CN109377040A - A kind of method, apparatus, equipment and storage medium calculating work saturation degree - Google Patents
A kind of method, apparatus, equipment and storage medium calculating work saturation degree Download PDFInfo
- Publication number
- CN109377040A CN109377040A CN201811196910.6A CN201811196910A CN109377040A CN 109377040 A CN109377040 A CN 109377040A CN 201811196910 A CN201811196910 A CN 201811196910A CN 109377040 A CN109377040 A CN 109377040A
- Authority
- CN
- China
- Prior art keywords
- work
- workload
- examination
- employee
- saturation degree
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Development Economics (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of method, apparatus, equipment and computer readable storage mediums for calculating work saturation degree, comprising: acquires in operation system by the work Trace Data of examination employee;According to the preset workload standards of grading of the operation system and preset scoring rule, workload integral calculation is carried out to the work Trace Data, the workload by examination employee is obtained and integrates;Effective operating time by examination employee is obtained according to the workload Integrator backstepping;The ratio for calculating effective operating time and prespecified operating time obtains the work saturation degree by examination employee.Method, apparatus, equipment and computer readable storage medium provided by the present invention, improve the accuracy of work saturation computation result.
Description
Technical field
The present invention relates to Techniques of Enterprise Management fields, more particularly to a kind of method, apparatus for calculating work saturation degree, set
Standby and computer readable storage medium.
Background technique
In power grid enterprises' management reality, the personnel in different posies, some are too busy to do it and some are then very not busy, such case
It is generally intuitively to show that the work saturation degree in different posies has differences as caused by the deviation of fixing post.
Work saturation degree, refers to the effective time and the ratio between defined working time of employee.On normal working day
Using 8 hours dutys, some employees may be occupied with nothing, and some employees are being engaged in always thing relevant to work, after
The work saturation degree of person is naturally just more much higher than the latter.Therefore, work saturation degree plays an important role for enterprise, it
It is basis and the direct basis of staffs training exploitation of fixing post, the even more standard of staffing effectiveness and examination, enterprise
By analyzing saturation degree the problem of capable of effectively learning currently in terms of post establishment, personnel selection, work.
Currently, the assessment for the saturation degree that works, which generallys use, directly records operating time, is then statisticalling analyze,
Spend larger time and efforts statistical data and analytical calculation, and result and less rigorously.
Traditional workload computing is the quadrature according to working time and working efficiency.In the Specific amounts of amount of calculation
When change value, it usually needs first quantify to working time and working efficiency.The working time quantization of general power grid enterprises is direct
Quantized value is taken according to operating time;Working efficiency refers to the ratio between work output and investment, and in the power grid of the opposite specification of work post process
Enterprise is quantified according to the ratio between work item quantity and operating time.Final identical work post workload is directly worked
The influence of item quantity.
In summary as can be seen that the accuracy rate for how improving work saturation computation result is that have to be solved ask at present
Topic.
Summary of the invention
It calculates the method, apparatus of work saturation degree, equipment the object of the present invention is to provide a kind of and computer-readable deposits
Storage media, to solve the problems, such as in the prior art using direct-recording operating time evaluation work saturation degree inaccuracy.
In order to solve the above technical problems, the present invention provides a kind of method for calculating work saturation degree, comprising: in operation system
Middle acquisition is by the work Trace Data of examination employee;According to the preset workload standards of grading of the operation system and preset meter
Divider then, to the work Trace Data carries out workload integral calculation, obtains the workload by examination employee and integrates;Root
Effective operating time by examination employee is obtained according to the workload Integrator backstepping;Calculate effective operating time and pre-
The ratio of operating time as defined in elder generation obtains the work saturation degree by examination employee.
Preferably, described acquired in operation system by the work Trace Data of examination employee includes: by ETL class tool
It acquires in operation system by the work Trace Data of examination employee.
Preferably, the predetermined registration operation by workload standards of grading includes:
According to five dimensions in preset workload Standardization System: normality the number of working processes, normality operation number, work
Degree-of-difficulty factor, environmental suitability coefficient and risk of loss property coefficient formulate the workload standards of grading of the operation system.
Preferably, described according to the preset workload standards of grading of the operation system and preset scoring rule, to institute
It states work Trace Data and carries out workload integral calculation, obtaining workload integral includes:
Be calculated it is described by examination personnel work role coefficient and group's coefficient ratio after, calculated the ratio with
The product of the workload standards of grading score value integrates to obtain the workload by examination personnel;
The work role coefficient is according in the scoring rule described in the work role type matching of examination personnel
Role's coefficient;
Role's coefficient value of each working member obtains group's coefficient value in the operation system that adds up.
Preferably, the ratio for calculating effective operating time and prespecified operating time, obtains the quilt
After examining the work saturation degree of employee further include:
Compare the size by the work saturation degree of examination employee and default saturation degree threshold value, judges described by examination person
Whether the workload of work is saturated.
The present invention also provides a kind of devices for calculating work saturation degree, comprising:
Acquisition module, for acquiring in operation system by the work Trace Data of examination employee;
Integration module is used for according to the preset workload standards of grading of the operation system and preset scoring rule, right
The work Trace Data carries out workload integral calculation, obtains the workload by examination employee and integrates;
It is counter to push away module, for obtaining effective operating time by examination employee according to the workload Integrator backstepping;
Computing module obtains described for calculating the ratio of effective operating time and prespecified operating time
By the work saturation degree of examination employee.
Preferably, the acquisition module is specifically used for: is acquired in operation system by ETL class tool by examination employee's
Work Trace Data.
Preferably, after the computing module further include:
Evaluation module is sentenced for the size by the work saturation degree of examination employee and default saturation degree threshold value
Whether the workload by examination employee of breaking is saturated.
The present invention also provides a kind of equipment for calculating work saturation degree, comprising:
Memory, for storing computer program;Processor realizes above-mentioned one kind when for executing the computer program
The step of calculating the method for work saturation degree.
The present invention also provides a kind of computer readable storage medium, meter is stored on the computer readable storage medium
The step of calculation machine program, the computer program realizes a kind of above-mentioned method for calculating work saturation degree when being executed by processor.
The method provided by the present invention for calculating work saturation degree, according to by the examination work Trace Data of employee and described
The preset workload standards of grading of operation system are calculated the workload by examination employee and integrate;According to the work
Amount Integrator backstepping obtains effective operating time by examination employee, satisfies so that the work by examination employee be calculated
And degree.Method provided by the present invention, by solving the prior art to by the calculating of the complete workload of the reality of examination employee
In directly by record operating time, the not rigorous problem of the work saturation degree of employee is calculated, improves employee work
The accuracy of saturation computation result.
Detailed description of the invention
It, below will be to embodiment or existing for the clearer technical solution for illustrating the embodiment of the present invention or the prior art
Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair
Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the flow chart of the first specific embodiment of the method provided by the present invention for calculating work saturation degree;
Fig. 2 is the flow chart of second of specific embodiment of the method provided by the present invention for calculating work saturation degree;
Fig. 3 is a kind of structural block diagram of device for calculating work saturation degree provided in an embodiment of the present invention.
Specific embodiment
Core of the invention, which is to provide, a kind of to be calculated the method, apparatus of work saturation degree, equipment and computer-readable deposits
Storage media improves the accuracy of employee work saturation computation result.
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description
The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under every other embodiment obtained, shall fall within the protection scope of the present invention.
Referring to FIG. 1, Fig. 1 is the first specific embodiment of the method provided by the present invention for calculating work saturation degree
Flow chart;Specific steps are as follows:
Step S101: it acquires in operation system by the work Trace Data of examination employee;
Work Trace Data can be acquired out from corresponding business datum theme from data warehouse by ETL class tool
Come, shield technology details, formed can amount of calculation integral actual achievements data.It is with production safety management information system
Example, production system developer provide performance systems integrated data by the data format of integrated demand requirement with pictorial representation;It is integrated
Quotient extracts the performance systems integrated data with ETL tool.
Step S102: according to the preset workload standards of grading of the operation system and preset scoring rule, to described
The Trace Data that works carries out workload integral calculation, obtains the workload by examination employee and integrates;
Step S103: effective operating time by examination employee is obtained according to the workload Integrator backstepping;
Step S104: the ratio of effective operating time and prespecified operating time is calculated, described examined is obtained
The work saturation degree of core employee.
In the present embodiment, it extracts in operation system by the work Trace Data of examination employee, passes through standards of grading meter
Workload integral is calculated, workload integral is the direct result after work quantization, and effective work can be calculated by carrying out counter push away to result
Make duration, the saturation degree that works after application system can be calculated automatically as a result, directly analysis, Ren Yuanxuan can be worked out using with post
It pulls out and is distributed with person works.
Based on the above embodiment, in the present embodiment, according to normality the number of working processes, normality operation number, work difficulty coefficient,
Environmental suitability coefficient and risk of loss property coefficient formulate the workload standards of grading of the operation system.Referring to FIG. 2, Fig. 2
For the flow chart of second of specific embodiment of the method provided by the present invention for calculating work saturation degree;Concrete operation step is such as
Under:
Step S201: according to normality the number of working processes, normality operation number, work difficulty coefficient, environmental suitability coefficient and
Risk of loss property coefficient formulates the workload standards of grading of the operation system;
In the present embodiment, five general dimensions have been formulated, quantization is realized to work.It in practical applications, can also root
The dimension for realizing work quantization is formulated according to actual conditions.It is (specified that five dimensions in the present embodiment are respectively as follows: normality the number of working processes
Working hour), normality operation number (specified number), work difficulty, amenity and risk of loss.
Workload standardization is realized to workload quantification, needs to meet certain item when being standardized workload quantification
Part, if any the job instruction of specification, i.e. the base producers of power grid enterprises are dynamic according to job instruction or defined operation
It carries out the work.
Wherein the normality the number of working processes, which refers to, completes standard working hours required for relevant work under universal, regular situation
Number, i.e. effective working.Normality operation number, which refers to, completes standard staff required for relevant work under universal, regular situation
Number.The judgment criteria of institute's work difficulty are as follows: this profession qualification can be competent within 6 months, by operation simple in rule, work operation
Situation is stablized;This profession qualification can be competent within 7 to 12 months, need professional skill to a certain degree and analysis processing capacity;It needs 1 year
The above profession qualification, skillfully grasps this post technical ability, needs cooperation and communication, Analysis and summary;Need 3 years or more professional qualifications;Have
Comparable professional skill or credentials could carry out the work;Need 5 years or more professional qualifications, and it is outstanding in this professional work
Person smooth could carry out this work;Need 8 years or more professional qualifications;It carries out the work whole anxiety, prompting and every need to be guarded
Step check.The amenity is divided into: the working environment and outdoor or condition indoor or familiar, stable, condition is relatively comfortable
The environment of poor (such as noise, sultry).The degree of risk is low, and work mistake probability is lower, and fault causes damages also smaller;
Degree of risk is higher, and fault will cause greater loss or a degree of injury;Degree of risk is high;Work can lead to unless you give your whole attention to it
Major accident or personal injury.
In the present embodiment, effective working refers to the hourage that employee actually works, time containing Job readiness, without not
Breath and physiology working hour;Workload standard design principle is commenting in each element for person works one hour for an intermediate operator qualification
Estimate workload in the case that coefficient is 1.0 and is scored at 1 point.
Workload standards of grading are formulated by above-mentioned five dimensions.Each corresponding business datum of work Trace Data,
Each corresponding item rating standard of work trace.Thus standardization is realized in the quantization of workload.Standardized process is to pass repeatedly
Education is compiled, that is, can be only achieved the stable quantized value of science after needing to be applied multiple times verification.
Step S202: it acquires in operation system by the work Trace Data of examination employee;
Step S203: the work role coefficient by examination personnel is calculated with after the ratio of group's coefficient, calculates
The product of the ratio and the workload standards of grading score value integrates to obtain the workload by examination personnel;
The usual more people in a hilllock of teams and groups of power grid enterprises personnel, the action of similar teams and groups' post personnel is roughly the same, work
Make content largely and be routine work task and often occur repeatedly, is suitble to that extraction, statistical work amount data can be integrated, using work
Work amount integrates examination patterns.
The statistics source of working quantity is each operation system of producers' application, such as safety production system, marketing system
Deng.There are each work trace by examination employee in all kinds of operation systems, these work traces can be cured as commenting accordingly
Minute mark is quasi-.By taking production plan executes the formulation of record standard point (p) as an example: p=s1*s2*s3*s4*s5;Wherein, s1 is normality
The number of working processes, s2 are normality operation number, and s3 is work difficulty, and s4 is amenity, and s5 is risk of loss.The work
Role's coefficient is according to role's coefficient in the scoring rule described in the work role type matching of examination personnel;Cumulative institute
The role's coefficient value for stating each working member in operation system obtains group's coefficient value.
The process integrated with job instruction illustration of the record of execution workload.Data source operation system path is that safety is raw
Produce the planning management in the comprehensive production management system unit in management subsystem.Class's member's job instruction executes record score value and is equal to work
The product of the ratio of industry guiding book template standard point (p) and role's coefficient and group's coefficient.
" job instruction template name " that job instruction executes in record is obtained in production system to be referred to according to operation
Book template name matching job instruction standards of grading are led, job instruction template standard score value is obtained.It is obtained in production system
Job instruction is taken to execute " work responsible person " in record, " working member " information, (" work is negative by work role type
Blame people ", " working member " etc.) role's coefficient value in matching job instruction scoring rule;Cumulative work responsible person and each
The value of role's coefficient of working member, obtains group's coefficient value.Job instruction is obtained in production system to execute in record
Class person's job instruction is executed the workload that record score value is included in month belonging to " end-of-job time " by " end-of-job time "
Original integral;The original integral of workload can be carried out with subordinate act specification level plus button, adjustment.
Step S204: effective operating time by examination employee is obtained according to the workload Integrator backstepping;
The Trace Data that works is when calculating with the in harness deadline.The data in working time section are intercepted, such as daily,
It weekly, is monthly, every year the period, it is anti-to release by the workload of examination employee;To can get effective operating time in the period.
Step S205: the ratio of effective operating time and prespecified operating time is calculated, described examined is obtained
The work saturation degree of core employee;
The work saturation degree r by examination employee is calculated by r=T1/T2 × 100%, wherein T1 is effectively work
Duration, T2 are regulation operating time.The saturation degree that works is high, and work efficiency is high for reflection.
Step S206: the size by the work saturation degree of examination employee and default saturation degree threshold value judges institute
It states by whether the workload of examination employee is saturated.
0.6 can be chosen as saturation degree threshold value, r >=0.6 item thinks that workload is saturated;R < 0.6 then thinks workload insatiable hunger
With.The default saturation degree threshold value can also be according to practical situations
In the present embodiment, with person works of an intermediate operator qualification one hour in each element metewand,
The particular number of work is defined on normality the number of working processes and normality operation number.Fully consider power grid enterprises in varying environment
Under workload computing dimension, more have convincingness.Five dimensions provided in this embodiment, have fully met power grid enterprises pair
Workload computing demand in need of consideration;Such as work difficulty, it is contemplated that the demand of professional qualification, work importance and difficulty and
Situations such as complexity.Same work, after being calculated according to five dimensions, obtained workload quantification result more has persuasion
Power, the anti-effective operating time pushed back are able to reflect out actual work saturation degree.Method provided by the present embodiment also improves
The feasibility of workload computing.
Referring to FIG. 3, Fig. 3 is a kind of structural block diagram of device for calculating work saturation degree provided in an embodiment of the present invention;
Specific device may include:
Acquisition module 100, for acquiring in operation system by the work Trace Data of examination employee;
Integration module 200 is used for according to the preset workload standards of grading of the operation system and preset scoring rule,
Workload integral calculation is carried out to the work Trace Data, the workload by examination employee is obtained and integrates;
It is counter to push away module 300, when for obtaining the effective work for being examined employee according to the workload Integrator backstepping
It is long;
Computing module 400 obtains institute for calculating the ratio of effective operating time and prespecified operating time
It states by the work saturation degree of examination employee.
The device of the calculating work saturation degree of the present embodiment is for realizing the method above-mentioned for calculating work saturation degree, therefore
Calculate the embodiment of the method for the visible calculating work saturation degree hereinbefore of specific embodiment in the device of work saturation degree
Part, for example, acquisition module 100, integration module 200 is counter to push away module 300, and computing module 400 is respectively used to realize above-mentioned meter
Step S101, S102, S103 and S104 in the method for work saturation degree are calculated, so, specific embodiment is referred to accordingly
Various pieces embodiment description, details are not described herein.
The specific embodiment of the invention additionally provides a kind of equipment for calculating work saturation degree, comprising: memory, for storing
Computer program;Processor realizes a kind of above-mentioned method for calculating work saturation degree when for executing the computer program
Step.
The specific embodiment of the invention additionally provides a kind of computer readable storage medium, the computer readable storage medium
On be stored with computer program, the computer program realizes a kind of above-mentioned side for calculating work saturation degree when being executed by processor
The step of method.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with it is other
The difference of embodiment, same or similar part may refer to each other between each embodiment.For being filled disclosed in embodiment
For setting, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part
Explanation.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure
And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These
Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession
Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered
Think beyond the scope of this invention.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor
The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
Above to method, apparatus, equipment and the computer-readable storage provided by the present invention for calculating work saturation degree
Medium is described in detail.It is used herein that a specific example illustrates the principle and implementation of the invention, with
The explanation of upper embodiment is merely used to help understand method and its core concept of the invention.It should be pointed out that being led for this technology
For the those of ordinary skill in domain, without departing from the principle of the present invention, can also to the present invention carry out it is several improvement and
Modification, these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims (10)
1. a kind of method for calculating work saturation degree characterized by comprising
It acquires in operation system by the work Trace Data of examination employee;
According to the preset workload standards of grading of the operation system and preset scoring rule, to the work Trace Data into
Row workload integral calculation obtains the workload by examination employee and integrates;
Effective operating time by examination employee is obtained according to the workload Integrator backstepping;
The ratio for calculating effective operating time and prespecified operating time obtains the work by examination employee and satisfies
And degree.
2. the method as described in claim 1, which is characterized in that described to acquire in operation system by the work trace of examination employee
Mark data include:
It is acquired in operation system by ETL class tool by the work Trace Data of examination employee.
3. the method as described in claim 1, which is characterized in that the predetermined registration operation by workload standards of grading includes:
According to five dimensions in preset workload Standardization System: normality the number of working processes, normality operation number, work difficulty
Coefficient, environmental suitability coefficient and risk of loss property coefficient formulate the workload standards of grading of the operation system.
4. method as claimed in claim 3, which is characterized in that described according to the preset workload scoring mark of the operation system
Quasi- and preset scoring rule carries out workload integral calculation to the work Trace Data, obtains workload integral and includes:
Be calculated it is described by examination personnel work role coefficient and group's coefficient ratio after, calculated the ratio with it is described
The product of workload standards of grading score value integrates to obtain the workload by examination personnel;
The work role coefficient is according to the angle in the scoring rule described in the work role type matching of examination personnel
Colour system number;
Role's coefficient value of each working member obtains group's coefficient value in the operation system that adds up.
5. method as claimed in claim 4, which is characterized in that described to calculate effective operating time and prespecified work
The ratio for making duration obtains described by after the work saturation degree of examination employee further include:
Compare the size by the work saturation degree of examination employee and default saturation degree threshold value, judges described by examination employee's
Whether workload is saturated.
6. a kind of device for calculating work saturation degree characterized by comprising
Acquisition module, for acquiring in operation system by the work Trace Data of examination employee;
Integration module is used for according to the preset workload standards of grading of the operation system and preset scoring rule, to described
The Trace Data that works carries out workload integral calculation, obtains the workload by examination employee and integrates;
It is counter to push away module, for obtaining effective operating time by examination employee according to the workload Integrator backstepping;
Computing module obtains described examined for calculating the ratio of effective operating time and prespecified operating time
The work saturation degree of core employee.
7. device as claimed in claim 6, which is characterized in that the acquisition module is specifically used for:
It is acquired in operation system by ETL class tool by the work Trace Data of examination employee.
8. device as claimed in claim 7, which is characterized in that after the computing module further include:
Evaluation module judges institute for the size by the work saturation degree of examination employee and default saturation degree threshold value
It states by whether the workload of examination employee is saturated.
9. a kind of equipment for calculating work saturation degree characterized by comprising
Memory, for storing computer program;
Processor realizes that a kind of calculating work is full as described in any one of claim 1 to 5 when for executing the computer program
The step of with the method for degree.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium
Program realizes a kind of calculating work saturation as described in any one of claim 1 to 5 when the computer program is executed by processor
The step of method of degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811196910.6A CN109377040A (en) | 2018-10-15 | 2018-10-15 | A kind of method, apparatus, equipment and storage medium calculating work saturation degree |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811196910.6A CN109377040A (en) | 2018-10-15 | 2018-10-15 | A kind of method, apparatus, equipment and storage medium calculating work saturation degree |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109377040A true CN109377040A (en) | 2019-02-22 |
Family
ID=65398467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811196910.6A Pending CN109377040A (en) | 2018-10-15 | 2018-10-15 | A kind of method, apparatus, equipment and storage medium calculating work saturation degree |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109377040A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110490494A (en) * | 2019-09-11 | 2019-11-22 | 北京市天元网络技术股份有限公司 | Universal integral and device |
CN110991835A (en) * | 2019-11-20 | 2020-04-10 | 云南电网有限责任公司电力科学研究院 | Laboratory management method and device |
CN111090493A (en) * | 2019-11-25 | 2020-05-01 | 中国银行股份有限公司 | Statistical method and system for virtual host use saturation |
CN111191933A (en) * | 2019-12-31 | 2020-05-22 | 北京银企融合技术开发有限公司 | Method for evaluating work saturation of research and development team, memory and electronic equipment |
CN111369165A (en) * | 2020-03-16 | 2020-07-03 | 重庆长安民生物流股份有限公司 | Work saturation-based system and method for allocating wages under standard working time |
CN111738701A (en) * | 2020-07-29 | 2020-10-02 | 普源精电科技股份有限公司 | Performance analysis method and device, computer equipment and storage medium |
CN112184003A (en) * | 2020-09-25 | 2021-01-05 | 中国建设银行股份有限公司 | Bank counter workload assessment method and device, storage medium and electronic equipment |
CN113112178A (en) * | 2021-04-30 | 2021-07-13 | 平安普惠企业管理有限公司 | Data processing method, device and equipment based on machine learning and storage medium |
CN113344421A (en) * | 2021-06-25 | 2021-09-03 | 携程科技(上海)有限公司 | Personnel dynamic allocation method, system, electronic equipment and storage medium |
CN115409667A (en) * | 2022-07-22 | 2022-11-29 | 佛山市四方建业建筑工程有限公司 | Municipal engineering construction information management method and device and computer equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103377425A (en) * | 2012-04-26 | 2013-10-30 | 腾讯科技(深圳)有限公司 | Method and device for acquiring assessment result |
CN104113644A (en) * | 2014-06-27 | 2014-10-22 | 国家电网公司 | Customer service center telephone traffic load prediction method |
CN106485421A (en) * | 2016-10-19 | 2017-03-08 | 江苏电力信息技术有限公司 | A kind of Employees' achievement assessment system based on work order data and method |
CN107368956A (en) * | 2017-07-03 | 2017-11-21 | 中国南方电网有限责任公司 | A set of performance quantization assessment system |
US20180150604A1 (en) * | 2016-11-28 | 2018-05-31 | Istituto Mediterraneo per i Trapianti e Terapie ad Alta Specializzazione S.r.l. | Method and System for Determining The Nursing Workload of Care Workers |
-
2018
- 2018-10-15 CN CN201811196910.6A patent/CN109377040A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103377425A (en) * | 2012-04-26 | 2013-10-30 | 腾讯科技(深圳)有限公司 | Method and device for acquiring assessment result |
CN104113644A (en) * | 2014-06-27 | 2014-10-22 | 国家电网公司 | Customer service center telephone traffic load prediction method |
CN106485421A (en) * | 2016-10-19 | 2017-03-08 | 江苏电力信息技术有限公司 | A kind of Employees' achievement assessment system based on work order data and method |
US20180150604A1 (en) * | 2016-11-28 | 2018-05-31 | Istituto Mediterraneo per i Trapianti e Terapie ad Alta Specializzazione S.r.l. | Method and System for Determining The Nursing Workload of Care Workers |
CN107368956A (en) * | 2017-07-03 | 2017-11-21 | 中国南方电网有限责任公司 | A set of performance quantization assessment system |
Non-Patent Citations (1)
Title |
---|
吴涛等: "法官工作饱和度测算模型的建构及运用", 《法律适用》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110490494A (en) * | 2019-09-11 | 2019-11-22 | 北京市天元网络技术股份有限公司 | Universal integral and device |
CN110991835A (en) * | 2019-11-20 | 2020-04-10 | 云南电网有限责任公司电力科学研究院 | Laboratory management method and device |
CN111090493A (en) * | 2019-11-25 | 2020-05-01 | 中国银行股份有限公司 | Statistical method and system for virtual host use saturation |
CN111191933A (en) * | 2019-12-31 | 2020-05-22 | 北京银企融合技术开发有限公司 | Method for evaluating work saturation of research and development team, memory and electronic equipment |
CN111369165A (en) * | 2020-03-16 | 2020-07-03 | 重庆长安民生物流股份有限公司 | Work saturation-based system and method for allocating wages under standard working time |
CN111738701A (en) * | 2020-07-29 | 2020-10-02 | 普源精电科技股份有限公司 | Performance analysis method and device, computer equipment and storage medium |
CN112184003A (en) * | 2020-09-25 | 2021-01-05 | 中国建设银行股份有限公司 | Bank counter workload assessment method and device, storage medium and electronic equipment |
CN113112178A (en) * | 2021-04-30 | 2021-07-13 | 平安普惠企业管理有限公司 | Data processing method, device and equipment based on machine learning and storage medium |
CN113344421A (en) * | 2021-06-25 | 2021-09-03 | 携程科技(上海)有限公司 | Personnel dynamic allocation method, system, electronic equipment and storage medium |
CN113344421B (en) * | 2021-06-25 | 2024-03-29 | 携程科技(上海)有限公司 | Personnel dynamic allocation method, system, electronic equipment and storage medium |
CN115409667A (en) * | 2022-07-22 | 2022-11-29 | 佛山市四方建业建筑工程有限公司 | Municipal engineering construction information management method and device and computer equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109377040A (en) | A kind of method, apparatus, equipment and storage medium calculating work saturation degree | |
US20220027744A1 (en) | Resource data modeling, forecasting and simulation | |
CN104281523B (en) | A kind of demand Testability Analysis method and system | |
CN111191933A (en) | Method for evaluating work saturation of research and development team, memory and electronic equipment | |
CN105956778A (en) | Work schedule management system and management method thereof | |
CN107403308B (en) | Data management method, system, computer readable storage medium and computer device | |
US20120179512A1 (en) | Change management system | |
CN103426067A (en) | Enterprise employee comprehensive performance evaluation system and method | |
CN110516948A (en) | A kind of human resources property tax optimization system Internet-based | |
JP2013186768A (en) | Project progress management system and storage medium for storing program | |
Umoh et al. | CAPACITY PLANNING AND CORPORATE PRODUCTIVITY PERFORMANCE IN THE NIGERIAN AVIATION INDUSTRY. | |
Grizzle | Developing standards for interpreting agency performance: an exploration of three models | |
CN112862340A (en) | Method and system for accurately calculating project labor cost | |
CN111340403A (en) | Human resource management data benchmarking platform | |
Boring et al. | Atomistic and holistic approaches to human reliability analysis in the US nuclear power industry | |
Heires | What I did last summer: A software development benchmarking case study | |
Bradshaw | Establishing a first class project controls organization for managing large complex projects | |
CN103489069A (en) | RDMP system based on network | |
Anderson et al. | Review of tuna Regional Fisheries Management Organisations longline scientific observer programmes | |
Arnheiter et al. | Measuring Expertise Learning Rates for Nonrepetitive Project Work | |
CN105321031A (en) | Method and apparatus for estimating human cost using information system | |
Nan et al. | The impact of schedule pressure on software development: A behavioral perspective | |
Oztemel et al. | Measuring the degree of technology adaptation in manufacturing systems | |
AGBO | PERFORMANCE APPRAISAL AND PRODUCTIVITY OF EMPLOYEES OF 7UP BOTTLING COMPANY IN ABA, NIGERIA | |
Madhavan et al. | Planning Fallacy: A Case of Task Planning in IT Project Support Services |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190222 |
|
RJ01 | Rejection of invention patent application after publication |