CN204920977U - Spray tube canopy construction equipment is revolved in advance to percussion drilling formula - Google Patents

Spray tube canopy construction equipment is revolved in advance to percussion drilling formula Download PDF

Info

Publication number
CN204920977U
CN204920977U CN201520606630.3U CN201520606630U CN204920977U CN 204920977 U CN204920977 U CN 204920977U CN 201520606630 U CN201520606630 U CN 201520606630U CN 204920977 U CN204920977 U CN 204920977U
Authority
CN
China
Prior art keywords
pipe
churning
roof
bolter
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520606630.3U
Other languages
Chinese (zh)
Inventor
张启军
杨铭竹
刘欢
蒋毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO YE GAO CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
QINGDAO YE GAO CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO YE GAO CONSTRUCTION ENGINEERING Co Ltd filed Critical QINGDAO YE GAO CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201520606630.3U priority Critical patent/CN204920977U/en
Application granted granted Critical
Publication of CN204920977U publication Critical patent/CN204920977U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model provides a spray tube canopy construction equipment is revolved in advance to percussion drilling formula, construction equipment includes air compressor, high -pressure grouting pump, roof -bolter, drilling rod and impacter, and the drilling rod includes the boring means pipe and spout the work pipe soon that boring means pipe front end is connected in the impacter rear end, installs nozzle soon on the work of spouting is soon managed, when construction equipment revolved the spray tube canopy, the roof -bolter unit head was connected in high -pressure grouting pump, spouted work pipe rear end soon and connected in the roof -bolter unit head, and the front end that spouts the work pipe soon seals and connects in the rear end of boring means pipe. Adopt the utility model discloses the geminate transistors canopy revolves spraying worker, and impacter and percussion bit can be broken fall barriers such as bold stone, have solved the difficult problem that the miscellaneous anhydrous safety of banketing was crept into, will creep into simultaneously, slip casting, as an organic wholeization of reaming combination construction process, has reduced construction equipment, has simplified construction process, has improved the efficiency of construction, has practiced thrift engineering cost, and the pollution of nos mud has realized energy -concerving and environment -protective construction requirements.

Description

Percussion drilling formula advanced churning pipe roof construction device
Technical field
The utility model relates to civil engineering support technology field, is especially a kind ofly applicable to that buried depth is more shallow, street pipe roof construction device is crossed in the tunneling on miscellaneous fill stratum containing obstructions such as boulders.
Background technology
Along with the quickening of various places urbanization process and the development of auto industry, traffic congestion and safety problem more and more become a real social concern, and the construction of crossing street also becomes a kind of measure alleviated traffic pressure and ensure pedestrains safety.For reducing the impact on existing traffic, crossing street often needs tunneling, the potential safety hazard of tunneling is landslide, landslide can threaten the life security of operator in hole on the one hand, can threaten the safety of life and property of road surface running vehicle, pedestrian on the other hand, the safety technics of tunneling is the key technology of its process of construction.
The poor tunneling of, formation condition more shallow for buried depth is crossed for street, and excavating passage after construction Shed-pipe Advanced Support is again the most important technical measures ensureing tunneling safety.Prior art, pipe canopy pore-forming adopts water drilling mud off to creep into usually, takes limit to creep into marginal not and enters a large amount of mud, pore-forming is gone out in dregs circulation, after drilling to completion, extracts drill rod boring tool, puts into the steel pipe slip casting processed section by section and forms pipe canopy.And cross that construction stratum, street usual buried depth is more shallow and to cross street penetrating ground often poor, for the miscellaneous fill stratum containing obstructions such as boulders, adopt water drilling drilling construction Shed-pipe Advanced Support, if run on the one hand boulder to creep into and need grinding to creep into, speed is very slow, if meet smaller piece stone, due to block stone meeting shift roll, be difficult to creep into, make difficulty of construction very big; On the other hand, the mud of system is stirred in water drilling boring owing to will inject large water gaging and mud, must have water effect to periphery backfill, and backfill can cause land subsidence under the effect of immersion, have a strong impact on the safety of top road and pipeline, be namely difficult to ensure follow-up construction safety and street use safety.
Summary of the invention
The utility model proposes a kind of percussion drilling formula advanced churning pipe roof construction device, prior art water drilling drilling construction Shed-pipe Advanced Support can be solved for the miscellaneous fill stratum containing obstructions such as boulders, difficulty of construction is large, and have water effect to periphery backfill, be difficult to the problem ensureing subsequent construction safety and street use safety.
In order to reach above-mentioned technical purpose, technical solutions of the utility model are: a kind of percussion drilling formula advanced churning pipe roof construction device, comprise the impactor that air compressor, high-pressure injection pump, roof-bolter, drilling rod and front end are provided with drill hammer, described drilling rod comprises boring means pipe and churning instrumentation tubes, the front end of described boring means pipe is connected to the rear end of described impactor, and described churning instrumentation tubes is provided with the churning nozzle be communicated with space in its pipe; When described construction equipment carries out creeping into punching, the unit head of described roof-bolter is connected to described air compressor, and the rear end of described boring means pipe is connected to the unit head of described roof-bolter; When described construction equipment carries out churning pipe canopy, the unit head of described roof-bolter is connected to described high-pressure injection pump, and the rear end of described churning instrumentation tubes is connected to the unit head of described roof-bolter, the front end of described churning instrumentation tubes is closed and is connected to the rear end of described boring means pipe.
In the technical solution of the utility model, also comprise following additional technical feature:
Described boring means pipe comprises at least two joint steel pipes of head and the tail connection successively on fore-and-aft direction, correspondingly, described churning instrumentation tubes to comprise on fore-and-aft direction at least two joint steel pipes that head and the tail successively connect, and described churning nozzle is positioned on the front side one joint steel pipe of described churning instrumentation tubes.
When the steel pipe joint number of described boring means pipe is greater than 3 joint, the steel pipe at interval of 1-2 joint is built-in with inclinometer, and described inclinometer is electrically connected with readout instrument.
Each steel pipe two ends of described boring means pipe and each steel pipe two ends of described churning instrumentation tubes all form interior square screw thread, connected by the box cupling with outer square screw thread between the adjacent steel pipe of described boring means pipe, connected by the box cupling with outer square screw thread between the adjacent steel pipe of described churning instrumentation tubes, the front end of the front side one joint steel pipe of described churning instrumentation tubes and described boring means pipe on rear side of a rear end saving steel pipe be connected by by the box cupling with outer square screw thread.
The front end of the front side one joint steel pipe of described churning instrumentation tubes is closed by plug, and the described box cupling at described plug and this steel pipe front end place is welded as a whole.
Described rear end of creeping into instrumentation tubes is connected to the front end of a driving tool pipe, and the rear end of described driving tool pipe is connected to the unit head of described roof-bolter.
The utility model adopts percussion drilling formula advanced churning pipe roof construction device and construction method to carry out rotary-spraying construction to pipe canopy, when running into the miscellaneous fill stratum containing obstructions such as boulders, impactor and drill hammer fragmentation can fall the obstructions such as boulder, solve a difficult problem for the anhydrous safety drilling of miscellaneous fill, to creep into simultaneously, slip casting, being combined into one of reaming construction technology, decrease construction equipment, simplify construction technology, improve efficiency of construction, save engineering cost, mud-less pollution, achieves the construction requirement of energy-conserving and environment-protective.
Accompanying drawing explanation
Fig. 1 is the johning knot composition that the utility model percussion drilling formula advanced churning pipe roof construction device is in when creeping into punching state;
Fig. 2 is the johning knot composition of the utility model percussion drilling formula advanced churning pipe roof construction device when being in churning pipe canopy;
Fig. 3 be in the utility model embodiment when boring means pipe and churning instrumentation tubes comprise the steel pipe that at least two joint head and the tail are connected drilling rod and the syndeton schematic diagram of impactor;
Fig. 4 is the I portion schematic enlarged-scale view of Fig. 3;
Fig. 5 is the structural representation of the utility model percussion drilling formula advanced churning pipe roof construction device when creeping into punching construction;
Fig. 6 is the structural representation one of the utility model percussion drilling formula advanced churning pipe roof construction device when rotary-spraying construction;
Fig. 7 is the structural representation two of the utility model percussion drilling formula advanced churning pipe roof construction device when rotary-spraying construction;
Fig. 8 is the structural representation three of the utility model percussion drilling formula advanced churning pipe roof construction device when rotary-spraying construction;
Fig. 9 is the structural representation four of the utility model percussion drilling formula advanced churning pipe roof construction device when rotary-spraying construction.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in more detail.
Referring to figs. 1 through Fig. 4, a kind of percussion drilling formula of the present embodiment advanced churning pipe roof construction device, comprise the impactor 40 that air compressor 10, high-pressure injection pump 20, roof-bolter 30, drilling rod and front end are provided with drill hammer 41, roof-bolter 30 comprises roof-bolter unit head 31, drilling rod comprises boring means pipe 50 and churning instrumentation tubes 60, the front end of boring means pipe 50 is connected to the rear end of impactor 40, churning instrumentation tubes 60 is provided with the churning nozzle 61 be communicated with space in its pipe; When construction equipment carries out creeping into punching, roof-bolter unit head 31 is connected to air compressor 10, and the rear end of boring means pipe 50 is connected to roof-bolter unit head 31; When construction equipment carries out churning pipe canopy, roof-bolter unit head 31 is connected to high-pressure injection pump 20, and the rear end of churning instrumentation tubes 60 is connected to roof-bolter unit head 31, and the front end of churning instrumentation tubes 60 is closed and is connected to the rear end of boring means pipe 50.
Boring means pipe 50 and churning instrumentation tubes 60 use the geological drilling steel pipe that material is identical, hardness is larger, and boring means pipe 50 is for penetrating formation drilling and wanting removal after creeping into, and churning instrumentation tubes 60 forever use as pipe canopy for wanting after churning.
Usually comparatively large owing to crossing street length, and geological drilling steel pipe normal length is 2-4m, then boring means pipe 50 comprises at least two joint steel pipes 51 of head and the tail connection successively on fore-and-aft direction, and often saving steel pipe 51 length is 2-4m; Correspondingly, churning instrumentation tubes 60 to comprise on fore-and-aft direction at least two joint steel pipes 62 that head and the tail successively connect, and often saving steel pipe 62 length is 2-4m, and churning nozzle 61 is positioned on the front side one joint steel pipe of churning instrumentation tubes 60.
Further, when steel pipe 51 joint number of boring means pipe 50 is greater than 3 joint, adjacent steel pipe 51 is owing to connecting from beginning to end, and in work progress, steel pipe 51 can be downward-sloping due to Action of Gravity Field, it is the direct of travel often saving steel pipe of moment monitoring boring means pipe 50, ensure that actual pipe canopy angle equals design pipe canopy angle, in the plurality of sections of steel pipes 51 of boring means pipe 50, save steel pipe 51 at interval of 1-2 and put into inclinometer 70 in next steel pipe 51, survey instrument 70 and be electrically connected with readout instrument 80.Inclinometer 70 can select portable inclinometer, the angle of inclination of monitoring front end steel pipe 51, when occurring that deviation exceeds requirement, should stop creeping into and taking satisfactory after correcting or displacement again to creep into.
Particularly, for the connection of boring means pipe 50 and churning instrumentation tubes 60, the connection of the adjacent steel pipe 51 of boring means pipe 50, the connection of the adjacent steel pipe 62 of churning instrumentation tubes 60, each steel pipe 51 two ends of boring means pipe 50 and each steel pipe 62 two ends of churning instrumentation tubes 60 all form interior square screw thread, namely two ends have internal thread, connected by the box cupling 90 with outer square screw thread between the adjacent steel pipe 51 of boring means pipe 50, also be connected by the box cupling 90 with outer square screw thread between the adjacent steel pipe 62 of churning instrumentation tubes 60, the front end of the front side one joint steel pipe 62 of churning instrumentation tubes 60 and boring means pipe 50 on rear side of one to save the rear end of steel pipe 51 same be connected by the box cupling 90 with outer square screw thread.Certainly, can adopt other connected modes, the present embodiment does not do concrete restriction to this yet.
The closed of steel pipe 62 front end save front side one for the churning instrumentation tubes 60 be connected with boring means pipe 50, plug 100 is adopted to close in the present embodiment, water under high pressure mud is prevented to be spilled over to forward boring means pipe 50, further, plug 100 is welded as a whole with the box cupling 90 at this steel pipe 62 front end place, to ensure the closed steadiness of plug 100.
Because the stroke of roof-bolter 30 is limited, when the final section steel pipe 62 of churning instrumentation tubes 60 enters stratum, stratum is entered smoothly for making this steel pipe, the rear end of creeping into instrumentation tubes 50 is connected to the front end of a driving tool pipe 110, the rear end of driving tool pipe 110 is connected to roof-bolter unit head 31, by driving tool pipe 110, the final section steel pipe 62 of churning instrumentation tubes 60 is advanced into stratum.
Adopt the present embodiment percussion drilling formula advanced churning pipe roof construction device to carry out churning pipe roof construction, comprise the steps:
(1) roof-bolter 30 is in place, is arranged on roof-bolter unit head 31 by boring means pipe 50, and is connected with the impactor 40 being provided with drill hammer 41 front end of boring means pipe 50, and meanwhile, roof-bolter 30 connects air compressor 10 by airduct 100;
(2) position, mobile roof-bolter 30 pairs of holes, use Horizontal angle rule to measure and adjust construction incident angle, make it than large 1 °-2 ° of design pipe canopy angle, start air compressor 10, high-pressure blast enters roof-bolter unit head 31, boring means pipe 50, impactor 40, drill hammer 41 percussion drilling by airduct 100, roof-bolter unit head 31 provides propulsive force and revolving force, creep into miscellaneous fill 190, when meeting the obstructions such as block stone, drill hammer impact grinding, continue to creep into, as shown in Figure 5;
(3) after impactor 40 and drill hammer 41 pass opposite, stratum otch 140, stopping is crept into, roof-bolter unit head 31 is separated in the rear end of boring means pipe 50, and connect churning instrumentation tubes 60 in the rear end of this boring means pipe 50, and the rear end of churning instrumentation tubes 60 is connected on roof-bolter unit head 31, start roof-bolter 30, churning instrumentation tubes 60 is rotated forward and advances stratum 50-60cm, removal air compressor 10, and high-pressure injection pump 20 is connected on roof-bolter unit head 31, as shown in Figure 6;
(4) carry out cement paste when shutoff process stops high-pressure slip-casting to the space of entrance port 130 churning instrumentation tubes 60 tube wall surrounding to flow out, and ensure that churning instrumentation tubes 60 still can not affect and creep into by slide anteroposterior under roof-bolter unit head 31 drives; Particularly, can utilize thin drill steel that the flexible blockage material such as cloth are pushed filling and form entrance port plugging structure 120, length is about 0.5m, as shown in Figure 7;
(5) roof-bolter unit head 31 advances churning instrumentation tubes high-pressure rotary-spray, expose after opposite, stratum otch 140 completely until impactor 40, removal impactor 40 and drill hammer 41, and the boring means pipe 50 tube wall surrounding at same otch 140 place, formation opposite carries out shutoff process, form opposite otch plugging structure 150, as shown in Figure 7;
(6), while churning instrumentation tubes 60 high-pressure rotary-spray creeps into, corresponding removal is carried out to the boring means pipe 50 that opposite otch 140 place passes, as shown in Figure 8;
(7) when high-pressure rotary-spray is to opposite, stratum otch 140, stop churning, further shutoff entrance port 130 and opposite otch 140, avoid stream slurry, removal high-pressure injection pump 20, removal boring means pipe 50, telephone-moving is to the next position construction churning pipe canopy;
(8) all churning pipe canopy 200 is constructed complete, withdraws construction equipment, the steel pipe place pouring reinforcement concrete collar tie beam 160 that Guan Peng exposes at two ends, intends excavation passage 170 both sides pouring reinforcement concrete support column 180, then enters tunneling operation, as shown in Figure 9.
Further, in step (2), when boring means pipe 50 comprises at least two joint steel pipe 51 of head and the tail connection successively on fore-and-aft direction, creeping into the last joint steel pipe degree of depth, next is being installed between last joint steel pipe and roof-bolter unit head 31 and saves steel pipe and continue to creep into until penetrate opposite otch 140; Correspondingly, in step (5), when churning instrumentation tubes 60 comprises at least two joint steel pipe 62 of head and the tail connection successively on fore-and-aft direction, creep into the last joint steel pipe degree of depth in churning, next is installed between last joint steel pipe and roof-bolter unit head 31 and saves steel pipe and continue churning and creep into until churning is to opposite otch 140.
Further, learn through practice, the water ash mass ratio of high-pressure injection pump 20 cement grout used is advisable with 0.8 ~ 1.0, better to bottom adhesive action, slip casting operating pressure remains on 15-25MPa, the fltting speed of roof-bolter 30 is advisable with 10-20cm/min, carries out horizontal direction churning, and churning diameter is about 400-500mm.
In step (2), when boring means pipe bit enter 2 joint steel pipes do not pass opposite, stratum otch 140 yet time, before next joint steel pipe of installation, in pipe, inclinometer 70 to the pipe end is pushed from last joint steel pipe nozzle, inclinometer 70 connects readout instrument 80, to go forward side by side line item for monitoring boring means pipe angle of inclination, often creep into 1 ~ 2 joint steel pipe and measure 1 time, when occurring that deviation exceeds requirement, should stop creeping into and take satisfactory after correcting or displacement again to creep into, to ensure that actual pipe canopy angle equals to design pipe canopy angle in advance.
The above, it is only preferred embodiment of the present utility model, be not restriction the utility model being made to other form, any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the Equivalent embodiments of equivalent variations.But everyly do not depart from technical solutions of the utility model content, any simple modification, equivalent variations and the remodeling done above embodiment according to technical spirit of the present utility model, still belong to the protection domain of technical solutions of the utility model.

Claims (6)

1. a percussion drilling formula advanced churning pipe roof construction device, comprise the impactor that air compressor, high-pressure injection pump, roof-bolter, drilling rod and front end are provided with drill hammer, it is characterized in that: described drilling rod comprises boring means pipe and churning instrumentation tubes, the front end of described boring means pipe is connected to the rear end of described impactor, and described churning instrumentation tubes is provided with the churning nozzle be communicated with space in its pipe; When described construction equipment carries out creeping into punching, the unit head of described roof-bolter is connected to described air compressor, and the rear end of described boring means pipe is connected to the unit head of described roof-bolter; When described construction equipment carries out churning pipe canopy, the unit head of described roof-bolter is connected to described high-pressure injection pump, and the rear end of described churning instrumentation tubes is connected to the unit head of described roof-bolter, the front end of described churning instrumentation tubes is closed and is connected to the rear end of described boring means pipe.
2. percussion drilling formula according to claim 1 advanced churning pipe roof construction device, it is characterized in that: described boring means pipe comprises at least two joint steel pipes of head and the tail connection successively on fore-and-aft direction, correspondingly, described churning instrumentation tubes to comprise on fore-and-aft direction at least two joint steel pipes that head and the tail successively connect, and described churning nozzle is positioned on the front side one joint steel pipe of described churning instrumentation tubes.
3. percussion drilling formula according to claim 2 advanced churning pipe roof construction device, is characterized in that: when the steel pipe joint number of described boring means pipe is greater than 3 joint, and the steel pipe at interval of 1-2 joint is built-in with inclinometer, and described inclinometer is electrically connected with readout instrument.
4. percussion drilling formula according to claim 2 advanced churning pipe roof construction device, it is characterized in that: each steel pipe two ends of described boring means pipe and each steel pipe two ends of described churning instrumentation tubes all form interior square screw thread, connected by the box cupling with outer square screw thread between the adjacent steel pipe of described boring means pipe, connected by the box cupling with outer square screw thread between the adjacent steel pipe of described churning instrumentation tubes, the front end of the front side one joint steel pipe of described churning instrumentation tubes and described boring means pipe on rear side of a rear end saving steel pipe be connected by the box cupling with outer square screw thread.
5. percussion drilling formula according to claim 4 advanced churning pipe roof construction device, is characterized in that: the front end of the front side one joint steel pipe of described churning instrumentation tubes is closed by plug, and the described box cupling at described plug and this steel pipe front end place is welded as a whole.
6. the percussion drilling formula advanced churning pipe roof construction device according to any one of claim 2 to 5, it is characterized in that: described in creep into instrumentation tubes rear end be connected to the front end of a driving tool pipe, the rear end of described driving tool pipe is connected to the unit head of described roof-bolter.
CN201520606630.3U 2015-08-13 2015-08-13 Spray tube canopy construction equipment is revolved in advance to percussion drilling formula Expired - Fee Related CN204920977U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520606630.3U CN204920977U (en) 2015-08-13 2015-08-13 Spray tube canopy construction equipment is revolved in advance to percussion drilling formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520606630.3U CN204920977U (en) 2015-08-13 2015-08-13 Spray tube canopy construction equipment is revolved in advance to percussion drilling formula

Publications (1)

Publication Number Publication Date
CN204920977U true CN204920977U (en) 2015-12-30

Family

ID=54970114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520606630.3U Expired - Fee Related CN204920977U (en) 2015-08-13 2015-08-13 Spray tube canopy construction equipment is revolved in advance to percussion drilling formula

Country Status (1)

Country Link
CN (1) CN204920977U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019917A (en) * 2015-08-13 2015-11-04 青岛业高建设工程有限公司 Impact drilling type advanced jet grouting pipe shed construction device and construction method
CN106194204A (en) * 2016-09-08 2016-12-07 长安大学 A kind of drift cobble tunnel advanced support structure and method for protecting support
CN110242327A (en) * 2019-06-21 2019-09-17 王亚星 A kind of underground engineering tunnel pipe canopy mounting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019917A (en) * 2015-08-13 2015-11-04 青岛业高建设工程有限公司 Impact drilling type advanced jet grouting pipe shed construction device and construction method
CN106194204A (en) * 2016-09-08 2016-12-07 长安大学 A kind of drift cobble tunnel advanced support structure and method for protecting support
CN110242327A (en) * 2019-06-21 2019-09-17 王亚星 A kind of underground engineering tunnel pipe canopy mounting device

Similar Documents

Publication Publication Date Title
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
WO2018045746A1 (en) Method for construction of boom-type roadheader for urban shallow tunnel with intensive karst and rich water
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN110056369A (en) A kind of construction method at tunnel's entrance and exit hole
CN109594990B (en) Large-section jacking pipe construction method for complex stratum
CN111577136A (en) High-pressure jet grouting pile hole guiding construction integrated device and construction method thereof
WO2020259059A1 (en) Tbm parallel heading tunnel trunk construction method
CN108590706A (en) One kind being used for speciality single-track railway tunnel drifter with booms Construction Techniques of Grouting in Heavy Curtain
CN110424385A (en) The construction of major diameter high verticality jet grouting stake in ovum rubble stratum
CN109630151A (en) Rectangular top pipe tunneling construction method
CN113550305B (en) Construction method and drill bit for high-pressure water jet stiffening core composite pile of hard soil interlayer foundation
CN204920977U (en) Spray tube canopy construction equipment is revolved in advance to percussion drilling formula
CN105019917A (en) Impact drilling type advanced jet grouting pipe shed construction device and construction method
CN106284295A (en) Multichannel high-pressure vibro-grouting jet groutinl construction method
CN107060800A (en) A kind of shield-tunneling construction huge stone handling construction method
CN106638643A (en) Water-stopping-curtain construction device and method
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN107604903A (en) A kind of miniature steel pipe isolation pile reinforced construction method
CN213233469U (en) Triaxial down-the-hole impact high-pressure jet grouting equipment
CN212671560U (en) High-pressure jet grouting pile hole guiding construction integrated device
CN103074887B (en) High-pressure vibro-grouting method for processing foundation and specific drilling tool assembly
CN203080528U (en) Drilling and spraying integrated foundation treating special drilling tool assembly
CN110173274A (en) A kind of head is removed obstacles method
CN115681613A (en) Pipe jacking construction method for silt silty clay layer construction
CN102758443B (en) Novel enclosing structure applicable to connection change between new pipes and old pipes and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230