fried Broken efficiency is relatively low, needs to spend more manpower and material resources, secondly, excavation facial contour cannot be pre-formed, therefore will lead to The out break phenomenon of conventional sinking and blasting increases secondary construction rate, is unfavorable for accelerating construction progress, thirdly, excavating rock mass When, shock wave vibrates big influence neighboring buildings, influences on surrounding enviroment big in explosion rock mass internal communication.
Summary of the invention
The object of the invention is that it is quick-fried to provide a kind of complex environment underground engineering Novel drill to solve the above-mentioned problems Construction method.
The present invention is through the following technical solutions to achieve the above objectives: a kind of novel construction of explosion of complex environment underground engineering Method, including following construction procedure:
Step 1 is excavated in the horizontal direction in working face, expands working space;
Step 2, wait excavate around rock mass, it is multiple horizontal long along being bored perpendicular to excavation face direction using L-type drilling technique Short-bore is bored between adjacent long hole in hole, runs through it in bottom hole realization;
Step 3, successively by the saw rope for saw of restricting pass through it is adjacent run through long hole, cut, in rock mass to be excavated and week Free face is formed between the rock of side, by repeatedly cutting, perforation free face obtains the contour line of pre- excavated section;
Step 4 is treated and excavates the sinking and blasting that rock mass carries out unglazed blast hole and keyhole.
Preferably, it in order to which the saw rope for saw of restricting successively is run through long hole across adjacent, and then is convenient for cutting, In the step 2, multiple long holes realize that the bottom between adjacent long hole is passed through by short-bore along rock mass circumferential distribution to be excavated It wears.
Preferably, in order to reduce the clipping to rock mass, be conducive to bore quick-fried progress, in the step 3, free face is perpendicular to opening Digging face, and it is consistent with excavated section profile after perforation.
When preferably, in order to preferably resolve underground engineering hard rock mass drill bursting construction under complex environment, vibration is big The problem for influencing neighboring buildings, in the step 4, the sinking and blasting of unglazed blast hole and keyhole only includes breaking hole.
The beneficial effects of the present invention are: the quick-fried construction method design of the complex environment underground engineering Novel drill is rationally, step 2 In, multiple long holes realize that the bottom between adjacent long hole is run through by short-bore along rock mass circumferential distribution to be excavated, and make it in hole Bottom is mutually communicated, and the saw rope for saw of restricting successively is run through long hole across adjacent, and then be convenient for cutting, in step 3, is faced sky Face is consistent with excavated section profile perpendicular to excavation face, and after penetrating through, and is formed between rock mass to be excavated and periphery rock Free face reduces the clipping to rock mass, is conducive to bore quick-fried progress, and by repeatedly cutting, perforation free face obtains pre- excavated section Contour line, avoid the out break phenomenon of conventional sinking and blasting, reduce secondary construction rate, in step 4, unglazed blast hole and keyhole Sinking and blasting, only include breaking hole, excavate rock mass, make shock wave in explosion rock mass internal communication, preferably resolve multiple Under heterocycle border when underground engineering hard rock mass drill bursting construction, the big problem for influencing neighboring buildings is vibrated.
Detailed description of the invention
Fig. 1 is schematic diagram of the three-dimensional structure;
Fig. 2 is the steel for shot schematic diagram of the present invention unglazed blast hole and keyhole sinking and blasting cross section.
In figure: 101, rock is whole, 102, rock mass to be excavated, 103,104,105,106,107,108,109, horizontal length Hole, 201,202,203,204,205,206,207, short-bore, 2-1, breaking hole.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~2, a kind of quick-fried construction method of complex environment underground engineering Novel drill, including following construction procedure:
Step 1 expands work along working face horizontal direction excavation according to mechanical scale, human resources and construction design drawing Make space;
Step 2, around rock mass 102 to be excavated, according to wishing to get excavation face shape, to cut for arc, along perpendicular to excavation Horixmtal long hole 103,104,105,106,107,108,109 is beaten in face direction respectively, and bore short-bore 201,202,203,204, 205,206,207, it is mutually communicated adjacent long hole;
Step 3 is each passed through long hole 103, short-bore 201 and long hole 104 using the saw rope of rope saw, and is carried out using rope saw Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 4 is each passed through long hole 104, short-bore 202 and long hole 105 using the saw rope of rope saw, and is carried out using rope saw Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 5 is each passed through long hole 105, short-bore 203 and long hole 106 using the saw rope of rope saw, and is carried out using rope saw Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 6 is each passed through long hole 106, short-bore 204 and long hole 107 using the saw rope of rope saw, and is carried out using rope saw Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 7 is each passed through long hole 107, short-bore 205 and long hole 108 using the saw rope of rope saw, and is carried out using rope saw Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 8 is each passed through long hole 108, short-bore 206 and long hole 109 using the saw rope of rope saw, and is carried out using rope saw Cutting makes to form a free face between rock mass 102 and rock to be excavated whole 101;
Step 9 is each passed through long hole 109, short-bore 207 and long hole 103 using the saw rope of rope saw, and is carried out using rope saw Cutting excavates band between rock mass 102 and rock whole 101 and forms a free face;
Step 10, short-bore 201,202,203,204,205,206,207, perpendicular to long hole 103,104,105,106,107, 108,109 arrangement.
Step 11 is treated and excavates the sinking and blasting that rock mass 102 carries out unglazed blast hole and keyhole, wishes to get and has excavated facial contour It is obtained by rope saw, it is only necessary to arrange breaking hole 2-1, eliminate arrangement keyhole and light blast hole carries out the process of explosion, be conducive to Construction speed since there are free faces to make shock wave in 102 internal communication of rock mass to be excavated, therefore can reduce Blasting Excavation to surrounding The vibration of building influences, while the increase of free face is conducive to explosion avalanche rock, reduces explosive specific charge.
Working principle: when using the complex environment underground engineering Novel drill quick-fried construction method, make rock mass 102 to be excavated with Free face is formed between rock whole 101, underground engineering hard rock mass under complex environment is preferably resolved and bores quick-fried vibration pair The biggish problem of Building Settlement around Foundation, and it has been pre-formed excavation facial contour, avoid the out break of conventional sinking and blasting existing As reducing secondary construction rate, progress is advantageous to accelerating;The construction method is safe and reliable, economical rationality, is underground under complex environment Engineering hard rock mass drill bursting construction, which provides, more preferably to be selected, and has great practical value and dissemination.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (4)

1. a kind of quick-fried construction method of complex environment underground engineering Novel drill, it is characterised in that: including following construction procedure:
Step 1 is excavated in the horizontal direction in working face, expands working space;
Step 2, wait excavate around rock mass, multiple horixmtal long holes, phase are bored along perpendicular to excavation face direction using L-type drilling technique Short-bore is bored between adjacent long hole, runs through it in bottom hole realization;
Step 3, successively by the saw rope for saw of restricting pass through it is adjacent run through long hole, cut, in rock mass to be excavated and periphery rock Free face is formed between stone, by repeatedly cutting, perforation free face obtains the contour line of pre- excavated section;
Step 4 is treated and excavates the sinking and blasting that rock mass carries out unglazed blast hole and keyhole.
2. a kind of quick-fried construction method of complex environment underground engineering Novel drill according to claim 1, it is characterised in that: described In step 2, multiple long holes realize that the bottom between adjacent long hole is run through by short-bore along rock mass circumferential distribution to be excavated.
3. a kind of quick-fried construction method of complex environment underground engineering Novel drill according to claim 1, it is characterised in that: described In step 3, free face is consistent with excavated section profile perpendicular to excavation face, and after penetrating through, on rock mass to be excavated and periphery Free face is formed between rock.
4. a kind of quick-fried construction method of complex environment underground engineering Novel drill according to claim 1, it is characterised in that: described In step 4, the sinking and blasting of unglazed blast hole and keyhole only includes avalanche blasthole.
CN201910019868.9A 2019-01-09 2019-01-09 Novel drilling and blasting construction method for complex environment underground engineering Active CN109469487B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910019868.9A CN109469487B (en) 2019-01-09 2019-01-09 Novel drilling and blasting construction method for complex environment underground engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910019868.9A CN109469487B (en) 2019-01-09 2019-01-09 Novel drilling and blasting construction method for complex environment underground engineering

Publications (2)

Publication Number Publication Date
CN109469487A true CN109469487A (en) 2019-03-15
CN109469487B CN109469487B (en) 2021-01-12

Family

ID=65678323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910019868.9A Active CN109469487B (en) 2019-01-09 2019-01-09 Novel drilling and blasting construction method for complex environment underground engineering

Country Status (1)

Country Link
CN (1) CN109469487B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114909962A (en) * 2022-05-23 2022-08-16 中铁二十二局集团第三工程有限公司 Construction method for damping and controlling explosion during tunnel approach construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615249A (en) * 2013-12-13 2014-03-05 中国新型建材设计研究院 Underground cutting mining method of process ore
CN103670421A (en) * 2012-08-30 2014-03-26 赵兵 Central inclined hole method parallel tunnel excavation method
CN106894816A (en) * 2017-02-23 2017-06-27 中国矿业大学 Far field key stratum based on set square structural model cuts top release shield lane method
CN107023033A (en) * 2017-03-20 2017-08-08 深圳市工勘岩土集团有限公司 Urban Underground piping lane hard rock mass rope saw cut excavation method
CN206647102U (en) * 2017-03-13 2017-11-17 深圳市工勘岩土集团有限公司 Foundation ditch rock rope saw cut airbag pushing tow abolishes equipment
CN108678420A (en) * 2018-05-29 2018-10-19 深圳市工勘岩土集团有限公司 A kind of basement bottom board Demolition Construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670421A (en) * 2012-08-30 2014-03-26 赵兵 Central inclined hole method parallel tunnel excavation method
CN103615249A (en) * 2013-12-13 2014-03-05 中国新型建材设计研究院 Underground cutting mining method of process ore
CN106894816A (en) * 2017-02-23 2017-06-27 中国矿业大学 Far field key stratum based on set square structural model cuts top release shield lane method
CN206647102U (en) * 2017-03-13 2017-11-17 深圳市工勘岩土集团有限公司 Foundation ditch rock rope saw cut airbag pushing tow abolishes equipment
CN107023033A (en) * 2017-03-20 2017-08-08 深圳市工勘岩土集团有限公司 Urban Underground piping lane hard rock mass rope saw cut excavation method
CN108678420A (en) * 2018-05-29 2018-10-19 深圳市工勘岩土集团有限公司 A kind of basement bottom board Demolition Construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114909962A (en) * 2022-05-23 2022-08-16 中铁二十二局集团第三工程有限公司 Construction method for damping and controlling explosion during tunnel approach construction
CN114909962B (en) * 2022-05-23 2023-09-08 中铁二十二局集团第三工程有限公司 Construction method for damping and explosion control during tunnel approaching construction

Also Published As

Publication number Publication date
CN109469487B (en) 2021-01-12

Similar Documents

Publication Publication Date Title
CN103234403B (en) Static blasting construction method for highway tunnel
CN107764144B (en) A kind of tunnel Millisecond Controlled Blasting method
CN104314574B (en) Hard rock tunnel non-blasting digging blocking method and construction method
CN107631669B (en) A kind of Cut Blasting optimum design method under large ground pressure
CN104406470B (en) Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method
CN106225618B (en) A kind of method that semo-infinite rock mass borehole blasting expansion is split
KR20080085523A (en) Blast construction working method for a tunnel
CN108151596A (en) Diversion Tunnel Blasting Excavation out break controls construction method
CN204788093U (en) Shallow blasting system of burying undercut tunnel vibration in control city
CN109281672A (en) A kind of hard rock tunnel excavation method
CN108060925A (en) The steel for shot structure of small section tunnel Cut Blasting
CN106194193A (en) The auxiliary excavation method of a kind of group hole, big cross section vertical shaft non-explosion large aperture
CN104482817B (en) A kind of deep-lying tunnel stress relieving presplit blasting method
CN111102892B (en) Wedge-shaped cut blast hole arrangement method suitable for blasting excavation of deep-buried tunnel
CN108204775B (en) A kind of deep-lying tunnel instant type rock burst active preventing control method
CN105065004B (en) A kind of Shallow Large Span rock tunnel Portal Section weak blast excavation construction method
CN109469487A (en) A kind of quick-fried construction method of complex environment underground engineering Novel drill
CN109405688A (en) Close on the blasting construction method in existing operation tunnel
CN107023033A (en) Urban Underground piping lane hard rock mass rope saw cut excavation method
CN108050902A (en) A kind of tunnel blasting excavation method
CN209961089U (en) Well stroke ization shale geology is bored to explode and is buried medicine structure
KR100438028B1 (en) A tunnel blasting method favorable to the environment,which utilizes pre-splitting and an upper center cut
CN206522138U (en) The steel for shot structure of small section tunnel Cut Blasting
CN104792237A (en) Tunnel blasting method
CN209672960U (en) Close on the blasting arrangement in existing operation tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant