CN103161194A - Construction site abandoned water well reusing construction method - Google Patents
Construction site abandoned water well reusing construction method Download PDFInfo
- Publication number
- CN103161194A CN103161194A CN2012102663791A CN201210266379A CN103161194A CN 103161194 A CN103161194 A CN 103161194A CN 2012102663791 A CN2012102663791 A CN 2012102663791A CN 201210266379 A CN201210266379 A CN 201210266379A CN 103161194 A CN103161194 A CN 103161194A
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- water tank
- well
- outlet pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The invention relates to a construction site abandoned water well reusing construction method. Main facilities of the method comprises a water pump arranged in a dewatering well, a water tank for storing water, a water replenishing pipe, a water outlet pipe and another water pump for pressurizing on the water outlet pipe, wherein the water pump arranged in the dewatering well is connected with the water tank through the water replenishing pipe, and a water pipe net for production and a water pipe net for fire protection are connected with the water tank through the water outlet pipe. The method includes the following steps that the water pump is arranged in the dewatering well, water in the dewatering well enters the water tank for storing the water through the water replenishing pipe by means of water pump pressurization, the water in the water tank is connected with the water pipe net for production and the water pipe net for fire protection through the additional arrangement of the water outlet pipe of the water pump, and water for production and water for fire protection on a construction site is provided. The construction site abandoned water well reusing construction method not only enables resources on the construction site to be effectively used, reduces construction cost and wasting of the resources, but also can solve the problems that that water supply is difficult, and cost is high in remote areas.
Description
Technical field
The present invention relates to a kind of building site component on site construction method, specifically, relate to a kind of job site discarded well recycling job practices.
Background technology
The water source of the industrial water of the job site overwhelming majority in building site, water for firefighting is from city planting ductwork at present.The method exists that the water expense is higher, city planting ductwork often keeps in repair, and causes the job site to cut off the water, and impact construction, city planting ductwork water source point are difficult for the defectives such as adapter sometimes.
Summary of the invention
For above-mentioned deficiency of the prior art, the invention provides a kind of job site that utilizes discarded well to supply production, water for firefighting discarded well recycling job practices.
The technical solution used in the present invention is:
A kind of job site discarded well recycling job practices, comprise the water pump that is arranged in dewatering well, water storage water tank, connect on water pump and the filling pipe of water tank, the outlet pipe that is connected water tank and industrial water pipe network and water for firefighting pipe network and outlet pipe for the water pump of supercharging, the method comprises the steps:
A., water pump is set in dewatering well;
B. pressurizeing by water pump makes the water in dewatering well enter into the water tank of water storage by filling pipe;
C. the water in water tank is connected with the water for firefighting pipe network with the industrial water pipe network by the outlet pipe of setting up water pump, and job site industrial water and water for firefighting are provided.
Described tank top is provided with stack.
Described water tank filling pipe opening is positioned at water tank upper.
Described radiator drain opening is positioned at the water tank middle and lower part.
Described water tank arranges the pressure release bypass pipe, and an end of described pressure release bypass pipe is connected with water tank, and the other end connects with the outlet pipe that is connected the industrial water pipe network.
Described filling pipe, stack, outlet pipe and pressure release bypass pipe are provided with butterfly valve.
The beneficial effect of the relative prior art of the present invention:
This job site discarded well recycling job practices can also can satisfy on-the-spot production and water for firefighting requirement in the situation that do not use municipal water sources, and on-the-spot water resource is fully used, and reduces construction cost; Can require open at any time or stop using according to site operation, make resource obtain fully, reasonably use; Can occur in the out of use situation of cause specific in municipal water sources, guarantee on-the-spot production and water for firefighting.
This method can take full advantage of industrial water and the water for firefighting that the on-the-spot existing discarded dewatering well of site construction provides site operation, the resource of job site is effectively utilized, reduce construction cost, reduce the wasting of resources, can also solve remote districts shipwreck, the problem that expense is high.
Description of drawings
Fig. 1 is job site of the present invention discarded well recycling job practices floor map.
Critical piece symbol description in accompanying drawing:
In figure:
1, dewatering well 2, water pump
3, filling pipe 4, butterfly valve
5, water tank 6, stack
7, outlet pipe 8, industrial water pipe network
9, water for firefighting pipe network 10, pressure release bypass pipe.
The specific embodiment
The present invention will be described in detail referring to drawings and Examples:
A kind of job site discarded well recycling job practices, its key facility comprise the water pump 2 that is arranged in dewatering well 1, water storage water tank 5, connect on water pump 2 and the filling pipe 3 of water tank 5, the outlet pipe 7 that is connected water tank 5 and industrial water pipe network 8 and water for firefighting pipe network 9 and outlet pipe 7 for the water pump 2 of supercharging, the method comprises the steps:
A., water pump 2 is set in dewatering well 1;
B. make the water in dewatering well 1 enter into the water tank 5 of water storage by filling pipe 3 by water pump 2 pressurizations;
C. the water in water tank 5 is connected with the water for firefighting pipe network with industrial water pipe network 8 by the outlet pipe 7 of setting up water pump 2 and is connected, and job site industrial water and water for firefighting are provided.
Described water tank 5 tops are provided with stack 6.
Described water tank 5 filling pipe 3 openings are positioned at water tank 5 tops.
Described water tank 5 outlet pipe 7 openings are positioned at water tank 5 middle and lower parts.
Described water tank 5 arranges pressure release bypass pipe 10, and an end of described pressure release bypass pipe 10 is connected with water tank 5, and the other end connects with the outlet pipe 7 that is connected industrial water pipe network 8.
Described filling pipe 3, stack 6, outlet pipe 7 and pressure release bypass pipe 10 are provided with butterfly valve 4.
Job site of the present invention discarded well recycling job practices: first utilize water pump by filling pipe, the water in dewatering well to be extracted in the water tank of water storage, then the water in water tank is received industrial water pipe network and water for firefighting pipe network by outlet pipe, realize water reuse.The filling pipe opening is located at water tank upper can reduces supplementing water pressure; The outlet pipe opening is located at the water tank middle and lower part, can strengthens discharge pressure, and be beneficial to taking full advantage of of Water in Water Tanks; Water pump is set on outlet pipe can strengthens discharge pressure, to satisfy different elevation water needs; A butterfly valve is set on every pipeline, can be as required opening and closing water at any time; In tank top, stack is set, can reduces intake pressure, and can do overfall when Water in Water Tank is full; At water tank, the pressure release bypass pipe is set, can be not when the full pressure of Water in Water Tank is enough large pressurize directly to the industrial water pipe network water supply by water pump, or sluice when Water in Water Tank is full and reduce pressure.
Job site of the present invention discarded well recycling job practices construction is simple, workable, in the situation that do not use municipal water sources, also can satisfy on-the-spot production and water for firefighting requirement, and on-the-spot water resource is fully used, and reduces construction cost; Can require open at any time or stop using according to site operation, make resource obtain fully, reasonably use; Can occur in the out of use situation of cause specific in municipal water sources, guarantee on-the-spot production and water for firefighting.
The present invention can take full advantage of industrial water and the water for firefighting that the on-the-spot existing discarded dewatering well of site construction provides site operation, the resource of job site is effectively utilized, reduce construction cost, reduce the wasting of resources, can also solve remote districts shipwreck, the problem that expense is high.
Claims (6)
1. the discarded well in job site recycles job practices, comprise the water pump that is arranged in dewatering well, water storage water tank, connect on water pump and the filling pipe of water tank, the outlet pipe that is connected water tank and industrial water pipe network and water for firefighting pipe network and outlet pipe the water pump for supercharging, it is characterized in that, the method comprises the steps:
A., water pump is set in dewatering well;
B. pressurizeing by water pump makes the water in dewatering well enter into the water tank of water storage by filling pipe;
C. the water in water tank is connected with the water for firefighting pipe network with the industrial water pipe network by the outlet pipe of setting up water pump, and job site industrial water and water for firefighting are provided.
2. the discarded well in job site recycles job practices according to claim 1, and it is characterized in that: described tank top is provided with stack.
3. the discarded well in job site recycles job practices according to claim 1, and it is characterized in that: described water tank filling pipe opening is positioned at water tank upper.
4. the discarded well recycling in job site job practices according to claim 1 is characterized in that: described radiator drain opening is positioned at the water tank middle and lower part.
5. the discarded well recycling in job site job practices according to claim 1, it is characterized in that: described water tank arranges the pressure release bypass pipe, and an end of described pressure release bypass pipe is connected with water tank, the other end and be connected the outlet pipe connection of industrial water pipe network.
6. the discarded well in job site recycles job practices according to claim 1, and it is characterized in that: described filling pipe, stack, outlet pipe and pressure release bypass pipe are provided with butterfly valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102663791A CN103161194A (en) | 2012-07-30 | 2012-07-30 | Construction site abandoned water well reusing construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102663791A CN103161194A (en) | 2012-07-30 | 2012-07-30 | Construction site abandoned water well reusing construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103161194A true CN103161194A (en) | 2013-06-19 |
Family
ID=48584702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102663791A Pending CN103161194A (en) | 2012-07-30 | 2012-07-30 | Construction site abandoned water well reusing construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103161194A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104499537A (en) * | 2014-11-20 | 2015-04-08 | 中国建筑第八工程局有限公司 | Construction wastewater collection and reuse system and construction wastewater collection and reuse method |
CN106498961A (en) * | 2016-11-28 | 2017-03-15 | 中铁大桥局集团第工程有限公司 | It is provided with the Yield rainfall relation system and its Yield rainfall relation method of detachable header tank |
CN108589752A (en) * | 2018-04-26 | 2018-09-28 | 青岛新华友建工集团股份有限公司 | Shallow source perched water green construction recycling construction |
CN110219315A (en) * | 2019-05-30 | 2019-09-10 | 五冶集团上海有限公司 | A kind of base pit dewatering and interim waterworks for firefighting integral construction method |
CN115845314A (en) * | 2022-11-25 | 2023-03-28 | 江西中烟工业有限责任公司 | Spraying control system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB685089A (en) * | 1950-11-20 | 1952-12-31 | Chance Brothers Ltd | Valves for water storage systems |
JPH07286340A (en) * | 1994-04-18 | 1995-10-31 | Hiroshi Koyama | Water storage device |
CN201109920Y (en) * | 2007-11-15 | 2008-09-03 | 上海熊猫机械(集团)有限公司 | Water storage tank |
CN101289865A (en) * | 2008-05-20 | 2008-10-22 | 上海市第二建筑有限公司 | Water resource recycling system for base pit engineering |
CN201155124Y (en) * | 2007-10-30 | 2008-11-26 | 上海熊猫机械(集团)有限公司 | Water tank |
CN201155125Y (en) * | 2007-10-30 | 2008-11-26 | 上海熊猫机械(集团)有限公司 | Water tank |
CN102444171A (en) * | 2011-12-31 | 2012-05-09 | 上海市机械施工有限公司 | Construction device recycling groundwater in watery sand layer |
-
2012
- 2012-07-30 CN CN2012102663791A patent/CN103161194A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB685089A (en) * | 1950-11-20 | 1952-12-31 | Chance Brothers Ltd | Valves for water storage systems |
JPH07286340A (en) * | 1994-04-18 | 1995-10-31 | Hiroshi Koyama | Water storage device |
CN201155124Y (en) * | 2007-10-30 | 2008-11-26 | 上海熊猫机械(集团)有限公司 | Water tank |
CN201155125Y (en) * | 2007-10-30 | 2008-11-26 | 上海熊猫机械(集团)有限公司 | Water tank |
CN201109920Y (en) * | 2007-11-15 | 2008-09-03 | 上海熊猫机械(集团)有限公司 | Water storage tank |
CN101289865A (en) * | 2008-05-20 | 2008-10-22 | 上海市第二建筑有限公司 | Water resource recycling system for base pit engineering |
CN102444171A (en) * | 2011-12-31 | 2012-05-09 | 上海市机械施工有限公司 | Construction device recycling groundwater in watery sand layer |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104499537A (en) * | 2014-11-20 | 2015-04-08 | 中国建筑第八工程局有限公司 | Construction wastewater collection and reuse system and construction wastewater collection and reuse method |
CN104499537B (en) * | 2014-11-20 | 2017-02-22 | 中国建筑第八工程局有限公司 | Construction wastewater collection and reuse system and construction wastewater collection and reuse method |
CN106498961A (en) * | 2016-11-28 | 2017-03-15 | 中铁大桥局集团第工程有限公司 | It is provided with the Yield rainfall relation system and its Yield rainfall relation method of detachable header tank |
CN106498961B (en) * | 2016-11-28 | 2018-11-23 | 中铁大桥局集团第一工程有限公司 | Yield rainfall relation system and its Yield rainfall relation method equipped with detachable header tank |
CN108589752A (en) * | 2018-04-26 | 2018-09-28 | 青岛新华友建工集团股份有限公司 | Shallow source perched water green construction recycling construction |
CN110219315A (en) * | 2019-05-30 | 2019-09-10 | 五冶集团上海有限公司 | A kind of base pit dewatering and interim waterworks for firefighting integral construction method |
CN115845314A (en) * | 2022-11-25 | 2023-03-28 | 江西中烟工业有限责任公司 | Spraying control system |
CN115845314B (en) * | 2022-11-25 | 2024-06-11 | 江西中烟工业有限责任公司 | Spray control system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103161194A (en) | Construction site abandoned water well reusing construction method | |
CN103174149A (en) | Dam body joint circulation grouting method | |
CN209261844U (en) | Serial siphon conveying device | |
CN203961922U (en) | A kind of taking out type low pressure associated gas recovery device | |
CN203890044U (en) | Oil storage system with pipeline residual oil collection device | |
CN102705702B (en) | Auxiliary unit used for hydraulic horizontal-pushing pressurizer and hydraulic horizontal-pushing pressurizer | |
CN207778028U (en) | Grout pipe line decompressor | |
CN203230399U (en) | Movable combined multifunctional chemical adding device for oil field | |
CN203628276U (en) | Liquid pumping apparatus | |
CN105133698B (en) | Energy gathering pumping device and pumping method thereof | |
CN204324860U (en) | One, two, three petroleum vapor recovery integrated treatment unit of petrol service station | |
CN203230400U (en) | Split type multifunctional chemical adding device for oil field | |
CN105297829A (en) | Multi-path water supply system | |
CN206000674U (en) | A kind of automatic air supply device of the governor oil pressure device for power station | |
CN203699888U (en) | Novel liquid discharging device | |
CN201671840U (en) | Device for extracting underground liquid | |
CN205242492U (en) | Multichannel water supply system | |
CN104361978A (en) | Converter transformer and pressure relief valve replacement method thereof | |
CN107859877A (en) | Grout pipe line decompressor | |
CN104190312B (en) | A kind of compound alcohol diesel oil automatic matching device | |
CN204237549U (en) | A kind of pipeline system of filling car | |
CN203806435U (en) | Storing and conveying system for hydrochloric acid storage tank | |
CN202209234U (en) | Unidirectional flow-limiting venturi | |
CN203130062U (en) | Safe emptying recycling device | |
CN203963503U (en) | High pressure helium recycle and reuse device in a kind of leak-testing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130619 |