CN109371767A - A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS- - Google Patents

A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS- Download PDF

Info

Publication number
CN109371767A
CN109371767A CN201811335366.9A CN201811335366A CN109371767A CN 109371767 A CN109371767 A CN 109371767A CN 201811335366 A CN201811335366 A CN 201811335366A CN 109371767 A CN109371767 A CN 109371767A
Authority
CN
China
Prior art keywords
railway roadbed
crts
water
water pipe
roadbed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811335366.9A
Other languages
Chinese (zh)
Inventor
吴秀雄
吴江涛
徐凯胜
袁安辉
薛廷贵
张坤
尹晟轩
王勃超
梁明松
漆新郑
李君�
王远彬
韩强
刘君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201811335366.9A priority Critical patent/CN109371767A/en
Publication of CN109371767A publication Critical patent/CN109371767A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-, including the geotextiles and plastic film on railway roadbed concrete, setting maintenance water pipe (8) between geotextiles and plastic film, there is row's aperture in maintenance water pipe (8), maintenance water pipe (8) is connected with water supply device.After the completion of gravity line is laid with, the Landfill covering plastic film on I type double block type ballastless railway roadbed concrete surface of CRTS-.Gravity line forms the closed wet environment suitable for I type double block type ballastless railway roadbed concrete curing of CRTS- by the continual flowing water of tap hole in plastic film, while achieving the purpose that control plastic film inner concrete temperature.

Description

A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-
Technical field
The invention belongs to technical field of construction equipment, and in particular to a kind of railway roadbed concrete construction curing means.
Background technique
Mountain area mostly uses I type double-block type ballastless track system of CRTS- at present, since sleeper is C60 precast concrete, railway roadbed C40 high performance concrete, in addition there are also edge insulator iso-stress centrostigmas, so railway roadbed cracking has become I type double-block type pair of CRTS- The unavoidable common quality defect of block type ballastless track structure.
Especially I type double block type ballastless railway roadbed of roadbed section CRTS- due to day and night temperature it is big, railway roadbed concrete summer is round the clock most The big temperature difference is up to 40 degree, and after pouring ballastless track bed concrete, due to the effect of expanding with heat and contract with cold repeatedly, in 2 months, ballastless track bed is mixed Solidifying soil can generate a large amount of face crack: mainly from sleeper crack at edge;Crack down from roadbed, crackle present it is big, under Small phenomenon.
Therefore I type double block type ballastless railway roadbed construction and maintenance of CRTS- becomes the important means of anti-railway roadbed concrete cracking, existing Common practice is to set up special maintenance teams and groups, and ceaselessly sprinkling maintenance carries out moisturizing, temperature control, splits to reduce ballastless track bed concrete Line;It was verified that maintenance is well-done, the crackle of ballastless track bed 80% can be reduced.And there is sprinkling and mend the uniform, time in nourishment Unstable problem.
Summary of the invention
Technical problem solved by the present invention is being provided aiming at the problem that current railway roadbed concrete curing is using artificial sprinkling A kind of curing means of automation.
The technical scheme adopted by the invention is as follows:
A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-, including the geotextiles and modeling on railway roadbed concrete Expect film, setting maintenance water pipe between geotextiles and plastic film, conserving has row's aperture on water pipe, maintenance water pipe and the dress that supplies water Set connection.
Water supply device water pumper, water inlet water pipe, high-level water storage case, Cistern valve and retort stand, high-level water storage case are mounted on On retort stand, water pumper is connected by water inlet water pipe, maintenance water pipe is connected by Cistern valve.
A set of curing means is arranged at interval of 25-35m along route longitudinal direction, is mounted between two lines road, each high position Water tank connects two maintenance water pipes.
Ground 1.6-2 meters of high-level water storage case distance from bottom.
It protects on water pipe and one apopore is set every 20-30cm, shield water pipe one end blocks, and one end connects Cistern valve.
Beneficial effects of the present invention: spray tube is clipped between geotextiles and plastic film, moisture diffusion can be made to obtain more Block more evenly, continual and steady water supply may be implemented by water supply device, keep concrete humidity, and it is mixed to effectively increase road bed board Coagulate the cracking resistance of soil.
Detailed description of the invention
Fig. 1 is the schematic diagram of apparatus of the present invention;
In Fig. 1,1- high-level water storage case, 2- is intake water pipe, and 3- Cistern valve, the right line of 4- poured a section ballastless track bed outer edge, 5- Left line line midline, 6- retort stand, the right line line midline of 7-, 8- conserve water pipe, and the left line of 9- does not pour a section ballastless track bed inner edge, The right line of 10- has poured a section ballastless track bed inner edge, 11- water pumper.
Specific embodiment
Install and use step
1) high water tank 1 is installed: using plastic cistern, volume 1m3, water tank bottom is away from ground 1.8m, bottom installation Cistern valve 3, to control water flow size, high water tank 1 is mounted among two lines road.
2) add water into high water tank 1: high water tank 1 connects water pumper by water inlet water pipe 2, starts at water source and draws water Machine 11 supplies water into high water tank 1, fills it up with water tank.
3) paving geotextiles cover the ballastless track bed poured: after ballastless track bed concrete final set, form removal, and ballastless track bed Concrete covers geotechnological cloth bag and wraps up in.
4) water pipe 8 is conserved on geotextiles upper berth: maintenance water pipe 8 is spread along ballastless track bed face transverse direction absolute altitude highest point, along maintenance The tap hole of 3mm is arranged at interval of 25cm on gravity line for water pipe 8, and is higher by concrete surface, and gravity flow spray tube one end blocks, separately One end is connected to Cistern valve 3.
5) paving plastic film covers: the paving plastic film covering in geotextiles and gravity flow spray tube, plastic film are thick 0.2mm;Plastic film side is clamped with clip, and the plastic film that bottom reserves one fixed width more is pushed down with small sandbag, prevents wind Blow film open.
6) gravity line is conserved from jet flow: maintenance water pipe 8 connects with 1 bottom Cistern valve 3 of high water tank, opens Cistern valve 3, it passes water through tap hole free jet and goes out, keep concrete face moist, maintenance 14 days or more;It (supplies water by adjusting water flow size Valve) and the aperture of discharge orifice adjust effective maintenance faces of dropper two sides, until water flow covers all concrete surfaces. One maintenance unit is set at interval of 30m along route is longitudinal, in maintenance processes, send special messenger's tour, it is found that water flow is unsmooth or water tank Anhydrous situation should exclude in time;If it find that concrete local surfaces have dry phenomenon don't be nervous, also need to look at this time Whether the presence of fog is had on film, because the presence of fog, which has been proven that inside film, has had enough humidity, and And it is greater than 95%;The care environments under curing membrane are inspected periodically, if it find that there is water shortage, timely feed-tank adds water;Film The phenomenon that if there is being opened by wind, covering is fixed again.
7) step 1) -6 is repeated), until completing entire ballastless track bed construction.

Claims (5)

1. a kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-, including on railway roadbed concrete geotextiles and Plastic film, it is characterised in that: setting maintenance water pipe (8) between geotextiles and plastic film, conserving on water pipe (8) has a row small Hole, maintenance water pipe (8) are connected with water supply device.
2. I type double block type ballastless railway roadbed concrete construction curing means of CRTS- according to claim 1, it is characterised in that: Water supply device water pumper (11), water inlet water pipe (2), high-level water storage case (1), Cistern valve (3) and retort stand (6), high-level water storage Case (1) is mounted on retort stand (6), by water inlet water pipe (2) connection water pumper (11), is connected and is conserved by Cistern valve (3) Water pipe (8).
3. I type double block type ballastless railway roadbed concrete construction curing means of CRTS- according to claim 2, it is characterised in that: A set of curing means is arranged at interval of 25-35m along route longitudinal direction, is mounted between two lines road, each high-level water storage case (1) Connect two maintenance water pipes (8).
4. I type double block type ballastless railway roadbed concrete construction curing means of CRTS- according to claim 2, it is characterised in that: 1.6-2 meters of high-level water storage case (1) distance from bottom ground.
5. I type double block type ballastless railway roadbed concrete construction curing means of CRTS- according to claim 2, it is characterised in that: It protects on water pipe (8) and one apopore is set every 20-30cm, shield water pipe (8) one end blocks, and one end connects Cistern valve (3).
CN201811335366.9A 2018-11-10 2018-11-10 A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS- Pending CN109371767A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811335366.9A CN109371767A (en) 2018-11-10 2018-11-10 A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811335366.9A CN109371767A (en) 2018-11-10 2018-11-10 A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-

Publications (1)

Publication Number Publication Date
CN109371767A true CN109371767A (en) 2019-02-22

Family

ID=65384332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811335366.9A Pending CN109371767A (en) 2018-11-10 2018-11-10 A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-

Country Status (1)

Country Link
CN (1) CN109371767A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258207A (en) * 2019-07-01 2019-09-20 中铁七局集团有限公司 A kind of maintenance of equipment for double-block ballastless track bed board

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413236A (en) * 2008-09-26 2009-04-22 中铁十二局集团第二工程有限公司 CRTS II type double-block type non-fragment rail bed board construction method
WO2012128411A1 (en) * 2011-03-23 2012-09-27 Kang Nam-Hun Manufacturing method for prefabricated solid-bed track having solid three-dimensional shape, and construction method for concrete solid-bed track using prefabricated solid-bed track manufactured by the method
CN104762850A (en) * 2015-03-12 2015-07-08 中交一航局第四工程有限公司 Optimization method of track bed slab concrete of CRTS I type double-block ballastless track
CN107151954A (en) * 2017-06-24 2017-09-12 中铁十局集团第二工程有限公司 A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting
CN108149526A (en) * 2017-11-06 2018-06-12 武汉三源特种建材有限责任公司 A kind of I type double-block ballastless track bed board cracking resistance construction methods of CRTS
CN209602883U (en) * 2018-11-10 2019-11-08 中铁五局集团有限公司 A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413236A (en) * 2008-09-26 2009-04-22 中铁十二局集团第二工程有限公司 CRTS II type double-block type non-fragment rail bed board construction method
WO2012128411A1 (en) * 2011-03-23 2012-09-27 Kang Nam-Hun Manufacturing method for prefabricated solid-bed track having solid three-dimensional shape, and construction method for concrete solid-bed track using prefabricated solid-bed track manufactured by the method
CN104762850A (en) * 2015-03-12 2015-07-08 中交一航局第四工程有限公司 Optimization method of track bed slab concrete of CRTS I type double-block ballastless track
CN107151954A (en) * 2017-06-24 2017-09-12 中铁十局集团第二工程有限公司 A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting
CN108149526A (en) * 2017-11-06 2018-06-12 武汉三源特种建材有限责任公司 A kind of I type double-block ballastless track bed board cracking resistance construction methods of CRTS
CN209602883U (en) * 2018-11-10 2019-11-08 中铁五局集团有限公司 A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258207A (en) * 2019-07-01 2019-09-20 中铁七局集团有限公司 A kind of maintenance of equipment for double-block ballastless track bed board

Similar Documents

Publication Publication Date Title
CN205261226U (en) Large -scale regulator of brief multi -functional incessant air feed
CN209602883U (en) A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-
CN109371767A (en) A kind of I type double block type ballastless railway roadbed concrete construction curing means of CRTS-
CN105781613A (en) Local dynamic dry-type waste water pump house for large-scale shield tunnel
CN203340578U (en) Automatic irrigation management system of urban road green belt
CN210969332U (en) Bridge construction is with spraying maintenance system
CN102330634A (en) Novel device and novel method for introducing water to low parts through plateau alpine pipelines for electric generation and water consumption and reducing pipeline flowing water friction resistance
CN206308584U (en) Urban road drainage system
CN203105240U (en) Automatic irrigation system for green belts on flyover
CN109636246B (en) Distributed surface water supply and source system
CN204626238U (en) The water-supply-pipe bridge construction of a kind of constructability and maintenance
CN103485387B (en) Canal-irrigation-area pipe water delivery irrigation system
CN206128021U (en) Irrigation and drainage system in modern farmland
CN106836175B (en) A kind of construction method suitable for cluster well platform during rainy season
CN107151954A (en) A kind of type unballasted track bed plates of CRTS III drop supercharging fills curing means and fills the method for supporting
CN205404576U (en) Analog system is handled to coastal area villaumite stain dirt road base disease
CN205922295U (en) Overpass virescence irrigation drainage device convenient to installation
CN205775702U (en) Water kerb excessively for sponge urban water-through footpath
CN207512520U (en) It is a kind of can long distance water transfer high-speed railway
CN205546790U (en) Water -saving irrigation system based on rainwater is collected
CN206902537U (en) A kind of and water delivery and the bridge of communication function
CN201787264U (en) Float ball quota hydrant for farmland low pressure pipeline
CN107119507A (en) It is a kind of can long distance water transfer high-speed railway
CN201358967Y (en) Multi-head siphon pipe
CN109707001B (en) Water supply high-sand-content water body water taking device based on flow-induced vibration principle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 550003 No. 23, jujube Road, Yunyan District, Guizhou, Guiyang

Applicant after: CHINA RAILWAY NO.5 ENGINEERING GROUP CO., LTD.

Applicant after: The Fifth Engeering Co., Ltd. of China Railway 5th Bureau Group Co., Ltd.

Address before: 550003 Zao Shan Road, Nanming District, Guiyang, Guizhou Province, No. 23

Applicant before: CHINA RAILWAY NO.5 ENGINEERING GROUP CO., LTD.

Applicant before: The Fifth Engeering Co., Ltd. of China Railway 5th Bureau Group Co., Ltd.