CN109339069A - A kind of high-speed railway rock matter cut slope ecological safeguard structure and its construction method - Google Patents

A kind of high-speed railway rock matter cut slope ecological safeguard structure and its construction method Download PDF

Info

Publication number
CN109339069A
CN109339069A CN201811270047.4A CN201811270047A CN109339069A CN 109339069 A CN109339069 A CN 109339069A CN 201811270047 A CN201811270047 A CN 201811270047A CN 109339069 A CN109339069 A CN 109339069A
Authority
CN
China
Prior art keywords
slope
anchor
ecological
main body
speed railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811270047.4A
Other languages
Chinese (zh)
Inventor
张世杰
宣立华
崔俊杰
马旭东
王晶
李淑梅
谢倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Consulting Group Co Ltd
Original Assignee
China Railway Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Consulting Group Co Ltd filed Critical China Railway Engineering Consulting Group Co Ltd
Priority to CN201811270047.4A priority Critical patent/CN109339069A/en
Publication of CN109339069A publication Critical patent/CN109339069A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention relates to a kind of high-speed railway rock matter cut slope ecological safeguard structures, including N grades of ecological protection slopes, N are positive integer;Every grade of ecological protection slope includes side slope main body, more Bower Anchor bars, multiple ecology bags and steel cable grid, and the more Bower Anchor bars are inserted in side slope main body, and the surface intersection of Bower Anchor bar and side slope main body is equipped with anchor pier, is equipped with anchor head on the outside of the anchor pier and closes;The multiple ecology bag is equably layed in side slope main body, is equipped with steel cable grid on the outside of the multiple ecology bag, the steel cable grid is fixed by wire rope anchor;When N is greater than 1, plain stage of slope is equipped between adjacent ecological protection slope, the plain stage of slope is equipped with platform intercepting ditch.The present invention does not use any bricklaying to protect, improves slope surface ecological afforestation requirement in addition to plain stage of slope and platform intercepting ditch, while guaranteeing that structure is safe and stable, utmostly reduces the influence and destruction built because of High Speed Rail Projects to surrounding enviroment.

Description

A kind of high-speed railway rock matter cut slope ecological safeguard structure and its construction method
Technical field
The present invention relates to subgrade engineering fields, and in particular to a kind of high-speed railway rock matter cut slope ecological safeguard structure and Its construction method.
Background technique
China express railway rock matter cut slope at present, according to rock category, structural plane occurrence, degree of rock weathering, The factors such as development degree and weather conditions are lauched, it is general using empty window revetment (slope), spray sowing or Anchored frame beam protection. Wherein no matter anchor bolt frame girder construction is better than sky window revetment (slope) from slope reinforcement effect or ecological protection effect or sprays Structure is given birth in mixed planting, but slope surface frame beam structure still needs to consume a large amount of armored concrete building materials.As we anticipate to environmental protection The raising of knowledge, while guaranteeing that structure is safe and stable, reducing to the consumption of bricklaying is the necessarily hair for building industry for engineering construction Exhibition direction and we preserve the ecological environment indispensable one aspect.
Summary of the invention
For the above-mentioned technical problems in the prior art, the purpose of the present invention is to provide one kind, and road is greatly lowered High-speed railway rock matter cut slope ecological safeguard structure and its construction method of the moat slope protection project to the consumption of bricklaying.
In order to achieve the above objectives, the present invention adopts the following technical scheme:
A kind of high-speed railway rock matter cut slope ecological safeguard structure, including N grades of ecological protection slopes, N are positive integer;
Every grade of ecological protection slope includes side slope main body, more Bower Anchor bars, multiple ecology bags and steel cable grid, and described more Bower Anchor bar is inserted in side slope main body, and the surface intersection of Bower Anchor bar and side slope main body is equipped with anchor pier, is equipped on the outside of the anchor pier Anchor head closing;
The multiple ecology bag is equably layed in side slope main body, is equipped with steel cable grid on the outside of the multiple ecology bag Net, the steel cable grid are fixed by wire rope anchor;
When N is greater than 1, plain stage of slope is equipped between adjacent ecological protection slope, the plain stage of slope is cut equipped with platform Ditch.
Preferably, every grade of high 8~10m in ecological protection slope, every grade of ecological protection slope ratio of slope are 1:1~1:1.5.
Preferably, it is connected between adjacent ecology bag by connection buckle.
Preferably, the steel cable grid is fixed with wire rope anchor and is connected by the capel and rope card of wire rope anchor end It connects.
Preferably, kind is implanted with herbaceous plant or Indigenous Shrub Species on the ecology bag;
It preferably, further include simple irrigation system.
Preferably, the simple irrigation system includes main pipeline, branch pipe(tube) and multiple irrigation rigs, and the main pipeline passes through Branch pipe(tube) is connected with multiple irrigation rigs.
Preferably, the irrigation rig be set to side slope main body on, the irrigation rig be rainer or drip irrigation appliance, In be equipped with runoff investigation valve on each irrigation rig.
A kind of construction method of high-speed railway rock matter cut slope ecological safeguard structure, includes the following steps:
Step 1: cut slope excavates step by step, Bower Anchor bar of constructing step by step, anchor pier and anchor head closing;
Step 2: plain stage of slope uses concrete enclosing, and apply platform intercepting ditch;
Step 3: piling up ecology bag in side slope main bodys at different levels, connected between adjacent ecology bag using connection buckle;
Step 4: drilling performs wire rope anchor in side slope main bodys at different levels, steel cable grid is laid on the outside of ecology bag, and Grid is fixedly connected by the capel of wire rope anchor end and rope card with wire rope anchor;
Step 5: the opportunity plantation herbaceous plant of selection suitable planting or Indigenous Shrub Species;
Step 6: simple to install irrigation system.
Compared with prior art, the invention has the benefit that high-speed railway rock matter cut slope according to the present invention Ecological safeguard structure does not use any bricklaying to protect, improves slope surface ecological afforestation in addition to plain stage of slope and platform intercepting ditch It is required that.While guaranteeing that structure is safe and stable, utmostly reduce because High Speed Rail Projects build the shadow to surrounding enviroment It rings and destroys, make to improve the green ecological function of slope project in the closer involvement periphery natural ecological environment of cut slope.
Detailed description of the invention
Fig. 1 is a kind of high-speed railway rock matter cut slope ecological safeguard structure involved in a specific embodiment of the invention Structural schematic diagram;
Fig. 2 is anchor pier involved by the embodiment of the present invention and the structural schematic diagram at anchor head closing;
Fig. 3 is a kind of high-speed railway rock matter cut slope ecological safeguard structure involved in another specific embodiment of the present invention Structural schematic diagram.
In figure:
1- side slope main body;2- Bower Anchor bar;3- anchor pier;The closing of 4- anchor head;5- ecology bag;6- connection buckle;7- steel cable grid; 8- wire rope anchor;9- herbaceous plant or Indigenous Shrub Species;10- plain stage of slope;11- platform intercepting ditch.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that the described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Based on this Embodiment in invention, every other reality obtained by those of ordinary skill in the art without making creative efforts Example is applied, shall fall within the protection scope of the present invention.
The present embodiment provides a kind of high-speed railway rock matter cut slope ecological safeguard structure, including N grades of ecological protection slopes, N For positive integer;
Every grade of ecological protection slope includes side slope main body 1, more Bower Anchor bars 2, multiple ecology bags 5 and steel cable grid 7, described More Bower Anchor bars 2 are inserted in side slope main body 1, and the surface intersection of Bower Anchor bar 2 and side slope main body 1 is equipped with anchor pier 3, the anchor pier 3 outsides are equipped with anchor head closing 4;Wherein, the Bower Anchor bar 2 is used for reinforcing side slope main body 1, makes 1 safety and stability of side slope main body;
The multiple ecology bag 5 is equably layed in side slope main body 1, is equipped with steel cable on the outside of the multiple ecology bag 5 Grid 7, the steel cable grid 7 are fixed by wire rope anchor 8;By the fixed steel cable grid 7 of wire rope anchor 8 in ecology 5 outside of bag forms seine safeguard structure, avoids the local shedding of ecology bag 5, so that ecology bag 5 and rock slope form one It is whole;
When N is greater than 1, plain stage of slope 10 is equipped between adjacent ecological protection slope, the plain stage of slope 10 is equipped with flat Platform intercepting ditch 11.
High-speed railway rock matter cut slope ecological safeguard structure involved in the present embodiment is cut except plain stage of slope 10 and platform Other than ditch 11, does not use any bricklaying to protect, improve slope surface ecological afforestation requirement.Guaranteeing safe and stable same of structure When, it utmostly reduces because High Speed Rail Projects build the influence and destruction to surrounding enviroment, makes cut slope is closer to melt Enter in the natural ecological environment of periphery, improves the green ecological function of slope project.
In addition, in the inventive solutions, there are many concrete implementation modes, will select two of them below, right Technical solution of the present invention is introduced in detail.
Embodiment one,
Referring to Fig.1, the present embodiment provides a kind of high-speed railway rock matter cut slope ecological safeguard structure, which only includes Level-one ecological protection slope;
Referring to Fig.1-2, which includes side slope main body 1, more Bower Anchor bars 2, multiple ecology bags 5 and steel cable Grid 7, the more Bower Anchor bars 2 are inserted in side slope main body 1, and the surface intersection of Bower Anchor bar 2 and side slope main body 1 is equipped with anchor Pier 3 is equipped with anchor head closing 4 on the outside of the anchor pier 3;
The multiple ecology bag 5 is equably layed in side slope main body 1, is equipped with steel cable on the outside of the multiple ecology bag 5 Grid 7, the steel cable grid 7 are fixed by wire rope anchor 8;
High-speed railway rock matter cut slope ecological safeguard structure involved in the present embodiment does not use any bricklaying to protect, and mentions High slope surface ecological afforestation requirement.While guaranteeing that structure is safe and stable, utmostly reduce because High Speed Rail Projects are repaired The influence and destruction to surrounding enviroment are built, makes to improve side slope work in the closer involvement periphery natural ecological environment of cut slope The green ecological function of journey.
Embodiment two,
Referring to Fig. 3, the present embodiment provides a kind of high-speed railway rock matter cut slope ecological safeguard structure, which includes two Grade ecological protection slope;It is followed successively by level-one ecological protection slope, second level ecological protection slope from the bottom up;
Level-one ecological protection slope includes level-one side slope main body, more Bower Anchor bars 2, multiple ecology bags 5 and steel cable grid Net 7, the more Bower Anchor bars 2 are inserted in level-one side slope main body, and Bower Anchor bar 2 and the surface intersection of level-one side slope main body are equipped with Anchor pier 3 is equipped with anchor head closing 4 on the outside of the anchor pier 3;The multiple ecology bag 5 is equably layed in level-one side slope main body, institute It states and is equipped with steel cable grid 7 on the outside of multiple ecology bags 5, the steel cable grid 7 is fixed by wire rope anchor 8;
Second level ecological protection slope includes second level side slope main body, more Bower Anchor bars 2, multiple ecology bags 5 and steel cable grid Net 7, the more Bower Anchor bars 2 are inserted in second level side slope main body, and Bower Anchor bar 2 and the surface intersection of second level side slope main body are equipped with Anchor pier 3 is equipped with anchor head closing 4 on the outside of the anchor pier 3;The multiple ecology bag 5 is equably layed in second level side slope main body, institute It states and is equipped with steel cable grid 7 on the outside of multiple ecology bags 5, the steel cable grid 7 is fixed by wire rope anchor 8;
Wherein, plain stage of slope 10 is equipped between level-one ecological protection slope and second level ecological protection slope, the side slope is flat Platform 10 is equipped with platform intercepting ditch 11.
In addition, preferably, in one particular embodiment of the present invention, every grade of high 8~10m in ecological protection slope, every grade of life State protective slope ratio of slope is 1:1~1:1.5,10 width 2-3m of plain stage of slope.
In addition, preferably, in one particular embodiment of the present invention, being connected between adjacent ecology bag 5 by connection buckle 6 It connects.Preferably, the connection buckle 6 is manufactured by polypropylene extruding, and 6 barb pawls, adjacent ecology bag 5 is respectively arranged in above and below Between monolithic stability kept by the piercing of barb pawl.
In addition, preferably, in one particular embodiment of the present invention, the steel cable grid 7 passes through 8 end of wire rope anchor The capel and rope card in portion are fixedly connected with wire rope anchor 8.Preferably, the steel cable grid 7 is 12~14mm's by diameter Galvanized steel wire rope is made, and mesh spacing is 0.4m.
In addition, preferably, in one particular embodiment of the present invention, kind is implanted with herbaceous plant or township on the ecology bag Native shrub 9;
In addition, preferably, further including simple irrigation system in one particular embodiment of the present invention.
In addition, preferably, in one particular embodiment of the present invention, the simple irrigation system includes main pipeline, branch Pipeline and multiple irrigation rigs, the main pipeline are connected by branch pipe(tube) with multiple irrigation rigs.
In addition, preferably, in one particular embodiment of the present invention, the irrigation rig is set in side slope main body, institute Stating irrigation rig is rainer or drip irrigation appliance, wherein being equipped with runoff investigation valve on each irrigation rig.
High-speed railway rock matter cut slope ecological safeguard structure described in the present embodiment, in non-barricade location, level-one ecology Protective slope directly connects with existing lateral sulcus platform;In barricade location, level-one ecological slope protection directly connects with barricade top.
Embodiment three,
The present embodiment provides a kind of applying for high-speed railway rock matter cut slope ecological safeguard structure involved in embodiment two Work method, specifically comprises the following steps:
Step 1: cut slope excavates step by step, Bower Anchor bar 2 of constructing step by step, anchor pier 3 and anchor head closing 4;
Step 2: plain stage of slope 10 uses concrete enclosing, and apply platform intercepting ditch 11;
Step 3: piling up ecology bag 5 in side slope main bodys at different levels, connected between adjacent ecology bag 5 using connection buckle 6;
Step 4: drilling performs wire rope anchor 8 in side slope main bodys at different levels, steel cable grid is laid on the outside of ecology bag 5 7, and steel cable grid 7 is fixedly connected by the capel of 8 end of wire rope anchor and rope card with wire rope anchor 8;
Step 5: the opportunity plantation herbaceous plant of selection suitable planting or Indigenous Shrub Species 9;
Step 6: simple to install irrigation system.
Preferably, 5 level of ecology bag is paved, and 6 junction of the edges of two sheets of paper of connection buckle is placed, and ecology bag 5 is put in " product " font when code is built It puts, then is compacted as integral interlock structure.
The protection system that the embodiment of the present invention is made up of Bower Anchor bar 2, ecology bag 5 and steel cable grid 7, can be by ecology bag 5 are closely fixed in side slope main body, so that bedrock side slope and reconstruction plant soil hypothallus are joined into an entirety, have Reliable side slope protection against erosion ability, it is ensured that the safety and stablization of cut slope in railway operation;Simultaneously also by the system gram It has taken rock matter cut slope and has been difficult to the difficulty afforested, substantially increased the adaptation of rock matter deep vertical shaft Yu periphery ecological environment Property.
Above embodiments are only exemplary embodiment of the present invention, are not used in the limitation present invention, protection scope of the present invention It is defined by the claims.Those skilled in the art can within the spirit and scope of the present invention make respectively the present invention Kind modification or equivalent replacement, this modification or equivalent replacement also should be regarded as being within the scope of the present invention.

Claims (9)

1. a kind of high-speed railway rock matter cut slope ecological safeguard structure, which is characterized in that including N grades of ecological protection slopes, N is positive Integer;
Every grade of ecological protection slope includes side slope main body, more Bower Anchor bars, multiple ecology bags and steel cable grid, the more Bower Anchors Bar is inserted in side slope main body, and the surface intersection of Bower Anchor bar and side slope main body is equipped with anchor pier, is equipped with anchor head on the outside of the anchor pier Closing;
The multiple ecology bag is equably layed in side slope main body, is equipped with steel cable grid on the outside of the multiple ecology bag, The steel cable grid is fixed by wire rope anchor;
When N is greater than 1, plain stage of slope is equipped between adjacent ecological protection slope, the plain stage of slope is equipped with platform intercepting ditch.
2. high-speed railway rock matter cut slope ecological safeguard structure according to claim 1, which is characterized in that every grade of ecology High 8~the 10m of protective slope, every grade of ecological protection slope ratio of slope are 1:1~1:1.5.
3. high-speed railway rock matter cut slope ecological safeguard structure according to claim 1, which is characterized in that adjacent life It is connected between state bag by connection buckle.
4. high-speed railway rock matter cut slope ecological safeguard structure according to claim 1, which is characterized in that the steel cable Grid is fixedly connected by the capel and rope card of wire rope anchor end with wire rope anchor.
5. high-speed railway rock matter cut slope ecological safeguard structure according to claim 1, which is characterized in that the ecology Bag Shang kind is implanted with herbaceous plant or Indigenous Shrub Species;
6. high-speed railway rock matter cut slope ecological safeguard structure according to claim 1, which is characterized in that further include letter Easy irrigation system.
7. high-speed railway rock matter cut slope ecological safeguard structure according to claim 6, which is characterized in that described simple Irrigation system includes main pipeline, branch pipe(tube) and multiple irrigation rigs, and the main pipeline passes through branch pipe(tube) and multiple irrigation rig phases Even.
8. high-speed railway rock matter cut slope ecological safeguard structure according to claim 7, which is characterized in that the irrigation Device is set in side slope main body, and the irrigation rig is rainer or drip irrigation appliance, wherein being equipped on each irrigation rig Runoff investigation valve.
9. a kind of construction method of high-speed railway rock matter cut slope ecological safeguard structure according to claims 1-8, special Sign is, includes the following steps:
Step 1: cut slope excavates step by step, Bower Anchor bar of constructing step by step, anchor pier and anchor head closing;
Step 2: plain stage of slope uses concrete enclosing, and apply platform intercepting ditch;
Step 3: piling up ecology bag in side slope main bodys at different levels, connected between adjacent ecology bag using connection buckle;
Step 4: drilling performs wire rope anchor in side slope main bodys at different levels, steel cable grid is laid on the outside of ecology bag, and by lattice Aperture plate is fixedly connected by the capel and rope card of wire rope anchor end with wire rope anchor;
Step 5: the opportunity plantation herbaceous plant of selection suitable planting or Indigenous Shrub Species;
Step 6: simple to install irrigation system.
CN201811270047.4A 2018-10-29 2018-10-29 A kind of high-speed railway rock matter cut slope ecological safeguard structure and its construction method Pending CN109339069A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811270047.4A CN109339069A (en) 2018-10-29 2018-10-29 A kind of high-speed railway rock matter cut slope ecological safeguard structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811270047.4A CN109339069A (en) 2018-10-29 2018-10-29 A kind of high-speed railway rock matter cut slope ecological safeguard structure and its construction method

Publications (1)

Publication Number Publication Date
CN109339069A true CN109339069A (en) 2019-02-15

Family

ID=65310795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811270047.4A Pending CN109339069A (en) 2018-10-29 2018-10-29 A kind of high-speed railway rock matter cut slope ecological safeguard structure and its construction method

Country Status (1)

Country Link
CN (1) CN109339069A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100513136B1 (en) * 2004-03-05 2005-09-07 이호형 Rock slope reinforcement structure and construction method thereof
CN201826317U (en) * 2010-09-19 2011-05-11 胡光全 Flexible ecological side slope structure
CN203270589U (en) * 2013-05-31 2013-11-06 中铁第四勘察设计院集团有限公司 Green protection structure of three-dimensional water drainage ecological bags on cutting steep side slope
CN105178339A (en) * 2015-08-25 2015-12-23 铁道第三勘察设计院集团有限公司 Spray-sowing slope protection structure for steep rock side slope
CN205024698U (en) * 2015-08-25 2016-02-10 铁道第三勘察设计院集团有限公司 Slope protection structure is given birth to in intermingle of spouting to precipitous rock matter side slope
CN106498955A (en) * 2016-12-21 2017-03-15 中国电建集团贵阳勘测设计研究院有限公司 Rock or concrete high and steep slope protection and greening structure and construction method thereof
CN106638634A (en) * 2017-02-09 2017-05-10 杭州江润科技有限公司 Road rock slope vine ecological protection structure and construction method
CN209293044U (en) * 2018-10-29 2019-08-23 中铁工程设计咨询集团有限公司 A kind of high-speed railway rock matter cut slope ecological safeguard structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100513136B1 (en) * 2004-03-05 2005-09-07 이호형 Rock slope reinforcement structure and construction method thereof
CN201826317U (en) * 2010-09-19 2011-05-11 胡光全 Flexible ecological side slope structure
CN203270589U (en) * 2013-05-31 2013-11-06 中铁第四勘察设计院集团有限公司 Green protection structure of three-dimensional water drainage ecological bags on cutting steep side slope
CN105178339A (en) * 2015-08-25 2015-12-23 铁道第三勘察设计院集团有限公司 Spray-sowing slope protection structure for steep rock side slope
CN205024698U (en) * 2015-08-25 2016-02-10 铁道第三勘察设计院集团有限公司 Slope protection structure is given birth to in intermingle of spouting to precipitous rock matter side slope
CN106498955A (en) * 2016-12-21 2017-03-15 中国电建集团贵阳勘测设计研究院有限公司 Rock or concrete high and steep slope protection and greening structure and construction method thereof
CN106638634A (en) * 2017-02-09 2017-05-10 杭州江润科技有限公司 Road rock slope vine ecological protection structure and construction method
CN209293044U (en) * 2018-10-29 2019-08-23 中铁工程设计咨询集团有限公司 A kind of high-speed railway rock matter cut slope ecological safeguard structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冯美军等: "《公路边坡生态恢复及防护技术》", vol. 1, 30 April 2014, 中国海洋大学出版社, pages: 166 *

Similar Documents

Publication Publication Date Title
CN101580305B (en) Wetland governance method for improving ecological environmental in reservoir falling zone
CN208136927U (en) A kind of soil cutting side slope supporting construction
CN104328766A (en) Ecological stone cage net box retaining wall and construction method
CN108222026B (en) Method for repairing small gangue dump of coal mine
CN104234062A (en) Landslide control method of ionic type rare earth in-situ mineral leaching stope
CN103758139A (en) Vegetation type anchor rod ecological bag and slope protection method thereof
CN108130888A (en) A kind of soft ecological revetment structure and its construction method
CN209293044U (en) A kind of high-speed railway rock matter cut slope ecological safeguard structure
CN109183817A (en) A kind of construction method of the tall and big effective soil horizon of precipitous rock slope ecological safeguard structure
CN114134877B (en) Treatment method for mining ground cracks of shallow coal seam in hilly and hilly areas of peaked landform
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN106522244B (en) A kind of embankment combination binding structure and its construction method
CN207714168U (en) Stone discharge device is blocked for mud-rock flow protection
CN109505302A (en) A kind of high precipitous rock slope vegetation type ecological bag fixer
CN209669897U (en) A kind of high precipitous rock slope vegetation type ecology bag fixed structure
CN203334301U (en) Cave slope strengthening protection structure
CN205805546U (en) A kind of drift-sand stratum highway tunnel structure
CN109339069A (en) A kind of high-speed railway rock matter cut slope ecological safeguard structure and its construction method
CN103541341A (en) Repeatedly utilized grass grid sand fixing method
CN204238176U (en) Ecotypic Stone Mesh-box net cage barricade
CN105256763A (en) Diking method based on bamboo raft frame structure
CN205296183U (en) Vegetation protection network
CN210263090U (en) Side slope protection and ecological green covering combined symbiotic universal constraint structure
CN207362869U (en) One species gravity type can afforest barrier wall structure
CN209100054U (en) It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination