CN109373926A - The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system - Google Patents

The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system Download PDF

Info

Publication number
CN109373926A
CN109373926A CN201811643505.4A CN201811643505A CN109373926A CN 109373926 A CN109373926 A CN 109373926A CN 201811643505 A CN201811643505 A CN 201811643505A CN 109373926 A CN109373926 A CN 109373926A
Authority
CN
China
Prior art keywords
fixing bolt
deformation
displacement sensor
rock
constructing tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811643505.4A
Other languages
Chinese (zh)
Inventor
江龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811643505.4A priority Critical patent/CN109373926A/en
Publication of CN109373926A publication Critical patent/CN109373926A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00Measuring arrangements characterised by the use of optical techniques
    • G01B11/16Measuring arrangements characterised by the use of optical techniques for measuring the deformation in a solid, e.g. optical strain gauge

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system include the following steps: to determine selection wall rock's level section, and arrange cross-section monitoring point according to constructing tunnel process;Determining and adjoining rock stability region of the wall rock's level section apart from nearest tunnel;In cross-section monitoring point, the second fixing bolt is set;In adjoining rock stability region, third fixing bolt is set;In the second fixing bolt and third fixing bolt midpoint, the first fixing bolt is set;The first photosensitive displacement sensor is set in the second fixing bolt, the second photosensitive displacement sensor is set in third fixing bolt;In the first fixing bolt, first laser light source and second laser light source are set;After signal processing system receives the signal of the first photosensitive displacement sensor and the second photosensitive displacement sensor, the real-time deformation shift value of monitoring point is determined.

Description

The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system
Technical field
The present invention relates to IPC code be E21F 17/18 technical field tunnel signal device and warning device, Signal alarm monitoring method and monitoring system more particularly, to a kind of continuous monitoring alarm of constructing tunnel surrouding rock deformation.
Background technique
Tunnel is a kind of underground structure being embedded in stratum, is widely used in city underground and crosses over mountain after mountain, gets over river The engineerings such as railway, highway and water conservancy, bring great convenience to our daily life.Shorten traffic since tunnel has Space length, the advantages that having fewer environmental impacts, therefore in wearing mountain traffic route over strait or the construction of city rail route often A large amount of tunnel can often be built.
However, since tunnel is in complicated geological conditions environment, tunnel construction has certain complexity, then plus The variation of upper natural environment and operation condition and the influence of various weathers and human factor cause tunnel cavern to generate convergence Deformation restrains the excessive safety for influencing whether constructing tunnel, or even great casualties occurs, economic asset loss, influences face Wide pernicious safety accident.Therefore, constructing tunnel reinforces safety of the monitoring deformed to it to construction is improved in the process, guarantees The quality and progress of construction have a very important significance.
Currently, the measurement methods such as traditional convergence gauge, measurement of the level have the shortcomings that it is obvious: time-consuming, measuring quality is unstable Fixed, human error is greatly, big to interference of constructing, measuring speed is slow, is easily affected by the surrounding environment, and own hardly possible meets modern tunnel skill The requirement of art.Three-dimensional laser scanning technique is ripe day by day, but is used for tunnel deformation monitoring, and cost of equipment is high, post-processing Overlong time, real-time is poor, is not easy to practical application.
In constructing tunnel, surrouding rock deformation is divided into 3 stages: at section excavation initial stage, and, country rock closer apart from excavation face Deformation is violent;As the solidification and other support systems of gunite concrete play a role, convergent deformation is gradually reduced;When section away from It is more than 2 times of hole diameters from excavation face, three-dimensional effect substantially eliminates, and convergent deformation speed eases up, and country rock is in the stabilization sub stage.Existing skill In art, in order to realize the real-time monitoring of tunnel wall rock deformation, by the unstable surrounding rock in tunnel install fixed detector or Corresponding light source or detector is arranged in person's light source on tunnel stabilization country rock, and the displacement information detected by detector is true Determine the deformation data of unstable surrounding rock.However, it needs detector or light source being set to stabilizing surrounding rock, remaining needs to monitor Surrounding rock in excavation distance farther out, and signal light can be scattered in transmission process, receive bias light influence etc., cause to detect The detection accuracy of device is affected.In order to reduce transmission range, can by the Distance Shortened of light source and detector, but in this way meeting Cause its be located at unstable surrounding rock perhaps secondary stabilizing surrounding rock since the surrouding rock deformation of light source or detector leads to the knot of detector Fruit inaccuracy.
Summary of the invention
The present invention provides a kind of continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system, can be improved and encloses The detection accuracy of rock measurement result.
It as one aspect of the present invention, provides constructing tunnel surrouding rock deformation continuous monitoring alarm method, including walks as follows It is rapid: (1) according to constructing tunnel process, to determine selection wall rock's level section, and arrange cross-section monitoring point;(2) determining to be supervised with country rock Survey adjoining rock stability region of the section apart from nearest tunnel;(3) the second fixing bolt is set in cross-section monitoring point;(4) in country rock Third fixing bolt is arranged in the position that stability region corresponds to cross-section monitoring point;(5) in the second fixing bolt and the fixed spiral shell of third The first fixing bolt is arranged in the line midpoint of bolt;(6) the first photosensitive displacement sensor is set in the second fixing bolt, it is solid in third Determine bolt and the second photosensitive displacement sensor is set;(7) first laser light source and second laser light source are set in the first fixing bolt, The first laser light source issues the first laser of the first photosensitive displacement sensor of irradiation, and the second laser light source issues irradiation The second laser of second photosensitive displacement sensor;(8) signal processing system receives the first photosensitive displacement sensor and the second light After the signal of quick displacement sensor, the real-time deformation shift value of monitoring point is determined.
Preferably, the wall rock's level section is tunnel excavation face.
Preferably, wall rock's level section described in the adjoining rock stability region distance is greater than twice of hole diameter.
Preferably, the signal processing system determines the first fixing bolt according to the signal of the second photosensitive displacement sensor Absolute displacement;According to the absolute displacement of the first fixing bolt and the signal of the first photosensitive sensor, the second fixed spiral shell is determined The decision of bolt is displaced, so that it is determined that the real-time deformation shift value of monitoring point.
Preferably, the first laser light source, second laser light source, the first photosensitive displacement sensor and the second photosensitive position Displacement sensor is located along the same line.
Preferably, the multiple cross-section monitoring points of setting in the step (1).
Preferably, in the step (9), signal processing system is greater than displacement threshold in real-time deformation shift value according to monitoring point When value, the first alarm signal is provided.
Preferably, in the step (9), the signal processing system also stores the shift value at each moment, unit of account The deformation displacement changing value of time provides the second alarm signal when the deformation displacement changing value of unit time is greater than threshold value.
As another aspect of the present invention, provides and continuously supervised for a kind of constructing tunnel surrouding rock deformation of the above method Control alarm system, comprising: the first fixing bolt, first fixing bolt is for installing laser light source;Second fixing bolt, institute State the second fixing bolt for install the first photosensitive displacement sensor;Second fixing bolt is set to monitoring point, the prison Measuring point is set to unstable surrounding rock;Third fixing bolt, the third fixing bolt are set to stabilizing surrounding rock, and the third is fixed The second photosensitive displacement sensor is arranged in bolt;First fixing bolt is set to the second fixing bolt and third fixing bolt Midpoint;The laser light source includes first laser light source and second laser light source, and the first laser light source issues The first laser of the first photosensitive displacement sensor is irradiated, the second laser light source issues the second photosensitive displacement sensor of irradiation Second laser;After signal processing system receives the signal of the first photosensitive displacement sensor and the second photosensitive displacement sensor, really Determine the real-time deformation shift value of monitoring point.
Preferably, the first laser light source, second laser light source, the first photosensitive displacement sensor and the second photosensitive position Displacement sensor is located along the same line.
Preferably, the signal processing system is provided according to monitoring point when real-time deformation shift value is greater than displacement threshold value First alarm signal.
Preferably, the signal processing system also stores the shift value at each moment, the deformation displacement of unit of account time Changing value provides the second alarm signal when the deformation displacement changing value of unit time is greater than threshold value.
Preferably, the surrounding rock stability of the fixed position of first fixing bolt is between the fixed position of the second fixing bolt Between surrounding rock stability and the surrounding rock stability of the fixed position of third fixing bolt.
Preferably, first fixing bolt is fixed on unstable surrounding rock.
Detailed description of the invention
Fig. 1 is the continuous monitoring and alarming system schematic diagram of constructing tunnel surrouding rock deformation of the embodiment of the present invention.
Specific embodiment
In order to illustrate more clearly of technical solution of the present invention, embodiment will be used simply to be situated between the present invention below Continue, it should be apparent that, be described below in be only one embodiment of the present of invention, for those of ordinary skill in the art come It says, without any creative labor, other technical solutions can also be obtained according to these embodiments, also belonged to Disclosure of the invention range.
The continuous monitoring and alarming system of constructing tunnel surrouding rock deformation of the embodiment of the present invention, referring to Fig. 1, including the first fixed spiral shell Bolt 10, the second fixing bolt 20, third fixing bolt 30, first laser light source 11, second laser light source 12, the first photosensitive displacement Sensor 21 and the second photosensitive displacement sensor 31.
During constructing tunnel, according to constructing tunnel process, selection wall rock's level section is determined, and arrange cross-section monitoring Point;Wherein wall rock's level section is located at the unstable surrounding rock for needing to monitor, and can be excavation face or excavation face is additional disconnected Face.In the monitoring point of wall rock's level section, the second fixing bolt 20 is set, it is either one or more, it can set It is placed in the vertex of monitoring section, the monitoring point such as 22,23 of detection section two sides can also be set to.Second fixing bolt 20 is used for First photosensitive displacement sensor 21 is installed, the first photosensitive displacement sensor 21 can determine the position of received irradiation light, be used for The displacement of the second fixing bolt 20 is determined, so that it is determined that the displacement of monitoring point.
According to the determination of the position of monitoring section and monitoring section apart from nearest adjoining rock stability region, the adjoining rock stability region The distance of distance detection section can be such as 2 times of Tunnel diameters.In the disconnected of adjoining rock stability corresponding with wall rock's level point region Third fixing bolt 30 is arranged in face position, and the quantity of third fixing bolt 30 corresponds to the quantity of the second fixing bolt 20.Third Fixed complex acid 30 can determine received irradiation for installing the second photosensitive displacement sensor 31, the second photosensitive displacement sensor 31 The position of light.Since third fixing bolt 30 is located at adjoining rock stability region, position be it is fixed, passed according to the second photosensitive displacement The signal of sensor 31 can determine the displacement information of radiation source.
First fixing bolt 10 is set in the midpoint of the second fixing bolt 20 and third fixing bolt 30, first is solid Determine surrounding rock stability and third fixed spiral shell of the surrounding rock stability between the fixed position of the second fixing bolt of the fixed position of bolt 10 Between the surrounding rock stability of the fixed position of bolt.First fixing bolt 10 includes first sharp for installing laser light source, laser light source Radiant 11 and second laser light source 12, the first of sending the first photosensitive displacement sensor 21 of irradiation of first laser light source 11 swash Light, second laser light source 12 issue the second laser of the second photosensitive displacement sensor 31 of irradiation.First photosensitive displacement sensor 21 And second the signal of photosensitive displacement sensor 31 signal processing system is transmitted to by wired or radio transmitting device.
After signal processing system receives the signal of the first photosensitive displacement sensor 21 and the second photosensitive displacement sensor 31, According to the signal of the second photosensitive displacement sensor 31, the absolute displacement of the first fixing bolt 10 is determined;According to the first fixing bolt The signal of 10 absolute displacement and the first photosensitive sensor 21 determines the absolute displacement of the second fixing bolt 20, so that it is determined that The real-time deformation shift value of monitoring point.When real-time deformation shift value of the signal processing system in monitoring point is greater than displacement threshold value, give First alarm signal out.Preferably, signal processing system also stores the shift value at each moment, the deforming position of unit of account time Changing value is moved, when the deformation displacement changing value of unit time is greater than threshold value, provides the second alarm signal.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (8)

1. a kind of continuous monitoring alarm method of constructing tunnel surrouding rock deformation, include the following steps: (1) according to constructing tunnel process, It determines selection wall rock's level section, and arranges cross-section monitoring point;(2) enclosing apart from nearest tunnel is determined with wall rock's level section Rock stability region;(3) the second fixing bolt is set in cross-section monitoring point;(4) correspond to cross-section monitoring point in adjoining rock stability region Position be arranged third fixing bolt;(5) in the second fixing bolt and the fixed spiral shell of third fixing bolt line midpoint setting first Bolt;(6) the first photosensitive displacement sensor is set in the second fixing bolt, the second photosensitive displacement sensing is set in third fixing bolt Device;(7) first laser light source and second laser light source be set in the first fixing bolt, the first laser light source issues irradiation the The first laser of one photosensitive displacement sensor, the second of the second laser light source sending second photosensitive displacement sensor of irradiation swash Light;(8) after the signal of signal processing system the first photosensitive displacement sensor of reception and the second photosensitive displacement sensor, prison is determined The real-time deformation shift value of measuring point;(9) signal processing system is according to the real-time deformation shift value of monitoring point, it is determined whether is reported It is alert.
2. the continuous monitoring alarm method of constructing tunnel surrouding rock deformation according to claim 1, it is characterised in that: the country rock Monitoring section is tunnel excavation face.
3. the continuous monitoring alarm method of constructing tunnel surrouding rock deformation according to claim 2, it is characterised in that: the country rock Stability region is greater than twice of hole diameter apart from the wall rock's level section.
4. the continuous monitoring alarm method of constructing tunnel surrouding rock deformation according to claim 3, it is characterised in that: described first Laser light source, second laser light source, the first photosensitive displacement sensor and the second photosensitive displacement sensor are located along the same line.
5. the continuous monitoring alarm method of constructing tunnel surrouding rock deformation according to claim 4, it is characterised in that: the step (1) the multiple cross-section monitoring points of setting in.
6. the continuous monitoring alarm method of constructing tunnel surrouding rock deformation according to claim 5, it is characterised in that: the step (9) in, signal processing system, when real-time deformation shift value is greater than displacement threshold value, provides the first alarm signal according to monitoring point.
7. the continuous monitoring alarm method of constructing tunnel surrouding rock deformation according to claim 6, it is characterised in that: the step (9) in, the signal processing system also stores the shift value at each moment, the deformation displacement changing value of unit of account time, When the deformation displacement changing value of unit time is greater than threshold value, the second alarm signal is provided.
8. a kind of continuous monitoring and alarming system of constructing tunnel surrouding rock deformation, is used for tunnel described in one of the claims and applies The continuous monitoring alarm method of work surrouding rock deformation.
CN201811643505.4A 2018-12-30 2018-12-30 The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system Pending CN109373926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811643505.4A CN109373926A (en) 2018-12-30 2018-12-30 The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811643505.4A CN109373926A (en) 2018-12-30 2018-12-30 The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system

Publications (1)

Publication Number Publication Date
CN109373926A true CN109373926A (en) 2019-02-22

Family

ID=65372171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811643505.4A Pending CN109373926A (en) 2018-12-30 2018-12-30 The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system

Country Status (1)

Country Link
CN (1) CN109373926A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112268797A (en) * 2020-10-09 2021-01-26 武汉威思顿环境***有限公司 All-round comprehensive detector in tunnel
CN113310425A (en) * 2021-05-20 2021-08-27 中国科学院武汉岩土力学研究所 Method and equipment for monitoring overall deformation of shield tunnel
CN113404541A (en) * 2021-06-29 2021-09-17 陕西工业职业技术学院 Tunnel surrounding rock deformation on-line monitoring and early warning system
WO2022174592A1 (en) * 2021-02-22 2022-08-25 南京派光智慧感知信息技术有限公司 Real-time tunnel deformation monitoring method and device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1664494A (en) * 2005-03-23 2005-09-07 西安交通大学 Laser dam safety monitoring method
CN101458069A (en) * 2008-12-30 2009-06-17 中铁二十四局集团福建铁路建设有限公司 Tunnel wall rock deformation monitoring method and monitoring system thereof
CN102967263A (en) * 2012-12-03 2013-03-13 中铁大桥局集团武汉桥梁科学研究院有限公司 Bridge deflection-corner integrated measurement method
CN102980516A (en) * 2012-11-29 2013-03-20 天津大学 Double laser beam optical axis collineation alignment method
CN103017673A (en) * 2012-12-26 2013-04-03 中铁二十四局集团有限公司 Real-time continuous monitoring alarming method for tunnel surrounding rock deformation
JP2014002027A (en) * 2012-06-18 2014-01-09 Hazama Ando Corp Method of measuring displacement of space within tunnel
CN206037986U (en) * 2016-08-26 2017-03-22 招商局重庆交通科研设计院有限公司 Tunnel surrouding rock deformation monitoring and early warning system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1664494A (en) * 2005-03-23 2005-09-07 西安交通大学 Laser dam safety monitoring method
CN101458069A (en) * 2008-12-30 2009-06-17 中铁二十四局集团福建铁路建设有限公司 Tunnel wall rock deformation monitoring method and monitoring system thereof
JP2014002027A (en) * 2012-06-18 2014-01-09 Hazama Ando Corp Method of measuring displacement of space within tunnel
CN102980516A (en) * 2012-11-29 2013-03-20 天津大学 Double laser beam optical axis collineation alignment method
CN102967263A (en) * 2012-12-03 2013-03-13 中铁大桥局集团武汉桥梁科学研究院有限公司 Bridge deflection-corner integrated measurement method
CN103017673A (en) * 2012-12-26 2013-04-03 中铁二十四局集团有限公司 Real-time continuous monitoring alarming method for tunnel surrounding rock deformation
CN206037986U (en) * 2016-08-26 2017-03-22 招商局重庆交通科研设计院有限公司 Tunnel surrouding rock deformation monitoring and early warning system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112268797A (en) * 2020-10-09 2021-01-26 武汉威思顿环境***有限公司 All-round comprehensive detector in tunnel
CN112268797B (en) * 2020-10-09 2022-07-19 武汉威思顿环境***有限公司 All-round comprehensive detector in tunnel
WO2022174592A1 (en) * 2021-02-22 2022-08-25 南京派光智慧感知信息技术有限公司 Real-time tunnel deformation monitoring method and device
US11908121B2 (en) 2021-02-22 2024-02-20 Nanjing Pioneer Awareness Information Technology Co., Ltd Conveying manipulator for machining precision parts
CN113310425A (en) * 2021-05-20 2021-08-27 中国科学院武汉岩土力学研究所 Method and equipment for monitoring overall deformation of shield tunnel
CN113404541A (en) * 2021-06-29 2021-09-17 陕西工业职业技术学院 Tunnel surrounding rock deformation on-line monitoring and early warning system

Similar Documents

Publication Publication Date Title
CN109373926A (en) The continuous monitoring alarm method of constructing tunnel surrouding rock deformation and monitoring system
US9817148B2 (en) Borehole while drilling electromagnetic tomography advanced detection apparatus and method
CN106524936B (en) A kind of tunneltron canopy deformation monitoring method
Wang et al. Study on an improved real-time monitoring and fusion prewarning method for water inrush in tunnels
CN101270666B (en) Tunnel influence geological condition section-expanding horizontal drilling estimation and prediction method
CN206987892U (en) A kind of prior-warning device for being used to monitor Propagation in Tunnel Disaster
CN108922123A (en) A kind of mine slope sliding stability monitoring and pre-alarming method
CN107314749A (en) Subway tunnel deformation based on laser distance measuring principle is monitored and early warning system in real time
CN103389523A (en) Method and system for forecasting tunnel geology
CN211291565U (en) Tunnel construction dynamic monitoring and early warning system
CN103389525A (en) Method and system for forecasting tunnel geology
CN108917718A (en) A kind of wireless tilt and displacement monitoring device, system and method
CN111060022B (en) Laser automatic analysis system and method for deformation of shield underpass structure
CN109681275A (en) A kind of continuous monitoring alarm method of constructing tunnel surrouding rock deformation and system
CN103399356A (en) Forecasting method and system for tunnel geology
CN103399354A (en) Forecasting method and system for tunnel geology
CN106556376A (en) A kind of monitoring underground space and the device and its measuring method of underground utilities deformation
Jinyi et al. A health monitoring system for inverted arch of salt rock tunnel based on laser level deformation monitor and wFBG
CN103389527A (en) Method and system for forecasting tunnel geology
Tu et al. Evolution Mechanism, Monitoring, and Early Warning Method of Water Inrush in Deep‐Buried Long Tunnel
CN103399355A (en) Forecasting method and system for tunnel geology
CN103389524A (en) Method and system for forecasting tunnel geology
CN112324451A (en) Earth surface settlement and pipeline deformation early warning system based on muck monitoring for earth pressure balance shield
US20170096890A1 (en) Ranging While Drilling Using Optical Fiber Sensors
CN207976596U (en) tunnel construction safety management platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190222

WD01 Invention patent application deemed withdrawn after publication