CN103031849A - Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well - Google Patents

Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well Download PDF

Info

Publication number
CN103031849A
CN103031849A CN2012105798697A CN201210579869A CN103031849A CN 103031849 A CN103031849 A CN 103031849A CN 2012105798697 A CN2012105798697 A CN 2012105798697A CN 201210579869 A CN201210579869 A CN 201210579869A CN 103031849 A CN103031849 A CN 103031849A
Authority
CN
China
Prior art keywords
dewatering well
construction
pit
dewatering
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105798697A
Other languages
Chinese (zh)
Other versions
CN103031849B (en
Inventor
贾华远
王晓
杨光然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG WANXIN CONSTRUCTION CO Ltd
Original Assignee
SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG WANXIN CONSTRUCTION CO Ltd filed Critical SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority to CN201210579869.7A priority Critical patent/CN103031849B/en
Publication of CN103031849A publication Critical patent/CN103031849A/en
Application granted granted Critical
Publication of CN103031849B publication Critical patent/CN103031849B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention belongs to the technical field of constructional engineering, and in particular relates to a method for construction of arranging a dewatering well in a foundation pit and flexibly closing the dewatering well. The following steps are adopted: 1, arranging the dewatering well in the foundation pit; 2, digging a pit of a buffer layer; 3, constructing a concrete cushion and a waterproof layer; 4, constructing a foundation raft; 5, filling the dewatering well; 6, laying the buffer layer; 7, filling and pouring a concrete cushion; 8, reserving the waterproof layer and constructing a protecting layer of the waterproof layer; 9, adhering expansive type sealing rubber strips; 10, bound connecting the foundation raft reinforcing steel bars; and 11, supplementarily pouring the foundation raft. The method has the beneficial effects that the method of construction of flexibly closing the dewatering well in the foundation pit is adopted, the problem that the foundation raft and the waterproof layer are cracked due to hogging moment above the dewatering well can be effectively solved, so that the requirement of the method for construction on arranging the dewatering well in a huge foundation pit is satisfied, and compared with a conventional dewatering method, the method can save 2/3 dewatering cost, can shorten the construction period and meets the efficient energy-saving green construction requirements.

Description

Arrange the job practices of dewatering well and the flexible sealing of dewatering well in the foundation ditch
Technical field
The present invention relates to arrange in a kind of foundation ditch the job practices of dewatering well and the flexible sealing of dewatering well, belong to construction engineering technical field.
Background technology
At present, China residential quarters all arrange the underground garage that covers the building line scope, thereby building foundation pit area several times are enlarged, and the way of traditional foundation ditch periphery dewatering well can't satisfy the precipitation requirement, therefore generally adopts the way of arranging dewatering well precipitation in the foundation ditch.But precipitation borehole wall bearing capacity is far above natural ground, and after the dewatering well sealing, seepage becomes a national technical barrier of builing industry because the pipe well wall to its top waterproofing course and basic raft plate generation hogging moment, often causes waterproofing course and basic raft plate cracking.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of safe and reliable, economical rationality, arrange the job practices of dewatering well and the flexible sealing of dewatering well in the workable foundation ditch, solved the precipitation borehole wall and produced waterproofing course and the basic raft plate cracking seepage guardian technique difficult problem that hogging moment causes, for arranging in the huge foundation ditch that dewatering well provides reliable technical guarantee.
The present invention is that the technical scheme that its technical problem of solution adopts is: arrange the job practices of dewatering well and the flexible sealing of dewatering well in the described foundation ditch, it is characterized in that taking following steps:
1) in foundation ditch, arranges dewatering well;
2) dig the cushion coat pit: from the dewatering well center line to around expand and add deep excavation 50 ㎜~100 ㎜ pits in 500 ㎜~700 ㎜ scopes;
3) concrete cushion and construction of waterproof layer: the concreting bed course is to pit edge, at concrete cushion top laying water-proof coiled material to pit edge;
4) basic raft plate construction: from the dewatering well center line to around extend to basic raft slab muscle lap length 2~3 times of width places stay and establish concrete construction joint, and reserve and satisfy the reinforcing bar that mutually staggers and overlap;
5) tamp dewatering well: after foundation pit dewatering is complete, adopt medium sand to tamp in the dewatering well, adopt the C30 expansive concrete to tamp in the scope from the pit soffit to the dewatering well degree of depth 1000~2000 ㎜;
6) lay cushion coat: laying depth is the extruded polystyrene board of 50 ㎜~100 ㎜ in pit;
7) replenish the concreting bed course: pouring concrete bed course after the extruded polystyrene board upper supplementary;
8) reserve the construction of waterproofing course and topping thereof: mend waterproof roll after the pouring concrete bed course is laid after replenishing, and tightly paste with waterproof roll overlap joint 200mm, at concreting topping on the waterproof roll and on the rear benefit waterproof roll;
9) paste intumescent watertight rubber bar: paste intumescent watertight rubber bar at concrete construction joint depth of section middle part;
10) colligation connects basic raft slab muscle: carry out bar splicing and connect according to the adjacent joint center 1.35 times of lapped length of steel bar that mutually stagger;
11) the additional underpin raft plate that waters: adopt than the expansive concrete that has watered a strength grade of underpin raft plate hight and replenish rear casting foundation raft plate.
The invention has the beneficial effects as follows:
Adopt the flexible closure construction method of precipitation well in foundation pit, can effectively solve basic raft plate and a waterproof layer cracking difficult problem that dewatering well top hogging moment causes, satisfied the job practices requirement that dewatering well is set in the huge foundation ditch, save precipitation expense 2/3 than traditional precipitation method, can shorten construction period, and meet energy-efficient green construction requirement.
Description of drawings
Fig. 1 is the flexible closure construction layout plan of precipitation well in foundation pit.
Fig. 2 is the A-A cross-sectional view of Fig. 1.
Among the figure: 1, dewatering well 2, pit 3, concrete construction joint 4, rear casting foundation raft plate 5, concrete cover 6, extruded polystyrene board 7, C30 expansive concrete 8, medium sand 9, concrete cushion 10, rear pouring concrete bed course 11, waterproof roll 12, rear benefit waterproof roll 13, basic raft plate 14, reinforcing bar 15, intumescent watertight rubber bar.
The specific embodiment
Below in conjunction with drawings and Examples the present invention is described further:
As depicted in figs. 1 and 2, arrange the job practices of dewatering well and the flexible sealing of dewatering well in the foundation ditch of the present invention, take following steps:
1) according to the precipitation design attitude, in foundation ditch, arranges dewatering well 1;
2) dig the cushion coat pit: be excavated at the bottom of the design of foundation pit behind the absolute altitude, from dewatering well 1 center line to around expand 500 ㎜ scopes and add deep excavation 50 ㎜ pits 2;
3) concrete cushion and construction of waterproof layer: concreting bed course 9 is to pit 2 edges, at concrete cushion 9 top laying water-proof coiled materials 11 to pit 2 edges;
4) basic raft plate construction: from dewatering well 1 center line to around extend to basic raft plate 13 lapped length of steel bar 2 times of width places stay and establish concrete construction joint 3, and reserve and satisfy the reinforcing bar 14 that mutually staggers and overlap;
5) tamp dewatering well: after foundation pit dewatering was complete, dewatering well 1 interior employing medium sand 8 tamped, and adopted C30 expansive concrete 7 to tamp in the scope of 1 degree of depth, 1000 ㎜ from pit 2 soffits to dewatering well;
6) lay cushion coat: be the extruded polystyrene board 6 of 50 ㎜ at pit 2 interior laying depths;
7) replenish the concreting bed course: pouring concrete bed course 10 after extruded polystyrene board 6 replenishes;
8) reserve the construction of waterproofing course and topping thereof: mend waterproof roll 12 after pouring concrete bed course 10 is laid after replenishing, and tightly paste with waterproof roll 11 overlap joint 200mm, at concreting topping 5 on the waterproof roll 11 and on the rear benefit waterproof roll 12;
9) paste intumescent watertight rubber bar: paste intumescent watertight rubber bar 15 at concrete construction joint 3 depth of sections middle part;
10) colligation connects basic raft slab muscle: carry out reinforcing bar 14 overlap joint and connect according to the adjacent joint center 1.35 times of lapped length of steel bar that mutually stagger, and satisfy the requirement of bar splice area occupation ratio 50%;
11) the additional underpin raft plate that waters: adopt than the expansive concrete that has watered underpin raft plate 13 high strength grades and replenish rear casting foundation raft plate 4.

Claims (1)

1. arrange dewatering well and the flexible job practices of sealing of dewatering well in a foundation ditch, it is characterized in that taking following steps:
1) in foundation ditch, arranges dewatering well (1);
2) dig the cushion coat pit: from dewatering well (1) center line to around expand and add deep excavation 50 ㎜~100 ㎜ pits (2) in 500 ㎜~700 ㎜ scopes;
3) concrete cushion and construction of waterproof layer: concreting bed course (9) is to pit (2) edge, at concrete cushion (9) top laying water-proof coiled material (11) to pit (2) edge;
4) basic raft plate construction: from dewatering well (1) center line to around extend to basic raft plate (13) lapped length of steel bar 2~3 times of width places stay and establish concrete construction joint (3), and reserve and satisfy the reinforcing bar (14) that mutually staggers and overlap;
5) tamp dewatering well: after foundation pit dewatering is complete, adopt medium sand (8) to tamp in the dewatering well (1), adopt C30 expansive concrete (7) to tamp in the scope from pit (2) soffit to dewatering well (1) degree of depth 1000~2000 ㎜;
6) lay cushion coat: laying depth is the extruded polystyrene board (6) of 50 ㎜~100 ㎜ in pit (2);
7) replenish the concreting bed course: pouring concrete bed course (10) after extruded polystyrene board (6) upper supplementary;
8) reserve the construction of waterproofing course and topping thereof: mend waterproof roll (12) after pouring concrete bed course (10) is laid after replenishing, and tightly paste the upper and upper concreting topping (5) of rear benefit waterproof roll (12) at waterproof roll (11) with waterproof roll (11) overlap joint 200mm;
9) paste intumescent watertight rubber bar: paste intumescent watertight rubber bar (15) at concrete construction joint (3) depth of section middle part;
10) colligation connects basic raft slab muscle: carry out reinforcing bar (14) overlap joint and connect according to the adjacent joint center 1.35 times of lapped length of steel bar that mutually stagger;
11) the additional underpin raft plate that waters: adopt than the expansive concrete that has watered the high strength grade of underpin raft plate (13) and replenish rear casting foundation raft plate (4).
CN201210579869.7A 2012-12-27 2012-12-27 Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well Expired - Fee Related CN103031849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210579869.7A CN103031849B (en) 2012-12-27 2012-12-27 Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210579869.7A CN103031849B (en) 2012-12-27 2012-12-27 Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well

Publications (2)

Publication Number Publication Date
CN103031849A true CN103031849A (en) 2013-04-10
CN103031849B CN103031849B (en) 2014-11-26

Family

ID=48019208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210579869.7A Expired - Fee Related CN103031849B (en) 2012-12-27 2012-12-27 Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well

Country Status (1)

Country Link
CN (1) CN103031849B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196045A (en) * 2014-08-28 2014-12-10 青岛海川建设集团有限公司 Well mouth sealing device and method for deep well and dewatering well in underground garage foundation pit
CN110939143A (en) * 2019-11-29 2020-03-31 中国建筑第四工程局有限公司 Simple and easy core section of thick bamboo stepping water conservancy diversion drainage structures
CN112575801A (en) * 2020-12-04 2021-03-30 中冶天工集团有限公司 Method for plugging dewatering well
CN115324090A (en) * 2022-10-13 2022-11-11 山东金城建设有限公司 Underground engineering pit-in-pit dewatering and well sealing construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2162122C2 (en) * 1998-06-17 2001-01-20 Уральская государственная академия путей сообщения Method for reducing subsoil water level near buildings and structures
CN101761096A (en) * 2009-12-14 2010-06-30 山东万鑫建设有限公司 Anti-crack and anti-leak construction method of arranging tower crane foundation below waterproof baseplate

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2162122C2 (en) * 1998-06-17 2001-01-20 Уральская государственная академия путей сообщения Method for reducing subsoil water level near buildings and structures
CN101761096A (en) * 2009-12-14 2010-06-30 山东万鑫建设有限公司 Anti-crack and anti-leak construction method of arranging tower crane foundation below waterproof baseplate

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中建一局建设发展公司: "金融街B7大厦工程深基坑降水与止水施工总结", 《工程质量》, no. 4, 28 February 2008 (2008-02-28), pages 9 - 1 *
刘勇等: "大孔降水井封井工法", 《建筑技术》, vol. 43, no. 12, 15 December 2012 (2012-12-15) *
李勇: "北京城建大厦地下室防水施工", 《中国建筑防水》, no. 5, 31 May 2004 (2004-05-31) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196045A (en) * 2014-08-28 2014-12-10 青岛海川建设集团有限公司 Well mouth sealing device and method for deep well and dewatering well in underground garage foundation pit
CN104196045B (en) * 2014-08-28 2016-08-17 青岛海川建设集团有限公司 Deep-well precipitation well head well-sealing device and method in underground garage foundation ditch
CN110939143A (en) * 2019-11-29 2020-03-31 中国建筑第四工程局有限公司 Simple and easy core section of thick bamboo stepping water conservancy diversion drainage structures
CN112575801A (en) * 2020-12-04 2021-03-30 中冶天工集团有限公司 Method for plugging dewatering well
CN115324090A (en) * 2022-10-13 2022-11-11 山东金城建设有限公司 Underground engineering pit-in-pit dewatering and well sealing construction method

Also Published As

Publication number Publication date
CN103031849B (en) 2014-11-26

Similar Documents

Publication Publication Date Title
CN206768880U (en) A kind of waterproof construction for seashore pipe gallery
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN104005419B (en) The box culvert structure of sinking method construction and construction method
CN103015456B (en) Rapid pit-in-pit form erecting method in foundation slab of buried concrete structure
CN103741714A (en) Construction method for full cover-excavation reverse method of underground engineering
CN203729424U (en) Modified horseback-riding inspection well for top pipe construction
CN104514216B (en) A kind of canal on embankment frost heaving resistant leakage preventing structure and construction method
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN103031849B (en) Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well
CN102011410A (en) Prefabricated prestressed underground continuous wall and construction method thereof
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN105484277A (en) Component for tubular well precipitation construction in elevator foundation pit or sump and construction method
CN113323017B (en) Construction method of side wall fertilizer groove foam concrete backfill system
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN203768925U (en) Seal device for dewatering well in foundation pit
CN102409702A (en) Method for performing seam waterproof construction in underground continuous wall by using embedded rubber water stop tapes
CN105507348B (en) The waterproof construction method and structure of basement detached column and Vierendeel girder in junction
CN216077128U (en) Subway double-layer full-section freezing underground excavation transfer station structure
CN103993609B (en) The multi-functional fast hard concrement manual repair foundation pit waterproof curtain of silicon ash sand guide drainage
CN206189430U (en) A escape canal for deep overburden ground
CN107345483B (en) Newly-built seepage-proof coal mine shaft and preparation method thereof
CN202440852U (en) Advance water-stop isolation structure of basement post-poured strip
CN113187487B (en) Construction method of double-layer full-section frozen underground excavation station structure of subway
CN206346308U (en) A kind of construction for facilitating structure base slab post-cast strip to clear up
CN108755724A (en) The external water drainage waterproof method of pipe gallery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141126