CN109252829A - Karst method for treating water in team road - Google Patents

Karst method for treating water in team road Download PDF

Info

Publication number
CN109252829A
CN109252829A CN201811202309.3A CN201811202309A CN109252829A CN 109252829 A CN109252829 A CN 109252829A CN 201811202309 A CN201811202309 A CN 201811202309A CN 109252829 A CN109252829 A CN 109252829A
Authority
CN
China
Prior art keywords
slip casting
hole
water
grouting
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811202309.3A
Other languages
Chinese (zh)
Inventor
白君才
***
司伟峰
全宗坤
崔志成
李润双
刘福春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN201811202309.3A priority Critical patent/CN109252829A/en
Publication of CN109252829A publication Critical patent/CN109252829A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Karst method for treating water is related to karst method for treating water in tunnel in team road.Mainly solve the problems, such as that pipe laying ejectment is invented there are larger difficulty of construction in hole when current water yield is larger.It is applied in front of tunnel heading and bores advanced hole, advanced hole starting point is at prediction gushing water with preceding 5~10m;Range of grouting is the circle of radius 12m, and slip casting section point tricyclic is implemented;6m is stayed not excavate the only slurry disk as next slip casting section after the completion of one slip casting section;Injected hole arrangement is radial in umbrella shape towards direction is excavated by working, and drilling is arranged to a few, and is combined using long short-bore;Injecting paste material is cement slurry;Drilling and grouting sequence are from outer ring to inner ring since arch, and same collar aperture interval construction buries seamless steel pipe as orifice tube in only slurry disk before slip casting;Single hole grouting pressure reaches design final pressure and continues slip casting 10min or more, can terminate this hole slip casting.Advantage is that difficulty of construction is small, and effect is good.

Description

Karst method for treating water in team road
Technical field:
The present invention relates to karst method for treating water in tunnel.
Background technique:
Karst water is underground water of the preservation in the corrosion fissure and solution cavity of soluble rock stratum, most evident characteristic be distributed pole not Uniformly, especially common in limestone area.The tunnel construction phase encounters the surprise attack of water burst, often floods construction site, destroys by rush of water Equipment, causes equipment and personal injury, and schedule delays increase construction investment.The permanent runtime can also jeopardize the knot of diversion system Structure safety.For the water burst, according to the conventional method, the mode of pipe laying ejectment in hole is mainly taken to be handled, due to karst Actually move towards complex, there are biggish difficulty of construction and construction risk, handlings for pipe laying ejectment in hole when water yield is larger With higher, effect not can guarantee.
Summary of the invention:
Technical problem to be solved by the invention is to provide a kind of processing karst water expense is low, difficulty of construction is small, the good team of effect Karst method for treating water in road.
Above-mentioned purpose is achieved in that
Objective condition limitation cannot use drainaging scheme, or because solution cavity is larger and is filled-type, and when having abundant underground water, Using grouting water blocking method;
Tunnel is discharged, total flow >=10m by fracture, rich water karst band when visiting at least 4 holes in the hole of 5~6, water hole3It is adopted when/h With tunneling boring deep hole grouting water blockoff;
One, according to advance geologic prediction data, front of tunnel heading applies 5~6 advanced holes of brill, verifies underground water developmental state and molten The geologic aspects such as hole, the orientation of solutional cavity, scale, advance borehole starting point should be at prediction gushing waters with preceding 5~10m;
Two, range of grouting is the circle of radius 12m, and slip casting segment length 30m, a point tricyclic implemented, the long 12m of the first ring, the long 10m of the second ring, The long 8m of third ring;6m is stayed not excavate the only slurry disk as next slip casting section after the completion of one slip casting section;
Three, by working, towards direction is excavated, in umbrella shape, radial, opening diameter 115mm, drilling are arranged to a few to injected hole arrangement, Internal and external cycle presses quincunx arrangement, and is combined using long short-bore, by reach slip casting sufficiently, do not stay dead angle for the purpose of, slurries diffusion Radius 2m, bottom hole spacing are not more than 3m;
Four, injecting paste material is cement slurry (using cement-sodium silicate double liquid when necessary), and concentration of slurry is according to rock mass condition and water Amount size is adjusted, and the ratio of mud of cement slurry is 0.5:1~1:1, and dual slurry matching parameter is C:S=1:0.6~1.0(volume Than), modulus of water glass 2.6~2.8, concentration of sodium silicate 35B;
Five, grouting pressure value is 0.5~1.0MPa of first pressing, 3.0~5.0MPa of final pressure;
Six, when rock crusher, cranny development, using protrusive slip casting;Wall-rock crack is not enough developed, when rock stratum is slightly good, after Formula slip casting is moved back, drilling and grouting sequence are from outer ring to inner ring since arch, and same collar aperture interval is constructed;
Seven, Φ 140mm seamless steel pipe is buried in only slurry disk before slip casting as orifice tube, aperture pipe range 3m, exposed 0.2~ 0.3m;
Eight, slip casting ending standard: single hole grouting pressure reaches design final pressure and continues slip casting 10min or more, can terminate this hole note Slurry;Single hole grouting amount with design grouting amount it is roughly the same, at the end of 20~30L/min or less of grout absorption can terminate this hole note Slurry;
Nine, after the injected hole of a slip casting section has all been infused, bores 2~3 holes and slip casting effect is checked, and coring is observed Slurries fill situation, while water yield should not exceed 0.2L/min.m in inspection hole, and the water leakage of certain is not more than 10L/ min;Or under 1.0MPa packer permeability test, inspection hole inflow is less than 2L/min.m, otherwise encrypts bored grouting.
Ten, slip casting start-up operation identity distance predicts 5~8m at gushing water, to guarantee that enough sealing batholites, terminal should be more than pre- Survey gushing water section 5m.
The invention has the advantages that processing karst water expense is low, difficulty of construction is small, and effect is good, guarantees tunnel structure object and battalion Transport the normal use and traffic safety of equipment.
Specific embodiment:
Objective condition limitation cannot use drainaging scheme, or because solution cavity is larger and is filled-type, and when having abundant underground water, Using grouting water blocking method;
Tunnel is discharged, total flow >=10m by fracture, rich water karst band when visiting at least 4 holes in the hole of 5~6, water hole3It is adopted when/h With tunneling boring deep hole grouting water blockoff;
One, according to advance geologic prediction data, front of tunnel heading applies 5~6 advanced holes of brill, verifies underground water developmental state and molten The geologic aspects such as hole, the orientation of solutional cavity, scale, advance borehole starting point should be at prediction gushing waters with preceding 5~10m;
Two, range of grouting is the circle of radius 12m, and slip casting segment length 30m, a point tricyclic implemented, the long 12m of the first ring, the long 10m of the second ring, The long 8m of third ring;6m is stayed not excavate the only slurry disk as next slip casting section after the completion of one slip casting section;
Three, by working, towards direction is excavated, in umbrella shape, radial, opening diameter 115mm, drilling are arranged to a few to injected hole arrangement, Internal and external cycle presses quincunx arrangement, and is combined using long short-bore, by reach slip casting sufficiently, do not stay dead angle for the purpose of, slurries diffusion Radius 2m, bottom hole spacing are not more than 3m;
Four, injecting paste material is cement slurry (using cement-sodium silicate double liquid when necessary), and concentration of slurry is according to rock mass condition and water Amount size is adjusted, and the ratio of mud of cement slurry is 0.5:1~1:1, and dual slurry matching parameter is C:S=1:0.6~1.0(volume Than), modulus of water glass 2.6~2.8, concentration of sodium silicate 35B;
Five, grouting pressure value is 0.5~1.0MPa of first pressing, 3.0~5.0MPa of final pressure;
Six, when rock crusher, cranny development, using protrusive slip casting;Wall-rock crack is not enough developed, when rock stratum is slightly good, after Formula slip casting is moved back, drilling and grouting sequence are from outer ring to inner ring since arch, and same collar aperture interval is constructed;
Seven, Φ 140mm seamless steel pipe is buried in only slurry disk before slip casting as orifice tube, aperture pipe range 3m, exposed 0.2~ 0.3m;
Eight, slip casting ending standard: single hole grouting pressure reaches design final pressure and continues slip casting 10min or more, can terminate this hole note Slurry;Single hole grouting amount with design grouting amount it is roughly the same, at the end of 20~30L/min or less of grout absorption can terminate this hole note Slurry;
Nine, after the injected hole of a slip casting section has all been infused, bores 2~3 holes and slip casting effect is checked, and coring is observed Slurries fill situation, while water yield should not exceed 0.2L/min.m in inspection hole, and the water leakage of certain is not more than 10L/ min;Or under 1.0MPa packer permeability test, inspection hole inflow is less than 2L/min.m, otherwise encrypts bored grouting;
Ten, slip casting start-up operation identity distance predicts 5~8m at gushing water, to guarantee that enough sealing batholites, terminal should be more than that prediction is prominent Water section 5m.

Claims (1)

1. karst method for treating water in group road, it is characterized in that:
One, according to advance geologic prediction data, front of tunnel heading applies 5~6 advanced holes of brill, verifies underground water developmental state and molten The geologic aspects such as hole, the orientation of solutional cavity, scale, advance borehole starting point should be at prediction gushing waters with preceding 5~10m;
Two, range of grouting is the circle of radius 12m, and slip casting segment length 30m, a point tricyclic implemented, the long 12m of the first ring, the long 10m of the second ring, The long 8m of third ring;6m is stayed not excavate the only slurry disk as next slip casting section after the completion of one slip casting section;
Three, by working, towards direction is excavated, in umbrella shape, radial, opening diameter 115mm, drilling are arranged to a few to injected hole arrangement, Internal and external cycle presses quincunx arrangement, and is combined using long short-bore, by reach slip casting sufficiently, do not stay dead angle for the purpose of, slurries diffusion Radius 2m, bottom hole spacing are not more than 3m;
Four, injecting paste material is cement slurry (using cement-sodium silicate double liquid when necessary), and concentration of slurry is according to rock mass condition and water Amount size is adjusted, and the ratio of mud of cement slurry is 0.5:1~1:1, and dual slurry matching parameter is C:S=1:0.6~1.0(volume Than), modulus of water glass 2.6~2.8, concentration of sodium silicate 35B;
Five, grouting pressure value is 0.5~1.0MPa of first pressing, 3.0~5.0MPa of final pressure;
Six, when rock crusher, cranny development, using protrusive slip casting;Wall-rock crack is not enough developed, when rock stratum is slightly good, after Formula slip casting is moved back, drilling and grouting sequence are from outer ring to inner ring since arch, and same collar aperture interval is constructed;
Seven, Φ 140mm seamless steel pipe is buried in only slurry disk before slip casting as orifice tube, aperture pipe range 3m, exposed 0.2~ 0.3m;
Eight, slip casting ending standard: single hole grouting pressure reaches design final pressure and continues slip casting 10min or more, can terminate this hole note Slurry;Single hole grouting amount with design grouting amount it is roughly the same, at the end of 20~30L/min or less of grout absorption can terminate this hole note Slurry;
Nine, after the injected hole of a slip casting section has all been infused, bores 2~3 holes and slip casting effect is checked, and coring is observed Slurries fill situation, while water yield should not exceed 0.2L/min.m in inspection hole, and the water leakage of certain is not more than 10L/ min;Or under 1.0MPa packer permeability test, inspection hole inflow is less than 2L/min.m, otherwise encrypts bored grouting;
Ten, slip casting start-up operation identity distance predicts 5~8m at gushing water, to guarantee that enough sealing batholites, terminal should be more than that prediction is prominent Water section 5m.
CN201811202309.3A 2018-10-16 2018-10-16 Karst method for treating water in team road Pending CN109252829A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811202309.3A CN109252829A (en) 2018-10-16 2018-10-16 Karst method for treating water in team road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811202309.3A CN109252829A (en) 2018-10-16 2018-10-16 Karst method for treating water in team road

Publications (1)

Publication Number Publication Date
CN109252829A true CN109252829A (en) 2019-01-22

Family

ID=65046569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811202309.3A Pending CN109252829A (en) 2018-10-16 2018-10-16 Karst method for treating water in team road

Country Status (1)

Country Link
CN (1) CN109252829A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519176A (en) * 2019-01-28 2019-03-26 粤水电轨道交通建设有限公司 Rich water granite residual soil stratum Tunneling by mining method grouting strengthening method and structure
CN110529147A (en) * 2019-06-28 2019-12-03 中铁四局集团第五工程有限公司 It is a kind of to utilize the Subway Tunnel construction method that pedestrian passage is worn under cantilever excavator

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5667015A (en) * 1995-02-03 1997-09-16 Bj Services Company Well barrier
CN103470267A (en) * 2013-09-28 2013-12-25 中铁二十局集团第二工程有限公司 Long tunnel fast construction process
CN105756700A (en) * 2016-03-11 2016-07-13 中铁十八局集团有限公司 Construction method and hole sealing structure for super-large section tunnel for traversing coal measure strata section
CN106761835A (en) * 2017-01-24 2017-05-31 江苏建筑职业技术学院 A kind of Karst Tunnel leak segmenting slip casting construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5667015A (en) * 1995-02-03 1997-09-16 Bj Services Company Well barrier
CN103470267A (en) * 2013-09-28 2013-12-25 中铁二十局集团第二工程有限公司 Long tunnel fast construction process
CN105756700A (en) * 2016-03-11 2016-07-13 中铁十八局集团有限公司 Construction method and hole sealing structure for super-large section tunnel for traversing coal measure strata section
CN106761835A (en) * 2017-01-24 2017-05-31 江苏建筑职业技术学院 A kind of Karst Tunnel leak segmenting slip casting construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周书明等: "《地下工程承压地下水的控制与防治技术研究》", 31 December 2012, 北京:中国铁道出版社 *
李学庄: ""通风竖井及联络风道交叉口施工方案探析"", 《价值工程》 *
袁飞云: ""五指山隧道工程风险管理"", 《中国优秀硕士学位论文全文数据库(电子期刊)工程科技Ⅱ辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519176A (en) * 2019-01-28 2019-03-26 粤水电轨道交通建设有限公司 Rich water granite residual soil stratum Tunneling by mining method grouting strengthening method and structure
CN109519176B (en) * 2019-01-28 2024-04-02 粤水电轨道交通建设有限公司 Mining tunnel grouting reinforcement method and structure for water-rich granite residual soil stratum
CN110529147A (en) * 2019-06-28 2019-12-03 中铁四局集团第五工程有限公司 It is a kind of to utilize the Subway Tunnel construction method that pedestrian passage is worn under cantilever excavator

Similar Documents

Publication Publication Date Title
CN107762533B (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN103291325B (en) The preventing control method of Coal-mining Above Confined-water floor strata gushing water
CN102787846B (en) Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
CN108060908A (en) Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN107605498B (en) Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum
CN103306713B (en) Networked reinforcement method for cross-layer drilling of outburst coal seam
CN104314587B (en) Fixed point control territory grouting device and grouting process
CN102140901A (en) High pressure resistant drilled hole sealing method
CN105041344B (en) High-pressure gas seam-expanding, grouting and water-plugging method for precutting trough of microfissure surrounding rock
CN106351662A (en) Partitioned phased grouting reinforcement method, construction method and application
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN106917627B (en) The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN106050185B (en) A kind of coal mining bottom plate meets the control method that tomography produces water inrush channel
CN108166989A (en) The asymmetric twin-arch tunnel interval wall construction method of water rich strata " OC " shape
CN103899323A (en) Construction method of shield passing through railway yard
CN107091101A (en) Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN102518470A (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN110017145A (en) A kind of sea area shield mine joins jointing and its construction method in Tunnel
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN109252829A (en) Karst method for treating water in team road
CN103276741B (en) Horizontal steel tube occlusion antipriming pipe curtain and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190122