CN108665022A - A kind of digitlization yard management system - Google Patents
A kind of digitlization yard management system Download PDFInfo
- Publication number
- CN108665022A CN108665022A CN201810289401.1A CN201810289401A CN108665022A CN 108665022 A CN108665022 A CN 108665022A CN 201810289401 A CN201810289401 A CN 201810289401A CN 108665022 A CN108665022 A CN 108665022A
- Authority
- CN
- China
- Prior art keywords
- information
- stored
- prefabricated components
- stockyard
- digitlization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012545 processing Methods 0.000 claims abstract description 18
- 238000013507 mapping Methods 0.000 claims description 12
- 230000004044 response Effects 0.000 claims description 9
- 239000000700 radioactive tracer Substances 0.000 claims description 2
- 238000000151 deposition Methods 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 14
- 238000007726 management method Methods 0.000 description 24
- 230000000875 corresponding effect Effects 0.000 description 9
- 238000013461 design Methods 0.000 description 9
- 238000000034 method Methods 0.000 description 8
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000006872 improvement Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 210000003195 fascia Anatomy 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
- G06K17/0025—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- General Health & Medical Sciences (AREA)
- Economics (AREA)
- Health & Medical Sciences (AREA)
- Computer Networks & Wireless Communication (AREA)
- General Engineering & Computer Science (AREA)
- Warehouses Or Storage Devices (AREA)
Abstract
The invention discloses a kind of digitlization yard management system, information collecting device is used to acquire the label information of prefabricated components to be stored, and the component information of prefabricated components to be stored is included in the label information;The processing unit being connected with information collecting device is stored to the stockyard position of shelf for obtaining prefabricated components to be stored, and generates the driving instruction that prefabricated components to be stored are delivered to stockyard position;The feed drive device being connected with information collecting device, for receiving driving instruction, prefabricated components to be stored are delivered at corresponding stockyard position by driving conveying device.Using digitlization yard management system provided by the present invention, user need not differentiate its corresponding component information from thousands of components of striking resemblances in appearance up to a hundred, the label information of the MES of production system is combined with stockyard position, realizes the digital information management in prefabricated components stockyard.
Description
Technical field
The present invention relates to assembled architecture technical fields, more particularly to a kind of digitlization yard management system.
Background technology
Assembled architecture refers in batches producing prefabricated component in factory as manufacturing machine product,
Transport to the building that building site is assembled.The maximum distinctive points of assembled architecture and traditional architecture are the building side in house
Formula, traditional architecture generally use cast-in-place mode.And assembled architecture, manufacture link is increased between design and construction, factory
According to the design of design department, various required prefabricated components are manufactured, including:Side fascia, lining, superimposed sheet, balcony, air-conditioning
Then plate, stair, precast beam, prefabricated post etc. are transported to on-site consolidation, i.e. design-manufacture-assembly.Assembled architecture it is good
Be in and do not needed in, erecting yard or seldom use wet construction, prefabricated component is quality controllable, is made by factory industry, it is artificial because
Plain controllable, short time limit, water-saving and environmental protection, scene seldom uses formwork form removal, greatly reduces the waste of template.
The prefabricated components produced in PC factories are mainly the open storage ground storage in planning.In order to improve building site dress
Installation effectiveness with formula building, factory generally require all prefabricated components of inventory's project before assembly.Therefore the heap of PC factories
Field planning area is larger.
Existing market PC factories yard management, which uses two ways, first method, to be carried out using container-type shelf
Component is stored, and disengaging stockyard all uses monoblock type management and transport.The advantages of this mode is:Whole management and transport, cost
It is relatively low;Input cost is relatively low.The disadvantage is that:Be not suitable for slotting menu manager, need fully according to sequentially being produced, to production requirement compared with
It is high.Second method is, is that single component stores library by stockyard construction using single component storage mode.This mode it is excellent
Putting is:Stockyard utilization rate is big, does not waste shelf and needs the space occupied;Single component storage, convenient for integration lifting at container
Transport.The disadvantage is that:Each component is required for the installation suspension centre that climbs up, elapsed time when lifting;Single component management manages quantity
It is more.In consideration of it, a kind of scheme carrying out digital information management to prefabricated components stockyard of offer is necessary.
Invention content
The object of the present invention is to provide a kind of digitlization yard management systems, to carry out digital letter to the stockyard of prefabricated components
Breathization manages.
In order to solve the above technical problems, the present invention provides a kind of digitlization yard management system, including:
Information collecting device, the label information for acquiring prefabricated components to be stored, comprising described in the label information
The component information of prefabricated components to be stored;
Processing unit is connected with described information harvester, is stored to shelf for obtaining the prefabricated components to be stored
Stockyard position, and generate and the prefabricated components to be stored be delivered to the driving instruction of the stockyard position;
Feed drive device is connected with the processing unit, for receiving the driving instruction, drives conveying device by institute
Prefabricated components to be stored are stated to be delivered at corresponding stockyard position.
Optionally, described information harvester is Quick Response Code and/or bar code scanner.
Optionally, further include:It is arranged on shelf, the signal trace for carrying out real-time tracking to the position of the shelf
Device.
Optionally, further include:To the storage device that the component information, stockyard information, correspondence mappings relationship are stored,
The correspondence mappings relationship is the correspondence of the component information and the stockyard information.
Optionally, the processing unit is additionally operable to:Receive inquired component institute deposit position input by user
One inquiry instruction calls the correspondence mappings relationship from the storage device, determines the stockyard position that component to be checked is stored
It sets.
Optionally, the processing unit is additionally operable to:Receive inquired heap place storage structure input by user
Two inquiry instructions call the correspondence mappings relationship from the storage device, determine the component letter stored position to be checked
Breath.
Optionally, the conveying device includes:Whole hanger, transport vehicle.
Digitlization yard management system provided by the present invention, information collecting device is for acquiring prefabricated components to be stored
Label information, the component information of prefabricated components to be stored is included in the label information;The processing being connected with information collecting device
Device is stored to the stockyard position of shelf for obtaining prefabricated components to be stored, and generates and be delivered to prefabricated components to be stored
The driving instruction of stockyard position;The feed drive device being connected with information collecting device, for receiving driving instruction, driving conveying
Prefabricated components to be stored are delivered at corresponding stockyard position by device.Using digitlization yard management system provided by the present invention
System, user need not differentiate its corresponding component information from thousands of components of striking resemblances in appearance up to a hundred, by production system
The label information of MES combine with stockyard position, realize the digital information management in prefabricated components stockyard.
Description of the drawings
It, below will be to embodiment or existing for the clearer technical solution for illustrating the embodiment of the present invention or the prior art
Attached drawing is briefly described needed in technology description, it should be apparent that, the accompanying drawings in the following description is only this hair
Some bright embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of structure diagram of specific implementation mode of digitlization yard management system provided by the present invention;
Fig. 2 is stockyard region division in a kind of specific implementation mode provided by the present invention for digitizing yard management system
Schematic diagram.
Specific implementation mode
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description
The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, shall fall within the protection scope of the present invention.
A kind of structure diagram such as Fig. 1 institutes of specific implementation mode of digitlization yard management system provided by the present invention
Show, which includes:
Information collecting device 1, the label information for acquiring prefabricated components to be stored, comprising described in the label information
The component information of prefabricated components to be stored;
Processing unit 2 is connected with described information harvester, is stored to shelf for obtaining the prefabricated components to be stored
Stockyard position, and generate and the prefabricated components to be stored be delivered to the driving instruction of the stockyard position;
Feed drive device 3 is connected with the processing unit, and for receiving the driving instruction, driving conveying device will
The prefabricated components to be stored are delivered at corresponding stockyard position.
It should be pointed out that prefabricated components are by the division of preset building unit in assembled architecture, it specifically can basis
Actual conditions are divided, such as one block of wallboard, beam or column.Design portions carry out building according to selected architectural structure system and set
Meter, including house type, appearance, hot-water heating Electromechanical Design etc., but factory cannot whole house disposable production, it is necessary to a component
The production of one component, for example, a face wall in a house, several meters to tens meters long to differ, factory can not possibly disposably give birth to again
Super big wallboard is produced, transport and lifting are too difficult, and too small wallboard manufacture and efficiency of assembling are again too low, and assembly also bothers, and need to do
The splicing node of water-proofing treatment is too many, so how building splits into reasonable, suitable prefabricated components, it is contact design, manufacture
And assembled extremely the key link, it is known as tearing plate open in industry, tears that plate is more reasonable, and manufacture is simpler, and production efficiency is also higher open,
Assembly is simple, and efficiency of assembling is also higher.
Label information can be 2 D code information and/or bar code and/or number information, can also be other forms certainly
Coding information does not limit herein.Specifically, each component of assembled can be given to assign a unique label information (can
To automatically generate), it is all made of this label information in design, manufacture, transport and logistics and is managed.Correlated process information is equal
It is collected with this unique encodings:Including stock, material, tooling, processing teams and groups personnel, assembly teams and groups, assembly time etc..Make
For a kind of specific implementation mode, information collecting device is specially Quick Response Code and/or bar code scanner in the present embodiment.By this
Information collecting device can collect the Quick Response Code or bar code information of prefabricated components to be stored.Further, it is also possible to by artificial
The label information is inputted, this does not influence the realization of the present invention.
The component information of prefabricated components to be stored is contained in label information, which can be specifically by the standby of component
Expect information, material information, tooling information, processing teams and groups personal information, assembly teams and groups information, assembly time information, logistics information,
Checking information, activity duration information, cost information, haulage vehicle information.Structural components service cycle be component from demand, plan, set
Count, produce, selling, running, use, maintenance, until recycling disposition whole life cycle.It is deposited in advance in database
Stored up component demand, planning, design, produce, sell, run, use, maintenance, until recycling disposes Life Cycle
The essential information in each stage in phase.By acquiring the label information, you can obtain corresponding prefabricated components relevant information.
Processing unit can obtain prefabricated components to be stored and store the stockyard position to shelf, specifically can be according to user
The stockyard location determination inputted by interface direct labor obtains.Furthermore it is also possible to by being obtained in pre-set component information,
Component information, which contains it, in this embodiment should be stored in the location information in stockyard.It can be to be stored pre- according to the stockyard position
Component processed is stored.After determining stockyard position, drive prefabricated components to be stored to corresponding stockyard position by feed drive device
Place.
Digitlization yard management system provided by the present invention, information collecting device is for acquiring prefabricated components to be stored
Label information, the component information of prefabricated components to be stored is included in the label information;The processing being connected with information collecting device
Device is stored to the stockyard position of shelf for obtaining prefabricated components to be stored, and generates and be delivered to prefabricated components to be stored
The driving instruction of stockyard position;The feed drive device being connected with information collecting device, for receiving driving instruction, driving conveying
Prefabricated components to be stored are delivered at corresponding stockyard position by device.Using digitlization yard management system provided by the present invention
System, user need not differentiate its corresponding component information from thousands of components of striking resemblances in appearance up to a hundred, by production system
The label information of MES combine with stockyard position, realize the digital information management in prefabricated components stockyard.
Further, digitlization yard management system provided by the present invention can also include:It is arranged on shelf, is used for
The signal tracer of real-time tracking is carried out to the position of the shelf.
During prefabricated components are delivered to specified stockyard position by conveying device, the signal trace of installation can be passed through
Device monitors the real time position of shelf, automatic route adjustment is carried out by the feedback of the real time position, until reaching designated position.
As a kind of specific implementation mode, the present embodiment can also include:To the component information, stockyard information, correspondence
The storage device that mapping relations are stored, the correspondence mappings relationship are that the component information is corresponding with the stockyard information
Relationship.
Processing unit is additionally operable in the present embodiment:Receive first inquired component institute deposit position input by user
Inquiry instruction calls the correspondence mappings relationship from the storage device, determines the stockyard position that component to be checked is stored.
In addition, processing unit can be also used for:The second inquiry instruction input by user inquired heap place storage structure is received,
The correspondence mappings relationship is called from the storage device, determines the component information that position to be checked is stored.
Setting in this way, the MES Quick Response Codes of production system and the position code in stockyard realize software system information
The problem of docking realizes a component dicode system, not will produce repeated encoding.In addition, it is only necessary to which input link information can be accurate
It is navigated in the location of stockyard, is not in be more convenient for the use of user the problem of can not find component.
Stockyard position can be indicated according to default rule.On the basis of the above embodiments, the present invention provides
A kind of specific implementation mode:Stockyard is subjected to band of position subdivision, position code is worked out, is arranged as shown in Fig. 2, stockyard is divided into 8 rows 8
Totally 64 zonules.Each region corresponds to the position code by number establishment.Its institute may know that by every set of number in this way
Position in stockyard.
The course of work of digitlization yard management system provided by the present invention is carried out with reference to specific implementation scene
It is further elaborated on.
Each prefabricated components that producing line is produced are each equipped with Quick Response Code coding by MES system, and barcode scanning can determine this
The relevant information of specific component.
The shelf of prefabricated components are numbered, which includes position code digital information, i.e., each component shelf are in heap
Fixed position storage is realized in field, and is easily found by searching for component number.For example, the component goods that number is 30503
Frame indicates that the shelf storage ranked fifth the third shelf of row in stockyard third.
Before storage structure, first by scanning the Quick Response Code of prefabricated components, then by the position of the shelf of prefabricated components to be stored
It sets in yard information input to Quick Response Code, then the prefabricated components are stored in designated position in company with shelf by driving and ferry bus.
By the location information of the component known to system queries component number, and component number and position code information not will produce in system
The problem of number repeats.Similarly, the details for also understanding the component of position storage by inquiring any position.Prefabricated components
After transporting stockyard, by barcode scanning outbound, the maintenance of information in digitlization stockyard is completed.
Conveying device can specifically include in the application:Whole hanger, transport vehicle.
To sum up, the application material handling use pallet control thinking, pallet control use position code idea in management, pallet with
Thinking is coexisted with Quick Response Code using number between position code, the storage of cargo and is received using information management thinking, is realized logical
The position code management mode for crossing the finished product differentiated control pattern and stockyard networking under MES controls, gets through the interface of MES and PMS.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with it is other
The difference of embodiment, just to refer each other for same or similar part between each embodiment.For being filled disclosed in embodiment
For setting, since it is corresponded to the methods disclosed in the examples, so description is fairly simple, related place is referring to method part
Explanation.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure
And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These
Function is implemented in hardware or software actually, depends on the specific application and design constraint of technical solution.Profession
Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered
Think beyond the scope of this invention.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor
The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
Digitlization yard management system provided by the present invention is described in detail above.It is used herein specifically
Principle and implementation of the present invention are described for a example, and the explanation of above example is only intended to help to understand the present invention
Method and its core concept.It should be pointed out that for those skilled in the art, not departing from original of the invention
, can be with several improvements and modifications are made to the present invention under the premise of reason, these improvement and modification also fall into right of the present invention and want
In the protection domain asked.
Claims (7)
1. a kind of digitlization yard management system, which is characterized in that including:
Information collecting device, the label information for acquiring prefabricated components to be stored wait depositing in the label information comprising described
Put the component information of prefabricated components;
Processing unit is connected with described information harvester, is stored to the heap of shelf for obtaining the prefabricated components to be stored
Field position, and generate the driving instruction that the prefabricated components to be stored are delivered to the stockyard position;
Feed drive device is connected with the processing unit, and for receiving the driving instruction, driving conveying device is waited for described
Storage prefabricated components are delivered at corresponding stockyard position.
2. digitlization yard management system as described in claim 1, which is characterized in that described information harvester is Quick Response Code
And/or bar code scanner.
3. digitlization yard management system as claimed in claim 2, which is characterized in that further include:It is arranged on shelf, is used for
The signal tracer of real-time tracking is carried out to the position of the shelf.
4. digitlization yard management system as described in any one of claims 1 to 3, which is characterized in that further include:To the structure
The storage device that part information, stockyard information, correspondence mappings relationship are stored, the correspondence mappings relationship are the component information
With the correspondence of the stockyard information.
5. digitlization yard management system as claimed in claim 4, which is characterized in that the processing unit is additionally operable to:It receives
The first inquiry instruction input by user inquired component institute deposit position, calls the correspondence from the storage device
Mapping relations determine the stockyard position that component to be checked is stored.
6. digitlization yard management system as claimed in claim 4, which is characterized in that the processing unit is additionally operable to:It receives
The second inquiry instruction input by user inquired heap place storage structure, calls the correspondence from the storage device
Mapping relations determine the component information that position to be checked is stored.
7. digitlization yard management system as claimed in claim 4, which is characterized in that the conveying device includes:Entirety is hung
Frame, transport vehicle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810289401.1A CN108665022A (en) | 2018-04-03 | 2018-04-03 | A kind of digitlization yard management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810289401.1A CN108665022A (en) | 2018-04-03 | 2018-04-03 | A kind of digitlization yard management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108665022A true CN108665022A (en) | 2018-10-16 |
Family
ID=63782821
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810289401.1A Pending CN108665022A (en) | 2018-04-03 | 2018-04-03 | A kind of digitlization yard management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108665022A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110659813A (en) * | 2019-09-11 | 2020-01-07 | 上海孟伯智能物联网科技有限公司 | Informationized management system suitable for management of prefabricated part factory superimposed sheet storage yard |
CN113065623A (en) * | 2021-04-08 | 2021-07-02 | 深圳市中瓴智慧科技有限公司 | Prefabricated part storage yard management method and device, computer equipment and storage medium thereof |
CN113128960A (en) * | 2021-04-16 | 2021-07-16 | 深圳市艾赛克科技有限公司 | Storage yard management method, device, equipment and storage medium |
CN114638564A (en) * | 2020-12-16 | 2022-06-17 | 广东博智林机器人有限公司 | Management method and device for unmanned storage yard, electronic equipment and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101064044A (en) * | 2006-04-24 | 2007-10-31 | 中国国际海运集装箱(集团)股份有限公司 | Container storage yard management information system and method |
CN103473665A (en) * | 2013-09-12 | 2013-12-25 | 金东纸业(江苏)股份有限公司 | Container dispatching management system and container dispatching management method |
CN107765594A (en) * | 2017-10-27 | 2018-03-06 | 盐田国际集装箱码头有限公司 | A kind of container terminal straddle truck stockyard case position localization method and alignment system |
-
2018
- 2018-04-03 CN CN201810289401.1A patent/CN108665022A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101064044A (en) * | 2006-04-24 | 2007-10-31 | 中国国际海运集装箱(集团)股份有限公司 | Container storage yard management information system and method |
CN103473665A (en) * | 2013-09-12 | 2013-12-25 | 金东纸业(江苏)股份有限公司 | Container dispatching management system and container dispatching management method |
CN107765594A (en) * | 2017-10-27 | 2018-03-06 | 盐田国际集装箱码头有限公司 | A kind of container terminal straddle truck stockyard case position localization method and alignment system |
Non-Patent Citations (1)
Title |
---|
丁振凡 等: "《电子商务物流管理》", 31 March 2009, 中国铁道出版社 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110659813A (en) * | 2019-09-11 | 2020-01-07 | 上海孟伯智能物联网科技有限公司 | Informationized management system suitable for management of prefabricated part factory superimposed sheet storage yard |
CN110659813B (en) * | 2019-09-11 | 2023-08-25 | 上海孟伯智能物联网科技有限公司 | Informationized management system suitable for management of superimposed sheet storage yard of prefabricated part factory |
CN114638564A (en) * | 2020-12-16 | 2022-06-17 | 广东博智林机器人有限公司 | Management method and device for unmanned storage yard, electronic equipment and storage medium |
CN113065623A (en) * | 2021-04-08 | 2021-07-02 | 深圳市中瓴智慧科技有限公司 | Prefabricated part storage yard management method and device, computer equipment and storage medium thereof |
CN113128960A (en) * | 2021-04-16 | 2021-07-16 | 深圳市艾赛克科技有限公司 | Storage yard management method, device, equipment and storage medium |
CN113128960B (en) * | 2021-04-16 | 2023-12-19 | 深圳市艾赛克科技有限公司 | Storage yard management method, device, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108665022A (en) | A kind of digitlization yard management system | |
Wang et al. | Improved precast production–scheduling model considering the whole supply chain | |
CN105023201B (en) | Assembled architecture Deepen Design and construction method based on BIM and big data | |
CN110503325A (en) | A kind of construction speed resource automatic optimization method based on Building Information Model | |
CN104036377B (en) | Intelligent storage and distribution system optimization scheduling method based on polychromatic sets theory | |
CN108053141A (en) | A kind of assembled architecture construction data adjustment control system | |
CN105373896A (en) | Project management system | |
KR20050100013A (en) | Information processing system for manufacturing building material, building material manufacturing method and facility, and building information circulating system | |
CN105160462A (en) | Reinforcement raw material information automatic integration apparatus and method for prefabricated concrete member | |
CN109767198A (en) | Operation system intelligent management and device | |
US20100043342A1 (en) | Non-destructive element splitting using location-based construction planning models | |
Peñaloza et al. | Guidelines for integrated production control in engineer-to-order prefabricated concrete building systems: preliminary results | |
CN109377063A (en) | A kind of method for scheduling task, device, equipment and storage medium | |
KR100800547B1 (en) | Method of construction process management connecting cost information by element | |
CN108428032A (en) | A kind of formulating method and device of the component production schedule | |
CN115965207B (en) | Resource allocation method, system and storage medium | |
CN108421940A (en) | A kind of wall plate member reinforcing bar assembling system and method based on BIM | |
Hui et al. | Comparative study on precast building construction and conventional building construction for housing project in Sarawak | |
Ribarović et al. | Application of multicriterional analysis to the ranking and evaluation of the investment programmes in the ready mixed concrete industry | |
US20070239410A1 (en) | Location-based construction planning and scheduling system | |
CN112508390B (en) | Collaborative manufacturing support system and method | |
CN114037403B (en) | Method for efficiently sharing and managing light weight of BIM data | |
US20210241194A1 (en) | Systems and methods for connecting management systems through scale ticket data | |
CN114925908A (en) | Information control method for construction progress of fabricated building | |
Liebers | An architecture for cost control in manufacturing: The use of cost information in order-related decisions. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181016 |
|
RJ01 | Rejection of invention patent application after publication |