CN108589699A - A kind of interpolation H profile steel TRD walls and its construction method - Google Patents

A kind of interpolation H profile steel TRD walls and its construction method Download PDF

Info

Publication number
CN108589699A
CN108589699A CN201810361259.7A CN201810361259A CN108589699A CN 108589699 A CN108589699 A CN 108589699A CN 201810361259 A CN201810361259 A CN 201810361259A CN 108589699 A CN108589699 A CN 108589699A
Authority
CN
China
Prior art keywords
trd
profile steel
wall
walls
cutting box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810361259.7A
Other languages
Chinese (zh)
Inventor
丁智
金杰克
黄文�
张霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201810361259.7A priority Critical patent/CN108589699A/en
Publication of CN108589699A publication Critical patent/CN108589699A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a kind of interpolation H profile steel TRD walls and its construction methods, including step:1) groove is excavated;2) provided box is hung;3) stake machine is in place;4) cutting box is connect with host;5) inclinometer is installed;6) TRD engineering methods are at wall;7) slurries fluidity is tested;8) H profile steel is inserted;9) displacement soil processing;10) cutting box is extracted.The beneficial effects of the invention are as follows:The advantages of present invention is by using for reference SMW engineering methods, interpolation shaped steel is applied in the construction of TRD walls, while the advantages of retaining TRD walls, the shortcomings of its flexing resistance is poor is made up by inserting shaped steel, so that TRD walls can only no longer be used separately as water-stop curtain, the water-stagnating effect better than engineering methods such as diaphram walls that TRD walls are once brought at wall can both have been played by inserting shaped steel TRD walls, while the shaped steel being inserted into can play the role of enclosure wall, therefore can promote to widen application range and the popularization of TRD walls.

Description

A kind of interpolation H profile steel TRD walls and its construction method
Technical field
The invention belongs to base pit engineering field more particularly to a kind of interpolation H profile steel TRD walls.
Background technology
TRD engineering methods, that is, soil-cement diaphram wall engineering method, construction equipment are made of host and cutter two large divisions, Host can be moved along the direction for making wall, in the chain saw type cutter insertion ground of host institute band and traversing along knife rest, while be turned round Movement pours into cement grout, and be mixed with undisturbed soil in the depth direction by the comprehensive stirring of each layer soil, mixing Form the soil-cement diaphram wall of equal thickness uniform quality.TRD engineering methods wall has 550mm to 850mm multi-thickness at present. The engineering method is primarily adapted for use in the foundation engineering of building, the vertical shaft of road tunnel and shield, large-scale landfill, subway and intersects The engineerings such as foundation stabilization sealing of mouthful active well, the retaining wall on basis, seepproof screen, bay and large reservoir dyke.But in work In journey example, there is also apparent deficiencies for this engineering method:
1) cement wall formed in TRD engineering methods using in situ soil in be added curing agent to form stable homogeneous Water sealing structure.Although it possesses good sealing performance, since soil cement self-strength is not high, lacks built-in steel skeleton and enters Native depth is deeper so that poor at wall anti-bending strength.
2) due to itself poor anti-bending strength, water-stop curtain is both needed to the corresponding earth-retaining of mating combination formed by TRD engineering methods Structure, such as cast-in-situ bored pile.This can make the construction cost of whole building enclosure higher, and the duration is partially long.
3) since water-stop curtain and corresponding engineering method of going along with sb. to guard him are generally mutually adjacent, the latter can be to water-stop curtain while construction Additional stress and additional displacement are generated, the possibility of engineering project disaster generation is inevitably increased.
Invention content
The purpose of the present invention is overcoming deficiency in the prior art, a kind of interpolation H profile steel TRD walls and its construction party are provided Method.
The construction method of this interpolation H profile steel TRD walls, includes the following steps:
1) groove is excavated
After going along with sb. to guard him center line of wall setting-out, along enclosure wall centerline parallel direction excavate working channel, groove width be 1.1~ 1.3m, gash depth are 0.9~1.1m;
2) provided box is hung
The pre-buried cave that cutting depth is 2.8~3.2m, length is 1.9~2.1m, width is 0.9~1.1m, by provided box It hangs in pre-buried cave;
3) stake machine is in place
It commands stake machine in place, check positioning scenarios and corrects in time;
4) cutting box is connect with host
Cutting box is hung paragraph by paragraph into pre-buried cave, host mobility to pre-buried acupuncture point sets connection cutting box, and host returns again to pre- Determine construction location progress cutting box and voluntarily squeezes into excavation process;
5) inclinometer is installed
Inclinometer is installed, the vertical precision management of wall is carried out;
6) TRD engineering methods are at wall
Host is connect with cutting box, is injected excavation liquid in cutting box bottom and is cut soil layer a distance in advance, then withdraws digging To original place, starting injection solidify liquid makes it be stirred with soil body Forced Mixing in situ, forms uniform thickness cement-earth underground continuous wall for pick;
7) slurries fluidity is tested
Slurries fluidity is detected with Flow Meter;
8) H profile steel is inserted
After one section of TRD engineering method is at wall, continue the construction of next section of TRD wall, before the preceding paragraph TRD wall initial sets, by table The H profile steel of anti-friction agent is smeared in face, is sling by machine crawler crane, and TRD walls are inserted into according to the position being pre-designed by H profile steel dead weight In vivo, or by external force by H profile steel it is pressed into designed elevation;It is stirred in 3 hours at wall and is inserted into H profile steel, H-type is controlled using theodolite The verticality of steel;H profile steel controls the absolute altitude of H profile steel using spirit level after being inserted into;H profile steel is by dead weight and necessary ancillary equipment It is inserted into the depth of design requirement, the verticality of H profile steel is not more than 1/300;
H profile steel chooses the H profile steel that depth of section is 100mm~150mm smaller than cement wall width, while H profile steel length is super TRD is crossed into wall depth 0.5m~1.0m, and is inserted into the good soil layer of mechanical property;For the TRD engineering methods separately as building enclosure It is 500mm~800mm that wall, which uses close slotting method, H profile steel center spacing,;When excavation of foundation pit depth is more than 15m, reduce in H profile steel In the heart away from;It can not interpolation H profile steel for the TRD engineering methods wall only as water-stop curtain;When excavation of foundation pit depth is more than 25m or foundation pit Slotting method of dredging can be used when safe class is high, H profile steel center spacing is 1000mm~1500mm;When TRD engineering method walls are not as permanent Property structure when H profile steel surface smear lubricant be used for the later stage Shaped steel recovery;
9) displacement soil processing
By the unified stacking of the discarded slurry generated in equal thickness Soil-cement Wall work progress, centralized processing;
10) cutting box is extracted
It works after surface construction, cutting box is segmented using TRD hosts and is extracted.
As preferred:Routine TRD engineering methods construction prior step is carried out before the step 1), is included the following steps:
1) on-site inspection;
2) machinery is marched into the arena;
3) levelling of the land, machinery assembly and backstage are arranged;
4) surveying setting-out.
As preferred:In the step 6), excavates liquid mixing and use sodium bentonite, every cube is stirred soil body incorporation 100kg/m3Bentonite, ratio of mud W/B are 5~20, and work progress is dug by 1000kg water, 50~200kg bentonite mixing slurries The control of liquid mixing mud fluidity is dug in 190mm~240mm;Solidify liquid mixing uses P.O42.5 grades of Portland cements, often It cube is stirred the cement of soil body incorporation no less than 25%, the ratio of mud 1.4~1.6, work progress is per 937kg water, 625kg cement Mixing slurries, solidify liquid mixing mud fluidity are controlled in 180mm~220mm.
The beneficial effects of the invention are as follows:
1, the advantages of present invention is by using for reference SMW engineering methods, interpolation shaped steel is applied in the construction of TRD walls, retains TRD walls The advantages of while, make up the shortcomings of its flexing resistance is poor by inserting shaped steel so that TRD walls no longer can only be separately as sealing curtain Curtain uses, and the sealing effect better than engineering methods such as diaphram walls that TRD walls are once brought at wall can both have been played by inserting shaped steel TRD walls Fruit, while the shaped steel being inserted into can play the role of enclosure wall, therefore can promote to widen application range and the popularization of TRD walls.
2, interpolation steel type TRD wall construction technologies of the present invention so that the scope of application is wider, and TRD engineering methods are more adaptable, can have Effect improves the anti-bending strength of cement soil wall itself.Simultaneously after structure integral construction, internal shaped steel can also be recycled, Environment-friendly and green and construction cost reduction.
3, interpolation steel type TRD walls of the present invention safeguard construction of the wall without neighbouring soil-baffling structure separately as building enclosure It influences, the generation safeguarded wall generation crack and lead to the engineering project disasters such as leakage can be reduced.
4, the use of interpolation steel type TRD walls of the present invention can obtain significant economic benefit, due to once at wall and slotting type It can make enclosure wall after steel, add one of enclosure wall compared with one of water-stop curtain wall before, difficulty of construction and construction can be reduced Cost, therefore can reduce investment outlay, shorten the construction period.
Description of the drawings
Fig. 1 is that the present invention uses close slotting type H profile steel TRD wall schematic top plan views;
Fig. 2 is the present invention using thin slotting type H profile steel TRD wall schematic top plan views;
Fig. 3 is the close slotting type H profile steel TRD wall left view schematic diagrams of Fig. 1.
Specific implementation mode
The present invention is described further with reference to embodiment.The explanation of following embodiments is merely used to help understand this Invention.It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, also Can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the protection domain of the claims in the present invention It is interior.
The construction method of the interpolation H profile steel TRD walls, first construction obtain one section of TRD wall, pre-hardening after TRD is at wall Before, be inserted into H profile steel within the walls toward TRD, the H profile steel size of wherein interpolation can be different, the distribution of insertion either close insert, Can also be that interval is inserted, H profile steel surface smear anti-friction agent, in order that facilitating the insertion of early period and the recovery operation in later stage.Its It is as follows:
Routine TRD engineering methods construction prior step is carried out first:
1) on-site inspection;
2) machinery is marched into the arena;
3) levelling of the land, machinery assembly and backstage are arranged;
4) surveying setting-out.
The construction of any one section of TRD wall is carried out later, which includes the following steps:
1) groove is excavated
According to TRD engineering method weights of equipment, after going along with sb. to guard him center line of wall setting-out, construction site be laid at the reinforcings such as steel plate Reason measure, it is ensured that construction site meets requirement of the mechanical equipment to foundation bearing capacity, it is ensured that the stability of stake machine.With excavator edge Excavate working channel, groove width about 1.2m, gash depth about 1.0m in enclosure wall centerline parallel direction.
2) provided box is hung
With the pre-buried cave of excavator cutting depth about 3m, length about 2m, width about 1m, hung using crane and by provided box Enter in pre-buried cave.
3) stake machine is in place
The case where assuming unified command of that stake machine is in place, seeing upper and lower, left and right various aspects clearly before mobile, discovery has barrier timely It removes, positioning scenarios are checked after mobile and corrects in time, stake machine is answered steady, straight and even.
4) cutting box is connect with host
Cutting box is hung paragraph by paragraph into pre-buried cave with specified tracklaying crane, is fixed using supporting table;TRD host mobilities Connection cutting box is set to pre-buried acupuncture point, host returns again to predetermined construction location progress cutting box and voluntarily squeezes into excavation process.
5) inclinometer is installed
After cutting box is voluntarily driven into projected depth, inclinometer is installed.It is surveyed by the multisection type inside cutting box Oblique instrument can carry out the vertical precision management of wall, usually can ensure that the precision within 1/250.
6) TRD engineering methods are at wall
After inclinometer installs, host is connect with cutting box.Excavation liquid, which is injected, in cutting box bottom cuts soil layer in advance A distance, then excavation is withdrawn to original place, starting solidify liquid makes it be stirred with soil body Forced Mixing in situ, forms uniform thickness soil cement Diaphram wall.It excavates liquid mixing and preferably uses sodium bentonite, every cube is stirred soil body incorporation 100kg/m3Bentonite, water ash It is 5~20 than W/B, work progress excavates liquid mixing mud fluidity by 1000kg water, 50~200kg bentonite mixing slurries It preferably controls in 190mm~240mm.Solidify liquid mixing preferably uses P.O42.5 grades of Portland cements, and every cube is stirred the soil body The cement of incorporation no less than 25%, the ratio of mud 1.5, work progress is per 937kg water, 625kg cement mixing slurries, solidify liquid mixing Mud fluidity is preferably controlled in 180mm~220mm.
7) slurries fluidity is tested
Slurries fluidity is detected with Flow Meter.
8) H profile steel is inserted
After one section of TRD engineering method is at wall, continue the construction of next section of TRD wall, before the preceding paragraph TRD wall initial sets, by table The H profile steel of anti-friction agent is smeared in face, is sling by machine crawler crane, and TRD walls are inserted into according to the position being pre-designed by shaped steel dead weight In vivo, shaped steel can be pressed into designed elevation by external force when necessary.3 hours planted agents are stirred at wall and are inserted into shaped steel, utilize theodolite Control the verticality of shaped steel;Shaped steel controls the absolute altitude of shaped steel using spirit level after being inserted into, it is ensured that the insertion depth of shaped steel;Shaped steel is suitable The depth of design requirement is inserted by dead weight and necessary ancillary equipment, the verticality of shaped steel is not more than 1/300.
H profile steel preferably chooses the shaped steel that depth of section is 100mm smaller than cement wall width, ensures that shaped steel is synchronous with cement soil wall Deformation, while shaped steel length is preferably more than TRD into wall depth 0.5m, and the soil layer of insertion mechanics better performances.For separately as The TRD engineering methods wall of building enclosure preferably uses close slotting method, and shaped steel center spacing is preferably 600mm;When excavation of foundation pit depth is more than 15m When, it can suitably reduce shaped steel center spacing to improve the anti-bending strength of building enclosure;For only as the TRD engineering methods of water-stop curtain Wall can not interpolation shaped steel, when excavation of foundation pit depth is more than 25m or deep pit monitor is higher ranked appropriate to the occasion using dredging slotting method, shaped steel center Spacing is preferably 1200mm.It can be in shaped steel surface smear lubricant for the later stage when TRD engineering methods wall is not as permanent structure Shaped steel recovery, to reduce engineering cost.
9) displacement soil processing
By the unified stacking of the discarded slurry generated in equal thickness Soil-cement Wall work progress, centralized processing.
10) cutting box is extracted
It works after surface construction, cutting box is segmented using TRD hosts and is extracted.
After the completion of last each section of interpolation H steel type TRD wall is all constructed, carries out machinery and withdraw from the arena.

Claims (3)

1. a kind of construction method of interpolation H profile steel TRD walls, which is characterized in that include the following steps:
1) groove is excavated
After going along with sb. to guard him center line of wall setting-out, working channel is excavated along enclosure wall centerline parallel direction, groove width is 1.1~1.3m, ditch Groove depth is 0.9~1.1m;
2) provided box is hung
The pre-buried cave that cutting depth is 2.8~3.2m, length is 1.9~2.1m, width is 0.9~1.1m, provided box is hung Enter in pre-buried cave;
3) stake machine is in place
It commands stake machine in place, check positioning scenarios and corrects in time;
4) cutting box is connect with host
Cutting box is hung paragraph by paragraph into pre-buried cave, host mobility to pre-buried acupuncture point sets connection cutting box, and host returns again to predetermined apply Station sets progress cutting box and voluntarily squeezes into excavation process;
5) inclinometer is installed
Inclinometer is installed, the vertical precision management of wall is carried out;
6) TRD engineering methods are at wall
Host is connect with cutting box, is injected excavation liquid in cutting box bottom and is cut soil layer a distance in advance, then withdraws excavation extremely Original place, starting injection solidify liquid makes it be stirred with soil body Forced Mixing in situ, forms uniform thickness cement-earth underground continuous wall;
7) slurries fluidity is tested
Slurries fluidity is detected with Flow Meter;
8) H profile steel is inserted
After one section of TRD engineering method is at wall, the construction for continuing next section of TRD wall applies surface before the preceding paragraph TRD wall initial sets The H profile steel for smearing anti-friction agent is sling by machine crawler crane, and TRD walls are inserted into according to the position being pre-designed by H profile steel dead weight It is interior, or H profile steel is pressed into designed elevation by external force;It is stirred in 3 hours at wall and is inserted into H profile steel, H profile steel is controlled using theodolite Verticality;H profile steel controls the absolute altitude of H profile steel using spirit level after being inserted into;H profile steel is inserted by dead weight and necessary ancillary equipment Enter the depth to design requirement, the verticality of H profile steel is not more than 1/300;
H profile steel chooses the H profile steel that depth of section is 100mm~150mm smaller than cement wall width, while H profile steel length is more than TRD At wall depth 0.5m~1.0m, and it is inserted into the good soil layer of mechanical property;For the TRD engineering method walls use separately as building enclosure Close slotting method, H profile steel center spacing are 500mm~800mm;When excavation of foundation pit depth is more than 15m, reduce H profile steel center spacing; It can not interpolation H profile steel for the TRD engineering methods wall only as water-stop curtain;When excavation of foundation pit depth is more than 25m or deep pit monitor etc. Slotting method of dredging can be used in grade when high, H profile steel center spacing is 1000mm~1500mm;When TRD engineering method walls are not as permanent structure When H profile steel surface smear lubricant be used for the later stage Shaped steel recovery;
9) displacement soil processing
By the unified stacking of the discarded slurry generated in equal thickness Soil-cement Wall work progress, centralized processing;
10) cutting box is extracted
It works after surface construction, cutting box is segmented using TRD hosts and is extracted.
2. the construction method of interpolation H profile steel TRD walls according to claim 1, which is characterized in that the advance of the step 1) Row routine TRD engineering methods construction prior step, includes the following steps:
1) on-site inspection;
2) machinery is marched into the arena;
3) levelling of the land, machinery assembly and backstage are arranged;
4) surveying setting-out.
3. the construction method of interpolation H profile steel TRD walls according to claim 1, which is characterized in that in the step 6), dig It digs liquid mixing and uses sodium bentonite, every cube is stirred soil body incorporation 100kg/m3Bentonite, ratio of mud W/B are 5~20, are applied Work process by 1000kg water, 50~200kg bentonite mixing slurries, excavate liquid mixing mud fluidity control 190mm~ 240mm;Solidify liquid mixing uses P.O42.5 grades of Portland cements, and every cube is stirred soil body incorporation no less than 25% Cement, the ratio of mud 1.4~1.6, work progress is per 937kg water, 625kg cement mixing slurries, solidify liquid mixing mud fluidity Control is in 180mm~220mm.
CN201810361259.7A 2018-04-20 2018-04-20 A kind of interpolation H profile steel TRD walls and its construction method Pending CN108589699A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810361259.7A CN108589699A (en) 2018-04-20 2018-04-20 A kind of interpolation H profile steel TRD walls and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810361259.7A CN108589699A (en) 2018-04-20 2018-04-20 A kind of interpolation H profile steel TRD walls and its construction method

Publications (1)

Publication Number Publication Date
CN108589699A true CN108589699A (en) 2018-09-28

Family

ID=63614305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810361259.7A Pending CN108589699A (en) 2018-04-20 2018-04-20 A kind of interpolation H profile steel TRD walls and its construction method

Country Status (1)

Country Link
CN (1) CN108589699A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137886A (en) * 2018-10-18 2019-01-04 中铁十二局集团有限公司 Wall type construction method for diaphragm walls is mixed in city underground
CN109403337A (en) * 2018-10-12 2019-03-01 江苏省送变电有限公司 A kind of basalt fibre reinforcement TRD engineering method diaphram wall and its construction method
CN109403338A (en) * 2018-10-12 2019-03-01 江苏省送变电有限公司 A kind of assembly lattice configuration steel TRD engineering method diaphram wall and its construction method
CN110306531A (en) * 2019-07-06 2019-10-08 中铁二十五局集团第五工程有限公司 High water level erratic boulder stratum construction of diaphragm wall technique
CN111042249A (en) * 2019-12-27 2020-04-21 上海建工四建集团有限公司 Construction method of ultra-deep equal-thickness cement-soil mixing wall under complex geological condition
CN111236262A (en) * 2020-03-16 2020-06-05 中铁建设集团有限公司 CSM + TRD underground continuous wall comprehensive construction method
CN112707692A (en) * 2021-01-06 2021-04-27 上海智平基础工程有限公司 Cutting fluid for TRD construction, preparation method and construction method
CN113756286A (en) * 2021-08-09 2021-12-07 上海市基础工程集团有限公司 Construction method for implementing underground water soil continuous steel wall by TRD method
CN114215070A (en) * 2021-12-23 2022-03-22 浙江省建筑设计研究院 Super-deep TRD (blast furnace direct reduction) wall forming construction method for gravel water-rich stratum based on assembled L-shaped guide wall
CN114837168A (en) * 2022-04-20 2022-08-02 浙江交工集团股份有限公司 Comprehensive pipe gallery enclosure wall and construction method thereof
CN116163318A (en) * 2023-04-25 2023-05-26 广州地铁设计研究院股份有限公司 Construction method and structure for foundation pit support of inserted section steel microorganism sand wall

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015429A (en) * 2012-12-04 2013-04-03 北京建材地质工程公司 Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015429A (en) * 2012-12-04 2013-04-03 北京建材地质工程公司 Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
余平等: ""TRD工法在深基坑工程中止水中的应用"", 《地质装备》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403337A (en) * 2018-10-12 2019-03-01 江苏省送变电有限公司 A kind of basalt fibre reinforcement TRD engineering method diaphram wall and its construction method
CN109403338A (en) * 2018-10-12 2019-03-01 江苏省送变电有限公司 A kind of assembly lattice configuration steel TRD engineering method diaphram wall and its construction method
CN109137886A (en) * 2018-10-18 2019-01-04 中铁十二局集团有限公司 Wall type construction method for diaphragm walls is mixed in city underground
CN110306531A (en) * 2019-07-06 2019-10-08 中铁二十五局集团第五工程有限公司 High water level erratic boulder stratum construction of diaphragm wall technique
CN111042249A (en) * 2019-12-27 2020-04-21 上海建工四建集团有限公司 Construction method of ultra-deep equal-thickness cement-soil mixing wall under complex geological condition
CN111236262A (en) * 2020-03-16 2020-06-05 中铁建设集团有限公司 CSM + TRD underground continuous wall comprehensive construction method
CN112707692A (en) * 2021-01-06 2021-04-27 上海智平基础工程有限公司 Cutting fluid for TRD construction, preparation method and construction method
CN113756286A (en) * 2021-08-09 2021-12-07 上海市基础工程集团有限公司 Construction method for implementing underground water soil continuous steel wall by TRD method
CN114215070A (en) * 2021-12-23 2022-03-22 浙江省建筑设计研究院 Super-deep TRD (blast furnace direct reduction) wall forming construction method for gravel water-rich stratum based on assembled L-shaped guide wall
CN114837168A (en) * 2022-04-20 2022-08-02 浙江交工集团股份有限公司 Comprehensive pipe gallery enclosure wall and construction method thereof
CN116163318A (en) * 2023-04-25 2023-05-26 广州地铁设计研究院股份有限公司 Construction method and structure for foundation pit support of inserted section steel microorganism sand wall

Similar Documents

Publication Publication Date Title
CN108589699A (en) A kind of interpolation H profile steel TRD walls and its construction method
CN106759473B (en) The constructing structure and its construction method of underground pipe gallery and road
CN103590425B (en) A kind of Peaty soft soil stratum subway station construction technology
CN102644466B (en) Joist arching method for constructing ultra-shallow buried large-span underground excavated subway station in rocky stratum
CN105298507A (en) Underground pipe gallery construction method of machine performing open excavation on upper portion and tunneling on lower portion
CN105951711A (en) Enclosing construction method of underground continuous wall of seashore power station
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN109403338A (en) A kind of assembly lattice configuration steel TRD engineering method diaphram wall and its construction method
CN103775110A (en) Underground excavation construction method for multilayer underground space of soft soil area
CN108842819A (en) A kind of urban track traffic cable run method for tunnel construction
CN108560536A (en) The continuous piling wall construction method of Soil-cement
CN110306531A (en) High water level erratic boulder stratum construction of diaphragm wall technique
CN103015429A (en) Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN110952528A (en) Construction method of cement-soil underground continuous wall under complex geological conditions
CN111636455A (en) Comprehensive construction method of TRD (Top gas recovery device) and rotary drilling lead hole depth waterproof curtain
CN108612083A (en) One kind can sealing interpolation S shaped steel TRD walls and its construction method
CN110984132B (en) Construction method for grooving underground diaphragm wall under complex geological condition
CN103015431A (en) Foundation pit supporting method for manual dig-hole cement-soil steel pile
CN108643167A (en) The slotting shape steel rolled stock type TRD engineering methods wall and its construction method of one type anchor pole
CN101824825B (en) Deep foundation pit open cutting construction method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN108612082A (en) One type shaped form TRD walls and its construction method
CN115627788A (en) TRD (blast furnace pressure recovery device) reinforcement construction method for metro section connection channel
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN106869165A (en) City integrated prefabricated piping lane open cut formula is from construction of prevention work method and self-propelled laydown machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928