A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
Technical field
The present invention relates to a kind of front pre-grouting method in tunnel, specially a kind of high-pressure water-enriched weak surrounding rock mountain tunnel
Front pre-grouting method, belong to Application in Building technical field.
Background technique
Tunnel is construction project key project, and some constructing tunnel areas need to pass through water-rich fault zone, fracture belt position rock
Body is broken, developmental joint fissure, and tax water bar part is preferable, and edpth of tunnel is big, and water pressure is high, since fracture location rock mass is relatively more broken
Broken, the construction disaster such as collapsing and gushing water, prominent mud easily occurs for construction period.The Treatment Methods of Tunnel Gushing are based on " row " at present,
Current most of tunnel to big flow water process measure use with arrange based on scheme, the tunnel built based on " row ", though
It so solves the problems, such as many tunnels, but also leaves hidden danger in some tunnels: making tunnel at drain cavern, it is big to have drawn surrounding
The underground water of amount, thus the loss of underground water is caused, a series of problem is produced, liner structure and traffic safety are such as influenced,
It causes engineering area water-bearing layer by drainage in terms of environment, makes deterioration of the ecological environment etc..
Current some tunnels occur prominent water burst situation when building, when active fault and are handling when water yield is high
After Tunnel Gushing, takes which kind of measure to reinforce front of tunnel heading weak surrounding rock and guarantee that tunnel safety construction is critical problem, it is right
High hydraulic pressure, big yield weak surrounding rock advanced pre-reinforcement is carried out using tunneling boring curtain-grouting, the grouting pressure needed is big, slip casting
When be likely to occur slip casting blind area, reduce slip casting effect.
Summary of the invention
The purpose of the present invention is to provide a kind of front pre-grouting methods of high-pressure water-enriched weak surrounding rock mountain tunnel, pass through
It is blocked up in row, reduces the hydraulic pressure of front of tunnel heading country rock, by lower section drainage hole to reach better slip casting effect.
To achieve the above object, a kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel, including tunnel,
The inside in the tunnel is equipped with face, and pours wall for grouting on the side wall of the face;The face be equipped with upper section,
Lower section, the upper section is equipped with injected hole of upper stage and carries out tunneling boring curtain-grouting, and the lower section is equipped with drainage hole
Reduce front of tunnel heading country rock hydraulic pressure;The side wall of the face is equipped with sealing batholite;Slip casting is poured in the one end in the tunnel
Curtain reinforcement area, the inside in the tunnel is equipped with pre-grouting area, and the one end in the pre-grouting area is equipped with next stage slip casting
Area;
Its step are as follows:
Step 1: advance geologic prediction is carried out, the front of tunnel heading fault belt, underground water position are detected;
Step 2: apart from water-rich fault zone one end apart from when, stop excavation construction, pour the wall for grouting, it is described only
Wall thickness empirically value is starched, it is related with grouting curtain stabilization zone thickness;
Step 3: after pouring the wall for grouting, carrying out advance boreholes, hydraulic pressure is surveyed according to drilling water yield, in water
It presses in very high situation, lower drain water slip casting is blocked up in selection;
Step 4: being arranged the drainage hole in the lower section borehole of the face, the draining hole number according to
Water setting is surveyed, the underground water of discharge is drained by tunnel cavern drainage groove;
Step 5: the upper section in strict accordance with front pre-grouting design scheme in the face lays the upper rank
Section injected hole, using protrusive segmenting slip casting, grouting sequence: " inner ring behind first outer ring jumps hole with collar aperture interval ";
Step 6: after the completion of the pre-grouting layer, in conjunction with advanced tubal curtain pre-reinforcement measure, implement to excavate, according to country rock
Characteristic selects benching tunnelling method or full-face excavation, excavate to reserved paragraph as the next stage the pre-grouting layer it is described
Sealing batholite starts next stage advanced curtain-grouting.
Preferably, in order to reduce the front of tunnel heading country rock hydraulic pressure.The drainage hole equidistantly divides on the lower section
Cloth.
Preferably, in order to reinforce the front of tunnel heading country rock, the pre-grouting area is located at the front of the face.
The beneficial effects of the present invention are: the method that the present invention should use stifled lower drain water slip casting is reinforced before face
Square country rock carries out tunneling boring curtain-grouting in upper section setting injected hole, but due to hydraulic pressure height in high-pressure water-enriched country rock, only
Grouting pressure is improved, may result in that slip casting effect is poor, slip casting blind area occurs, therefore in lower section setting drainage hole, passes through row
Water hole reduces front of tunnel heading country rock hydraulic pressure, blocks up in row, slip casting is uniform, closely knit to reach, and reinforces the effect of weak surrounding rock.This
Invention is solved in high-pressure water-enriched country rock the problem of hydraulic pressure is high, grouting difficulty, is conducive to using upper stifled lower drain water grouting method
Reduce mortar depositing construction cost.
Detailed description of the invention
Fig. 1 is upper stifled lower drain water slip casting vertical section schematic diagram;
Fig. 2 is upper stifled lower drain water slip casting schematic cross-sectional view.
In figure: 1, drainage hole, 2, lower section, 3, face, 4, sealing batholite, 5, wall for grouting, 6, upper section, 7, upper stage
Injected hole, 8, tunnel, 9, pre-grouting area, 10, grouting curtain stabilization zone, 11, next stage slip casting area.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
It please refers to shown in Fig. 1-2, a kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel, including tunnel
8, the inside in the tunnel 8 is equipped with face 3, and wall for grouting 5 is poured on the side wall of the face 3;The face 3 is equipped with
Upper section 6, lower section 2, the upper section 6 are equipped with injected hole of upper stage 7 and carry out tunneling boring curtain-grouting, and the lower section 2
3 front country rock hydraulic pressure of face is reduced equipped with drainage hole 1;The side wall of the face 3 is equipped with sealing batholite 4;The tunnel
Grouting curtain stabilization zone 10 is poured in the one end in road 8, and the inside in the tunnel 8 is equipped with pre-grouting area 9, and the pre-grouting area
9 one end is equipped with next stage slip casting area 11;
Steps are as follows:
Step 1: advance geologic prediction is carried out, the 3 front fault belt of face, underground water position are detected;
Step 2: apart from water-rich fault zone one end apart from when, stop excavation construction, pour the wall for grouting 5, it is described only
5 thickness of wall empirically value is starched, it is related with 10 thickness of grouting curtain stabilization zone;
Step 3: after pouring the wall for grouting 5, carrying out advance boreholes, hydraulic pressure is surveyed according to drilling water yield, in water
It presses in very high situation, lower drain water slip casting is blocked up in selection;
Step 4: the drainage hole 1,1 quantity of drainage hole are set in the lower drilling of section 2 of the face 3
According to actual measurement water setting, the underground water of discharge is drained by tunnel cavern drainage groove;
Step 5: the upper section 6 in strict accordance with front pre-grouting design scheme in the face 3 is laid on described
Stage injected hole 7, using protrusive segmenting slip casting, grouting sequence: " inner ring behind first outer ring jumps hole with collar aperture interval ";
Step 6: after the completion of the pre-grouting layer 9, in conjunction with advanced tubal curtain pre-reinforcement measure, implement to excavate, according to country rock
Characteristic selects benching tunnelling method or full-face excavation, excavates to reserved institute of the paragraph as the pre-grouting layer 9 of next stage
Sealing batholite 4 is stated, next stage advanced curtain-grouting is started.
As a kind of technical optimization scheme of the invention, the drainage hole 1 is equally spaced on the lower section 2.
As a kind of technical optimization scheme of the invention, the pre-grouting area 9 is located at the front of the face 3.
In the use of the present invention, first carrying out advance geologic prediction, 3 front fault belt of face, level of ground water are detected
It sets;Apart from water-rich fault zone one end apart from when, stop excavation construction, pour wall for grouting 5,5 thickness of wall for grouting empirically value,
It is related with 10 thickness of grouting curtain stabilization zone.After pouring wall for grouting 5, advance boreholes are carried out, according to drilling water yield actual measurement
Hydraulic pressure blocks up lower drain water slip casting in the very high situation of hydraulic pressure, in selection.Again in the drilling setting draining of lower section 2 of face 3
Hole 1,1 quantity of drainage hole are arranged according to actual measurement water, and the underground water of discharge is drained by tunnel cavern drainage groove.
In work progress, the upper section 6 in strict accordance with front pre-grouting design scheme in face 3 lays the slip casting of upper stage
Hole 7, using protrusive segmenting slip casting, grouting sequence: " inner ring behind first outer ring jumps hole with collar aperture interval ".Pre-grouting layer 9 is completed
Afterwards, in conjunction with advanced tubal curtain pre-reinforcement measure, implement to excavate, benching tunnelling method or full-face excavation are selected according to characteristics of surrounding rock, opened
Sealing batholite 4 of the reserved paragraph as the pre-grouting layer 9 of next stage is dug, next stage advanced curtain-grouting is started.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.