CN109217470A - It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card - Google Patents
It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card Download PDFInfo
- Publication number
- CN109217470A CN109217470A CN201811045386.2A CN201811045386A CN109217470A CN 109217470 A CN109217470 A CN 109217470A CN 201811045386 A CN201811045386 A CN 201811045386A CN 109217470 A CN109217470 A CN 109217470A
- Authority
- CN
- China
- Prior art keywords
- checked
- check
- substation
- automatically
- accepted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 33
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000012795 verification Methods 0.000 claims abstract description 8
- 230000011664 signaling Effects 0.000 claims description 22
- 238000012360 testing method Methods 0.000 claims description 14
- 238000012790 confirmation Methods 0.000 claims description 6
- 238000006073 displacement reaction Methods 0.000 claims description 4
- 238000007689 inspection Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 2
- 238000011017 operating method Methods 0.000 claims description 2
- 230000001360 synchronised effect Effects 0.000 claims description 2
- 235000013399 edible fruits Nutrition 0.000 claims 1
- 238000010200 validation analysis Methods 0.000 abstract description 2
- 239000012141 concentrate Substances 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000008030 elimination Effects 0.000 description 2
- 238000003379 elimination reaction Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
- 238000010606 normalization Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C25/00—Arrangements for preventing or correcting errors; Monitoring arrangements
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Human Computer Interaction (AREA)
- Power Engineering (AREA)
- Selective Calling Equipment (AREA)
Abstract
It is checked and accepted automatically and check method and system the invention discloses a kind of based on the boss station monitoring information for checking and accepting card, according to the unique characteristic of information point number between the main and sub station of regulator control system, it is compared by checking and accepting card with third party's information point table, realize the parameters validation that point table is checked and accepted at boss station, and by the automatic comparison with the number of delivering letters on substation, the automatic examination function of monitoring signal between main and sub station is realized.The present invention replaces tradition to regulate and control the process of main website and substation monitoring signal artificial nucleus couple by this method, reduces the risk that error was omitted, checked to the artificial information checked and accepted in verification, improves main website to the working efficiency of substation's Centralized Monitoring.
Description
Technical field
The invention belongs to Operation of Electric Systems and automatic field, and in particular to a kind of stood based on the boss for checking and accepting card is monitored
Information is checked and accepted and check method and system automatically.
Background technique
In recent years, with the continuous expansion of power grid scale, monitoring device is continuously increased, and saves that ground regulator control system, calamity are standby to be adjusted
The construction of control system, monitoring personnel are also being continuously increased the workload that basis signal is checked and accepted.Supervisory control of substation signal at present
Checking and accepting requires monitoring personnel and substation field personnel cooperate, and Field Force applies mould to the measurement of monitoring one by one
Analog quantity, monitoring personnel monitoring confirmation.The monitoring signal of one substation often accesses multiple and different monitoring centers, and when examination needs
Switch different systems or monitors confirmation with simultaneously from several monitoring personnels.When building back scheduling automated system
Needing to put into a large amount of manpowers and time carries out an acceptance inspection to the supervisory control of substation signal of the back scheduling system of all accesses.
Summary of the invention
The purpose of the present invention is to provide checked and accepted automatically based on the boss for checking and accepting card monitoring information of standing and check method and be
System is replaced the process of tradition regulation main website and substation monitoring signal artificial nucleus couple by this method, reduces and manually check and accept verification
In information omit, verification error risk, improve main website to the working efficiency of substation's Centralized Monitoring.
The technical solution for realizing the aim of the invention is as follows: a kind of to be checked and accepted automatically based on the boss station monitoring information for checking and accepting card
With check method, include the following steps:
Step 1, main website read main website advance data information point table, check and accept card with third party and check, check and pass through
Point table generates remote signalling, telemetering, remote control examination sequence according to type is checked and accepted;
Third party's information point table is checked and accepted card and carries out a table information check with Master Control Unit by step 2, substation, is checked and is passed through
Signal automatically generates examination sequence, and when main website, which initiates signal, to be checked and accepted, the signal of automatic trigger Master Control Unit is according to examination sequence
Sequence is automatic to be uploaded;
Step 2, main website check and accept sequence according to remote signalling, notice substation start remote signals it is automatic on give, and check on substation
The remote signals of biography check the pass flag of stamping passed through, unacceptable to stamp fail flag;
Step 3, main website check and accept sequence according to telemetering, notice substation start telemetered signal it is automatic on give, and check on substation
The telemetered signal of biography checks the pass flag of stamping passed through, unacceptable to stamp fail flag;
Step 4, main website check and accept sequence according to remote control, and notice substation starts remote control and checks and accepts, and sends control command one by one, controls
System successfully stamps pass flag, unsuccessful to stamp fail flag;
Step 5 after checking and accepting, generates remote signalling, telemetering, remote control acceptance report respectively.
It is a kind of to be checked and accepted automatically and nucleus correcting system based on the boss for checking and accepting card monitoring information of standing, including the automatic Acceptance Test System of main website
With the automatic Acceptance Test System in substation, wherein the automatic Acceptance Test System of the main website include advance data library, third party's information point table check and accept
Card, database information automatic Check module, remote signals check and accept module, telemetered signal automatically and check and accept module, remote signal automatically
It is automatic to check and accept module;The automatic Acceptance Test System in substation includes that third party's information point table examination card and substation check and accept mould automatically
Block, in which:
Third party's information point table, which checks and accepts card, to be independently generated by third party system, for record include point number, title,
Voltage class, alarm type, device type parameter information;
The advance data library is used to store preposition table information of the preparatory typing in main website side, including point number, title, voltage
Grade, alarm type, device type parameter information;
The database information automatic Check module is used to check and accept third party's information point table in card and advance data library
Point table information carries out automatic Check, and checking content includes point number, title, voltage class, alarm type, device type, will be whole
It checks the point table passed through to be solidified, while automatically generating remote signalling, telemetering, remote control examination sequence;
The remote signals check and accept automatically module for notify substation start remote signals it is automatic on give, and substation is uploaded
Remote signals and remote signalling check and accept sequence and checked one by one;
Sequence is checked and accepted according to the remote signals that database information automatic Check module generates, checks the distant of substation upload one by one
Believe signal;
The telemetered signal check and accept automatically module for notify substation start telemetered signal it is automatic on give, and substation is uploaded
Telemetered signal and telemetering check and accept sequence and checked one by one;
The remote signal check and accept automatically module for notify substation start remote control check and accept, and according to remote control check and accept sequence by
One sends control command to substation;
The substation checks and accepts module automatically and carries out a table letter with Master Control Unit for third party's information point table to be checked and accepted card
Breath is checked, and checking content includes point number, title, voltage class, alarm type, device type, is checked the signal passed through and is given birth to automatically
At checking and accepting sequence, when main website, which initiates signal, to be checked and accepted, the signal of automatic trigger Master Control Unit according to check and accept sequence order it is automatic on
It passes.
Compared with prior art, the present invention its remarkable advantage is: 1) present invention can complete multinomial in the same time
Checking and accepting greatly improves monitoring and checks and accepts efficiency;2) the invention enables checking and accepting whole process information more to standardize, Responsibility of Staff is more
Add clear;3) present invention can concentrate discovery to concentrate defect elimination equipment deficiency in the course of receiving, promote acceptance quality promotion.
Detailed description of the invention
Fig. 1 is that the present invention is based on the boss station monitoring informations for checking and accepting card to check and accept automatically and the structure chart of nucleus correcting system.
Specific embodiment
The present invention according to the unique characteristic of information point number between the main and sub station of regulator control system, by with third party's information point table
It checks and accepts card to be compared, realizes boss and stand and check and accept the parameters validation of point table, and by the automatic comparison with the number of delivering letters on substation,
The automatic examination function of realizing monitoring signal between main and sub station, based on check and accept card boss stand monitoring information checks and accepts automatically and
Check method, the specific steps are as follows:
Step 1, database information automatic Check: main website reads preposition table information of main station system, with third party's information point
Table is checked and accepted card and is checked, and checking type includes telemetering, remote signalling, remote control, verification mode may be selected exact matching, fuzzy matching,
Manual intervention, checking content includes the parameters such as point number, title, voltage class, alarm type, device type, is provided when inconsistent
Prompt and alarm, will all check the point table passed through and solidify, and automatically generate remote signalling, telemetering, distant according to the difference of type
Sequence, the basis checked and accepted automatically as next step signal are checked and accepted in control.By automatic Check, effectively reduces and pass through artificial nucleus in the past
To the risk of error.
Step 2, substation are checked and accepted sequence and generated: third party's information point table is checked and accepted card for substation and Master Control Unit carries out a table and believes
Breath is checked, and is checked the signal passed through and is automatically generated examination sequence, when main website, which initiates signal, to be checked and accepted, automatic trigger Master Control Unit
Signal uploads automatically according to sequence order is checked and accepted.
Step 3, remote signals are checked and accepted automatically: after main website notice substation starts remote signals examination, substation is first by master control
Interior all remote signalling are reset to point (involution) state and Shang Song main website, then distant according still further to the sequence automatic trigger of substation examination sequence
Letter signal on give, above send rule be same signal using first " conjunctions ", afterwards " dividing " respectively verify it is primary by the way of generate displacement point by point, master
It stands and the remote signalling displacement received is compared with main website examination sequence, whether verification point number is consistent, and whether remote signalling value is identical, record
Check results provide prompt, and comparison result are shown in picture when inconsistent.
Step 4, telemetered signal are checked and accepted automatically: after main website notice substation starts telemetered signal examination, substation is first by master control
Interior all telemetering amounts are reset to 0 and Shang Song main website, then check and accept in sequence automatic trigger telemetered signal and send according still further to substation, telemetering
It is that point number adds offset that rule is sent in value, and wherein offset is configurable, main website the telemetry value and main website that receive check and accept sequence into
Row compares, and whether verifying point number is consistent, and whether deviation meets the requirements, and records check results, prompt is provided when inconsistent, and will
Comparison result is in picture exhibition.The deviation range that telemetry value allows with setting value can be configured according to actual needs.
Step 5, remote signal are checked and accepted automatically: main website is before being remotely controlled signal and checking and accepting, it is necessary first to input user name, close
Code verifying remote control permission, inputs plant stand zone of responsibility belonging to plant stand name verifying, substation is then notified to start remote signal examination.Main website
According to remote control sequence, operation successively is remotely controlled to each equipment, operating procedure is first closed a floodgate by same equipment, separating brake is successively grasped again
Make sequence twice to carry out, single step or continuous may be selected in remote control mode, single step refers to operated an equipment every time after need people
Work confirmation could continue next equipment, continuously refer to without manual confirmation, successively execute in sequence automatically.In remote control process
Signal is conjugated in real time by automatic read switch, to judge whether remote control succeeds, and is marked automatically, is remotely controlled result in picture
Upper synchronous displaying.Secondary remote control sequence is automatically recorded and generates for the switch of remote control failure, it can be according to remote control operation step again
It is secondary to carry out an acceptance inspection.
Step 6, acceptance report generate: after all signals are checked and accepted, generating remote signalling, telemetering, remote control acceptance report, can mention
Each profession is handed over to carry out report analysis, Problem Summary and defect elimination filing.
Boss station monitoring information based on examination card is checked and accepted automatically and nucleus correcting system, including the automatic Acceptance Test System of main website and son
It stands automatic Acceptance Test System, wherein the automatic Acceptance Test System of the main website includes that advance data library, third party's information point table check and accept card, number
Module, telemetered signal are checked and accepted automatically according to library information automatic Check module, remote signals check and accept module, remote signal automatically test automatically
Receive module;The automatic Acceptance Test System in substation includes that third party's information point table examination card and substation check and accept module automatically, in which:
Third party's information point table, which checks and accepts card, to be independently generated by third party system, is that signal is checked and accepted automatically and checked
Precondition, the parameter informations such as record point number, title, voltage class, alarm type, device type.
The advance data library is used to store preposition table information of the preparatory typing in main website side, and content covers third party
Information point table checks and accepts the parameters such as all the elements, including point number, title, voltage class, alarm type, device type in card letter
Breath.
The database information automatic Check module is used to check and accept third party's information point table in card and advance data library
Point table information carries out automatic Check, and checking content includes the parameters such as point number, title, voltage class, alarm type, device type,
The point table passed through will all be checked to solidify, while automatically generating remote signalling, telemetering, remote control examination sequence according to the difference of type
Column, the basis checked and accepted automatically as signal.
The remote signals check and accept remote signals of the module for generating according to database information automatic Check module automatically
Sequence is checked and accepted, checks the remote signals that substation uploads one by one.
The telemetered signal checks and accepts telemetered signal of the module for generating according to database information automatic Check module automatically
Sequence is checked and accepted, checks the telemetered signal that substation uploads one by one.
The remote signal checks and accepts remote signal of the module for generating according to database information automatic Check module automatically
Sequence is checked and accepted, checks the remote signal that substation uploads one by one.
The substation checks and accepts module automatically and carries out a table letter with Master Control Unit for third party's information point table to be checked and accepted card
Breath is checked, and checking content equally includes the parameters such as point number, title, voltage class, alarm type, device type, is checked and is passed through
Signal automatically generates examination sequence, and when main website, which initiates signal, to be checked and accepted, the signal of automatic trigger Master Control Unit is according to examination sequence
It is sent on sequence is automatic.
The present invention has broken traditional artificial verification mode, realizes the technological break-through and management innovation of monitoring and scheduling profession,
The lean for helping to reinforce the monitoring signal course of receiving is managed.Be mainly manifested in first is that realize main website leading information point table with
Third party's information point table checks and accepts the automatic Check of card and the automatic checking of monitoring signal, promotes the normalization of information point table;Second is that
Management responsibility is further clarified, duty fulfillment is deepened, promotes acceptance quality;Third is that optimization examination mode, configuration of reallocating resources have
Effect saves the time, improves and checks and accepts efficiency.
Claims (6)
1. a kind of boss station monitoring information based on examination card is checked and accepted automatically and check method, which is characterized in that including walking as follows
It is rapid:
Step 1, main website read main website advance data information point table, check and accept card with third party and check, check the point table passed through
Remote signalling, telemetering, remote control examination sequence are generated respectively according to type is checked and accepted;
Third party's information point table is checked and accepted card and carries out a table information check with Master Control Unit by step 2, substation, checks the signal passed through
It automatically generates substation and checks and accepts sequence, when main website, which initiates signal, to be checked and accepted, the signal of automatic trigger Master Control Unit is checked and accepted according to substation
Sequence order uploads automatically;
Step 3, main website notice substation start remote signals it is automatic on give, and by substation upload remote signals and remote signalling check and accept sequence
Column are checked one by one, check the pass flag of stamping passed through, unacceptable to stamp fail flag;
Step 4, main website notice substation start telemetered signal it is automatic on give, and by substation upload telemetered signal and telemetering check and accept sequence
Column are checked one by one, check the pass flag of stamping passed through, unacceptable to stamp fail flag;
Step 5, main website notice substation start remote control and check and accept, and check and accept sequence according to remote control and send control command one by one to substation,
Control successfully stamps pass flag, unsuccessful to stamp fail flag;
Step 6 after checking and accepting, generates remote signalling, telemetering, remote control acceptance report respectively.
2. the boss station monitoring information according to claim 1 based on examination card is checked and accepted automatically and check method, feature
It is, it includes telemetering, remote signalling, remote control that type is checked in step 1 and 2, and verification mode includes exact matching, fuzzy matching, manually
Intervene, check content include point number, title, voltage class, alarm type, device type parameter information.
3. the boss station monitoring information according to claim 1 based on examination card is checked and accepted automatically and check method, feature
It is, step 3 carries out the method that remote signals are checked and accepted automatically are as follows: after main website notice substation starts remote signals examination, substation is first
Remote signalling all in master control are first reset to isloation state and Shang Song main website, the sequence automatic trigger of sequence is then checked and accepted according still further to substation
Sent in remote signals, above send rule be same signal using first " conjunction ", afterwards " dividing " respectively verify it is primary by the way of generate displacement point by point,
The remote signalling displacement received is checked and accepted sequence with main website and is compared by main website, and whether verification point number is consistent, and whether remote signalling value is identical, note
Check results are recorded, prompt are provided when inconsistent, and comparison result is shown in picture.
4. the boss station monitoring information according to claim 1 based on examination card is checked and accepted automatically and check method, feature
It is, step 4 takes remote measurement the method that signal is checked and accepted automatically are as follows: main website notice substation starts after telemetered signal checks and accepts, and substation is first
Telemetering amounts all in master control are first reset to 0 and Shang Song main website, then check and accept sequence automatic trigger telemetered signal according still further to substation
On give, it is that point number adds offset that rule is sent in telemetry value, and main website is compared the telemetry value received with main website examination sequence, is tested
Demonstrate,prove whether point number is consistent, and whether deviation meets the requirements, record check results, provide prompt when inconsistent, and by comparison result
In picture exhibition.
5. the boss station monitoring information according to claim 1 based on examination card is checked and accepted automatically and check method, feature
It is, step 5 is remotely controlled the method that signal is checked and accepted automatically are as follows: main website is before being remotely controlled signal and checking and accepting, it is necessary first to input
User name, password authentification are remotely controlled permission, and input plant stand name verifies affiliated plant stand zone of responsibility, then substation notified to start remote signal
It checks and accepts;Main website is successively remotely controlled operation to each equipment according to remote control sequence, and operating procedure is first closed a floodgate, again by same equipment
Separating brake successively operates the progress of sequence twice, and remote control mode selects single step or continuous, and single step refers to has operated an equipment every time
After need manual confirmation that could continue next equipment, continuously refer to without manual confirmation, successively execute in sequence automatically;It is distant
During control signal is conjugated by automatic read switch in real time, to judge whether remote control succeeds, and is marked automatically, remote control knot
Fruit is synchronous on picture to be shown, the switch of remote control failure is automatically recorded and generates secondary remote control sequence, according to remote control operation
Step carries out an acceptance inspection again.
6. a kind of boss station monitoring information based on examination card is checked and accepted automatically and nucleus correcting system, which is characterized in that certainly including main website
Dynamic Acceptance Test System and the automatic Acceptance Test System in substation, wherein the automatic Acceptance Test System of the main website includes advance data library, third party's letter
Breath point table examination card, database information automatic Check module, remote signals check and accept module automatically, telemetered signal checks and accepts mould automatically
Block, remote signal check and accept module automatically;The automatic Acceptance Test System in substation includes that third party's information point table checks and accepts card and substation
It is automatic to check and accept module, in which:
Third party's information point table, which checks and accepts card, to be independently generated by third party system, includes point number, title, voltage for recording
Grade, alarm type, device type parameter information;
The advance data library is used to store the table information, including point number, title, voltage etc. of the preparatory typing in main website side at preposition
Grade, alarm type, device type parameter information;
The database information automatic Check module is used to third party's information point table checking and accepting card and the point table in advance data library
Information carries out automatic Check, and checking content includes point number, title, voltage class, alarm type, device type, by whole checks
By point table solidified, while automatically generate remote signalling, telemetering, remote control check and accept sequence;
The remote signals check and accept automatically module for notify substation start remote signals it is automatic on give, and by substation upload it is distant
Letter signal is checked and accepted sequence with remote signalling and is checked one by one;
Sequence is checked and accepted according to the remote signals that database information automatic Check module generates, checks the remote signalling letter that substation uploads one by one
Number;
The telemetered signal check and accept automatically module for notify substation start telemetered signal it is automatic on give, and by substation upload it is distant
Signal is surveyed to be checked one by one with telemetering examination sequence;
The remote signal checks and accepts module for notifying substation starts remote control to check and accept automatically, and checks and accepts sequence according to remote control and send out one by one
Send control command to substation;
The substation checks and accepts module automatically and carries out a table information school with Master Control Unit for third party's information point table to be checked and accepted card
Core, checking content includes point number, title, voltage class, alarm type, device type, checks the signal passed through and automatically generates and tests
Sequence is received, when main website, which initiates signal, to be checked and accepted, the signal of automatic trigger Master Control Unit uploads automatically according to sequence order is checked and accepted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811045386.2A CN109217470A (en) | 2018-09-07 | 2018-09-07 | It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811045386.2A CN109217470A (en) | 2018-09-07 | 2018-09-07 | It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109217470A true CN109217470A (en) | 2019-01-15 |
Family
ID=64987242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811045386.2A Pending CN109217470A (en) | 2018-09-07 | 2018-09-07 | It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109217470A (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109818420A (en) * | 2019-03-26 | 2019-05-28 | 国网北京市电力公司 | Measuring and controlling equipment and TT&C system |
CN110112831A (en) * | 2019-06-03 | 2019-08-09 | 国网四川省电力公司电力科学研究院 | A kind of supervisory control of substation information automation checks and accepts device and its acceptance method |
CN110212532A (en) * | 2019-07-09 | 2019-09-06 | 国家电网有限公司 | A kind of portable power network schedule automation simulation checking system |
CN110535125A (en) * | 2019-08-29 | 2019-12-03 | 国网冀北电力有限公司张家口供电公司 | A kind of power system signal automatic checking method |
CN110571927A (en) * | 2019-08-30 | 2019-12-13 | 深圳供电局有限公司 | Four-remote signal parameter checking method |
CN110598805A (en) * | 2019-10-15 | 2019-12-20 | 广东电网有限责任公司 | Method and system for identifying monitoring information of power system |
CN110659822A (en) * | 2019-09-20 | 2020-01-07 | 云南恒协科技有限公司 | Intelligent information monitoring and management system for transformer substation |
CN110781241A (en) * | 2019-10-15 | 2020-02-11 | 深圳供电局有限公司 | Four-remote information acceptance method and system |
CN110838946A (en) * | 2019-11-17 | 2020-02-25 | 云南电网有限责任公司普洱供电局 | Automatic acceptance system and method based on simulation substation |
CN111274355A (en) * | 2020-01-15 | 2020-06-12 | 广东电网有限责任公司 | Lucene-based main plant station remote signaling signal automatic comparison method |
CN111585348A (en) * | 2020-06-03 | 2020-08-25 | 国网山东省电力公司泰安供电公司 | Wireless auxiliary counter-point acceptance system for monitoring information of intelligent substation |
CN112364043A (en) * | 2020-11-11 | 2021-02-12 | 贵州电网有限责任公司 | Automatic checking method for remote point table of dispatching automation system |
CN112434497A (en) * | 2020-11-16 | 2021-03-02 | 国家电网有限公司 | Multi-person collaborative editing-based transformer substation monitoring information point form acceptance method |
CN113114732A (en) * | 2021-03-23 | 2021-07-13 | 国网江苏省电力有限公司连云港供电分公司 | Automatic data point aligning system and method suitable for multiple links of transformer substation |
CN114285172A (en) * | 2021-12-31 | 2022-04-05 | 广东电网有限责任公司 | Method and device for automatically checking telemetering signal, electronic equipment and storage medium |
CN114612079A (en) * | 2022-05-16 | 2022-06-10 | 国网江西省电力有限公司电力科学研究院 | Automatic checking method for monitoring information graph library of centralized control station |
CN114785681A (en) * | 2022-04-15 | 2022-07-22 | 国网江苏省电力有限公司徐州供电分公司 | Automatic checking and acceptance system and method for monitoring information of in-operation equipment of transformer substation |
CN115603461A (en) * | 2022-10-25 | 2023-01-13 | 国网黑龙江省电力有限公司电力科学研究院(Cn) | Stock transformer substation monitoring information checking and accepting checking system |
CN116938937A (en) * | 2023-09-18 | 2023-10-24 | 国网江苏省电力有限公司扬州供电分公司 | Automatic point-to-point method, equipment and medium for cooperation of cloud edges of transformer substation and multiple main stations |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106329730A (en) * | 2016-09-14 | 2017-01-11 | 国网江苏省电力公司连云港供电公司 | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system |
CN107450445A (en) * | 2017-09-05 | 2017-12-08 | 国网山东省电力公司 | A kind of unified check of electric power supervisory control signal multistation and acceptance method |
-
2018
- 2018-09-07 CN CN201811045386.2A patent/CN109217470A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106329730A (en) * | 2016-09-14 | 2017-01-11 | 国网江苏省电力公司连云港供电公司 | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system |
CN107450445A (en) * | 2017-09-05 | 2017-12-08 | 国网山东省电力公司 | A kind of unified check of electric power supervisory control signal multistation and acceptance method |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109818420A (en) * | 2019-03-26 | 2019-05-28 | 国网北京市电力公司 | Measuring and controlling equipment and TT&C system |
CN110112831A (en) * | 2019-06-03 | 2019-08-09 | 国网四川省电力公司电力科学研究院 | A kind of supervisory control of substation information automation checks and accepts device and its acceptance method |
CN110212532A (en) * | 2019-07-09 | 2019-09-06 | 国家电网有限公司 | A kind of portable power network schedule automation simulation checking system |
CN110535125A (en) * | 2019-08-29 | 2019-12-03 | 国网冀北电力有限公司张家口供电公司 | A kind of power system signal automatic checking method |
CN110571927B (en) * | 2019-08-30 | 2024-02-13 | 深圳供电局有限公司 | Four-remote signal parameter checking method |
CN110571927A (en) * | 2019-08-30 | 2019-12-13 | 深圳供电局有限公司 | Four-remote signal parameter checking method |
CN110659822A (en) * | 2019-09-20 | 2020-01-07 | 云南恒协科技有限公司 | Intelligent information monitoring and management system for transformer substation |
CN110598805A (en) * | 2019-10-15 | 2019-12-20 | 广东电网有限责任公司 | Method and system for identifying monitoring information of power system |
CN110781241A (en) * | 2019-10-15 | 2020-02-11 | 深圳供电局有限公司 | Four-remote information acceptance method and system |
CN110838946A (en) * | 2019-11-17 | 2020-02-25 | 云南电网有限责任公司普洱供电局 | Automatic acceptance system and method based on simulation substation |
CN111274355A (en) * | 2020-01-15 | 2020-06-12 | 广东电网有限责任公司 | Lucene-based main plant station remote signaling signal automatic comparison method |
CN111585348A (en) * | 2020-06-03 | 2020-08-25 | 国网山东省电力公司泰安供电公司 | Wireless auxiliary counter-point acceptance system for monitoring information of intelligent substation |
CN112364043A (en) * | 2020-11-11 | 2021-02-12 | 贵州电网有限责任公司 | Automatic checking method for remote point table of dispatching automation system |
CN112434497A (en) * | 2020-11-16 | 2021-03-02 | 国家电网有限公司 | Multi-person collaborative editing-based transformer substation monitoring information point form acceptance method |
CN113114732A (en) * | 2021-03-23 | 2021-07-13 | 国网江苏省电力有限公司连云港供电分公司 | Automatic data point aligning system and method suitable for multiple links of transformer substation |
CN113114732B (en) * | 2021-03-23 | 2022-03-15 | 国网江苏省电力有限公司连云港供电分公司 | Automatic data point aligning system and method suitable for multiple links of transformer substation |
CN114285172A (en) * | 2021-12-31 | 2022-04-05 | 广东电网有限责任公司 | Method and device for automatically checking telemetering signal, electronic equipment and storage medium |
CN114785681A (en) * | 2022-04-15 | 2022-07-22 | 国网江苏省电力有限公司徐州供电分公司 | Automatic checking and acceptance system and method for monitoring information of in-operation equipment of transformer substation |
CN114785681B (en) * | 2022-04-15 | 2024-03-15 | 国网江苏省电力有限公司徐州供电分公司 | Automatic checking and accepting system and method for monitoring information of transformer substation on-line equipment |
CN114612079A (en) * | 2022-05-16 | 2022-06-10 | 国网江西省电力有限公司电力科学研究院 | Automatic checking method for monitoring information graph library of centralized control station |
CN115603461A (en) * | 2022-10-25 | 2023-01-13 | 国网黑龙江省电力有限公司电力科学研究院(Cn) | Stock transformer substation monitoring information checking and accepting checking system |
CN115603461B (en) * | 2022-10-25 | 2023-09-05 | 国网黑龙江省电力有限公司电力科学研究院 | Checking and checking system for monitoring information of stock transformer substation |
CN116938937A (en) * | 2023-09-18 | 2023-10-24 | 国网江苏省电力有限公司扬州供电分公司 | Automatic point-to-point method, equipment and medium for cooperation of cloud edges of transformer substation and multiple main stations |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109217470A (en) | It is checked and accepted automatically and check method and system based on the boss station monitoring information for checking and accepting card | |
CN106971351B (en) | The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method | |
CN107450445A (en) | A kind of unified check of electric power supervisory control signal multistation and acceptance method | |
CN106329730A (en) | Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system | |
CN104483842B (en) | One kind regulation and control one automation main website comparison method | |
CN107203838A (en) | Equipment management system | |
CN111612646A (en) | Networked intelligent secondary operation and maintenance system | |
CN110401692B (en) | Integrated automatic checking and accepting system and method for monitoring information of transformer substation | |
CN106969924A (en) | A kind of test system and method that track traffic brakes is detected and safeguarded | |
CN110932226B (en) | Automatic checking system for relay protection setting value | |
CN109269707A (en) | It can recognize that informationization cloud manages blower nut tightening technique detection method | |
CN114399408A (en) | Intelligent construction site comprehensive management platform and method thereof | |
CN107450493A (en) | A kind of nuclear power plant's control system controls change online management method temporarily | |
EP2608981B1 (en) | Securing and synchronizing the system time of a charging station | |
CN109816349A (en) | A kind of test verification management platform | |
CN112270422A (en) | Knowledge service-based electricity maintenance auxiliary system and method | |
CN107069957A (en) | A kind of recording constant value remote online modification and check method | |
CN110350660B (en) | Online monitoring method and system for relay protection function pressing plate | |
CN105117984A (en) | Data analysis-based power grid lean management system | |
CN110781241A (en) | Four-remote information acceptance method and system | |
CN106909615B (en) | Method and device for verifying data information consistency between master station and substation | |
CN110502257B (en) | Transformer substation monitoring information management, control and checking method | |
CN107169180A (en) | A kind of power grid regulation model center system of two-stage deployment | |
CN111291546A (en) | Transformer substation equipment monitoring information table carding method based on version difference checking | |
CN106991626A (en) | A kind of educational administration management system based on Quality Culture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190115 |