CN207976596U - tunnel construction safety management platform - Google Patents
tunnel construction safety management platform Download PDFInfo
- Publication number
- CN207976596U CN207976596U CN201820506771.1U CN201820506771U CN207976596U CN 207976596 U CN207976596 U CN 207976596U CN 201820506771 U CN201820506771 U CN 201820506771U CN 207976596 U CN207976596 U CN 207976596U
- Authority
- CN
- China
- Prior art keywords
- safety monitoring
- monitoring system
- tunnel
- safety
- management platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
The utility model discloses a kind of tunnel construction Safety Management platforms, system is monitored including advanced safety monitoring system, cable construction safety monitoring system and operation security, further include data transmission system and processor, its monitoring data is transported to processor by data transmission system respectively and carries out summarizing integration by the advanced safety monitoring system, cable construction safety monitoring system and operation security monitoring system;Advance geologic prediction monitoring, work progress safety monitoring and operation management safety monitoring before tunnel construction are integrated into a safety monitoring system by the utility model, both the utilization rate of each phase security monitoring materials had been increased, construction period and operation phase safety monitoring measure are unified into a system simultaneously, form Tunnel Engineering life-cycle safety monitoring system;This management platform is to be combined information technology with tunnel safety monitoring, with on-line monitoring under formation line, handles data, the safety management platform that early stage safe early warning is combined on line.
Description
Technical field
The utility model is related to tunnel construction construction field, more particularly to a kind of tunnel construction Safety Management platform.
Background technology
At this stage, before tunnel construction, though there is design drawing, engineering geologic investigation data is also indicated on drawing, is constructed
Stage still needs to take advance geologic prediction measure to predict the auspicious feelings of tunnel tunnel face front geology, to determine tunnel excavation method
And preliminary bracing measure.After tunnel excavation, cross-section convergence and vault sinking safety monitoring point should be laid in time, monitors tunnel
Peripheral rock, Tunnel malformation and stress to take safety prevention measure, and are applied as adjoining rock stability judgement
The foundation of lining cutting.Tunnel operation stage need to arrange special messenger's periodic monitoring tunnel lining structure deformation, to take emergent arrange
It applies, it is ensured that safety.Above-mentioned tunnel safety monitoring method and measure, it is respectively independent, it is only served in tunnel construction or operation pipe
The a certain stage of reason, monitoring materials fail general, and monitoring measure each stage is separately provided.Therefore, the waste of resource had both been caused,
Meanwhile every monitoring data do not form aggregate measures, are also unfavorable for tunnel construction and operation phase safety management.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of tunnel construction Safety Management platform, tunnel is solved
Road engineering each stage establishes safety monitoring system respectively, and monitoring data are respectively independent, does not form the problem of comprehensive utilization manages.
The tunnel construction Safety Management platform of the utility model, including advanced safety monitoring system, construction safety prison
Examining system and operation security monitor system, further include data transmission system and processor, the advanced safety monitoring system, construction
Its monitoring data is transported to processor by data transmission system respectively and carried out by safety monitoring system and operation security monitoring system
Summarize integration.
Further, the advanced safety monitoring system includes for carrying out the infrared detector of infrared acquisition, for carrying out
The TSP seismic waves survey meters of TSP seismic wave survey meters, the geological radar for carrying out geology detecting and for carrying out forward probe
Horizontal drilling instrument in one or more kinds of combinations.
Further, the cable construction safety monitoring system is the clearance convergence and vault being arranged in Tunnel structure sheaf
Sinking safety monitoring instrument.
Further, the cable construction safety monitoring system monitors system along operation stage is continued as operation security.
Further, the data transmission system is mode of wireless transmission structure.
The beneficial effects of the utility model:
The tunnel construction Safety Management platform of the utility model, advance geologic prediction before tunnel construction is supervised
Survey, work progress safety monitoring and operation management safety monitoring are integrated into a safety monitoring system, have both increased each stage peace
The utilization rate of full monitoring materials, while construction period and operation phase safety monitoring measure are unified into a system, form tunnel
Road engineering life-cycle safety monitoring system;This management platform is to be combined information technology with tunnel safety monitoring, is formed under line
With on-line monitoring, data, the safety management platform that early stage safe early warning is combined are handled on line.
Description of the drawings
The utility model is further described with reference to the accompanying drawings and examples:
Fig. 1 is the principles of the present invention block diagram.
Specific implementation mode
As shown in the figure:The tunnel construction Safety Management platform of the present embodiment, including advanced safety monitoring system, construction
Safety monitoring system and operation security monitor system, further include data transmission system and processor, the advanced safety monitoring system
Its monitoring data is transported to processing by system, cable construction safety monitoring system and operation security monitoring system by data transmission system respectively
Device carries out summarizing integration;Advance geologic prediction before tunnel construction is monitored, is applied by this tunnel construction Safety Management platform
Work process safety monitors and operation management safety monitoring is integrated into a safety monitoring system, has both increased each phase security monitoring
The utilization rate of data, while construction period and operation phase safety monitoring measure are unified into a system, form Tunnel Engineering
Life-cycle safety monitoring system;This management platform be by information technology with tunnel safety monitoring be combined, formation line under on line
It monitors, data, the safety management platform that early stage safe early warning is combined is handled on line.
In the present embodiment, the advanced safety monitoring system includes for carrying out the infrared detector of infrared acquisition, being used for
Carry out the TSP seismic waves survey meters of TSP seismic wave survey meters, the geological radar for carrying out geology detecting and advanced for carrying out
One or more kinds of combinations in the horizontal drilling instrument of detection are chosen with specific reference to tunnel geology situation;Geological radar
Predict tunnel tunnel face front 30-50m range geological conditions;Infrared detector predicts front of tunnel heading 30-50m geology and underground
Water distribution situation;TSP seismic wave survey meters predict front of tunnel heading 100m range geological conditions;Horizontal drilling instrument is generally set to tunnel
Road face, per the holes section 3-5, drill depth 30m, and core-drilling is to judge tunnel tunnel face front geological condition;By above-mentioned
Advanced safety monitoring measure, comprehensive analysis tunnel front geological condition take corresponding excavation and initial stage branch by geological security grade
Shield measure;After tunnel excavation, root disturbs country rock and discloses situation, further adjusts preliminary bracing measure, is optimal.
In the present embodiment, the cable construction safety monitoring system be the clearance convergence being arranged in Tunnel structure sheaf and
Vault sinking safety monitoring instrument;Clearance convergence and vault sinking safety monitoring value are constructed in instructing the processes such as tunnel-liner;
In the present embodiment, the cable construction safety monitoring system monitors system along operation stage is continued as operation security;It applies
Work safety monitoring system integrates with operation security monitoring system, forms tunnel life cycle management and monitors system.
In the present embodiment, the data transmission system is mode of wireless transmission structure;Data transmission system may include several
Wireless Transmitter, consequently facilitating the transmission of data, is conducive to the integration of data;Infrared detector, TSP seismic waves survey meter,
Matter radar, horizontal drilling instrument, clearance convergence and vault sinking safety monitoring instrument signal output end can pass through Wireless Transmitter
It is connected with the signal input part of processor.
Finally illustrate, above example is merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng
The utility model is described in detail according to preferred embodiment, it will be understood by those of ordinary skill in the art that, it can be to this
The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model
It encloses, should all cover in the right of the utility model.
Claims (5)
1. a kind of tunnel construction Safety Management platform, including advanced safety monitoring system, cable construction safety monitoring system and fortune
Seek safety monitoring system, it is characterised in that:Further include data transmission system and processor, the advanced safety monitoring system is applied
Work safety monitoring system and operation security monitoring system respectively by data transmission system by its monitoring data transport to processor into
Row summarizes integration.
2. tunnel construction Safety Management platform according to claim 1, it is characterised in that:The advanced safety monitoring
System includes being detected for carrying out the infrared detector of infrared acquisition, for carrying out the TSP seismic waves of TSP seismic wave survey meters
In instrument, the geological radar for carrying out geology detecting and the horizontal drilling instrument for carrying out forward probe it is one or two kinds of with
On combination.
3. tunnel construction Safety Management platform according to claim 2, it is characterised in that:The safety monitoring during construction
System is the clearance convergence being arranged in Tunnel structure sheaf and vault sinking safety monitoring instrument.
4. tunnel construction Safety Management platform according to claim 3, it is characterised in that:The safety monitoring during construction
System monitors system along operation stage is continued as operation security.
5. tunnel construction Safety Management platform according to claim 4, it is characterised in that:The data transmission system
For mode of wireless transmission structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820506771.1U CN207976596U (en) | 2018-04-11 | 2018-04-11 | tunnel construction safety management platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820506771.1U CN207976596U (en) | 2018-04-11 | 2018-04-11 | tunnel construction safety management platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207976596U true CN207976596U (en) | 2018-10-16 |
Family
ID=63764011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820506771.1U Active CN207976596U (en) | 2018-04-11 | 2018-04-11 | tunnel construction safety management platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207976596U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110056394A (en) * | 2019-03-12 | 2019-07-26 | 中交一公局桥隧工程有限公司 | A kind of safety for tunnel engineering monitoring device and its control system |
CN110778362A (en) * | 2019-09-18 | 2020-02-11 | 安徽亚浩智能科技有限公司 | Intelligent construction management platform for tunnel |
-
2018
- 2018-04-11 CN CN201820506771.1U patent/CN207976596U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110056394A (en) * | 2019-03-12 | 2019-07-26 | 中交一公局桥隧工程有限公司 | A kind of safety for tunnel engineering monitoring device and its control system |
CN110778362A (en) * | 2019-09-18 | 2020-02-11 | 安徽亚浩智能科技有限公司 | Intelligent construction management platform for tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105257339B (en) | The multi-parameter integrated monitoring and pre-alarming method of driving face | |
US9817148B2 (en) | Borehole while drilling electromagnetic tomography advanced detection apparatus and method | |
CN107605536B (en) | Coal and gas prominent real-time early warning device and method based on Multi-source Information Fusion | |
CN101270666B (en) | Tunnel influence geological condition section-expanding horizontal drilling estimation and prediction method | |
CN111648826B (en) | Coal mine rock burst prediction early warning system and method | |
CN106680894B (en) | A kind of tunnel geological advanced prediction method based on C/S framework | |
CN107387166A (en) | Stope coal seam plate destructing depth real-time system for monitoring and pre-warning and method | |
CN109653800B (en) | Composite power disaster monitoring and early warning system and method for deep water-rich overburden thick coal seam mining | |
CN202001063U (en) | System for pre-warning water disaster of mine bottom plate | |
CN201251564Y (en) | Device for monitoring stability of roof strata or concrete structure of well in real-time | |
CN105759010B (en) | A kind of dynamic monitoring of mining influence tunnel and Stability Assessment method | |
CN106437853A (en) | Method for early warning against coal rock burst dynamic disasters | |
CN207976596U (en) | tunnel construction safety management platform | |
CN211291565U (en) | Tunnel construction dynamic monitoring and early warning system | |
Zhang et al. | A new monitoring-while-drilling method of large diameter drilling in underground coal mine and their application | |
CN101251498A (en) | Method for testing and evaluating wall rock loosening ring based on electromagnetic radiation principle | |
CN110792450B (en) | Method for determining advanced support of grouting anchor cable | |
WO2021134929A1 (en) | Structure activation dual-parameter monitoring system and monitoring method | |
Shen et al. | Estimating locations of soil–rock interfaces based on vibration data during shield tunnelling | |
CN107764323B (en) | A kind of multi-parameter enclosed area risk Monitoring and forecasting system in real-time method | |
CN107387073B (en) | Quantitative detection system for rock debris returned while drilling | |
CN114810213A (en) | Multi-source information fusion intelligent early warning method and device for coal and gas outburst | |
CN104727815A (en) | Real-time well drilling formation correction method and device | |
CN106401652A (en) | Tandem type network construction method for tunnel remote on-line remote-measuring system | |
CN201857953U (en) | Advanced abutment pressure monitoring device on coal face |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |