CN109166440A - Bidirectional power physical simulation experiment device and experimental method for Elevated Gravity - Google Patents

Bidirectional power physical simulation experiment device and experimental method for Elevated Gravity Download PDF

Info

Publication number
CN109166440A
CN109166440A CN201811323840.6A CN201811323840A CN109166440A CN 109166440 A CN109166440 A CN 109166440A CN 201811323840 A CN201811323840 A CN 201811323840A CN 109166440 A CN109166440 A CN 109166440A
Authority
CN
China
Prior art keywords
experimental
movable plate
simulation experiment
physical simulation
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811323840.6A
Other languages
Chinese (zh)
Other versions
CN109166440B (en
Inventor
贾东
吴晓俊
杨树锋
励音骐
陈汉林
陈竹新
尹宏伟
李泉
李一泉
袁剑英
吴武军
王彦君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing University
Original Assignee
Nanjing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing University filed Critical Nanjing University
Priority to CN201811323840.6A priority Critical patent/CN109166440B/en
Publication of CN109166440A publication Critical patent/CN109166440A/en
Application granted granted Critical
Publication of CN109166440B publication Critical patent/CN109166440B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B23/00Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
    • G09B23/40Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for geology

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Geology (AREA)
  • Mathematical Optimization (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Algebra (AREA)
  • Computational Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mathematical Physics (AREA)
  • Pure & Applied Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a kind of Bidirectional power physical simulation experiment devices and experimental method for Elevated Gravity, experimental provision includes experimental box and power device, movable plate of the experimental box by being located at the fixed plate of front and rear sides and positioned at the left and right sides forms, fixed plate and movable plate are arranged vertically, experimental material is placed in experimental box, the two sidewalls of movable plate move back and forth along fixed plate under the action of power device, to the experimental material being squeezed and deformed in experimental box.Experimental provision of the invention completes the arrangement to the experimental material in infrastructure physical simulation experiment case under normal gravity condition;Under the conditions of centrifugal force, the Bidirectional power device of simulation experiment of tectonics physics case is carried out automatically controlling, so that simulation experiment of tectonics physics case completes infrastructure physical simulation experiment, Bidirectional power structural deformation physical simulation experiment process study in experimental box, provides instant geological structure evolutionary process model for researcher.

Description

Bidirectional power physical simulation experiment device and experimental method for Elevated Gravity
Technical field
The present invention relates to a kind of experimental provision and experimental method more particularly to a kind of Bidirectional powers for Elevated Gravity Physical simulation experiment device and experimental method.
Background technique
Architectonic physical analogy has 200 years of researches history.The research in this field is until eighties of last century 30 (Hubbert, 1937 just obtain substantive development, and eventually become Modeling of Geological Structural Deformation rule for the foundation of age similarity theory Rule, the main means of forming process and study of genetic mechanism.For a long time, people utilize normal gravity tectonics physical simulating device There is comprehensive research to geological structure process spread, and greatly advanced the research and the level of understanding of structural geology.Especially Since last century the mid-80, structural deformation physical analogy is a kind of important experiment hand for studying Modeling of Geological Structural Deformation process Section, plays an important role to the research of structural geology.
At home and abroad structural geology research field achieves remarkable effect to structural deformation physical simulating method, and domestic and international one A little prominent universities and research institute establish respective laboratory one after another, for example, Stanford Univ USA, Rice University, English London University of state, Bern, SUI university etc..At home, Nanjing University, The Chinese Geology Univ. (Beijing), Chengdu University of Technology, The colleges and universities such as Chinese Petroleum Univ. establish simulation experiment of tectonics physics room in succession, are mainly used for simulating structural deformation physics The experimental study of simulation;Structural physical open laboratory of Research Institute of Geology, China Earthquake Administration, in rock rupture and friction and earthquake Source physics process, On Characteristics of Earthquake Precursors and Physical Mechanism, the physical property and the rheological equationm of state and ground of the earth's crust and outer mantle rock Shake origin mechanism and dynamics etc. carried out a large amount of experimental study.However, most of simulation experiment of tectonics physics be It is completed in sandbox experiment under the conditions of normal gravity.Normal gravity tectonics physical simulation experiment is being related to rock flow deformation (such as Gushed on mantle plume, asthenosphere convection current, Lower lip pits and magma and gypsum-salt bed diapir) the problems such as construction process physical analogy For aspect there are great limitation, normal gravity tectonics physical simulation experiment can simulate structural deformation form true to nature, but test and lack The stress influence factor of structural deformation is lacked.
Ground knowledge for being related to gravity is inscribed, and centrifuge has irreplaceable role.Using centrifuge, may be implemented just Chang Chongli hundred times, even 1000 times or more of Elevated Gravity, therefore practical geologic body can be dwindled into a geological model, It is studied under lab.For the rock in the earth's crust, gravity is to control its principal element destroyed and deformed, and is used It is inevitable choice that centrifuge, which carries out related physical simulation experiment,.The laboratory Sweden Uppsala university Ramberg takes the lead in carrying out Based on centrifuge Elevated Gravity PHYSICAL MODELING OF IN (Ramberg, 1967, then Canada's Queens University and Italian Buddhist This respect work has also been carried out in the modelling structural experiments rooms such as Lauren Sa university in succession, foreign scholar also delivered corresponding research at Fruit (Harris&Koyi (2003, JSG), Acocella (2008, EPSL), Noble&Dixon (2011, JSG), Corti& Dooley (2015, Tectonophysics), Dietl&Koyi (2011, JSG) etc..
The simulated experiment carried out under centrifuge Elevated Gravity is to solve the problems, such as that normal gravity tectonics physical simulation experiment exists Effective way, however since structure is complicated that cost is high for long-armed super-magnum centrifuge, the physics mould of centrifuge super gravity field environment Quasi- most lower, smaller drum centrifuges of size using cost.Although these drum centrifuge geology structural model devices Highest acceleration of gravity up to 1000g or more, but the size of experimental model is minimum (more than ten centimetres maximum, it is difficult to fine analog Practical geological structure phenomenon, and due to Laboratory Module narrow space, no image of Buddha Chang Chongli experimental provision is equipped with force application part like that With real-time observation instrument, it is difficult to precision control rate of deformation and synchronous recording whole deformation process.In China, for centrifuge environment Under architectonic simulation experiment study example it is also considerably less, the experiment of most centrifuge modellings is mainly used in ground work The research of the stress-deformation characteristic and Penetration Signature of journey structure.As China Water Resources & Hydropower Science Research Institute's civil engineering laboratory is gathered around There is large geotechnical centrifugal model test machine, the relevant device for being applied to modelling structural experiment under centrifuge environment does not almost have then at present Have.
Summary of the invention
Goal of the invention: the first object of the present invention, which is to provide, a kind of to be provided Elevated Gravity geological structure for researcher and drills Become the Bidirectional power physical simulation experiment device of process model;The second object of the present invention is to provide the reality using the experimental provision Proved recipe method.
Technical solution: the present invention is used for Elevated Gravity Bidirectional power physical simulation experiment device, including experimental box and dynamic Power device, movable plate of the experimental box by being located at the fixed plate of front and rear sides and positioned at the left and right sides form, fixed plate and work Movable plate is arranged vertically, and experimental material is placed in experimental box, and the two sidewalls of movable plate are come along fixed plate under the action of power device Return is dynamic, to the experimental material being squeezed and deformed in experimental box.
Wherein, the power device includes the power screw rod connecting with movable plate and provides the electricity of power for power screw rod Machine and speed reducer, wherein the power screw rod is set on power sliding rail, and drives movable plate by the sliding on power sliding rail Move back and forth.
Preferably, motor is arranged vertically;The input shaft and output shaft of speed reducer are on same axis, and the axis vertical Arrangement.Power sliding rail sets up or is provided on the bottom plate of experimental box, it is preferred that power sliding rail is also to lay vertically.Here perpendicular It is straight to lay the bottom plate laying referred to perpendicular to experimental box.
Movable plate is equipped with movable slider, while peripheral hardware or opening up movable rail in fixed plate, and movable slider is in activity Moving back and forth for movable plate is realized in sliding in sliding rail.Preferably, movable slider is located at two sides at the top of movable plate, and movable rail is located at At the top of fixed plate.
In the present invention, at least one piece in fixed plate and movable plate is transparent fixed plate.Preferably, movable plate is transparent solid Fixed board.Further, one of movable plate is transparent fixed plate.Meanwhile it being set in transparent fixed plate side installation photographing It is standby.
To prevent the experimental material in experimental box from revealing, while the frictional force that movable plate is contacted with fixed plate is reduced, in work The moving contact position of movable plate and fixed plate is equipped with sealing strip.Preferred sealing strip is Teflon sealing strip.
Further, scanner is installed at the top of experimental box, to shoot the deformation process of experimental material.
Experimental provision of the invention is suitable for 160-200G centrifugal force genvironments, overweight especially suitable for 160G centrifugal force Environment.
When originally with centrifugal force genvironments, experimental provision is set in the hanging basket of centrifuge, and movement is additionally provided on centrifuge Equipment is controlled, which is connect by wired or wireless way with the computer outside centrifuge, while the movement control Control equipment connects the experimental provision in hanging basket with signal wire by conductor wire.
The experimental method of Bidirectional power physical simulation experiment device of the present invention, includes the following steps:
(1) centrifuge operating before, under normal gravity environment, experimental material is routed in experimental box, experimental provision installation Into the hanging basket of centrifuge, conductor wire and signal wire are connected;
(2) revolving speed or gravity value of presetting centrifuge, starting centrifuge wait for that its operating reaches the revolving speed or gravity of setting When value, hanging basket rotates and is in horizontality;Start computer, sets the movement rate and move distance of movable plate, power dress It sets and drives movable plate setting in motion, the experimental material in experimental box starts to deform;
(3) while movable plate moves, the deformation data of experimental material in experimental box is recorded;
(4) when the movement rate of movable plate and move distance reach preset value, centrifugation is closed in stop motion Machine, hanging basket restore suspension plumbness, take out the experimental provision in hanging basket, carry out experimental study to the deformation data of record.
The utility model has the advantages that compared with prior art, experimental provision of the invention is completed under normal gravity condition to infrastructure The arrangement of experimental material in physical simulation experiment case, under the conditions of centrifugal force, to the two-way dynamic of simulation experiment of tectonics physics case Power device carries out automatically controlling, so that simulation experiment of tectonics physics case completes infrastructure physical simulation experiment, in experimental box Bidirectional power structural deformation physical simulation experiment process study provides instant geological structure evolutionary process model for researcher.
Detailed description of the invention
Fig. 1 is the top view of Bidirectional power physical simulation experiment device of the present invention;
Fig. 2 is the side view of Bidirectional power physical simulation experiment device of the present invention;
Fig. 3 is the side view in Bidirectional power physical simulation experiment of the present invention cabin;
Fig. 4 is the structural schematic diagram of Bidirectional power physical simulation experiment device of the present invention under centrifuge Elevated Gravity.
Specific embodiment
Technical solution of the present invention is described further with reference to the accompanying drawing.
As shown in Figure 1-3, experimental provision includes experimental box 5 and power device.Experimental box 5 is by the fixation positioned at front and rear sides Plate 11 and transparent fixed plate 16, and the composition of movable plate 8 positioned at the left and right sides, fixed plate 11,16 bottom of transparent fixed plate are solid Due on experiment Ceiling 18.Fixed plate 11,16 top of transparent fixed plate are equipped with movable rail 9 along its length, and activity is sliding Rail 9 is connect by movable slider 12 with movable plate 8.
In specific implementation, experimental provision of the invention is suitable for 160-200G centrifugal force genvironments, especially suitable for 160G centrifugal force genvironments.
All gravity values are own wt under normal gravity environment, and the gravity that 160-200G Elevated Gravity is subjected to need to be held The 160-200 times of weight by self gravity is indeformable, and the bottom endurance of the fixed plate 11 and movable plate 8 that are disposed vertically is itself 160-200 times of weight, example: the self weight 20Kg of fixed plate 11, in 160G Elevated Gravity, which is 3200Kg, this requires that the material of manufacture baffle is special material, material generally selects aviation magnesium alloy or titanium alloy. Movable plate 8 not only needs to overcome self gravity, also to overcome and test the frictional force between bottom plate when moving, and is overcoming the two Itself cannot be deformed while power, and under Elevated Gravity, frictional force can be very big, reduce frictional force, only between reduction plate Contact pressure, therefore inventor devises movable rail 9 and movable slider 12, guide rail is installed on the top of fixed plate 11, with work Movable slider 12 connects movable plate 8, and when movable plate 8 moves, movable slider 12 moves together with movable plate 8, and carries movable plate 8 Vertical gravity so that frictional force becomes minimum.
Fixed plate 11 and transparent fixed plate 16 should fully consider the lateral stress under 160-200G Elevated Gravity when manufacturing, The lateral pressure 160-200G Centrifugal Environment for being subjected to material in experimental box 5 is indeformable.Movable plate 8 fully considers 160- when manufacturing Lateral stress under 200G hypergravity is subjected to the lateral pressure 160-200G centrifugal hoop of material in experimental box 5 under motion state Border, movable plate 8 is indeformable under motion state.Movable slider 12 and power sliding rail 13 are subjected under 160-200G Centrifugal Environment living The weight of movable plate 8, and can move freely.
Power device is located at the left and right sides of experimental box 5, wherein movable plate 8 is connect with the power screw rod 14 of its two sides, is moved Power screw rod 14 is drivingly connected by integrated motor 15 with speed reducer 23, and another movable tail end of power screw rod 14 and power sliding block 4 connect It connects, power sliding block 4 is connect with the power sliding rail 13 for being fixed on experiment Ceiling 18.Power screw rod 14 in Fig. 2 is perpendicular to gravity Direction itself need to carry 160-200 times of hypergravity of own wt, can be deformed, therefore devises power sliding block 4 and move Power sliding rail 13 carries its own gravity, and can drive precise motion by motor 15 under constant shape state.Motor 15 is in hypergravity Environment can only could run well perpendicular to experiment bottom plate placement, therefore motor 15 is installed perpendicular to experiment Ceiling 18.
Power screw rod 14 according to thrust size type selecting, need to be subjected to the lateral pressure 160-200G of material in experimental box 5 from Thimble border.The lateral pressure 160-200G that integrated motor 15 and 23 thrust of speed reducer need to be greater than the material in experimental box 5 is centrifuged Environment, in order to guarantee that integrated motor 15 and normal operation of the speed reducer 23 under the Centrifugal Environment, motor 15 must be vertically real Hatch checking bottom plate 18 is installed.23 input shaft of speed reducer and output shaft on the same axis, and axis perpendicular to experiment Ceiling 18 pacify Dress.
Under Elevated Gravity, since the sand lateral force in experiment sandbox is very big, it is easy to reveal, movable plate 8 and solid Fixed board 11 must be fully sealed, this is high to accuracy of manufacture requirement, and special material sealed set, the present invention must be also used between plate It is middle specially to have made sealing strip with teflon material.Specifically, movable plate 8 is contacted with fixed plate 11, transparent fixed plate 16 Two sides are equipped with Teflon sealing strip 21, for preventing the material in experimental box 5 from revealing, and reduce movable plate 8 and fixed plate 11, The frictional force that transparent fixed plate 16 contacts need to calculate frictional force when calculating the push-pull effort size of movable plate 8.
Spatial digitizer 6 is installed, spatial digitizer 6 is installed on the scanner peace on experiment bottom plate 18 at the top of Laboratory Module 3 Fill bracket 17.Scanner mounting bracket 17 is subjected to 6 weight of spatial digitizer, and indeformable under 160-200G Centrifugal Environment. The side of the transparent fixed plate 16 in 3 bottom of Laboratory Module is equipped with photographing equipment 7, and photographing equipment 7 is fixed on Laboratory Module bottom On plate 18.
In specific implementation, experimental box 5 is horizontally arranged at 3 bottom centre of Laboratory Module.
As shown in figure 4, being equipped with Laboratory Module 3 in the centrifugal basket 2 on centrifuge 1, fortune is installed at the top of centrifuge 1 Dynamic control equipment 10, the computer 22 that motion control apparatus 10 passes through the experiment control outside wired or wireless way and centrifuge 1 Connection;Motion control apparatus 10 passes through 1 rotation center conducting slip ring 19 of centrifuge and the conductor wire and signal wire 20 on rotating arm Connection, conductor wire and signal wire 20 connect the equipment in Laboratory Module 3, and Laboratory Module 3 reaches certain gravity in the operating of centrifuge 1 and accelerates It starts to work after degree.
Experimental method:
1, before the operating of centrifuge 1, under normal gravity environment, experimental material is routed in experimental box 5, Laboratory Module 3 is pacified It is attached in the centrifugal basket 2 of centrifuge 1, connects the conductor wire and signal wire 20 of control.
2, presetting 1 revolving speed of centrifuge or directly setting gravity value 10-160-200G, start centrifuge 1, wait centrifuge When 1 operating reaches setting gravity value, 2 high speed rotation of centrifugal basket, and it is in horizontality;Starting control computer 22, if Surely movement rate and move distance are pushed and pulled, by the power screw rod 14 of motor 15, power screw rod 14 drives 8 setting in motion of movable plate, Material starts to deform in experimental box 5, wherein motion control rate reaches 0.00001mm/s.
3, while setting 8 setting in motion of movable plate, control computer 22 controls simultaneously opens 7 He of photographing equipment Spatial digitizer 6,3 D deformation number at the top of material in the material anamorphic image and experimental box 5 in the transparent fixed plate 16 of time recording According to.
4, when the distance that movable plate 8 moves reaches preset value, it is automatically stopped movement.Centrifuge 1 is closed to transport Dynamic, centrifugal basket 2 restores suspension plumbness, and Laboratory Module 3 is taken out from centrifugal basket 2, takes out 7 He of photographing equipment The data recorded in spatial digitizer 6 carry out experimental study.
The present invention is based on the simulation experiment of tectonics physics of long-armed super-magnum centrifuge, not only can highlight rock under Elevated Gravity The flow deformation effect of stone, analog large scale infrastructure evolutionary process, can be to be related to the infrastructure of LITHOSPHERIC SCALE Journey simulation provides maximally efficient research means, it is expected to grind as the important innovations for solving the problems, such as the great basic theory of geoscience Study carefully means.

Claims (10)

1. a kind of Bidirectional power physical simulation experiment device for Elevated Gravity, it is characterised in that: including experimental box (5) and Power device, the experimental box (5) is by being located at the fixed plate (11) of front and rear sides and positioned at movable plate (8) group of the left and right sides At fixed plate (11) and movable plate (8) are arranged vertically, and experimental material is placed in experimental box (5), living under the action of power device The two sidewalls of movable plate (8) move back and forth along fixed plate (11), to the experimental material being squeezed and deformed in experimental box (5).
2. Bidirectional power physical simulation experiment device according to claim 1, it is characterised in that: the power device includes The power screw rod (14) being connect with movable plate (8) and motor (15) and speed reducer for power screw rod (14) offer power (23), wherein the power screw rod (14) is set on power sliding rail (13), and is driven by the sliding on power sliding rail (13) Movable plate (8) move back and forth.
3. Bidirectional power physical simulation experiment device according to claim 2, it is characterised in that: the motor (15) is vertical Arrangement;The input shaft and output shaft of the speed reducer (23) are on same axis, and the axis vertical is arranged.
4. Bidirectional power physical simulation experiment device according to claim 1, it is characterised in that: on the movable plate (8) It peripheral hardware or is opened up movable rail (9) equipped with movable slider (12), while on fixed plate (11), movable slider (12) is sliding in activity Moving back and forth for movable plate (8) is realized in sliding in rail (9).
5. Bidirectional power physical simulation experiment device according to claim 4, it is characterised in that: the movable slider (12) Positioned at two sides at the top of movable plate (8), the movable rail (9) is located at the top of fixed plate (11).
6. Bidirectional power physical simulation experiment device according to claim 1, it is characterised in that: the fixed plate (11) and At least one piece in movable plate (8) is transparent fixed plate (16).
7. Bidirectional power physical simulation experiment device according to claim 6, it is characterised in that: the movable plate (8) is Transparent fixed plate (16).
8. Bidirectional power physical simulation experiment device according to claim 1, it is characterised in that: the movable plate (8) with The moving contact position of fixed plate (16) is equipped with sealing strip.
9. Bidirectional power physical simulation experiment device according to claim 1, it is characterised in that: the experimental provision is set to In centrifugal basket (2), motion control apparatus (10) are additionally provided on centrifuge (1), which passes through wired Or wireless mode is connect with the computer (22) of centrifuge (1) outside, while the motion control apparatus (10) passes through conductor wire and letter Experimental provision in number line (20) connection hanging basket.
10. a kind of experiment side using the Bidirectional power physical simulation experiment device for being used for Elevated Gravity described in claim 9 Method, it is characterised in that include the following steps:
(1) before centrifuge (1) operating, under normal gravity environment, experimental material is routed in experimental box (5), experimental provision peace It is attached in centrifugal basket (2), connects conductor wire and signal wire (20);
(2) revolving speed or gravity value of presetting centrifuge (1), starting centrifuge (1) reach the revolving speed or again of setting to its operating When force value, hanging basket rotates and is in horizontality;Start computer (22), set movable plate (8) movement rate and movement away from From power device drives movable plate (8) setting in motion, and the experimental material in experimental box (5) starts to deform;
(3) while movable plate (8) moves, the deformation data of experimental box (5) interior experimental material is recorded;
(4) when the movement rate of movable plate (8) and move distance reach preset value, centrifuge is closed in stop motion (1), centrifugal basket (2) restores suspension plumbness, takes out the experimental provision in hanging basket, carries out to the deformation data of record real Test research.
CN201811323840.6A 2018-11-08 2018-11-08 Bidirectional dynamic physical simulation experiment device and experiment method for supergravity environment Active CN109166440B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811323840.6A CN109166440B (en) 2018-11-08 2018-11-08 Bidirectional dynamic physical simulation experiment device and experiment method for supergravity environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811323840.6A CN109166440B (en) 2018-11-08 2018-11-08 Bidirectional dynamic physical simulation experiment device and experiment method for supergravity environment

Publications (2)

Publication Number Publication Date
CN109166440A true CN109166440A (en) 2019-01-08
CN109166440B CN109166440B (en) 2020-12-25

Family

ID=64876852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811323840.6A Active CN109166440B (en) 2018-11-08 2018-11-08 Bidirectional dynamic physical simulation experiment device and experiment method for supergravity environment

Country Status (1)

Country Link
CN (1) CN109166440B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111189709A (en) * 2020-03-04 2020-05-22 天津优瑞纳斯液压机械有限公司 Two-dimensional extrusion stretching device
CN112750356A (en) * 2021-01-28 2021-05-04 中国石油大学(华东) Sand box model, physical simulation method and system for stretching deformation and application
CN112945739A (en) * 2021-01-20 2021-06-11 南京大学 Supergravity experimental device and experimental method for interaction of brittleness and toughness deformation

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6162284A (en) * 1998-01-09 2000-12-19 Dailey Canada Limited Separator for gases, liquids and solids from a well
CN1538359A (en) * 2003-10-22 2004-10-20 中国科学院地质与地球物理研究所 Multifunctional three-dimensional structure simulation test device
CN1790444A (en) * 2005-12-15 2006-06-21 南京大学 Geologic structure deformation simulative experiment instrument
CN103050044A (en) * 2012-12-17 2013-04-17 中国石油天然气股份有限公司 Geological structure physical simulation bottom uniform expansion experimental device
US20140360538A1 (en) * 2013-06-06 2014-12-11 Ryan P. Elliott Intrinsically safe drill cuttings sample cleaning station
CN104952345A (en) * 2014-03-31 2015-09-30 中国石油化工股份有限公司 Strike-slip structure physical simulation experiment device and operation method thereof
CN105806575A (en) * 2016-03-25 2016-07-27 浙江大学 Device for measuring force on subsurface structure under dynamic centrifuge test conditions
CN107247128A (en) * 2017-05-16 2017-10-13 华北水利水电大学 The model test apparatus of retrogressive landslide sliding process under real-time measurement condition of raining
CN207571955U (en) * 2017-08-30 2018-07-03 中国石油天然气股份有限公司 Physical simulation equipment for basin walking and sliding structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6162284A (en) * 1998-01-09 2000-12-19 Dailey Canada Limited Separator for gases, liquids and solids from a well
CN1538359A (en) * 2003-10-22 2004-10-20 中国科学院地质与地球物理研究所 Multifunctional three-dimensional structure simulation test device
CN1790444A (en) * 2005-12-15 2006-06-21 南京大学 Geologic structure deformation simulative experiment instrument
CN103050044A (en) * 2012-12-17 2013-04-17 中国石油天然气股份有限公司 Geological structure physical simulation bottom uniform expansion experimental device
US20140360538A1 (en) * 2013-06-06 2014-12-11 Ryan P. Elliott Intrinsically safe drill cuttings sample cleaning station
CN104952345A (en) * 2014-03-31 2015-09-30 中国石油化工股份有限公司 Strike-slip structure physical simulation experiment device and operation method thereof
CN105806575A (en) * 2016-03-25 2016-07-27 浙江大学 Device for measuring force on subsurface structure under dynamic centrifuge test conditions
CN107247128A (en) * 2017-05-16 2017-10-13 华北水利水电大学 The model test apparatus of retrogressive landslide sliding process under real-time measurement condition of raining
CN207571955U (en) * 2017-08-30 2018-07-03 中国石油天然气股份有限公司 Physical simulation equipment for basin walking and sliding structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
MENGXIAO_009: ""构造物理模拟实验"", 《HTTPS://WENKU.BAIDU.COM/VIEW/271D8CB3DA38376BAF1FAEF9.HTML》 *
刘玉萍 等: ""褶皱-冲断体系双层滑脱构造变形物理模拟实验"", 《石油实验地质》 *
孔德松: ""离心场移动照相机构控制***研究"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111189709A (en) * 2020-03-04 2020-05-22 天津优瑞纳斯液压机械有限公司 Two-dimensional extrusion stretching device
CN112945739A (en) * 2021-01-20 2021-06-11 南京大学 Supergravity experimental device and experimental method for interaction of brittleness and toughness deformation
CN112945739B (en) * 2021-01-20 2022-05-17 南京大学 Supergravity experimental device and experimental method for interaction of brittleness and ductile deformation
CN112750356A (en) * 2021-01-28 2021-05-04 中国石油大学(华东) Sand box model, physical simulation method and system for stretching deformation and application

Also Published As

Publication number Publication date
CN109166440B (en) 2020-12-25

Similar Documents

Publication Publication Date Title
CN109166440A (en) Bidirectional power physical simulation experiment device and experimental method for Elevated Gravity
CN109345936A (en) Multidirectional power physical simulation experiment device and experimental method for Elevated Gravity
CN109166441B (en) Diapir physical simulation experiment device and method used in supergravity environment
Kim et al. A newly developed state-of-the-art geotechnical centrifuge in Korea
CN207194039U (en) Piled-box foundaton horizontal cyclic load testing machine
CN104032776B (en) Centrifugal field Support of Foundation Pit Excavation analog machine
CN108195684B (en) Test system for researching mechanical behavior of foundation under action of cyclic moving load
CN107064466A (en) A kind of indoor sound carries the swollen coefficient determination experimental provision of salt marsh earth salt and method
CN109192035A (en) Extensional fault physical simulation experiment device and experimental method for Elevated Gravity
Gaudin et al. A wireless high-speed data acquisition system for geotechnical centrifuge model testing
CN109297823A (en) A kind of experimental rig and test method for simulating mining rock Progressive failure
CN105547827A (en) Fluid-solid-soil multi-phase coupled six-freedom degree unidirectional/bidirectional static/dynamic loading instrument
CN105952437A (en) Indoor experimental research apparatus for friction and torque of strings in three-dimensional curved boreholes
CN111638029A (en) Be used for assembled bridge engineering with antidetonation experimental apparatus
CN108442418B (en) Simulation method for influence of tunnel stratum loss on pile foundation in centrifugal field
CN112881188A (en) Laboratory three-dimensional dynamic rock breaking test system and method
CN108362857A (en) A kind of model test apparatus for soil body large deformation flowing test under geological process
Idinyang et al. Real-time data coupling for hybrid testing in a geotechnical centrifuge
CN109285436A (en) Strike-slip fault zone physical simulation experiment device and experimental method for Elevated Gravity
CN103048241B (en) Sand flowing model testing system for drop tower platform
CN109991080A (en) A kind of centrifugal test device and method that simulation static pressure pile-sinking soil compaction effect influences neighbouring existing tunnel
CN207998878U (en) Tunnel in centrifugal field Stratum Loss influences simulation system to pile foundation
CN112014309A (en) Non-contact adjustment normal stress bottom friction test device for slope model test
CN106169267B (en) Tunnel stratum loss simulation system in centrifugal field
CN207300760U (en) A kind of large-scale triaxial shear test device in situ

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant