CN107023033A - Urban Underground piping lane hard rock mass rope saw cut excavation method - Google Patents

Urban Underground piping lane hard rock mass rope saw cut excavation method Download PDF

Info

Publication number
CN107023033A
CN107023033A CN201710167040.9A CN201710167040A CN107023033A CN 107023033 A CN107023033 A CN 107023033A CN 201710167040 A CN201710167040 A CN 201710167040A CN 107023033 A CN107023033 A CN 107023033A
Authority
CN
China
Prior art keywords
piping lane
rope saw
rock mass
hard rock
active
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710167040.9A
Other languages
Chinese (zh)
Inventor
尚增弟
谢艺东
雷斌
尹佳
雷帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Gongkan Geotechnical Group Co Ltd
Original Assignee
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical Shenzhen Gongkan Geotechnical Group Co Ltd
Priority to CN201710167040.9A priority Critical patent/CN107023033A/en
Publication of CN107023033A publication Critical patent/CN107023033A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to the technical field of Urban Underground piping lane, Urban Underground piping lane hard rock mass rope saw cut excavation method, including following construction procedure are disclosed:1), active well is excavated in advance in piping lane basis;2), piping lane basis is divided between multiple active sections, the adjacent active section and faces dummy section with longitudinal direction, the depth for facing dummy section is deeper than the depth on piping lane basis;3), in active well, two sides of active section and bottom surface are restricted saw cut respectively using rope saw cut technique so that the hard rock mass in active section departs from rock parent;4), repeat according to step 3), sequentially the hard rock mass in multiple active sections and rock parent are departed from.The Urban Underground piping lane hard rock mass rope saw cut excavation method that the present invention is provided, construction speed is fast, shakes small, it is safely controllable on surrounding building without influence, moderate cost, good working face is provided for the construction of later stage underground pipe gallery, with great practical value and dissemination.

Description

Urban Underground piping lane hard rock mass rope saw cut excavation method
Technical field
The present invention relates to the technical field of Urban Underground piping lane, more particularly to Urban Underground piping lane hard rock mass rope saw cut Excavation method.
Background technology
At present, the need for adapt to urban construction and development, each big city carries out underground pipe gallery exploitation on a large scale, and pipe is wide In long and narrow bar shaped distribution in basic typically 4~8m of buried depth, wide 4~6m, plane.
In underground pipe gallery work progress, the excavation of hard rock stratum is frequently encountered.For the excavation method of hard rock stratum, generally Excavated using explosive blasting or static blasting mode, because underground pipe gallery construction is in densely populated city, forbid making Blow construction up with dynamite, although and use static blasting produce vibration it is small, the quiet blast hole quantity of its Drilling is more, noise greatly, dust Environment is polluted, while quiet quick-fried medicament reaction time length and can not be constructed in the rainy day, causes that comprehensive cost is high, it is long in time limit to excavate.
The content of the invention
It is an object of the invention to provide Urban Underground piping lane hard rock mass rope saw cut excavation method, it is intended to solves existing In the Urban Underground piping lane work progress of technology, hard rock mass is excavated using explosive blasting or static blasting mode, there is noise Greatly, difficulty of construction is big, high cost and the problem of the long construction period.
The present invention is achieved in that Urban Underground piping lane hard rock mass rope saw cut excavation method, including following construction Step:
1) active well, is excavated in advance in piping lane basis, the both sides of the active well extend to the two of the piping lane basis Outside side section, the near depth of the work is deeper than the depth on the piping lane basis;
2), along the length direction on piping lane basis, the piping lane basis is divided into multiple work being sequentially adjacently positioned Have longitudinal direction between section, and the adjacent active section faces dummy section, and the depth for facing dummy section is deeper than the piping lane base The depth of plinth;
3), in the active well, by the design size of the active section, using rope saw cut technique by the two of active section Individual side and bottom surface are restricted saw cut respectively so that the hard rock mass in active section departs from rock parent;
4), repeat according to step 3), sequentially the hard rock mass in multiple active sections and rock parent are departed from.
Further, in the step 3) in, set level rope saw hole, and institute respectively in the both sides of the active section bottom Level rope saw hole is stated to communicate with the dummy section that faces;Rope saw is sawed into hole through the level rope and faces dummy section, and rope is sawed In vertical face arrange, sequentially cut the both sides of the active section so that the both sides of the hard rock mass in the active section respectively with rock Stone parent departs from;Rope saw is sawed into holes through two level ropes and faces dummy section, and the rope saw is in horizontally disposed, cutting The bottom of the active section so that the bottom of the hard rock mass in active section departs from rock parent.
Further, between the depth depth 10cm-30cm on the depth ratio piping lane basis of the active well.
Further, the both sides of the active well are extended between the outer 0.5m-1.5m of two side sections on piping lane basis.
Further, the excavation of the active well plays sequence point by hard rock mass buried depth position.
Further, when the active well, which is in fill stratum, to be excavated, active well is excavated using ratio of slope method.
Further, the flat section length of the active section on the piping lane basis is between 5m-15m.
Further, between the adjacent active section, formed using down-hole hammer drilling tool Drilling and described face dummy section.
Further, between the depth depth 5cm-15cm on the depth ratio piping lane basis for facing dummy section.
Further, between a diameter of 70mm-100mm in the level rope saw hole.
The Urban Underground piping lane hard rock mass rope saw cut excavation method that the present invention is provided, work is excavated in piping lane basis Well, and piping lane basis formed be formed between multiple adjacent active sections, active section it is longitudinal face dummy section, using rope sawing Cut construction technology sequentially to depart from the hard rock mass in multiple active sections and rock parent, construction speed is fast, and vibrations are small, to periphery Building is safely controllable without influence, moderate cost, also provides good working face for the construction of later stage underground pipe gallery, has Great practical value and dissemination.
Brief description of the drawings
Fig. 1 is the schematic diagram that the embodiment of the present invention provides piping lane foundation excavation active well and multiple active sections arrangement;
Fig. 2 is the schematic front view for the active section that the embodiment of the present invention provides rope saw piping lane basis;
Fig. 3 is the perspective diagram for the active section that the embodiment of the present invention provides rope saw piping lane basis.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
The realization of the present invention is described in detail below in conjunction with specific embodiment.
Referring to figs. 1 to shown in Fig. 3, for the preferred embodiment of the invention provided.
The Urban Underground piping lane hard rock mass rope saw cut excavation method that the present embodiment is provided, for Urban Underground pipe of constructing Corridor.
Urban Underground piping lane hard rock mass rope saw cut excavation method, including following construction procedure:
1) active well 101, is excavated in advance in piping lane basis, the both sides of the active well 101 extend to the two of piping lane basis Outside side section, and the depth of active well 101 is deeper than the basic absolute altitude of piping lane;
2), along the length direction on piping lane basis, piping lane basis is divided into multiple active sections 102 being adjacently positioned, and it is adjacent Active section 102 between be formed with it is longitudinal face dummy section 103, the depth for facing dummy section 103 is deeper than the depth on piping lane basis;
3), in active well 101, by the design size of active section 102, using rope saw cut technique paragraph by paragraph by active section 102 two sides and bottom surface carry out rope saw cut respectively, the hard rock mass in active section 102 is departed from rock parent;
4), repeat according to step 3) operation, sequentially the hard rock mass in multiple active sections 102 and rock parent are departed from.
The Urban Underground piping lane hard rock mass rope saw cut excavation method of above-mentioned offer, active well is excavated in piping lane basis 101, and piping lane basis formed be formed between multiple adjacent active sections 102, active section 102 it is longitudinal face dummy section 103, Sequentially the hard rock mass in multiple active sections 102 and rock parent are departed from using rope saw cut construction technology, construction speed is fast, Vibrations are small, and safely controllable on surrounding building without influence, moderate cost, the also construction for later stage underground pipe gallery is provided well Working face, with great practical value and dissemination.
In the present embodiment, in step 4) after, the hard rock mass that will be disengaged from out carries out Mechanical Crushing, and entrucking is transported outward, and The bottom on piping lane basis, is not required to secondary cleaning, so that it may carry out the site operation of underground pipe gallery after cleaning.
In above-mentioned construction procedure 1) in, between the depth depth 10cm-30cm on the depth ratio piping lane basis of active well 101, Preferably 20cm;The both sides of active well 101 are extended between the outer 0.5m-1.5m of two side sections on piping lane basis, preferably 1m.
For the ease of the smooth formation of active well 101, when excavating active well 101 at the scene, the excavation of active well 101 plays sequence Point can first be excavated, rock when excavating active well 101 to reduce by the larger position of hard rock mass buried depth along the basic soil layer section of piping lane The excavated volume of layer.
When active well 101 is in fill stratum and excavates deeper, excavated using ratio of slope method, and interim spray plane can be implemented to work Make well 101 and carry out supporting.
In above-mentioned construction procedure 2) in, efficiency is excavated to improve, the flat section length of the active section 102 on piping lane basis For between 5m-15m, preferably 10m.
Between adjacent active section 102, longitudinal direction is formed using down-hole hammer drilling tool Drilling and faces dummy section 103, and faces dead zone Between the depth depth 5cm-15cm on the depth ratio piping lane basis in domain 103, preferably 10cm.
In above-mentioned construction procedure 3) in, set level rope saw hole 105, and water respectively in the both sides of the bottom of active section 102 Flat rope saw hole 105 is communicated with facing dummy section 103.
Rope saw 104 is run through into level rope saw hole 105 and faces dummy section 103, and rope saw 104 is arranged in the face of indulging, sequentially Cut the both sides of active section 102 so that the both sides of the hard rock mass in active section 102 depart from rock parent respectively;By rope saw 104 saw holes 105 through two level ropes and face dummy section 103, and rope saw 104 is in horizontally disposed, rope saw cut active section 102 Bottom so that the bottom of the hard rock mass of active section 102 departs from rock parent.
In the present embodiment, between a diameter of 70mm-100mm in level rope saw hole 105, preferably 90mm.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (10)

1. Urban Underground piping lane hard rock mass rope saw cut excavation method, it is characterised in that including following construction procedure:
1) active well, is excavated in advance in piping lane basis, the both sides of the active well extend to the basic both sides of the piping lane and broken Outside face, the near depth of the work is deeper than the depth on the piping lane basis;
2), along the length direction on piping lane basis, the piping lane basis is divided into multiple active sections being sequentially adjacently positioned, and There is the dummy section that faces of longitudinal direction, the depth for facing dummy section is deeper than the depth on the piping lane basis between the adjacent active section Degree;
3), in the active well, by the design size of the active section, using rope saw cut technique by two sides of active section Face and bottom surface are restricted saw cut respectively so that the hard rock mass in active section departs from rock parent;
4), repeat according to step 3), sequentially the hard rock mass in multiple active sections and rock parent are departed from.
2. Urban Underground piping lane hard rock mass rope saw cut excavation method as claimed in claim 1, it is characterised in that described Step 3) in, set level rope saw hole respectively in the both sides of the active section bottom, and sky is faced in level rope saw hole with described Region is communicated;Rope saw is sawed into hole through the level rope and faces dummy section, and rope saw is sequentially cut described in vertical face arrangement The both sides of active section so that the both sides of the hard rock mass in the active section depart from rock parent respectively;Rope saw is run through two The individual level rope saws hole and faces dummy section, and the rope saw cuts the bottom of the active section so that work in horizontally disposed The bottom and rock parent for making the hard rock mass in section depart from.
3. Urban Underground piping lane hard rock mass rope saw cut excavation method as claimed in claim 1 or 2, it is characterised in that institute Between the depth depth 10cm-30cm on depth ratio piping lane basis for stating active well.
4. Urban Underground piping lane hard rock mass rope saw cut excavation method as claimed in claim 1 or 2, it is characterised in that institute The both sides for stating active well are extended between the outer 0.5m-1.5m of two side sections on piping lane basis.
5. Urban Underground piping lane hard rock mass rope saw cut excavation method as claimed in claim 1 or 2, it is characterised in that institute The excavation for stating active well plays sequence point by hard rock mass buried depth position.
6. Urban Underground piping lane hard rock mass rope saw cut excavation method as claimed in claim 5, it is characterised in that when described When active well is in fill stratum excavation, active well is excavated using ratio of slope method.
7. Urban Underground piping lane hard rock mass rope saw cut excavation method as claimed in claim 1 or 2, it is characterised in that institute The flat section length of active section on piping lane basis is stated between 5m-15m.
8. Urban Underground piping lane hard rock mass rope saw cut excavation method as claimed in claim 1 or 2, it is characterised in that Between the adjacent active section, formed using down-hole hammer drilling tool Drilling and described face dummy section.
9. Urban Underground piping lane hard rock mass rope saw cut excavation method as claimed in claim 1 or 2, it is characterised in that institute Between the depth depth 5cm-15cm for stating the depth ratio piping lane basis for facing dummy section.
10. Urban Underground piping lane hard rock mass rope saw cut excavation method as claimed in claim 1 or 2, it is characterised in that institute Between a diameter of 70mm-100mm for stating level rope saw hole.
CN201710167040.9A 2017-03-20 2017-03-20 Urban Underground piping lane hard rock mass rope saw cut excavation method Pending CN107023033A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710167040.9A CN107023033A (en) 2017-03-20 2017-03-20 Urban Underground piping lane hard rock mass rope saw cut excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710167040.9A CN107023033A (en) 2017-03-20 2017-03-20 Urban Underground piping lane hard rock mass rope saw cut excavation method

Publications (1)

Publication Number Publication Date
CN107023033A true CN107023033A (en) 2017-08-08

Family

ID=59526261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710167040.9A Pending CN107023033A (en) 2017-03-20 2017-03-20 Urban Underground piping lane hard rock mass rope saw cut excavation method

Country Status (1)

Country Link
CN (1) CN107023033A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678420A (en) * 2018-05-29 2018-10-19 深圳市工勘岩土集团有限公司 A kind of basement bottom board Demolition Construction method
CN109469487A (en) * 2019-01-09 2019-03-15 安徽理工大学 A kind of quick-fried construction method of complex environment underground engineering Novel drill
CN109854263A (en) * 2019-01-19 2019-06-07 北京地矿工程建设有限责任公司 The excavation method of service channel portal in a kind of competent bed
CN111364991A (en) * 2020-03-20 2020-07-03 冯烈龙 Marble single-head tunneling method based on diamond bead saw

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103375169A (en) * 2012-04-22 2013-10-30 赵兵 Method for applying diamond wire saw to large-section underground rock project
CN103615249A (en) * 2013-12-13 2014-03-05 中国新型建材设计研究院 Underground cutting mining method of process ore
CN103670421A (en) * 2012-08-30 2014-03-26 赵兵 Central inclined hole method parallel tunnel excavation method
CN103835722A (en) * 2012-11-22 2014-06-04 桂林特邦新材料有限公司 Mining method for metallic ore distributed like plates
KR20150139232A (en) * 2014-06-03 2015-12-11 한국철도기술연구원 Movable Type Jig Apparatus for Tunnel Excavation using Wire-Saw

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103375169A (en) * 2012-04-22 2013-10-30 赵兵 Method for applying diamond wire saw to large-section underground rock project
CN103670421A (en) * 2012-08-30 2014-03-26 赵兵 Central inclined hole method parallel tunnel excavation method
CN103835722A (en) * 2012-11-22 2014-06-04 桂林特邦新材料有限公司 Mining method for metallic ore distributed like plates
CN103615249A (en) * 2013-12-13 2014-03-05 中国新型建材设计研究院 Underground cutting mining method of process ore
KR20150139232A (en) * 2014-06-03 2015-12-11 한국철도기술연구원 Movable Type Jig Apparatus for Tunnel Excavation using Wire-Saw

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678420A (en) * 2018-05-29 2018-10-19 深圳市工勘岩土集团有限公司 A kind of basement bottom board Demolition Construction method
CN109469487A (en) * 2019-01-09 2019-03-15 安徽理工大学 A kind of quick-fried construction method of complex environment underground engineering Novel drill
CN109854263A (en) * 2019-01-19 2019-06-07 北京地矿工程建设有限责任公司 The excavation method of service channel portal in a kind of competent bed
CN111364991A (en) * 2020-03-20 2020-07-03 冯烈龙 Marble single-head tunneling method based on diamond bead saw
CN111364991B (en) * 2020-03-20 2022-01-28 冯烈龙 Marble single-head tunneling method based on diamond bead saw

Similar Documents

Publication Publication Date Title
CN103234403B (en) Static blasting construction method for highway tunnel
CN107023033A (en) Urban Underground piping lane hard rock mass rope saw cut excavation method
CN106014421B (en) A kind of limited rock tunnel excavation method of concussion of blasting
CN104947690A (en) Grooving construction method for embedding underground continuous wall into rock
CN103774690A (en) Grabbing, drilling and punching combined underground continuous wall grooving construction method
CN106194193A (en) The auxiliary excavation method of a kind of group hole, big cross section vertical shaft non-explosion large aperture
KR101889961B1 (en) Excavation method for rock blasting having no-vibration
CN206644159U (en) Hard rock mass rope saw cut structure
KR101254090B1 (en) Guide apparatus for boring
KR100725450B1 (en) Tunnel blasting method for three-arch tunnel
CN102435114A (en) Explosion vibration control construction method of advance and following expanding excavation method of lower large heading of tunnel
CN207032288U (en) Urban Underground piping lane hard rock mass rope saw cut excavates structure
CN103375169A (en) Method for applying diamond wire saw to large-section underground rock project
CN105155546B (en) A kind of construction method of prebored hole cubic meter of stone mechanical equivalent of light excavation
KR101066296B1 (en) Rock cutting method using boring lid
JP2010522289A (en) Rock blasting method for constructing foundation of transmission tower
CN105888663A (en) Hard rock blasting construction method combining wire sawing with carbon dioxide cracking
CN106089210A (en) A kind of hole, environment-friendly type mine mining method
JP3967473B2 (en) Construction method of underground structure
JP5524642B2 (en) Cutting method
KR100997117B1 (en) Excavator used in excavation method using wire saw
KR101633281B1 (en) construction method of caverna using the rock for charnel house
JP4253801B2 (en) Tunnel construction method
CN104762989A (en) Method for speeding up diaphragm retaining wall construction at hard rock strata
KR101803277B1 (en) Excavation method for decreasing blasting vibration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170808