CN107762533B - A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel - Google Patents

A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel Download PDF

Info

Publication number
CN107762533B
CN107762533B CN201710971986.0A CN201710971986A CN107762533B CN 107762533 B CN107762533 B CN 107762533B CN 201710971986 A CN201710971986 A CN 201710971986A CN 107762533 B CN107762533 B CN 107762533B
Authority
CN
China
Prior art keywords
grouting
tunnel
face
water
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710971986.0A
Other languages
Chinese (zh)
Other versions
CN107762533A (en
Inventor
李献民
刘拥华
薛君
吕志强
王贺起
黄明利
王润泽
井维秋
吴景利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Central South Engineering Bureau Co ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201710971986.0A priority Critical patent/CN107762533B/en
Publication of CN107762533A publication Critical patent/CN107762533A/en
Application granted granted Critical
Publication of CN107762533B publication Critical patent/CN107762533B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of front pre-grouting methods of high-pressure water-enriched weak surrounding rock mountain tunnel, including drainage hole, lower section, face, sealing batholite, wall for grouting, upper section, injected hole of upper stage, tunnel, pre-grouting area, grouting curtain stabilization zone and next stage slip casting area.The beneficial effects of the present invention are: the method that the present invention should use stifled lower drain water slip casting is reinforced in front of tunnel heading country rock, tunneling boring curtain-grouting is carried out in upper section setting injected hole, in lower section, drainage hole is set, front of tunnel heading country rock hydraulic pressure is reduced by drainage hole, is blocked up in row, it is uniform, closely knit to reach slip casting, reinforce the effect of weak surrounding rock, it solves in high-pressure water-enriched country rock the problem of hydraulic pressure is high, grouting difficulty, advantageously reduces mortar depositing construction cost.

Description

A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
Technical field
The present invention relates to a kind of front pre-grouting method in tunnel, specially a kind of high-pressure water-enriched weak surrounding rock mountain tunnel Front pre-grouting method, belong to Application in Building technical field.
Background technique
Tunnel is construction project key project, and some constructing tunnel areas need to pass through water-rich fault zone, fracture belt position rock Body is broken, developmental joint fissure, and tax water bar part is preferable, and edpth of tunnel is big, and water pressure is high, since fracture location rock mass is relatively more broken Broken, the construction disaster such as collapsing and gushing water, prominent mud easily occurs for construction period.The Treatment Methods of Tunnel Gushing are based on " row " at present, Current most of tunnel to big flow water process measure use with arrange based on scheme, the tunnel built based on " row ", though It so solves the problems, such as many tunnels, but also leaves hidden danger in some tunnels: making tunnel at drain cavern, it is big to have drawn surrounding The underground water of amount, thus the loss of underground water is caused, a series of problem is produced, liner structure and traffic safety are such as influenced, It causes engineering area water-bearing layer by drainage in terms of environment, makes deterioration of the ecological environment etc..
Current some tunnels occur prominent water burst situation when building, when active fault and are handling when water yield is high After Tunnel Gushing, takes which kind of measure to reinforce front of tunnel heading weak surrounding rock and guarantee that tunnel safety construction is critical problem, it is right High hydraulic pressure, big yield weak surrounding rock advanced pre-reinforcement is carried out using tunneling boring curtain-grouting, the grouting pressure needed is big, slip casting When be likely to occur slip casting blind area, reduce slip casting effect.
Summary of the invention
The purpose of the present invention is to provide a kind of front pre-grouting methods of high-pressure water-enriched weak surrounding rock mountain tunnel, pass through It is blocked up in row, reduces the hydraulic pressure of front of tunnel heading country rock, by lower section drainage hole to reach better slip casting effect.
To achieve the above object, a kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel, including tunnel, The inside in the tunnel is equipped with face, and pours wall for grouting on the side wall of the face;The face be equipped with upper section, Lower section, the upper section is equipped with injected hole of upper stage and carries out tunneling boring curtain-grouting, and the lower section is equipped with drainage hole Reduce front of tunnel heading country rock hydraulic pressure;The side wall of the face is equipped with sealing batholite;Slip casting is poured in the one end in the tunnel Curtain reinforcement area, the inside in the tunnel is equipped with pre-grouting area, and the one end in the pre-grouting area is equipped with next stage slip casting Area;
Its step are as follows:
Step 1: advance geologic prediction is carried out, the front of tunnel heading fault belt, underground water position are detected;
Step 2: apart from water-rich fault zone one end apart from when, stop excavation construction, pour the wall for grouting, it is described only Wall thickness empirically value is starched, it is related with grouting curtain stabilization zone thickness;
Step 3: after pouring the wall for grouting, carrying out advance boreholes, hydraulic pressure is surveyed according to drilling water yield, in water It presses in very high situation, lower drain water slip casting is blocked up in selection;
Step 4: being arranged the drainage hole in the lower section borehole of the face, the draining hole number according to Water setting is surveyed, the underground water of discharge is drained by tunnel cavern drainage groove;
Step 5: the upper section in strict accordance with front pre-grouting design scheme in the face lays the upper rank Section injected hole, using protrusive segmenting slip casting, grouting sequence: " inner ring behind first outer ring jumps hole with collar aperture interval ";
Step 6: after the completion of the pre-grouting layer, in conjunction with advanced tubal curtain pre-reinforcement measure, implement to excavate, according to country rock Characteristic selects benching tunnelling method or full-face excavation, excavate to reserved paragraph as the next stage the pre-grouting layer it is described Sealing batholite starts next stage advanced curtain-grouting.
Preferably, in order to reduce the front of tunnel heading country rock hydraulic pressure.The drainage hole equidistantly divides on the lower section Cloth.
Preferably, in order to reinforce the front of tunnel heading country rock, the pre-grouting area is located at the front of the face.
The beneficial effects of the present invention are: the method that the present invention should use stifled lower drain water slip casting is reinforced before face Square country rock carries out tunneling boring curtain-grouting in upper section setting injected hole, but due to hydraulic pressure height in high-pressure water-enriched country rock, only Grouting pressure is improved, may result in that slip casting effect is poor, slip casting blind area occurs, therefore in lower section setting drainage hole, passes through row Water hole reduces front of tunnel heading country rock hydraulic pressure, blocks up in row, slip casting is uniform, closely knit to reach, and reinforces the effect of weak surrounding rock.This Invention is solved in high-pressure water-enriched country rock the problem of hydraulic pressure is high, grouting difficulty, is conducive to using upper stifled lower drain water grouting method Reduce mortar depositing construction cost.
Detailed description of the invention
Fig. 1 is upper stifled lower drain water slip casting vertical section schematic diagram;
Fig. 2 is upper stifled lower drain water slip casting schematic cross-sectional view.
In figure: 1, drainage hole, 2, lower section, 3, face, 4, sealing batholite, 5, wall for grouting, 6, upper section, 7, upper stage Injected hole, 8, tunnel, 9, pre-grouting area, 10, grouting curtain stabilization zone, 11, next stage slip casting area.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
It please refers to shown in Fig. 1-2, a kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel, including tunnel 8, the inside in the tunnel 8 is equipped with face 3, and wall for grouting 5 is poured on the side wall of the face 3;The face 3 is equipped with Upper section 6, lower section 2, the upper section 6 are equipped with injected hole of upper stage 7 and carry out tunneling boring curtain-grouting, and the lower section 2 3 front country rock hydraulic pressure of face is reduced equipped with drainage hole 1;The side wall of the face 3 is equipped with sealing batholite 4;The tunnel Grouting curtain stabilization zone 10 is poured in the one end in road 8, and the inside in the tunnel 8 is equipped with pre-grouting area 9, and the pre-grouting area 9 one end is equipped with next stage slip casting area 11;
Steps are as follows:
Step 1: advance geologic prediction is carried out, the 3 front fault belt of face, underground water position are detected;
Step 2: apart from water-rich fault zone one end apart from when, stop excavation construction, pour the wall for grouting 5, it is described only 5 thickness of wall empirically value is starched, it is related with 10 thickness of grouting curtain stabilization zone;
Step 3: after pouring the wall for grouting 5, carrying out advance boreholes, hydraulic pressure is surveyed according to drilling water yield, in water It presses in very high situation, lower drain water slip casting is blocked up in selection;
Step 4: the drainage hole 1,1 quantity of drainage hole are set in the lower drilling of section 2 of the face 3 According to actual measurement water setting, the underground water of discharge is drained by tunnel cavern drainage groove;
Step 5: the upper section 6 in strict accordance with front pre-grouting design scheme in the face 3 is laid on described Stage injected hole 7, using protrusive segmenting slip casting, grouting sequence: " inner ring behind first outer ring jumps hole with collar aperture interval ";
Step 6: after the completion of the pre-grouting layer 9, in conjunction with advanced tubal curtain pre-reinforcement measure, implement to excavate, according to country rock Characteristic selects benching tunnelling method or full-face excavation, excavates to reserved institute of the paragraph as the pre-grouting layer 9 of next stage Sealing batholite 4 is stated, next stage advanced curtain-grouting is started.
As a kind of technical optimization scheme of the invention, the drainage hole 1 is equally spaced on the lower section 2.
As a kind of technical optimization scheme of the invention, the pre-grouting area 9 is located at the front of the face 3.
In the use of the present invention, first carrying out advance geologic prediction, 3 front fault belt of face, level of ground water are detected It sets;Apart from water-rich fault zone one end apart from when, stop excavation construction, pour wall for grouting 5,5 thickness of wall for grouting empirically value, It is related with 10 thickness of grouting curtain stabilization zone.After pouring wall for grouting 5, advance boreholes are carried out, according to drilling water yield actual measurement Hydraulic pressure blocks up lower drain water slip casting in the very high situation of hydraulic pressure, in selection.Again in the drilling setting draining of lower section 2 of face 3 Hole 1,1 quantity of drainage hole are arranged according to actual measurement water, and the underground water of discharge is drained by tunnel cavern drainage groove.
In work progress, the upper section 6 in strict accordance with front pre-grouting design scheme in face 3 lays the slip casting of upper stage Hole 7, using protrusive segmenting slip casting, grouting sequence: " inner ring behind first outer ring jumps hole with collar aperture interval ".Pre-grouting layer 9 is completed Afterwards, in conjunction with advanced tubal curtain pre-reinforcement measure, implement to excavate, benching tunnelling method or full-face excavation are selected according to characteristics of surrounding rock, opened Sealing batholite 4 of the reserved paragraph as the pre-grouting layer 9 of next stage is dug, next stage advanced curtain-grouting is started.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (3)

1. a kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel, including tunnel (8), it is characterised in that: institute The inside for stating tunnel (8) is equipped with face (3), and pours wall for grouting (5) on the side wall of the face (3);The face (3) it is equipped with upper section (6), lower section (2), the upper section (6) is equipped with injected hole of upper stage (7) and carries out tunneling boring curtain note Slurry, and the lower section (2) is equipped with drainage hole (1) to reduce country rock hydraulic pressure in front of face (3);The side of the face (3) Wall is equipped with sealing batholite (4);Grouting curtain stabilization zone (10) are poured in one end of the tunnel (8), the inside of the tunnel (8) Equipped with pre-grouting area (9), and the one end in the pre-grouting area (9) is equipped with next stage slip casting area (11);
Its step are as follows:
Step 1: carrying out advance geologic prediction, detects fault belt, underground water position in front of the face (3);
Step 2: apart from water-rich fault zone one end apart from when, stop excavation construction, pour the wall for grouting (5), it is described only starch Wall (5) thickness empirically value, it is related with grouting curtain stabilization zone (10) thickness;
Step 3: after pouring the wall for grouting (5), carrying out advance boreholes, hydraulic pressure is surveyed according to drilling water yield, in hydraulic pressure Lower drain water slip casting is blocked up in very high situation, in selection;
Step 4: the drainage hole (1), the drainage hole (1) are set in lower section (2) drilling of the face (3) Quantity is drained according to actual measurement water setting, the underground water of discharge by tunnel cavern drainage groove;
Step 5: the upper section (6) in strict accordance with front pre-grouting design scheme in the face (3) is laid on described Stage injected hole (7), using protrusive segmenting slip casting, grouting sequence: " inner ring behind first outer ring jumps hole with collar aperture interval ";
Step 6: after the completion of the pre-grouting layer (9), in conjunction with advanced tubal curtain pre-reinforcement measure, implement to excavate, according to country rock spy Property selection benching tunnelling method or full-face excavation, excavate to reserved institute of the paragraph as the pre-grouting layer (9) of next stage It states sealing batholite (4), starts next stage advanced curtain-grouting.
2. a kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel according to claim 1, feature Be: the drainage hole (1) is equally spaced on the lower section (2).
3. a kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel according to claim 1, feature Be: the pre-grouting area (9) is located at the front of the face (3).
CN201710971986.0A 2017-10-18 2017-10-18 A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel Active CN107762533B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710971986.0A CN107762533B (en) 2017-10-18 2017-10-18 A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710971986.0A CN107762533B (en) 2017-10-18 2017-10-18 A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel

Publications (2)

Publication Number Publication Date
CN107762533A CN107762533A (en) 2018-03-06
CN107762533B true CN107762533B (en) 2019-11-22

Family

ID=61268316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710971986.0A Active CN107762533B (en) 2017-10-18 2017-10-18 A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel

Country Status (1)

Country Link
CN (1) CN107762533B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519220B (en) * 2018-10-29 2021-05-25 中铁十二局集团有限公司 Grouting treatment method for broken water-rich section of diversion tunnel in karst area
CN109854275A (en) * 2018-12-24 2019-06-07 龙口矿业集团有限公司 Rich water sandstone tunnel passing fault crushed zone administering method
CN110529147A (en) * 2019-06-28 2019-12-03 中铁四局集团第五工程有限公司 It is a kind of to utilize the Subway Tunnel construction method that pedestrian passage is worn under cantilever excavator
CN110439579B (en) * 2019-09-17 2020-11-24 中国水利水电第四工程局有限公司 Advanced pre-grouting method for open-type TBM (tunnel boring machine) water-rich tunnel
CN110924976B (en) * 2019-12-03 2020-09-18 中南大学 Surrounding rock outer ring grouting reinforcement method
CN111119951A (en) * 2019-12-27 2020-05-08 中铁十六局集团第一工程有限公司 Construction method for highway tunnel to pass through fault fracture zone water-rich cavity area
CN113153307A (en) * 2020-11-26 2021-07-23 西南交通大学 Tunnel construction method suitable for water-rich fractured rock mass
CN113137250B (en) * 2021-05-28 2023-06-30 中建隧道建设有限公司 Rapid pre-reinforcement grouting method for tunnel face excavation of deep-buried high-pressure water-rich tunnel
CN113175336A (en) * 2021-06-15 2021-07-27 中交二公局萌兴工程有限公司 Drainage construction method for tunnel fault fracture zone
CN113217036B (en) * 2021-06-23 2023-09-12 中交路桥华东工程有限公司 Post grouting construction method for fault fracture tunnel structure with water flushing section
CN114991819B (en) * 2022-05-20 2023-09-12 中国矿业大学(北京) Three-super control technology for water damage tunnel

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798930B (en) * 2010-03-24 2012-05-23 中铁十二局集团有限公司 Rapid construction method of high-pressure water-rich fault zone of tunnel
CN101994513B (en) * 2010-10-30 2013-01-02 中铁十二局集团第二工程有限公司 Method for constructing tunnel by finishing full section curtain grouting from upper-half section
CN102493822B (en) * 2011-12-29 2014-04-02 中铁二十三局集团有限公司 Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN102787846B (en) * 2012-07-31 2015-07-08 中铁隧道集团有限公司 Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
CN106049418A (en) * 2016-06-22 2016-10-26 中铁二局集团有限公司 Combined grouting reinforcement method for tunnel surface in shallow buried traversing faultage

Also Published As

Publication number Publication date
CN107762533A (en) 2018-03-06

Similar Documents

Publication Publication Date Title
CN107762533B (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN103306683B (en) A kind of construction method of comprehensive precipitation in hole when excavating deep tunnel
CN104047623B (en) A kind of big across cavern excavation construction method
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN110685714B (en) Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology
CN106917627B (en) The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN110985055B (en) Tunnel grouting and drainage synchronous construction method for controlling surface uplift
CN105041333A (en) Method for treating tunnel collapse through dugand covered method
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN105134219B (en) Soft rock strata freezing shaft borehole wall construction technology
CN109139104A (en) One kind passes through that clastic rock steep dip is inverse to rush rich water tomography tunnel drainage construction method
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN103758123A (en) Method for constructing protecting wall lining of cast-in-place manual hole digging pile
CN108166989A (en) The asymmetric twin-arch tunnel interval wall construction method of water rich strata " OC " shape
CN104533451A (en) Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock
CN108678753B (en) Reverse-slope tunnel construction method
CN110617067A (en) Low-risk construction method for full-section boundary advanced pipe shed of extremely-soft surrounding rock tunnel
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN110284885A (en) Shield inspection-pit construction method
CN105804754A (en) Coal uncovering method for mining shaft with coal seam as main water-bearing layer
CN102704950B (en) Support method used in passing water guide fracture structure in mine exploration
CN108180018A (en) A kind of shallow embedding collapsible loess tunnel Core Soil and glass bolt anchorage construction method
CN108915702B (en) Shield receiving method in circular small-section tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 201, building 11, Zhongnan headquarters base, no.688, Section 2, Wanjiali South Road, Tianxin District, Changsha, Hunan 410000

Patentee after: CCCC Central South Engineering Bureau Co.,Ltd.

Patentee after: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Address before: Room B901 and 916, No.10 Xinghuo Road, Science City, Fengtai District, Beijing (Park)

Patentee before: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.