CN109252829A - Karst method for treating water in team road - Google Patents
Karst method for treating water in team road Download PDFInfo
- Publication number
- CN109252829A CN109252829A CN201811202309.3A CN201811202309A CN109252829A CN 109252829 A CN109252829 A CN 109252829A CN 201811202309 A CN201811202309 A CN 201811202309A CN 109252829 A CN109252829 A CN 109252829A
- Authority
- CN
- China
- Prior art keywords
- slip casting
- hole
- water
- grouting
- slurry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 45
- 238000000034 method Methods 0.000 title claims abstract description 10
- 238000007569 slipcasting Methods 0.000 claims abstract description 42
- 239000002002 slurry Substances 0.000 claims abstract description 33
- 238000005553 drilling Methods 0.000 claims abstract description 8
- 239000004568 cement Substances 0.000 claims abstract description 7
- 238000013461 design Methods 0.000 claims abstract description 7
- 230000000694 effects Effects 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 239000011435 rock Substances 0.000 claims description 13
- 239000004115 Sodium Silicate Substances 0.000 claims description 6
- 238000007689 inspection Methods 0.000 claims description 6
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 claims description 6
- 229910052911 sodium silicate Inorganic materials 0.000 claims description 6
- 206010057175 Mass conditions Diseases 0.000 claims description 3
- 241001074085 Scophthalmus aquosus Species 0.000 claims description 3
- 238000010521 absorption reaction Methods 0.000 claims description 3
- 238000011161 development Methods 0.000 claims description 3
- 238000009792 diffusion process Methods 0.000 claims description 3
- 230000009977 dual effect Effects 0.000 claims description 3
- 239000011440 grout Substances 0.000 claims description 3
- 239000007788 liquid Substances 0.000 claims description 3
- 230000035699 permeability Effects 0.000 claims description 3
- 235000019353 potassium silicate Nutrition 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 239000003643 water by type Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 10
- 230000000903 blocking effect Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000005641 tunneling Effects 0.000 description 2
- 238000006424 Flood reaction Methods 0.000 description 1
- 235000019738 Limestone Nutrition 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Soil Sciences (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Karst method for treating water is related to karst method for treating water in tunnel in team road.Mainly solve the problems, such as that pipe laying ejectment is invented there are larger difficulty of construction in hole when current water yield is larger.It is applied in front of tunnel heading and bores advanced hole, advanced hole starting point is at prediction gushing water with preceding 5~10m;Range of grouting is the circle of radius 12m, and slip casting section point tricyclic is implemented;6m is stayed not excavate the only slurry disk as next slip casting section after the completion of one slip casting section;Injected hole arrangement is radial in umbrella shape towards direction is excavated by working, and drilling is arranged to a few, and is combined using long short-bore;Injecting paste material is cement slurry;Drilling and grouting sequence are from outer ring to inner ring since arch, and same collar aperture interval construction buries seamless steel pipe as orifice tube in only slurry disk before slip casting;Single hole grouting pressure reaches design final pressure and continues slip casting 10min or more, can terminate this hole slip casting.Advantage is that difficulty of construction is small, and effect is good.
Description
Technical field:
The present invention relates to karst method for treating water in tunnel.
Background technique:
Karst water is underground water of the preservation in the corrosion fissure and solution cavity of soluble rock stratum, most evident characteristic be distributed pole not
Uniformly, especially common in limestone area.The tunnel construction phase encounters the surprise attack of water burst, often floods construction site, destroys by rush of water
Equipment, causes equipment and personal injury, and schedule delays increase construction investment.The permanent runtime can also jeopardize the knot of diversion system
Structure safety.For the water burst, according to the conventional method, the mode of pipe laying ejectment in hole is mainly taken to be handled, due to karst
Actually move towards complex, there are biggish difficulty of construction and construction risk, handlings for pipe laying ejectment in hole when water yield is larger
With higher, effect not can guarantee.
Summary of the invention:
Technical problem to be solved by the invention is to provide a kind of processing karst water expense is low, difficulty of construction is small, the good team of effect
Karst method for treating water in road.
Above-mentioned purpose is achieved in that
Objective condition limitation cannot use drainaging scheme, or because solution cavity is larger and is filled-type, and when having abundant underground water,
Using grouting water blocking method;
Tunnel is discharged, total flow >=10m by fracture, rich water karst band when visiting at least 4 holes in the hole of 5~6, water hole3It is adopted when/h
With tunneling boring deep hole grouting water blockoff;
One, according to advance geologic prediction data, front of tunnel heading applies 5~6 advanced holes of brill, verifies underground water developmental state and molten
The geologic aspects such as hole, the orientation of solutional cavity, scale, advance borehole starting point should be at prediction gushing waters with preceding 5~10m;
Two, range of grouting is the circle of radius 12m, and slip casting segment length 30m, a point tricyclic implemented, the long 12m of the first ring, the long 10m of the second ring,
The long 8m of third ring;6m is stayed not excavate the only slurry disk as next slip casting section after the completion of one slip casting section;
Three, by working, towards direction is excavated, in umbrella shape, radial, opening diameter 115mm, drilling are arranged to a few to injected hole arrangement,
Internal and external cycle presses quincunx arrangement, and is combined using long short-bore, by reach slip casting sufficiently, do not stay dead angle for the purpose of, slurries diffusion
Radius 2m, bottom hole spacing are not more than 3m;
Four, injecting paste material is cement slurry (using cement-sodium silicate double liquid when necessary), and concentration of slurry is according to rock mass condition and water
Amount size is adjusted, and the ratio of mud of cement slurry is 0.5:1~1:1, and dual slurry matching parameter is C:S=1:0.6~1.0(volume
Than), modulus of water glass 2.6~2.8, concentration of sodium silicate 35B;
Five, grouting pressure value is 0.5~1.0MPa of first pressing, 3.0~5.0MPa of final pressure;
Six, when rock crusher, cranny development, using protrusive slip casting;Wall-rock crack is not enough developed, when rock stratum is slightly good, after
Formula slip casting is moved back, drilling and grouting sequence are from outer ring to inner ring since arch, and same collar aperture interval is constructed;
Seven, Φ 140mm seamless steel pipe is buried in only slurry disk before slip casting as orifice tube, aperture pipe range 3m, exposed 0.2~
0.3m;
Eight, slip casting ending standard: single hole grouting pressure reaches design final pressure and continues slip casting 10min or more, can terminate this hole note
Slurry;Single hole grouting amount with design grouting amount it is roughly the same, at the end of 20~30L/min or less of grout absorption can terminate this hole note
Slurry;
Nine, after the injected hole of a slip casting section has all been infused, bores 2~3 holes and slip casting effect is checked, and coring is observed
Slurries fill situation, while water yield should not exceed 0.2L/min.m in inspection hole, and the water leakage of certain is not more than 10L/
min;Or under 1.0MPa packer permeability test, inspection hole inflow is less than 2L/min.m, otherwise encrypts bored grouting.
Ten, slip casting start-up operation identity distance predicts 5~8m at gushing water, to guarantee that enough sealing batholites, terminal should be more than pre-
Survey gushing water section 5m.
The invention has the advantages that processing karst water expense is low, difficulty of construction is small, and effect is good, guarantees tunnel structure object and battalion
Transport the normal use and traffic safety of equipment.
Specific embodiment:
Objective condition limitation cannot use drainaging scheme, or because solution cavity is larger and is filled-type, and when having abundant underground water,
Using grouting water blocking method;
Tunnel is discharged, total flow >=10m by fracture, rich water karst band when visiting at least 4 holes in the hole of 5~6, water hole3It is adopted when/h
With tunneling boring deep hole grouting water blockoff;
One, according to advance geologic prediction data, front of tunnel heading applies 5~6 advanced holes of brill, verifies underground water developmental state and molten
The geologic aspects such as hole, the orientation of solutional cavity, scale, advance borehole starting point should be at prediction gushing waters with preceding 5~10m;
Two, range of grouting is the circle of radius 12m, and slip casting segment length 30m, a point tricyclic implemented, the long 12m of the first ring, the long 10m of the second ring,
The long 8m of third ring;6m is stayed not excavate the only slurry disk as next slip casting section after the completion of one slip casting section;
Three, by working, towards direction is excavated, in umbrella shape, radial, opening diameter 115mm, drilling are arranged to a few to injected hole arrangement,
Internal and external cycle presses quincunx arrangement, and is combined using long short-bore, by reach slip casting sufficiently, do not stay dead angle for the purpose of, slurries diffusion
Radius 2m, bottom hole spacing are not more than 3m;
Four, injecting paste material is cement slurry (using cement-sodium silicate double liquid when necessary), and concentration of slurry is according to rock mass condition and water
Amount size is adjusted, and the ratio of mud of cement slurry is 0.5:1~1:1, and dual slurry matching parameter is C:S=1:0.6~1.0(volume
Than), modulus of water glass 2.6~2.8, concentration of sodium silicate 35B;
Five, grouting pressure value is 0.5~1.0MPa of first pressing, 3.0~5.0MPa of final pressure;
Six, when rock crusher, cranny development, using protrusive slip casting;Wall-rock crack is not enough developed, when rock stratum is slightly good, after
Formula slip casting is moved back, drilling and grouting sequence are from outer ring to inner ring since arch, and same collar aperture interval is constructed;
Seven, Φ 140mm seamless steel pipe is buried in only slurry disk before slip casting as orifice tube, aperture pipe range 3m, exposed 0.2~
0.3m;
Eight, slip casting ending standard: single hole grouting pressure reaches design final pressure and continues slip casting 10min or more, can terminate this hole note
Slurry;Single hole grouting amount with design grouting amount it is roughly the same, at the end of 20~30L/min or less of grout absorption can terminate this hole note
Slurry;
Nine, after the injected hole of a slip casting section has all been infused, bores 2~3 holes and slip casting effect is checked, and coring is observed
Slurries fill situation, while water yield should not exceed 0.2L/min.m in inspection hole, and the water leakage of certain is not more than 10L/
min;Or under 1.0MPa packer permeability test, inspection hole inflow is less than 2L/min.m, otherwise encrypts bored grouting;
Ten, slip casting start-up operation identity distance predicts 5~8m at gushing water, to guarantee that enough sealing batholites, terminal should be more than that prediction is prominent
Water section 5m.
Claims (1)
1. karst method for treating water in group road, it is characterized in that:
One, according to advance geologic prediction data, front of tunnel heading applies 5~6 advanced holes of brill, verifies underground water developmental state and molten
The geologic aspects such as hole, the orientation of solutional cavity, scale, advance borehole starting point should be at prediction gushing waters with preceding 5~10m;
Two, range of grouting is the circle of radius 12m, and slip casting segment length 30m, a point tricyclic implemented, the long 12m of the first ring, the long 10m of the second ring,
The long 8m of third ring;6m is stayed not excavate the only slurry disk as next slip casting section after the completion of one slip casting section;
Three, by working, towards direction is excavated, in umbrella shape, radial, opening diameter 115mm, drilling are arranged to a few to injected hole arrangement,
Internal and external cycle presses quincunx arrangement, and is combined using long short-bore, by reach slip casting sufficiently, do not stay dead angle for the purpose of, slurries diffusion
Radius 2m, bottom hole spacing are not more than 3m;
Four, injecting paste material is cement slurry (using cement-sodium silicate double liquid when necessary), and concentration of slurry is according to rock mass condition and water
Amount size is adjusted, and the ratio of mud of cement slurry is 0.5:1~1:1, and dual slurry matching parameter is C:S=1:0.6~1.0(volume
Than), modulus of water glass 2.6~2.8, concentration of sodium silicate 35B;
Five, grouting pressure value is 0.5~1.0MPa of first pressing, 3.0~5.0MPa of final pressure;
Six, when rock crusher, cranny development, using protrusive slip casting;Wall-rock crack is not enough developed, when rock stratum is slightly good, after
Formula slip casting is moved back, drilling and grouting sequence are from outer ring to inner ring since arch, and same collar aperture interval is constructed;
Seven, Φ 140mm seamless steel pipe is buried in only slurry disk before slip casting as orifice tube, aperture pipe range 3m, exposed 0.2~
0.3m;
Eight, slip casting ending standard: single hole grouting pressure reaches design final pressure and continues slip casting 10min or more, can terminate this hole note
Slurry;Single hole grouting amount with design grouting amount it is roughly the same, at the end of 20~30L/min or less of grout absorption can terminate this hole note
Slurry;
Nine, after the injected hole of a slip casting section has all been infused, bores 2~3 holes and slip casting effect is checked, and coring is observed
Slurries fill situation, while water yield should not exceed 0.2L/min.m in inspection hole, and the water leakage of certain is not more than 10L/
min;Or under 1.0MPa packer permeability test, inspection hole inflow is less than 2L/min.m, otherwise encrypts bored grouting;
Ten, slip casting start-up operation identity distance predicts 5~8m at gushing water, to guarantee that enough sealing batholites, terminal should be more than that prediction is prominent
Water section 5m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811202309.3A CN109252829A (en) | 2018-10-16 | 2018-10-16 | Karst method for treating water in team road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811202309.3A CN109252829A (en) | 2018-10-16 | 2018-10-16 | Karst method for treating water in team road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109252829A true CN109252829A (en) | 2019-01-22 |
Family
ID=65046569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811202309.3A Pending CN109252829A (en) | 2018-10-16 | 2018-10-16 | Karst method for treating water in team road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109252829A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109519176A (en) * | 2019-01-28 | 2019-03-26 | 粤水电轨道交通建设有限公司 | Rich water granite residual soil stratum Tunneling by mining method grouting strengthening method and structure |
CN110529147A (en) * | 2019-06-28 | 2019-12-03 | 中铁四局集团第五工程有限公司 | It is a kind of to utilize the Subway Tunnel construction method that pedestrian passage is worn under cantilever excavator |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5667015A (en) * | 1995-02-03 | 1997-09-16 | Bj Services Company | Well barrier |
CN103470267A (en) * | 2013-09-28 | 2013-12-25 | 中铁二十局集团第二工程有限公司 | Long tunnel fast construction process |
CN105756700A (en) * | 2016-03-11 | 2016-07-13 | 中铁十八局集团有限公司 | Construction method and hole sealing structure for super-large section tunnel for traversing coal measure strata section |
CN106761835A (en) * | 2017-01-24 | 2017-05-31 | 江苏建筑职业技术学院 | A kind of Karst Tunnel leak segmenting slip casting construction method |
-
2018
- 2018-10-16 CN CN201811202309.3A patent/CN109252829A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5667015A (en) * | 1995-02-03 | 1997-09-16 | Bj Services Company | Well barrier |
CN103470267A (en) * | 2013-09-28 | 2013-12-25 | 中铁二十局集团第二工程有限公司 | Long tunnel fast construction process |
CN105756700A (en) * | 2016-03-11 | 2016-07-13 | 中铁十八局集团有限公司 | Construction method and hole sealing structure for super-large section tunnel for traversing coal measure strata section |
CN106761835A (en) * | 2017-01-24 | 2017-05-31 | 江苏建筑职业技术学院 | A kind of Karst Tunnel leak segmenting slip casting construction method |
Non-Patent Citations (3)
Title |
---|
周书明等: "《地下工程承压地下水的控制与防治技术研究》", 31 December 2012, 北京:中国铁道出版社 * |
李学庄: ""通风竖井及联络风道交叉口施工方案探析"", 《价值工程》 * |
袁飞云: ""五指山隧道工程风险管理"", 《中国优秀硕士学位论文全文数据库(电子期刊)工程科技Ⅱ辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109519176A (en) * | 2019-01-28 | 2019-03-26 | 粤水电轨道交通建设有限公司 | Rich water granite residual soil stratum Tunneling by mining method grouting strengthening method and structure |
CN109519176B (en) * | 2019-01-28 | 2024-04-02 | 粤水电轨道交通建设有限公司 | Mining tunnel grouting reinforcement method and structure for water-rich granite residual soil stratum |
CN110529147A (en) * | 2019-06-28 | 2019-12-03 | 中铁四局集团第五工程有限公司 | It is a kind of to utilize the Subway Tunnel construction method that pedestrian passage is worn under cantilever excavator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107762533B (en) | A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel | |
CN105041325B (en) | Construction method of high-tension water-rich extra-large-section weak breccia tunnel | |
CN103291325B (en) | The preventing control method of Coal-mining Above Confined-water floor strata gushing water | |
CN102787846B (en) | Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone | |
CN108060908A (en) | Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building | |
CN107605498B (en) | Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum | |
CN103306713B (en) | Networked reinforcement method for cross-layer drilling of outburst coal seam | |
CN104314587B (en) | Fixed point control territory grouting device and grouting process | |
CN102140901A (en) | High pressure resistant drilled hole sealing method | |
CN105041344B (en) | High-pressure gas seam-expanding, grouting and water-plugging method for precutting trough of microfissure surrounding rock | |
CN106351662A (en) | Partitioned phased grouting reinforcement method, construction method and application | |
CN101709651A (en) | Grouting water blocking method for undersea tunnel | |
CN202117686U (en) | Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums | |
CN106917627B (en) | The advanced support method of pilot tunnel under a kind of water rich strata boring construction | |
CN106050185B (en) | A kind of coal mining bottom plate meets the control method that tomography produces water inrush channel | |
CN108166989A (en) | The asymmetric twin-arch tunnel interval wall construction method of water rich strata " OC " shape | |
CN103899323A (en) | Construction method of shield passing through railway yard | |
CN107091101A (en) | Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site | |
CN107165661A (en) | A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method | |
CN102518470A (en) | Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel | |
CN110017145A (en) | A kind of sea area shield mine joins jointing and its construction method in Tunnel | |
CN101793154A (en) | Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes | |
CN103089276A (en) | Deep-shallow hole and high-low pressure coupling grouting technology | |
CN109252829A (en) | Karst method for treating water in team road | |
CN103276741B (en) | Horizontal steel tube occlusion antipriming pipe curtain and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190122 |