CN207362869U - One species gravity type can afforest barrier wall structure - Google Patents

One species gravity type can afforest barrier wall structure Download PDF

Info

Publication number
CN207362869U
CN207362869U CN201720434038.9U CN201720434038U CN207362869U CN 207362869 U CN207362869 U CN 207362869U CN 201720434038 U CN201720434038 U CN 201720434038U CN 207362869 U CN207362869 U CN 207362869U
Authority
CN
China
Prior art keywords
soil
engineering bag
paste
afforest
cement slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720434038.9U
Other languages
Chinese (zh)
Inventor
韩晓雷
胡涛
熊波
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201720434038.9U priority Critical patent/CN207362869U/en
Application granted granted Critical
Publication of CN207362869U publication Critical patent/CN207362869U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a species gravity type can afforest barrier wall structure, including soil paste soil engineering bag and soil cement slurry soil engineering bag, the soil paste soil engineering bag or soil cement slurry soil engineering bag massif slope outer most edge bond into stepped ramp type, between per two-stage step TGXG is laid with according to certain longitudinal pitch, at the same time, followed closely and be connected with reinforcing bar between upper and lower two layers of soil paste soil engineering bag and soil cement slurry soil engineering bag, wherein, soil cement and soil or slag are filled in behind soil cement slurry soil engineering bag per level-one step successively to massif slope, generally form a Gravity Retaining Wall, greening soil matrix is used as in the soil paste soil engineering bag of every grade of step of Gravity Retaining Wall most leading edge.Have the advantages that to afforest, good integrity, economy, beauty, easy to constructing and safe and reliable, all soil paste soil engineering bags or soil cement slurry soil engineering bag, framework of steel reinforcement, reinforcing bar nail and TGXG can be completed according to design requirement in factory process, be rapidly performed by in-site installation and construction.

Description

One species gravity type can afforest barrier wall structure
Technical field
The utility model belongs to Geotechnical Engineering field, and in particular to the Retaining Wall Reinforcement knot that a species gravity type can afforest Structure.
Background technology
In social and economic construction, the engineering construction such as highway, railway, water conservancy, especially enlargement of cities, mining all can Excavate substantial amounts of massif, bring a series of geological environment and ecological environment problem, vegetation is destroyed, rock slope it is naked Dew, so as to provide condition for geological disasters such as soil erosion, mud-rock flow, landslides, while also result in local stingy The ecological problem such as the deterioration of time and the destruction of food chain.
Recently as expanding economy, people have natural environment the requirement of higher in terms of safety, landscape.It is at different levels Land resources department divides emphasis progressively to be administered and recovered for the geological disaster in mine exploited in the past and ecological environment, Especially the mine management speed of the important main line of communication, Outskirts of City is accelerated.What Ministry of Land and Resources was formulated《Mining geology Pollution control regulation》, also go into effect on May 1st, 2009, Newly-built mine is both needed to establishment mining geology while exploitation Environmental protection and treatment recovery scheme, has effectively contained the destruction dug up mine to geological environment and has alleviated mine geological environment The difficulty of recovery.The high steep rock slope geological disaster that the exploitation of randomness is left before this, can be controlled by engineering measure Reason.But ecological environment and landscape recovering, often by conditionality, effect is undesirable even after many rock matter stopes and slope greening Utter failure.
The content of the invention
For above-mentioned ecological environment and landscape recovering exist there are the defects of or deficiency, the purpose of this utility model is that, The Retaining Wall Reinforcement structure that one species gravity type can afforest is provided.
In order to realize above-mentioned task, the utility model takes following technical solution:
One species gravity type can afforest barrier wall structure, including soil paste soil engineering bag and soil cement slurry soil engineering bag, it is characterised in that The soil paste soil engineering bag and soil cement slurry soil engineering bag massif slope outer most edge bond into stepped ramp type, per two-stage step it Between longitudinal pitch be equipped with TGXG, meanwhile, use reinforcing bar between upper and lower two layers of soil paste soil engineering bag and soil cement slurry soil engineering bag Nail is connected, wherein, soil cement and soil or slag are filled in behind the soil cement slurry soil engineering bag per level-one step successively to massif slope Face, generally forms a Gravity Retaining Wall, and greening is used as in the soil paste soil engineering bag of every grade of step of Gravity Retaining Wall most leading edge Soil matrix.
Other features of the utility model are:
Using framework of steel reinforcement as inner support, each reinforcing bar inside the soil paste soil engineering bag and soil cement slurry soil engineering bag The side of frame towards massif slope is disposed with iron wire mesh sheet, and one is incorporated in by the form and framework of steel reinforcement welding or bind Rise, for preventing soil paste soil engineering bag and soil cement slurry soil engineering bag undue evagination when shaping is filled in.
The soil paste soil engineering bag and soil cement slurry soil engineering bag according to the concrete condition adjusted design size of construction site, Factory process is molded.
The soil paste soil engineering bag of every grade of step most leading edge is used as greening soil matrix, and soil paste vegetation according to selected by greening takes root hair Requirement is educated, selects suitable moisture content to reach required compactness by way of ramming, stirring or irrigate, to ensure plant Normal growth.
The most soil cement slurry soil engineering bag cement is prepared with soil, and cement content is 5%~10%.
The TGXG being laid between every two-stage step, untill length is routed to massif slope, maximum is laid with length Degree is no more than 15m, and TGXG is smaller than 2.0m along massif slope extending direction arranged for interval.
Followed closely and connected with reinforcing bar between the bilevel soil paste soil engineering bag, reinforcing bar nail is arranged in each soil paste soil engineering bag Between, the length of reinforcing bar nail is 50cm, is respectively inserted into 25cm, spacing 1.5m × 1.5m up and down.
It is 4.5m~6.0m, fill level and soil paste soil engineering bag and soil cement slurry geotechnique that every layer of soil cement, which fills in width, Bag is concordant.
The described every grade soil filled in or slag tamp the compactness for reaching design using cal rolling to massif slope.
Spilled water hole is both provided between every two layers of soil paste soil engineering bag.
The class gravity type of the utility model can afforest barrier wall structure, and having can afforest, good integrity, economy, beauty, be easy to The advantages of constructing and is safe and reliable, all soil paste soil engineering bags and soil cement slurry soil engineering bag, framework of steel reinforcement, reinforcing bar nail and geotechnological lattice Grid can be completed according to design requirement in factory process, be rapidly performed by in-site installation and construction.
Brief description of the drawings
Fig. 1 is that the class gravity type of the utility model can afforest barrier wall structure profile.
Fig. 2 is that the class gravity type of the utility model can afforest barrier wall structure elevation.
Fig. 3 is the support frame figure of soil engineering bag.
Mark in figure represents respectively:1st, soil paste soil engineering bag, 2, soil cement slurry soil engineering bag, 3, soil cement, 4, soil or slag, 5th, reinforcing bar is followed closely, 6 TGXG.
Below in conjunction with drawings and examples, the utility model is described in further detail.
Embodiment
Referring to Fig. 1 to Fig. 3, the present embodiment, which provides a species gravity type, can afforest barrier wall structure, including 1 He of soil paste soil engineering bag Soil cement slurry soil engineering bag 2, the soil paste soil engineering bag 1 and soil cement slurry soil engineering bag 2 massif slope outer most edge bond into Stepped ramp type, is often laid with TGXG 6 between two-stage step according to certain longitudinal pitch, meanwhile, upper and lower two layers of soil paste soil engineering bag 1 It is connected between soil cement slurry soil engineering bag 2 with reinforcing bar nail 5, wherein, the soil cement slurry soil engineering bag 2 per level-one step is filled out successively below Water filling soil 3 and soil or slag 4 generally form a Gravity Retaining Wall, in Gravity Retaining Wall most leading edge to massif slope Every grade of step soil paste soil engineering bag 1 as greening soil matrix.
In the present embodiment, the soil paste soil engineering bag 1 and the inside of soil cement slurry soil engineering bag 2 use framework of steel reinforcement as interior branch Support (Fig. 3), the side of each framework of steel reinforcement towards massif slope is disposed with the iron wire mesh sheet of grid, passes through what is welded or bind Form is combined together with framework of steel reinforcement, for preventing soil paste soil engineering bag 1 and soil cement slurry soil engineering bag 2 when shaping is filled in Undue evagination.
The soil paste soil engineering bag 1 and soil cement slurry soil engineering bag 2 according to the concrete condition adjusted design size of construction site, It is molded in factory process.
The soil paste soil engineering bag 1 of every grade of step most leading edge is used as greening soil matrix, and soil paste vegetation according to selected by greening takes root Development requires, and selects suitable moisture content to reach required compactness by way of ramming, stirring or irrigate, to ensure to plant Thing normal growth.
The soil cement slurry soil engineering bag 2 is prepared with cement and soil, and cement content is 5%~10%.
The TGXG 6 being laid between every two-stage step, untill length is routed to massif slope, maximum is laid with length Degree is no more than 15m, and TGXG 6 is smaller than 2.0m along massif slope extending direction arranged for interval.
With 5 connection of reinforcing bar nail between the bilevel soil paste soil engineering bag 1, the relatively wrong of upper and lower two-stage step is prevented It is dynamic.Reinforcing bar nail 5 is arranged among each soil paste soil engineering bag 1, and the length of reinforcing bar nail 5 is 50cm, is respectively inserted into 25cm, spacing up and down 1.5m×1.5m。
It is 4.5m~6.0m, fill level and soil paste soil engineering bag 1 and soil cement puddled soil that every layer of soil cement 3, which fills in width, Work bag 2 is concordant.
The described every grade soil filled in or slag 4 arrive massif slope, and the compactness of design is reached using cal rolling compacting.
Spilled water hole is both provided between every two layers of soil paste soil engineering bag 1.
Certainly, framework of steel reinforcement, reinforcing bar nail and TGXG can also be completed according to design requirement in factory process, quickly Carry out in-site installation and construction.
For the ease of construction, height selection 0.8m~1.5m of every grade of step, the width that every grade of step is inwardly taken in preferably selects 0.5m~1.5m is selected, enough working faces are left to upper level step construction.
In construction, the slope surface angle of Gravity Retaining Wall can be controlled between 35 °~50 °, be at natural stability State, it is convenient to afforest operation.

Claims (9)

1. a species gravity type can afforest barrier wall structure, including soil paste soil engineering bag (1) and soil cement slurry soil engineering bag (2), its feature Be, the soil paste soil engineering bag (1) and soil cement slurry soil engineering bag (2) massif slope outer most edge bond into stepped ramp type, Longitudinal pitch between per two-stage step is equipped with TGXG (6), meanwhile, upper and lower two layers of soil paste soil engineering bag (1) and soil cement (5) are followed closely between slurry soil engineering bag (2) with reinforcing bar to be connected, wherein, the soil cement slurry soil engineering bag (2) per level-one step is filled in successively below Soil cement (3) and soil or slag (4) generally form a Gravity Retaining Wall to massif slope, Gravity Retaining Wall most before The soil paste soil engineering bag (1) of every grade of step of edge is as greening soil matrix.
2. class gravity type as claimed in claim 1 can afforest barrier wall structure, it is characterised in that the soil paste soil engineering bag (1) With soil cement slurry soil engineering bag (2) inside using framework of steel reinforcement as inner support, each framework of steel reinforcement towards massif slope one Side is disposed with iron wire mesh sheet, is combined together by the form and framework of steel reinforcement welding or bind, for preventing soil paste soil engineering bag (1) and soil cement slurry soil engineering bag (2) undue evagination when shaping is filled in.
3. class gravity type as claimed in claim 1 can afforest barrier wall structure, it is characterised in that the soil paste soil engineering bag (1) Concrete condition adjusted design size with soil cement slurry soil engineering bag (2) according to construction site, is molded in factory process.
4. class gravity type as claimed in claim 1 can afforest barrier wall structure, it is characterised in that every grade of step most leading edge Soil paste soil engineering bag (1) is used as greening soil matrix, and soil paste vegetation rooting development requirement according to selected by greening, selects suitable moisture content to lead to Cross the mode rammed, stir or irrigated and reach required compactness, to ensure plant normal growth.
5. class gravity type as claimed in claim 1 can afforest barrier wall structure, it is characterised in that be spread between every two-stage step If TGXG (6), untill length is routed to massif slope, maximum laying length is no more than 15m, TGXG (6) edge Massif slope extending direction arranged for interval, is smaller than 2.0m.
6. class gravity type as claimed in claim 1 can afforest barrier wall structure, it is characterised in that the bilevel soil paste soil (5) are followed closely between work bag (1) with reinforcing bar to connect, reinforcing bar nail (5) is arranged among each soil paste soil engineering bag (1), the length of reinforcing bar nail (5) Spend for 50cm, up and down each insertion 25cm, spacing 1.5m × 1.5m.
7. class gravity type as claimed in claim 1 can afforest barrier wall structure, it is characterised in that every layer of soil cement (3) is filled out Note width is 4.5m~6.0m, and fill level is concordant with soil paste soil engineering bag (1) and soil cement slurry soil engineering bag (2).
8. class gravity type as claimed in claim 1 can afforest barrier wall structure, it is characterised in that the described every grade soil filled in or ore deposit Slag (4) arrives massif slope, and the compactness of design is reached using cal rolling compacting.
9. class gravity type as claimed in claim 1 can afforest barrier wall structure, it is characterised in that every two layers of soil paste soil engineering bag (1) spilled water hole is both provided between.
CN201720434038.9U 2017-04-24 2017-04-24 One species gravity type can afforest barrier wall structure Expired - Fee Related CN207362869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720434038.9U CN207362869U (en) 2017-04-24 2017-04-24 One species gravity type can afforest barrier wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720434038.9U CN207362869U (en) 2017-04-24 2017-04-24 One species gravity type can afforest barrier wall structure

Publications (1)

Publication Number Publication Date
CN207362869U true CN207362869U (en) 2018-05-15

Family

ID=62423675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720434038.9U Expired - Fee Related CN207362869U (en) 2017-04-24 2017-04-24 One species gravity type can afforest barrier wall structure

Country Status (1)

Country Link
CN (1) CN207362869U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110786206A (en) * 2019-11-05 2020-02-14 中国电力工程顾问集团西南电力设计院有限公司 Slope greening method for soil slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110786206A (en) * 2019-11-05 2020-02-14 中国电力工程顾问集团西南电力设计院有限公司 Slope greening method for soil slope

Similar Documents

Publication Publication Date Title
CN112360462B (en) Mining process for filling and grouting short-wall fully-mechanized mining gangue
CN102182472B (en) Backfill repairing method for tunnel collapse cavity
CN101408106B (en) Small tube shed pre-grouting method
CN108412542A (en) A kind of wide lane digging gangue paste body filling of high seam is at lane method
WO2016045440A1 (en) Mining method
CN109595029B (en) Goaf partial stowage supporting structure and its construction method under the conditions of tight roof
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN104775817A (en) All-negative pressure continuous-mining continuous-filling step-by-step replacement mining method for coal underneath cities and towns, industrial buildings, railways and other buildings
CN104763433A (en) Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum
CN107060771A (en) Middle short tunnel is unidirectionally appeared excavation method
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN103362513A (en) Transformation and construction method for existing cavity in underground excavation region
CN106968676A (en) The method that cavity is passed through in tunnelling
CN104234062A (en) Landslide control method of ionic type rare earth in-situ mineral leaching stope
AU2021355609B2 (en) Method for mining by filling and caving
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN102418528B (en) End ore-drawing caving mining technology with steel concrete composite man-made false roofs
CN106870001B (en) Tunnel is layered pocket type self-support filling counterfort construction method
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN102080551B (en) Three-amplitude construction method for inverted arch of primary support of weak broken wall rock tunnel
CN102587385A (en) Foundation pit supporting method for sludge-exchanged and filled soft soil
CN207362869U (en) One species gravity type can afforest barrier wall structure
CN107829748B (en) A kind of complementary cycle formula excavation method suitable for floating pebble layer large cross-section tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515