CN108589776A - Tunnel open excavation half reversed construction method in river is worn under one kind - Google Patents
Tunnel open excavation half reversed construction method in river is worn under one kind Download PDFInfo
- Publication number
- CN108589776A CN108589776A CN201810400068.7A CN201810400068A CN108589776A CN 108589776 A CN108589776 A CN 108589776A CN 201810400068 A CN201810400068 A CN 201810400068A CN 108589776 A CN108589776 A CN 108589776A
- Authority
- CN
- China
- Prior art keywords
- river
- top plate
- tunnel
- enclosure wall
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 238000009412 basement excavation Methods 0.000 title claims abstract description 19
- 239000010410 layer Substances 0.000 claims abstract description 15
- 239000002689 soil Substances 0.000 claims abstract description 14
- 238000009413 insulation Methods 0.000 claims abstract description 13
- 239000011241 protective layer Substances 0.000 claims abstract description 13
- 238000000034 method Methods 0.000 claims abstract description 8
- 230000010485 coping Effects 0.000 claims abstract description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 239000004567 concrete Substances 0.000 claims description 3
- 239000011150 reinforced concrete Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 13
- 238000011084 recovery Methods 0.000 abstract description 3
- 230000008595 infiltration Effects 0.000 abstract description 2
- 238000001764 infiltration Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/06—Constructions, or methods of constructing, in water
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/40—Protecting water resources
- Y02A20/402—River restoration
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
Wear tunnel open excavation half reversed construction method in river under one kind, step 1, in river bed construction foundation pit enclosure wall is arranged Guan Liang going along with sb. to guard him coping, excavates the river bed soil body to ceiling location;Step 2 pours tunnel structure top plate in ceiling location, and top plate forms iterative structure with enclosure wall;Step 3 applies waterproof layer above top plate, two side flangings of waterproof layer to Guan Liang bottom;Step 4 is laid with protective layer in the top of waterproof layer, and waterproof insulation blanket is arranged in the top of protective layer;Step 5, from the soil body below adjacent excavation of foundation pit top plate to foundation pit bottom;Step 6 pours bottom plate and side wall respectively, and construction is completed.It is shorter to solve river dry season, it is desirable that open trench tunnel construct fast quick-recovery river the problem of;Using multiple tracks water proof safeguard procedures, soil excavation and structure below top plate is avoided to pour period river water infiltration;Enclosure wall forms iterative structure with internal structure, and whole stress reduces structure uneven subsidence, reduces construction risk.
Description
Technical field
The present invention relates to tunnel open excavation half adverse construction method side in river is worn under a kind of method for tunnel construction more particularly to one kind
Method.
Background technology
It need to generally ensure that river water flow section, usual way are within river dry season when wearing river construction under open trench tunnel
Tunnel is built using Open Cut Method, the wet season restores river water flowing, but when dry season, the time was shorter, is applied in dry season tunnel
Work does not complete, and there are problems that river can not be restored in time in the wet season.
Invention content
The object of the present invention is to provide tunnel open excavation half reversed construction method in river is worn under one kind.Therefore, the present invention uses
Following technical scheme.
Tunnel open excavation half reversed construction method in river is worn under one kind, the described method comprises the following steps:
Step 1, in river bed construction foundation pit enclosure wall, Guan Liang is set in the coping of going along with sb. to guard him, excavates the river bed soil body to tunnel
Structure roof position;
Step 2 pours tunnel structure top plate in the tunnel structure ceiling location, and the top plate forms overlapping knot with enclosure wall
Structure;
Step 3 applies waterproof layer above the top plate, two side flangings of the waterproof layer to the Guan Liang bottom;
Step 4 is laid with protective layer in the top of the waterproof layer, and waterproof insulation blanket is arranged in the top of the protective layer, described
The both sides of waterproof insulation blanket wrap the Guan Liang;
Step 5 carries out earthing above the waterproof insulation blanket, restores river, from adjacent excavation of foundation pit top plate below the soil body to
Foundation pit bottom;
Step 6 pours tunnel structure bottom plate and tunnel structure side wall respectively, the bottom plate and the side wall with the enclosure wall
Iterative structure is formed, construction is completed.
Preferably, the enclosure wall, top plate and bottom plate and side wall are reinforced concrete structure.
Preferably, the top plate and bottom plate is connect with the reinforcing bar of the enclosure wall by reinforcing bar connector, forms one.
Preferably, the protective layer is microlith element concrete structure.
Preferably, the thickness of the protective layer is not less than 0.3 meter.
The beneficial effects of the invention are as follows:It is shorter to solve river dry season, it is desirable that the fast quick-recovery river of open trench tunnel construction
The problem of;Wet season river water is avoided to flood the risk of open-cut foundation ditch;Using multiple tracks water proof safeguard procedures, the soil body below top plate is avoided
It excavates and structure pours period river water and penetrates into;Enclosure wall forms iterative structure with internal structure, and enclosure wall is whole with internal structure
Stress can reduce structure uneven subsidence, reduce construction risk.
Description of the drawings
Fig. 1 is tunnel structure schematic diagram in the present invention.
Reference sign:1, enclosure wall;2, top plate;3, Guan Liang;4, waterproof layer;5, protective layer;6, waterproof insulation blanket;7、
The river bed soil body;8, bottom plate;9, side wall.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Tunnel open excavation half reversed construction method in river is worn under one kind, is included the following steps:Step 1, in river bed construction foundation pit
Enclosure wall 1 is arranged Guan Liang 3 going along with sb. to guard him coping, excavates the river bed soil body 7 to tunnel structure ceiling location.Step 2, in tunnel
Structure roof position pours tunnel structure top plate 2, and top plate 2 forms iterative structure with enclosure wall 1.Step 3 applies above top plate
Waterproof layer 4, to Guan Liang bottom, waterproof layer needs to meet level-one waterproofing grade requirement two side flangings of waterproof layer.Step 4 is being prevented
The top of water layer is laid with protective layer 5, and protective layer can be microlith element concrete structure, and the thickness of protective layer is not less than 0.3 meter, is protecting
The top setting waterproof insulation blanket 6 of layer, the both sides of waterproof insulation blanket wrap Guan Liang, setting waterproof insulation blanket use multiple tracks every
Water safeguard procedures avoid soil excavation and structure below top plate from pouring period river water infiltration, and the both sides of waterproof insulation blanket wrap
Guan Liang avoids river water from being penetrated by gap.Step 5 carries out earthing above waterproof insulation blanket, restores river, is opened from Adjacent Pit
Digging the soil body below top plate can carry out in the case of river recovery water flowing or river not water flowing below excavation top plate to foundation pit bottom
The construction of the soil body.Step 6 pours tunnel structure bottom plate 8 and tunnel structure side wall 9 respectively, bottom plate and side wall with enclosure wall shape
At iterative structure, construction is completed.Enclosure wall forms iterative structure with top plate, and strengthens the vertical bearing capacity of enclosure wall, encloses
The amount of reinforcement of revetment is higher than the amount of reinforcement of common enclosure wall by 5% ~ 10%, applying when reducing soil excavation below top plate
Work risk.Enclosure wall, top plate and bottom plate and side wall are reinforced concrete structure, the reinforcing bar of top plate and bottom plate and side wall with go along with sb. to guard him
The reinforcing bar of wall connects to form iterative structure by reinforcing bar connector, and enclosure wall forms iterative structure, i.e. enclosure wall with internal structure
It is respectively formed iterative structure with top plate and bottom plate and side wall, one, enclosure wall and internal structure entirety stress is formed, structure can be reduced
Uneven subsidence reduces construction risk.The tunnel structure that half reversed construction method of open cut applies is as described in Figure 1.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe
The personage for knowing this technology can all carry out modifications and changes to above-described embodiment without violating the spirit and scope of the present invention.Cause
This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as
At all equivalent modifications or change, should by the present invention claim be covered.
Claims (5)
1. wearing tunnel open excavation half reversed construction method in river under one kind, which is characterized in that the described method comprises the following steps:
Step 1, in river bed construction foundation pit enclosure wall, Guan Liang is set in the coping of going along with sb. to guard him, excavates the river bed soil body to tunnel
Structure roof position;
Step 2 pours tunnel structure top plate in the tunnel structure ceiling location, and the top plate forms overlapping knot with enclosure wall
Structure;
Step 3 applies waterproof layer above the top plate, two side flangings of the waterproof layer to the Guan Liang bottom;
Step 4 is laid with protective layer in the top of the waterproof layer, and waterproof insulation blanket is arranged in the top of the protective layer, described
The both sides of waterproof insulation blanket wrap the Guan Liang;
Step 5 carries out earthing above the waterproof insulation blanket, restores river, from adjacent excavation of foundation pit top plate below the soil body to
Foundation pit bottom;
Step 6 pours tunnel structure bottom plate and tunnel structure side wall respectively, the bottom plate and the side wall with the enclosure wall
Iterative structure is formed, construction is completed.
2. wearing half reversed construction method of river tunnel open excavation under one kind according to claim 1, which is characterized in that described to enclose
Revetment, top plate and bottom plate and side wall are reinforced concrete structure.
3. wearing half reversed construction method of river tunnel open excavation under one kind according to claim 2, which is characterized in that the top
Plate, bottom plate are connect with the reinforcing bar of the enclosure wall by reinforcing bar connector, and one is formed.
4. wearing half reversed construction method of river tunnel open excavation under one kind according to claim 1, which is characterized in that the guarantor
Sheath is microlith element concrete structure.
5. wearing half reversed construction method of river tunnel open excavation under one kind according to claim 1 or 4, which is characterized in that institute
The thickness for stating protective layer is not less than 0.3 meter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810400068.7A CN108589776A (en) | 2018-04-28 | 2018-04-28 | Tunnel open excavation half reversed construction method in river is worn under one kind |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810400068.7A CN108589776A (en) | 2018-04-28 | 2018-04-28 | Tunnel open excavation half reversed construction method in river is worn under one kind |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108589776A true CN108589776A (en) | 2018-09-28 |
Family
ID=63619250
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810400068.7A Pending CN108589776A (en) | 2018-04-28 | 2018-04-28 | Tunnel open excavation half reversed construction method in river is worn under one kind |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108589776A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110410083A (en) * | 2019-08-16 | 2019-11-05 | 招商局重庆交通科研设计院有限公司 | Hazy tunnel method |
CN110424988A (en) * | 2019-08-16 | 2019-11-08 | 招商局重庆交通科研设计院有限公司 | Tunnel waterproofing construction and tunnel waterproofing method |
CN111749275A (en) * | 2020-06-23 | 2020-10-09 | 中国建筑第二工程局有限公司 | Cover-excavation top-down underground passage structure and construction method thereof |
CN113186977A (en) * | 2021-04-22 | 2021-07-30 | 湖北工业大学 | Reverse-order construction method for underground comprehensive pipe gallery |
CN113529790A (en) * | 2021-07-26 | 2021-10-22 | 中铁四局集团第五工程有限公司 | Underground driveway prestressed side wall and tensioning construction method thereof |
CN115506403A (en) * | 2022-10-12 | 2022-12-23 | 辽宁工程技术大学 | Assembled cable tunnel shock-resistant structure |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046579A (en) * | 2013-01-10 | 2013-04-17 | 深圳市市政设计研究院有限公司 | Lakebed open-excavation and concealed-burying tunnel structure with bidirectional eight lanes |
CN104452809A (en) * | 2014-11-14 | 2015-03-25 | 中铁二十一局集团第三工程有限公司 | Ultra-shallow buried tunnel cover-excavation construction method |
CN107794942A (en) * | 2017-10-30 | 2018-03-13 | 中国冶集团有限公司 | Riverbed comprehensive pipe gallery structure and its construction method are worn under one kind |
-
2018
- 2018-04-28 CN CN201810400068.7A patent/CN108589776A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046579A (en) * | 2013-01-10 | 2013-04-17 | 深圳市市政设计研究院有限公司 | Lakebed open-excavation and concealed-burying tunnel structure with bidirectional eight lanes |
CN104452809A (en) * | 2014-11-14 | 2015-03-25 | 中铁二十一局集团第三工程有限公司 | Ultra-shallow buried tunnel cover-excavation construction method |
CN107794942A (en) * | 2017-10-30 | 2018-03-13 | 中国冶集团有限公司 | Riverbed comprehensive pipe gallery structure and its construction method are worn under one kind |
Non-Patent Citations (1)
Title |
---|
梁兆平: "渡槽盖挖法在明挖隧道下穿河道施工中的应用", 施工技术, pages 1 - 6 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110410083A (en) * | 2019-08-16 | 2019-11-05 | 招商局重庆交通科研设计院有限公司 | Hazy tunnel method |
CN110424988A (en) * | 2019-08-16 | 2019-11-08 | 招商局重庆交通科研设计院有限公司 | Tunnel waterproofing construction and tunnel waterproofing method |
CN110410083B (en) * | 2019-08-16 | 2021-02-09 | 招商局重庆交通科研设计院有限公司 | Semi-bright and semi-dark tunnel entering method |
CN111749275A (en) * | 2020-06-23 | 2020-10-09 | 中国建筑第二工程局有限公司 | Cover-excavation top-down underground passage structure and construction method thereof |
CN113186977A (en) * | 2021-04-22 | 2021-07-30 | 湖北工业大学 | Reverse-order construction method for underground comprehensive pipe gallery |
CN113529790A (en) * | 2021-07-26 | 2021-10-22 | 中铁四局集团第五工程有限公司 | Underground driveway prestressed side wall and tensioning construction method thereof |
CN115506403A (en) * | 2022-10-12 | 2022-12-23 | 辽宁工程技术大学 | Assembled cable tunnel shock-resistant structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108589776A (en) | Tunnel open excavation half reversed construction method in river is worn under one kind | |
CN105002913B (en) | A kind of highly permeable stratum deep basal pit back cover water sealing structure and its construction method | |
CN106677189B (en) | A kind of taper pile wall supporting type foundation pit supporting construction and its construction method | |
CN102434175A (en) | Tunnel lining self waterproof drainage system | |
CN205677631U (en) | It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function | |
CN202483588U (en) | Self water-proof drainage system of tunnel lining | |
CN205134283U (en) | Base concrete panel rock -fill dam | |
CN108589771A (en) | One kind having runed underground station increasing layer transfer node construction method | |
CN205012288U (en) | Embankment dam pitch core -wall base | |
CN105297685A (en) | Base concrete face rock fill dam and construction method thereof | |
CN105040707B (en) | Combine the construction method of close pile deep foundation pit support building enclosure | |
CN106758890A (en) | Campshed box culvert structure and its construction method | |
CN107338770B (en) | Combined dam shape of asphalt concrete core wall dam and concrete gravity dam and construction method thereof | |
CN203716064U (en) | Roadbed sewer convenient for dredging | |
CN108755719A (en) | Seabed municipal tunnel over strait cofferdam open cutting construction method | |
CN106567365A (en) | Earth and rockfill dam longitudinal reinforcement construction method | |
CN103031849A (en) | Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well | |
CN208235589U (en) | River tunnel is worn under a kind of half adverse construction method of open cut | |
CN203174746U (en) | Wavy tailing dam slope drainage ditches for coping with rainstorm | |
CN211200274U (en) | Assembled channel shore protection structure | |
CN113846609A (en) | A manger plate gravity dam joint design for covering layer connects basement rock foundation | |
CN107100208A (en) | The anti-floating waterproof construction and construction method of a kind of underground structure | |
CN110500116B (en) | Actively-draining anti-floating duct piece and lining structure | |
CN113187487A (en) | Double-deck full section of subway freezes secretly digs station structure | |
CN208563267U (en) | A kind of earth and rockfill dam pressure slope body discharge structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180928 |