CN108534879A - A kind of metering method and device of consumption of raw materials amount - Google Patents
A kind of metering method and device of consumption of raw materials amount Download PDFInfo
- Publication number
- CN108534879A CN108534879A CN201710119461.4A CN201710119461A CN108534879A CN 108534879 A CN108534879 A CN 108534879A CN 201710119461 A CN201710119461 A CN 201710119461A CN 108534879 A CN108534879 A CN 108534879A
- Authority
- CN
- China
- Prior art keywords
- raw material
- burden balance
- value
- metering
- default
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G19/00—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
- G01G19/22—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for apportioning materials by weighing prior to mixing them
- G01G19/32—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for apportioning materials by weighing prior to mixing them using two or more weighing apparatus
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01G—WEIGHING
- G01G19/00—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
- G01G19/22—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for apportioning materials by weighing prior to mixing them
- G01G19/34—Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for apportioning materials by weighing prior to mixing them with electrical control means
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Factory Administration (AREA)
- Weight Measurement For Supplying Or Discharging Of Specified Amounts Of Material (AREA)
Abstract
This application discloses a kind of metering method and device of consumption of raw materials amount, which includes:After metering starts, if receiving the trigger signal that refueling operation occurs for burden balance, the burden balance number for including in the trigger signal is obtained, determines the target batch scale that refueling operation occurs in more burden balance;According to the time for receiving trigger signal every time, the corresponding burden balance number for storing every target batch scale, preceding kind of raw material name code and preceding kind of raw material consumption;At the end of metering, according to the metering end time, corresponding burden balance number, the total amount consumed of the name code of current raw material and raw material for storing every burden balance;According to the data of aforementioned storage, the consumption of the raw material of each name code is measured.The metering method, can measure the consumption of different material, and metering is more accurate.
Description
Technical field
This application involves raw material field of measuring techniques more particularly to a kind of metering methods and device of consumption of raw materials amount.
Background technology
The metering of consumption of raw materials amount is a mostly important analysis in sintering plant cost analysis, in general, the original of sintering plant
Material includes fuel, blending ore and solvent etc..
Currently, the system that most sintering plants measure consumption of raw materials amount, is commonly configured with more burden balance and control
Device, same raw material are weighed using same burden balance, and acquire the variable of burden balance in real time by control device.Example
Such as, it uses mark only to be weighed to fuel for the burden balance of fuel, uses and indicate to be the burden balance of blending ore only to blending ore
It is weighed, uses mark only to be weighed to solvent for the burden balance of solvent, control device acquires aforementioned three dispensings in real time
Variable in scale, to realize the metering to the consumption of fuel, blending ore and solvent.
But in actual production, each raw material may include a variety of heterogeneities, different ratio or different qualities
Subclass raw material, such as fuel, the fuel of a variety of subclass comprising heterogeneity can be divided into, can also be drawn
There are many fuel of the different subclass of composition proportion equally to be divided according to quality, can also be divided into a variety of different qualities
The fuel of subclass, etc..During meter feedstock consumption, if refueling operation, i.e. burden balance occur for burden balance
In raw material by this kind of raw material a category material change be another category raw material, at this time still use above-mentioned side
Formula measures consumption of raw materials amount, due to the classification of burden balance None- identified raw material itself, can only measure each raw material
Total amount consumed can not accurately measure the consumption of subclass raw material.If for each category raw material of various raw materials
A burden balance are configured, then needs the quantity that burden balance equipment is significantly greatly increased, causes a large amount of wastes of resource.Moreover, because
The diversity of raw material subclass and variability, though increase burden balance equipment quantity, it is also difficult to realization include to various raw materials
Each category consumption of raw materials amount metering.
Invention content
This application provides a kind of metering methods and device of consumption of raw materials amount can not be accurate to solve in the prior art
The problem of measuring the consumption of every category raw material of various raw materials.
In a first aspect, this application provides a kind of metering method of consumption of raw materials amount, which includes:Metering starts
Afterwards, if receiving the trigger signal that refueling operation occurs for burden balance, the burden balance number for including in the trigger signal is obtained,
Determine the target batch scale that refueling operation occurs in more burden balance;According to the time for receiving trigger signal every time, correspondence is deposited
Store up the burden balance number of every target batch scale, the name code and preceding kind of raw material of preceding kind of raw material consumption;At the end of metering,
According to the metering end time, corresponding burden balance number, the name code of current raw material and the raw material for storing every burden balance disappears
Consume total amount;According to described according to the time for receiving trigger signal every time, the burden balance of every target batch scale of corresponding storage
Number, the consumption of the name code of preceding kind of raw material and preceding kind of raw material and described according to the metering end time, corresponding storage
Burden balance number, the total amount consumed of the name code of current raw material and raw material of every burden balance, measure each name code
The consumption of raw material.
With reference to first aspect, in the first possible realization method of first aspect, believe according to triggering is received every time
Number time, the corresponding burden balance number for storing every target batch scale, the name code of preceding kind of raw material and preceding kind of raw material disappear
Before the process of consumption, which further includes:After receiving trigger signal every time, carried out for each target batch scale
Following operation:The value of the default indicating label that reloads of the target batch scale is configured to;By the target batch scale it is default before
The value of the name code label of kind raw material is configured to the title generation of raw material in target batch scale when this receives trigger signal
Code;Configuring the value of the name code label of the default current raw material of the target batch scale to should after this receives trigger signal
The name code for the raw material replaced in target batch scale;The variable of target batch scale when this is received trigger signal,
This receives the time of trigger signal and the corresponding storage of the burden balance of target batch scale number;By the target batch scale
Before default the value of the consumption label of kind of raw material be configured to when this receives trigger signal the variable of the target batch scale with
The difference of the variable of preceding primary target batch scale when receiving trigger signal, wherein if connect to this since metering
It receives and does not receive trigger signal in the time between trigger signal, then by the consumption of default preceding kind of the raw material of the target batch scale
The value of amount label is configured to the initial of the variable of the target batch scale and the target batch scale when this receives trigger signal
The difference of variable.
The possible realization method of with reference to first aspect the first, in second of possible realization method of first aspect
In, according to the time for receiving trigger signal every time, the corresponding burden balance number for storing every target batch scale, preceding kind of raw material
The process of the consumption of name code and preceding kind of raw material, specifically includes:After metering starts, by detecting whether that existence value is in real time
The default indicating label that reloads for being searches target batch scale corresponding with the time for receiving trigger signal every time;It searches every time
To after target batch scale, the value of the name code label of default preceding kind of the raw material of every target batch scale, default preceding kind of original are read
The every class value and this that read are received trigger signal by the value of the consumption label of material and the value of default index tab
Time correspondence is stored into the first table, after the completion of storage, by the name code label of default preceding kind of the raw material of all burden balance
Value be configured to sky, it is default before the value of consumption label of kind of raw material be configured to 0, the value of the default indicating label that reloads is configured to
It is no.
Second of possible realization method with reference to first aspect, in the third possible realization method of first aspect
In, according to the metering end time, corresponding burden balance number, the name code of current raw material and the raw material for storing every burden balance
Before total amount consumed, which further includes:For each burden balance, proceed as follows:By the default of the burden balance
The value of the total amount consumed label of raw material is configured to the original measurement value of the variable and the burden balance of the burden balance at the end of measuring
Difference.
The third possible realization method with reference to first aspect, in the 4th kind of possible realization method of first aspect
In, according to the metering end time, corresponding burden balance number, the name code of current raw material and the raw material for storing every burden balance
The process of total amount consumed, specifically includes:Read the value of the total amount consumed label of the default raw material of every burden balance, default current original
The value of the name code label of material and the value of default index tab, each class value read is corresponding with the metering end time
Storage.
The 4th kind of possible realization method with reference to first aspect, in the 5th kind of possible realization method of first aspect
In, numbered according to the burden balance of the every target batch scale stored according to the time for receiving trigger signal every time, correspondence,
The consumption of the name code of preceding kind of raw material and preceding kind of raw material and described according to the metering end time, every of corresponding storage matches
Burden balance number, the total amount consumed of the name code of current raw material and raw material for expecting scale, measure the raw material of each name code
The process of consumption, specifically includes:For each burden balance, proceed as follows:Judge whether deposited in first table
Contain the index number of the burden balance;If so, the value of the total amount consumed label of the default raw material of the burden balance is reconfigured
The corresponding total amount consumed of index number institute corresponding with the index number stored in first table at the end of for metering
There is the difference of consumption;It reads the value of the total amount consumed label of the default raw material of the burden balance, preset the title generation of current raw material
The value of the value and default index tab of code label corresponding stores the class value read to the second table with the end time is measured
In;Data in first table are stored into the second table;According to the data in second table, each name is measured
Claim the consumption of the raw material of code.
Second aspect, present invention also provides a kind of metering device of consumption of raw materials amount, which includes that target is matched
Scale determining module is expected, for after metering starts, if receiving the trigger signal that refueling operation occurs for burden balance, described in acquisition
The burden balance number for including in trigger signal, determines the target batch scale that refueling operation occurs in more burden balance;First note amount
Module is numbered, preceding kind for the burden balance that according to the time for receiving trigger signal every time, correspondence stores every target batch scale
The consumption of the name code of raw material and preceding kind of raw material;Second metering module is used at the end of metering, at the end of metering
Between, corresponding burden balance number, the total amount consumed of the name code of current raw material and raw material for storing every burden balance;Third is measured
Module, for, according to the time for receiving trigger signal every time, corresponding to the dispensing of every target batch scale of storage according to described
Scale number, the consumption of the name code of preceding kind of raw material and preceding kind of raw material and described according to metering end time, corresponding storage
Every burden balance burden balance number, the name code of current raw material and raw material total amount consumed, measure each name code
Raw material consumption.
In conjunction with second aspect, in the first possible realization method of second aspect, which further includes:First
Configuration module, for after the target batch scale determining module receives trigger signal every time, for each target batch
Scale proceeds as follows:The value of the default indicating label that reloads of the target batch scale is configured to;By the target batch scale
The value of the name code label of kind of raw material is configured to when this receives trigger signal raw material in the target batch scale before default
Name code;It configures the value of the name code label of the default current raw material of the target batch scale to this and receives triggering letter
The name code for the raw material replaced in the target batch scale after number;The meter of target batch scale when this is received trigger signal
Magnitude, this receives the time of trigger signal and the burden balance number of the target batch scale corresponds to storage;The target is matched
The value of the consumption label of default preceding kind of the raw material of material scale is configured to the meter of target batch scale when this receives trigger signal
Magnitude with it is preceding it is primary receive trigger signal when the target batch scale variable difference, wherein if since metering to
This receives in the time between trigger signal and does not receive trigger signal, then by default preceding kind of the raw material of the target batch scale
The value of consumption label be configured to the variable of the target batch scale and the target batch scale when this receives trigger signal
Original measurement value difference.
In conjunction with the first possible realization method of second aspect, in second of possible realization method of second aspect
In, first metering module is specifically used for:After metering starts, by detecting whether the default finger that reloads that existence value is yes in real time
Indicating label search target batch scale corresponding with the time for receiving trigger signal every time;After finding target batch scale every time,
Read every target batch scale it is default before kind of raw material name code label value, it is default before kind of raw material consumption label
The value of value and default index tab is stored the every class value read is corresponding with the time that this receives trigger signal to the
In one table, after the completion of storage, configures the value of the name code label of default preceding kind of the raw material of all burden balance to sky, preset
The value of the consumption label of preceding kind of raw material is configured to 0, and the value of the default indicating label that reloads is configured to no.
In conjunction with second of possible realization method of second aspect, in the third possible realization method of second aspect
In, which further includes:Second configuration module is proceeded as follows for being directed to each burden balance:By the burden balance
The value of total amount consumed label of default raw material be configured to the initial of variable and the burden balance of the burden balance at the end of metering
The difference of variable.
In conjunction with the third possible realization method of second aspect, in the 4th kind of possible realization method of second aspect
In, the second metering module is specifically used for:Read the value of the total amount consumed label of the default raw material of every burden balance, default current original
The value of the name code label of material and the value of default index tab, each class value read is corresponding with the metering end time
Storage.
In conjunction with the 4th kind of possible realization method of second aspect, in the 5th kind of possible realization method of second aspect
In, the third metering module is specifically used for:For each burden balance, proceed as follows:Judge in first table
Whether the index number of the burden balance is stored with;If so, by the value weight of the total amount consumed label of the default raw material of the burden balance
New index number pair for being configured to store in the corresponding total amount consumed of the index number and first table at the end of metering
The difference for all consumptions answered;It reads the value of the total amount consumed label of the default raw material of the burden balance, preset current raw material
The value of the value of name code label and default index tab is stored the class value read is corresponding with the metering end time to the
In two tables;Data in first table are stored into the second table;According to the data in second table, metering
The consumption of the raw material of each name code.
The embodiment of the present application can include the following benefits:This application provides a kind of metering methods of consumption of raw materials amount
And device, in the metering method, the target batch scale that refueling operation occurs is determined according to the trigger signal received first, later
According to the time that refueling operation occurs, the title of corresponding every burden balance of storage former raw material when refueling operation occurs every time
Code and consumption, and according to the metering end time, the consumption of corresponding storage every burden balance raw material at the end of metering is total
The name code of amount and current raw material, later counts the consumption of the raw material of each name code according to the data of storage
Amount, using the metering method, can measure the consumption of every category raw material of same raw material, disappear for raw material
The metering of consumption is more accurate, and applicability is more preferable.
Description of the drawings
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below
Singly introduce, it should be apparent that, for those of ordinary skills, without having to pay creative labor,
Other drawings may also be obtained based on these drawings.
Fig. 1 is a kind of flow diagram of the metering method of consumption of raw materials amount provided by the embodiments of the present application;
Fig. 2 is a kind of structural schematic diagram of the metering device of consumption of raw materials amount provided by the embodiments of the present application.
Specific implementation mode
Show that a kind of flow of the metering method of consumption of raw materials amount provided by the embodiments of the present application is shown referring to Fig. 1, Fig. 1
It is intended to, which includes:
After step 101, metering start, if receiving the trigger signal that refueling operation occurs for burden balance, described touch is obtained
The burden balance number for including in signalling, determines the target batch scale that refueling operation occurs in more burden balance.
In a particular application, more burden balance and a control device are usually set, and more burden balance are and control device
It is connected by signal transmssion line, measure control is carried out to the raw material in more burden balance by control device simultaneously.Metering is opened
Begin the time and metering the end time can arbitrarily set according to actual needs, for example, can by every teams and groups work start when
Between be set as metering the time started, by every teams and groups work terminate time be set as metering the end time, it is corresponding to every teams and groups
Consumption of raw materials amount in working time is measured, and measures the actually required time further according to the consumption of every teams and groups Central Plains material later
The consumption of raw material in section, metering is very convenient flexibly, meets needs of production.
For the ease of metering, before starting metering, every burden balance are correspondingly arranged a burden balance number, and metering starts
Afterwards, the original measurement value for obtaining every burden balance first (herein, burden balance is defined as in the variable for measuring start time
The original measurement value of the burden balance), and deposit the original measurement value of every burden balance is corresponding with the burden balance of burden balance number
Storage.
After metering starts, control device detects whether to receive the trigger signal that refueling operation occurs for burden balance in real time, touches
Signalling can be set to the push button on control device by user's execute-in-place and be generated, and the corresponding touch-control of every burden balance is pressed
Button is different, and the corresponding push button of every burden balance is corresponding with the burden balance of burden balance number.In a further embodiment,
Material name Code Selection interface is provided in control device, be provided on the material name Code Selection interface it is multiple selection by
Button, wherein each select button corresponds to a burden balance number, i.e. select button is corresponded with burden balance number, user
It can enter corresponding burden balance by each select button and number corresponding material name Code Selection sub-interface, every dispensing
When raw material in the batch bin of scale needs replacing, user can be triggered and the dispensing by the material name Code Selection interface
The burden balance of scale number corresponding select button, later in the burden balance number corresponding material name Code Selection sub-interface
The name code for the new raw material that will be replaced is selected, control device is corresponding with each burden balance number by detecting in real time as a result,
Material name Code Selection sub-interface in whether have that name code is chosen, and pass through the chosen name code of identification and name
Whether the name code before claiming Code Selection operation to occur is identical, judges whether corresponding burden balance occur refueling operation, if
Determine that refueling operation occurs for the burden balance, the name code before name code selection operation occurs control device is recorded as this
Chosen name code is recorded as this refueling operation hair by the name code of kind of raw material before refueling operation is corresponding when occurring
The name code of the new raw material of corresponding replacement when raw need to only pass through it follows that it is not necessary that push button is arranged on control device
Whether detect in real time has new name code chosen in the corresponding material name Code Selection sub-interface of every burden balance
Determine whether to receive the trigger signal that refueling operation occurs for the burden balance, control operation is more quickly timely.
In the same time, the burden balance that refueling operation occurs can be one, can also be Duo Tai, therefore, control device
It may be one in the trigger signal that the same time receives, it is also possible to multiple.Terminate to metering since metering, every is matched
Multiple refueling operation may occur for material scale, correspondingly, terminating to metering since metering, control device may also be received repeatedly
To trigger signal.After control device receives trigger signal every time, need from each trigger signal obtain it includes match
Expect scale number, is that refueling operation occurs for which platform burden balance with determination, that is, determines the target batch scale that refueling operation occurs.
Step 102, according to the time for receiving trigger signal every time, the corresponding burden balance for storing every target batch scale are compiled
Number, the consumption of the name code and preceding kind of raw material of preceding kind of raw material.
In actual production, it is believed that control device receives the time of trigger signal and refueling operation occurs for burden balance
Time is identical.
Usually in practical applications, if the raw material in the batch bin of a certain burden balance will be replaced, i.e., this is matched
Refueling operation will occur for material scale, and user can first remove the corresponding push button of the touch-control burden balance or in the corresponding original of the burden balance
New name code (i.e. by the name code of the new raw material of replacement) is selected in material name code selection sub-interface, it later will be new
Raw material is positioned in batch bin, and also that is, when control device receives trigger signal, the raw material in the batch bin has not occurred more
It changes, is still the raw material before refueling operation occurs, since control device receives trigger signal, the raw material meeting in the batch bin
It is changed to new raw material.It follows that if it is considered to control device receives the time of trigger signal and burden balance reload
The time of operation is identical, when control device receives trigger signal every time, kind of raw material (this paper before every target batch scale is corresponding
In, kind of raw material before the old raw material that will be replaced in an arbitrary refueling operation is defined as when the secondary refueling operation occurs,
The new raw material replaced in the secondary refueling operation is defined as the current raw material after the secondary refueling operation occurs) name code can
The name code of raw material obtains in the batch bin of the target batch scale when being occurred by obtaining refueling operation, for example, at some
In embodiment, control device is occurred by receiving user by the refueling operation that the input equipment being connected with control device inputs
When the target batch scale batch bin in raw material name code, obtain the target batch scale it is corresponding before kind of raw material title generation
Code;In further embodiments, control device is by identifying the corresponding material name Code Selection sub-interface of the target batch scale
In it is with newly selected name code corresponding before kind of raw material name code, obtain the target batch scale it is corresponding before kind of raw material
Name code;And the consumption of corresponding preceding kind of the raw material of the target batch scale can be obtained by following manner:Obtain the target
The current variable of burden balance subtracts each other variable when refueling operation once occurs before the variable and the target batch scale,
If starting not receive trigger signal to this time between receiving trigger signal since metering, by the variable and
The original measurement value of the target batch scale is subtracted each other, when obtained difference is that this refueling operation occurs, the target batch scale pair
The consumption for the preceding kind of raw material answered, and want to obtain aforementioned difference needs to obtain behaviour of once reloading before the target batch scale
Variable when making, variable when therefore, it is necessary to which refueling operation being occurred every time for the target batch scale is according to behaviour of reloading every time
Make the time occurred correspondence storage.
When it is implemented, according to the time for receiving trigger signal every time, corresponding every target batch scale of storage is matched
Before the process for expecting the consumption of scale number, the name code of preceding kind of raw material and preceding kind of raw material, following step can be first carried out:Often
It is secondary receive trigger signal after, proceeded as follows for each target batch scale:Default by the target batch scale is reloaded
The value of indicating label is configured to;Configure the value of the name code label of default preceding kind of the raw material of the target batch scale to this
When receiving trigger signal in the target batch scale raw material name code;By the name of the default current raw material of the target batch scale
The value of code label is claimed to be configured to the name code that this receives the raw material replaced in the target batch scale after trigger signal;It will
The variable of target batch scale when this receives trigger signal, this receive trigger signal time and the target match
Expect the corresponding storage of burden balance number of scale;Configure the value of the consumption label of default preceding kind of the raw material of the target batch scale to this
The variable of secondary target batch scale when receiving trigger signal with it is preceding it is primary receive trigger signal when the target batch scale
The difference of variable, wherein if to not receiving triggering in this time between receiving trigger signal since metering
Signal, then by the target batch scale it is default before the value of consumption label of kind of raw material be configured to this and receive trigger signal when
The difference of the variable of the target batch scale and the original measurement value of the target batch scale.
As a result, according to the time for receiving trigger signal every time, the corresponding burden balance number for storing every target batch scale,
The process of the name code of preceding kind of raw material and the consumption of preceding kind of raw material, specifically includes:After metering starts, it is by detecting in real time
The default indicating label that reloads that no existence value is yes searches target batch corresponding with the time for receiving trigger signal every time
Scale;After finding target batch scale every time, the value of the name code label of default preceding kind of the raw material of every target batch scale of reading,
The value of the consumption label of kind of raw material and the value of default index tab, the every class value and this that read are received before default
Time of trigger signal corresponds to and stores into the first table, after the completion of storage, i.e., all target batch scales for finding this
Analog value (value of the name code label of kind of raw material before default, it is default before the value of consumption label of kind of raw material and default
The value of index tab) it stores to the first table, by the value of the name code label of default preceding kind of the raw material of all burden balance
Be configured to sky, it is default before the value of consumption label of kind of raw material be configured to 0, the value of the default indicating label that reloads is configured to no.This
Kind realization method, is conducive to other equipment and links with control device, the consumption data of each raw material is presented to difference
User, for use in other analyses.
Further, before metering starts, which further includes:Multigroup label is preset, every burden balance correspond to one
Group label, and a group of labels of every burden balance are associated by the burden balance number of the burden balance.Every burden balance are corresponding
A group of labels include:Index tab, the burden balance, the value of the index tab are preconfigured to the dispensing of the burden balance for identification
Scale is numbered;Reload indicating label, for marking whether the burden balance occur refueling operation, when which occurs refueling operation,
The value of the label is configured to (True), and when which does not occur refueling operation, the value of the label is configured to no
(False);The name code label of preceding kind of raw material, will be replaced when for marking the burden balance that refueling operation occurs every time
The name code of old raw material, when every time refueling operation occurs for the burden balance, the value of the label is configured to this refueling operation hair
The name code for the old raw material that will be replaced when raw;The name code label of current raw material, for indicating that the burden balance are each
The name code that the new raw material replaced after refueling operation occurs, after every time refueling operation occurs for the burden balance, the label
Value is configured to the name code for the new raw material replaced after this refueling operation occurs;The consumption label of preceding kind of raw material, is used for
The consumption for the old raw material that will be replaced when marking the burden balance that refueling operation occurs every time, when the burden balance change every time
When material operation, the value of the label is configured to this variable when occurring refueling operation of the burden balance and preceding primary behaviour of reloading
The difference of variable when making, wherein if to the burden balance in the time between this generation refueling operation since metering
Refueling operation does not occur, then configures the value of the label to variable and the dispensing of burden balance when this occurs refueling operation
The difference of the original measurement value of scale;The total amount consumed label of default raw material, for marking the burden balance to be weighed in Dose times
All raw materials total amount consumed, at the end of metering, the value of the label be configured at the end of metering the variable of the burden balance with
The difference of the original measurement value of the burden balance.
At the end of step 103, metering, according to the metering end time, the corresponding burden balance number for storing every burden balance, when
The name code of preceding raw material and the total amount consumed of raw material.
At the end of metering, the current raw material of every burden balance is the raw material in the burden balance at this time, correspondingly, metering terminates
When, the name code of the current raw material of every burden balance is exactly the name code of raw material in the burden balance at this time, at the end of metering,
The total amount consumed of the raw material of every burden balance refer to metering at the end of the burden balance variable and the burden balance initial meter
The difference of magnitude.
According to the metering end time, the corresponding burden balance number for storing every burden balance, current raw material name code and
Before the total amount consumed of raw material, which further includes:For each burden balance, proceed as follows:By the burden balance
The value of total amount consumed label of default raw material be configured to the initial of variable and the burden balance of the burden balance at the end of metering
The difference of variable.
In conjunction with above-mentioned it is found that according to the metering end time, the burden balance number for storing every burden balance, current raw material are corresponded to
Name code and raw material total amount consumed process, can specifically realize in the following manner:Read the default of every burden balance
The value of the total amount consumed label of raw material, preset current raw material name code label value and default index tab value, will
The each class value read storage corresponding with the metering end time.
Step 104, basis are described according to the time for receiving trigger signal every time, every target batch scale of corresponding storage
Burden balance number, the name code of preceding kind of raw material and the consumption of preceding kind of raw material and described according to the metering end time, it is right
Burden balance number, the total amount consumed of the name code of current raw material and raw material for the every burden balance that should be stored, measure each name
Claim the consumption of the raw material of code.
When it is implemented, the step can be realized in the following manner:For each burden balance, proceed as follows:Sentence
Whether the index number of the burden balance is stored in disconnected first table;If so, disappearing the default raw material of the burden balance
The corresponding total amount consumed of the index number is deposited with first table at the end of the value of consumption total amount label is reconfigured for metering
The difference of the corresponding all consumptions of the index number of storage;Read the total amount consumed label of the default raw material of the burden balance
It is worth, presets the value of the value and default index tab of the name code label of current raw material, by each class value read and metering
End time correspondence is stored into the second table;Data in first table are stored into the second table;According to described
Data in second table measure the consumption of the raw material of each name code.Such realization method is conducive to other equipment and control
The consumption of the raw material of each name code, is presented to different users by device linkage processed, for other subsequent analyses, is fitted
It is more preferable with property.In addition, in a further embodiment, if it is determined that be stored with the index number of the burden balance in the first table, then
The corresponding total amount consumed of the index number is corresponding with the index number stored in first table at the end of calculating metering
The difference of all consumptions, and read the value of the name code label of the default current raw material of the burden balance and default index mark
The value of label corresponding stores the class value read, the difference into the second table with the metering end time;By described first
Data in table are stored into the second table;According to the data in second table, the raw material of each name code is measured
Consumption.Such realization method can without being configured again to the value of the total amount consumed label of the default raw material of burden balance
To accelerate metering rate, measure simpler quick.
Whether the metering method of consumption of raw materials amount provided by the embodiments of the present application receives triggering letter by real-time judge
Number, determine whether burden balance occur refueling operation, and for the every scale that reloads, stored according to the time for generation of reloading every time each
Reload the name code and consumption of former raw material when occurring, and stores every burden balance according to the metering end time and counting
The total flow of all raw materials weighed in the time is measured, later disappearing according to the raw material of the data metering of storage each name code
Consumption, it is more smart for the metering of consumption of raw materials amount to realize the metering to every category raw material of same raw material
Really, applicability is more preferable.
Corresponding with the metering method of consumption of raw materials amount of the application, present invention also provides a kind of meters of consumption of raw materials amount
Measure device.
Referring to Fig. 2, Fig. 2 shows be that the structure of metering device of consumption of raw materials amount provided by the embodiments of the present application a kind of is shown
It is intended to, which includes:
Target batch scale determining module 201, for after metering starts, if receiving burden balance occurs refueling operation
Trigger signal obtains the burden balance number for including in the trigger signal, determines the mesh that refueling operation occurs in more burden balance
Mark burden balance;
First note amount module 202, for according to the time for receiving trigger signal every time, every target batch of corresponding storage
The consumption of the burden balance number of scale, the name code and preceding kind of raw material of preceding kind of raw material;
Second metering module 203, at the end of metering, according to the metering end time, corresponding to every burden balance of storage
Burden balance number, the name code of current raw material and raw material total amount consumed;
Third metering module 204, for, according to the time for receiving trigger signal every time, corresponding to the every of storage according to described
The burden balance number of platform target batch scale, the consumption of the name code of preceding kind of raw material and preceding kind of raw material and described according to metering
End time, burden balance number, the total amount consumed of the name code of current raw material and raw material of every burden balance of corresponding storage,
Measure the consumption of the raw material of each name code.
Further, which further includes:First configuration module 205, for determining mould in the target batch scale
After block 201 receives trigger signal every time, proceeded as follows for each target batch scale:By the pre- of the target batch scale
If the value for the indicating label that reloads is configured to;By the value configuration of the name code label of default preceding kind of the raw material of the target batch scale
When receiving trigger signal for this in target batch scale raw material name code;By the default current original of the target batch scale
The value of the name code label of material is configured to this title for receiving the raw material replaced in the target batch scale after trigger signal
Code;The variable of target batch scale when this is received trigger signal, this receive trigger signal time and
The corresponding storage of burden balance number of the target batch scale;By the value of the consumption label of default preceding kind of the raw material of the target batch scale
Be configured to when this receives trigger signal the variable of the target batch scale with it is preceding it is primary receive trigger signal when the target
The difference of the variable of burden balance, wherein if to not connecing in this time between receiving trigger signal since metering
Receive trigger signal, then by the target batch scale it is default before kind of raw material consumption label value be configured to this receive it is tactile
The difference of the variable of the target batch scale and the original measurement value of target batch scale when signalling.
Further, the first metering module 202 is specifically used for:After metering starts, by detecting whether that existence value is yes in real time
The default indicating label that reloads, search corresponding with the time for receiving trigger signal every time target batch scale;It finds every time
After target batch scale, the value of the name code label of default preceding kind of the raw material of every target batch scale, default preceding kind of raw material are read
Consumption label value and default index tab value, by the every class value and this that read receive trigger signal when
Between correspondence store into the first table, it is after the completion of storage, i.e., the analog value of this all target batch scale found is (default
The value of the name code label of preceding kind of raw material, it is default before kind of raw material consumption label value and default index tab value)
It stores to the first table, configures the value of the name code label of default preceding kind of the raw material of all burden balance to sky, preset
The value of the consumption label of preceding kind of raw material is configured to 0, and the value of the default indicating label that reloads is configured to no.
Further, which further includes:Second configuration module 206 is carried out for being directed to each burden balance
Following operation:Configure the value of the total amount consumed label of the default raw material of the burden balance to the metering of the burden balance at the end of measuring
The difference of value and the original measurement value of the burden balance.
Further, the second metering module 203 is specifically used for:Read the total amount consumed label of the default raw material of every burden balance
Value, preset current raw material name code label value and default index tab value, by each class value read with
Measure end time correspondence storage.
Further, third metering module 204 is specifically used for:For each burden balance, proceed as follows:Described in judgement
Whether the index number of the burden balance is stored in first table;If so, by the total amount consumed of the default raw material of the burden balance
What the value of label was reconfigured for storing in the corresponding total amount consumed of the index number and first table at the end of metering should
The difference of the corresponding all consumptions of index number;It reads the value of the total amount consumed label of the default raw material of the burden balance, preset
The value of the value and default index tab of the name code label of current raw material, by the class value read and metering end time pair
It should store into the second table;Data in first table are stored into the second table;According in second table
Data, measure the consumption of the raw material of each name code.
Metering device provided in this embodiment can realize each step in above-mentioned metering method embodiment, reach corresponding
Technique effect can be to same raw material when being measured to consumption of raw materials amount using metering device provided in this embodiment
It is measured per the consumption of category raw material, metering is more accurate, and applicability is more preferable.
In the specific implementation, the present invention also provides a kind of computer storage medias, wherein the computer storage media can store
Have program, the program execute when may include consumption of raw materials amount provided by the invention metering method each embodiment in part or
Overall Steps.The storage medium can be magnetic disc, CD, read-only memory (English:Read-only memory, letter
Claim:ROM) or random access memory is (English:Random access memory, referred to as:RAM) etc..
It is required that those skilled in the art can be understood that the technology in the embodiment of the present invention can add by software
The mode of general hardware platform realize.Based on this understanding, the technical solution in the embodiment of the present invention substantially or
Say that the part that contributes to existing technology can be expressed in the form of software products, which can deposit
Storage is in storage medium, such as ROM/RAM, magnetic disc, CD, including some instructions are used so that computer equipment (can be with
Be personal computer, server either network equipment etc.) execute certain part institutes of each embodiment of the present invention or embodiment
The method stated.
The same or similar parts between the embodiments can be referred to each other in this specification.Especially for consumption of raw materials
For the metering device embodiment of amount, since it is substantially similar to the method embodiment, so description is fairly simple, related place
Referring to the explanation in embodiment of the method.
Invention described above embodiment is not intended to limit the scope of the present invention..
Claims (12)
1. a kind of metering method of consumption of raw materials amount, which is characterized in that including:
After metering starts, if receiving the trigger signal that refueling operation occurs for burden balance, obtains in the trigger signal and include
Burden balance number, determine in more burden balance occur refueling operation target batch scale;
According to the time for receiving trigger signal every time, the corresponding burden balance number for storing every target batch scale, preceding kind of raw material
Name code and preceding kind of raw material consumption;
At the end of metering, according to the metering end time, corresponding burden balance number, the title of current raw material for storing every burden balance
The total amount consumed of code and raw material;
According to described according to the time for receiving trigger signal every time, the burden balance of every target batch scale of corresponding storage are compiled
Number, the consumption of the name code of preceding kind of raw material and preceding kind of raw material and described according to the metering end time, corresponding storage it is every
Burden balance number, the total amount consumed of the name code of current raw material and raw material of platform burden balance, measure the original of each name code
The consumption of material.
2. metering method as described in claim 1, which is characterized in that corresponding according to the time for receiving trigger signal every time
Store the consumption of the burden balance number of every target batch scale, the name code of preceding kind of raw material and preceding kind of raw material process it
Before, which further includes:
After receiving trigger signal every time, proceeded as follows for each target batch scale:
The value of the default indicating label that reloads of the target batch scale is configured to;
By the target batch scale it is default before the value of name code label of kind of raw material be configured to this and receive trigger signal when
The name code of raw material in the target batch scale;
The value of the name code label of the default current raw material of the target batch scale is configured after this receives trigger signal to
The name code for the raw material replaced in the target batch scale;
The variable of target batch scale when this is received trigger signal, this receive trigger signal time and should
The corresponding storage of burden balance number of target batch scale;
Configuring the value of the consumption label of default preceding kind of the raw material of the target batch scale to should when this receives trigger signal
The variable of target batch scale with it is preceding it is primary receive trigger signal when the target batch scale variable difference, wherein such as
Fruit does not receive trigger signal in the time since metering to this between receiving trigger signal, then by the target batch scale
It is default before the value of consumption label of kind of raw material be configured to the variable of target batch scale when this receives trigger signal
With the difference of the original measurement value of the target batch scale.
3. metering method as claimed in claim 2, which is characterized in that corresponding according to the time for receiving trigger signal every time
Store the process of the consumption of the burden balance number of every target batch scale, the name code of preceding kind of raw material and preceding kind of raw material, tool
Body includes:
After metering starts, by detecting whether the default indicating label that reloads that existence value is yes in real time, searching and receiving every time
The time corresponding target batch scale of trigger signal;
After finding target batch scale every time, the name code label of default preceding kind of the raw material of every target batch scale is read
It is worth, the value of the value of the consumption label of default preceding kind of raw material and default index tab, the every class value and this that read is connect
The time correspondence for receiving trigger signal is stored into the first table, after the completion of storage, by default preceding kind of the raw material of all burden balance
The value of name code label be configured to sky, it is default before the value of consumption label of kind of raw material be configured to 0, the default indicateing arm that reloads
The value of label is configured to no.
4. metering method as claimed in claim 3, which is characterized in that according to metering end time, every dispensing of corresponding storage
Before the burden balance number of scale, the total amount consumed of the name code of current raw material and raw material, which further includes:
For each burden balance, proceed as follows:
By the value of the total amount consumed label of the default raw material of the burden balance be configured to metering at the end of the burden balance variable with
The difference of the original measurement value of the burden balance.
5. metering method as claimed in claim 4, which is characterized in that according to metering end time, every dispensing of corresponding storage
Burden balance number, the process of the total amount consumed of the name code of current raw material and raw material of scale, specifically include:
Read the value of the total amount consumed label of the default raw material of every burden balance, the value for the name code label for presetting current raw material
And the value of default index tab, by each class value read storage corresponding with the metering end time.
6. metering method as claimed in claim 5, which is characterized in that according to it is described according to receive every time trigger signal when
Between, the burden balance number of every target batch scale of corresponding storage, preceding kind of raw material name code and preceding kind of raw material consumption
And it is described according to metering end time, the burden balance number of every burden balance of corresponding storage, the name code of current raw material
With the total amount consumed of raw material, the process of the consumption of the raw material of each name code is measured, is specifically included:
For each burden balance, proceed as follows:
Judge the index number that the burden balance whether are stored in first table;
If so, the index is compiled at the end of the value of the total amount consumed label of the default raw material of the burden balance is reconfigured for metering
The difference of number corresponding total amount consumed all consumptions corresponding with the index number stored in first table;
Read the total amount consumed label of the default raw material of the burden balance value, preset current raw material name code label value and
The value of default index tab is stored the class value read is corresponding with the end time is measured into the second table;
Data in first table are stored into the second table;
According to the data in second table, the consumption of the raw material of each name code is measured.
7. a kind of metering device of consumption of raw materials amount, which is characterized in that including:
Target batch scale determining module, for after metering starts, if receiving the triggering letter that refueling operation occurs for burden balance
Number, the burden balance number for including in the trigger signal is obtained, determines the target batch that refueling operation occurs in more burden balance
Scale;
First note amount module, for according to the time for receiving trigger signal every time, corresponding every target batch scale of storage to be matched
Expect scale number, preceding kind of raw material name code and preceding kind of raw material consumption;
Second metering module, at the end of metering, according to the metering end time, corresponding to the burden balance of every burden balance of storage
Number, the total amount consumed of the name code of current raw material and raw material;
Third metering module, for, according to the time for receiving trigger signal every time, corresponding to every target of storage according to described
The burden balance number of burden balance, the name code of preceding kind of raw material and preceding kind of raw material consumption and it is described according to metering at the end of
Between, burden balance number, the total amount consumed of the name code of current raw material and raw material of every burden balance of corresponding storage, metering is often
The consumption of the raw material of kind name code.
8. metering device as claimed in claim 7, which is characterized in that further include:First configuration module, in the target
After burden balance determining module receives trigger signal every time, proceeded as follows for each target batch scale:
The value of the default indicating label that reloads of the target batch scale is configured to;
By the target batch scale it is default before the value of name code label of kind of raw material be configured to this and receive trigger signal when
The name code of raw material in the target batch scale;
The value of the name code label of the default current raw material of the target batch scale is configured after this receives trigger signal to
The name code for the raw material replaced in the target batch scale;
The variable of target batch scale when this is received trigger signal, this receive trigger signal time and should
The corresponding storage of burden balance number of target batch scale;
Configuring the value of the consumption label of default preceding kind of the raw material of the target batch scale to should when this receives trigger signal
The variable of target batch scale with it is preceding it is primary receive trigger signal when the target batch scale variable difference, wherein such as
Fruit does not receive trigger signal in the time since metering to this between receiving trigger signal, then by the target batch scale
It is default before the value of consumption label of kind of raw material be configured to the variable of target batch scale when this receives trigger signal
With the difference of the original measurement value of the target batch scale.
9. metering device as claimed in claim 8, which is characterized in that first metering module is specifically used for:
After metering starts, by detecting whether the default indicating label that reloads that existence value is yes in real time, searching and receiving every time
The time corresponding target batch scale of trigger signal;
After finding target batch scale every time, the name code label of default preceding kind of the raw material of every target batch scale is read
It is worth, the value of the value of the consumption label of default preceding kind of raw material and default index tab, the every class value and this that read is connect
The time correspondence for receiving trigger signal is stored into the first table, after the completion of storage, by default preceding kind of the raw material of all burden balance
The value of name code label be configured to sky, it is default before the value of consumption label of kind of raw material be configured to 0, the default indicateing arm that reloads
The value of label is configured to no.
10. metering device as claimed in claim 9, which is characterized in that further include:
Second configuration module is proceeded as follows for being directed to each burden balance:
By the value of the total amount consumed label of the default raw material of the burden balance be configured to metering at the end of the burden balance variable with
The difference of the original measurement value of the burden balance.
11. metering device as claimed in claim 10, which is characterized in that the second metering module is specifically used for:
Read the value of the total amount consumed label of the default raw material of every burden balance, the value for the name code label for presetting current raw material
And the value of default index tab, by each class value read storage corresponding with the metering end time.
12. metering device as claimed in claim 11, which is characterized in that the third metering module is specifically used for:
For each burden balance, proceed as follows:
Judge the index number that the burden balance whether are stored in first table;
If so, the index is compiled at the end of the value of the total amount consumed label of the default raw material of the burden balance is reconfigured for metering
The difference of number corresponding total amount consumed all consumptions corresponding with the index number stored in first table;
Read the total amount consumed label of the default raw material of the burden balance value, preset current raw material name code label value and
The value of default index tab is stored the class value read is corresponding with the end time is measured into the second table;
Data in first table are stored into the second table;
According to the data in second table, the consumption of the raw material of each name code is measured.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119461.4A CN108534879B (en) | 2017-03-02 | 2017-03-02 | Method and device for metering raw material consumption |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119461.4A CN108534879B (en) | 2017-03-02 | 2017-03-02 | Method and device for metering raw material consumption |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108534879A true CN108534879A (en) | 2018-09-14 |
CN108534879B CN108534879B (en) | 2019-12-27 |
Family
ID=63488916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710119461.4A Active CN108534879B (en) | 2017-03-02 | 2017-03-02 | Method and device for metering raw material consumption |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108534879B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111609906A (en) * | 2020-06-02 | 2020-09-01 | 上海凯宝健康科技有限公司 | Weighing device management system and method |
CN112335930A (en) * | 2020-12-07 | 2021-02-09 | 云南昆船电子设备有限公司 | Method for counting single-class tobacco shred consumption of tobacco feeder of cigarette factory and storage medium |
CN113939717A (en) * | 2019-09-17 | 2022-01-14 | 休特林有限责任公司 | Method for dosing target components |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04225121A (en) * | 1990-12-27 | 1992-08-14 | Tsukishima Kikai Co Ltd | Method and apparatus for measuring many kinds of materials in broad range |
US6776561B1 (en) * | 2003-11-28 | 2004-08-17 | Neng-Kuei Yeh | Materials collecting apparatus with weighing and vacuum sucking functions |
CN102213610A (en) * | 2011-04-13 | 2011-10-12 | 山西太钢不锈钢股份有限公司 | Automatic weighing method and device for various materials |
CN202734940U (en) * | 2012-09-07 | 2013-02-13 | 郑州新水工机械有限公司 | Material superposed-metering device |
CN103076071A (en) * | 2013-01-18 | 2013-05-01 | 莱芜钢铁集团有限公司 | Control method and control system applied to belt weighers |
CN104406666A (en) * | 2014-11-13 | 2015-03-11 | 甘肃酒钢集团宏兴钢铁股份有限公司 | Belt scale material feed metering control device and control method thereof |
CN105092002A (en) * | 2015-07-28 | 2015-11-25 | 正将自动化设备(江苏)有限公司 | Miniature formula metering device |
CN105953882A (en) * | 2016-06-03 | 2016-09-21 | 北京智衡物联科技有限公司 | Weighing system |
CN205826102U (en) * | 2016-06-03 | 2016-12-21 | 北京智衡物联科技有限公司 | A kind of weighing system |
CN106282545A (en) * | 2015-06-01 | 2017-01-04 | 中钢设备有限公司 | The method for handover control of stockpile and device in iron ore powder sintering |
-
2017
- 2017-03-02 CN CN201710119461.4A patent/CN108534879B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04225121A (en) * | 1990-12-27 | 1992-08-14 | Tsukishima Kikai Co Ltd | Method and apparatus for measuring many kinds of materials in broad range |
US6776561B1 (en) * | 2003-11-28 | 2004-08-17 | Neng-Kuei Yeh | Materials collecting apparatus with weighing and vacuum sucking functions |
CN102213610A (en) * | 2011-04-13 | 2011-10-12 | 山西太钢不锈钢股份有限公司 | Automatic weighing method and device for various materials |
CN202734940U (en) * | 2012-09-07 | 2013-02-13 | 郑州新水工机械有限公司 | Material superposed-metering device |
CN103076071A (en) * | 2013-01-18 | 2013-05-01 | 莱芜钢铁集团有限公司 | Control method and control system applied to belt weighers |
CN104406666A (en) * | 2014-11-13 | 2015-03-11 | 甘肃酒钢集团宏兴钢铁股份有限公司 | Belt scale material feed metering control device and control method thereof |
CN106282545A (en) * | 2015-06-01 | 2017-01-04 | 中钢设备有限公司 | The method for handover control of stockpile and device in iron ore powder sintering |
CN105092002A (en) * | 2015-07-28 | 2015-11-25 | 正将自动化设备(江苏)有限公司 | Miniature formula metering device |
CN105953882A (en) * | 2016-06-03 | 2016-09-21 | 北京智衡物联科技有限公司 | Weighing system |
CN205826102U (en) * | 2016-06-03 | 2016-12-21 | 北京智衡物联科技有限公司 | A kind of weighing system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113939717A (en) * | 2019-09-17 | 2022-01-14 | 休特林有限责任公司 | Method for dosing target components |
CN111609906A (en) * | 2020-06-02 | 2020-09-01 | 上海凯宝健康科技有限公司 | Weighing device management system and method |
CN112335930A (en) * | 2020-12-07 | 2021-02-09 | 云南昆船电子设备有限公司 | Method for counting single-class tobacco shred consumption of tobacco feeder of cigarette factory and storage medium |
CN112335930B (en) * | 2020-12-07 | 2022-04-08 | 云南昆船电子设备有限公司 | Method for counting single-class tobacco shred consumption of tobacco feeder of cigarette factory and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN108534879B (en) | 2019-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108534879A (en) | A kind of metering method and device of consumption of raw materials amount | |
CN101506631B (en) | Electronic balance | |
US20100164895A1 (en) | Apparatus and method for performing scroll function in portable terminal | |
CA2653907C (en) | A system and a method for managing sample test results and respective sample result context information | |
CN102253287A (en) | LABview-based method for measuring temperature-resistivity | |
CN101226402A (en) | Method and apparatus for detecting airplane digital type fuel oil measurement control system | |
US7289802B2 (en) | Communication terminal performance measurement system having effective trace information display function and communication terminal performance measurement method | |
CN111198942A (en) | Data analysis report generation method and device, mobile terminal and storage medium | |
CN109815403A (en) | A kind of screening sample method and device | |
CN106156111A (en) | Patent document search method, device and system | |
CN107316156A (en) | Data processing method, device, server and storage medium | |
CN101839930B (en) | A kind of have the measurement apparatus of configuration file management function, system and configuration file copying method | |
CN101419531A (en) | Character input method and device in computer | |
CN110442852B (en) | Target cost compiling method, storage medium and intelligent terminal thereof | |
CN102999604B (en) | The detection method and device of a kind of database performance | |
CN206671117U (en) | Material kind device for identifying | |
CN111596045B (en) | Reagent information management method, sample analyzer, and storage medium | |
CN103176017A (en) | Oscilloscope, configuring device and configuring method thereof | |
CN112116314B (en) | Sample weighing data management system | |
CN106527889B (en) | Method and device for quickly positioning list entries | |
EP3822761B1 (en) | Display for an electronic measurement device | |
CN106021218A (en) | Word processing method and device | |
CN109857927A (en) | User's recommended method, device, computer equipment and computer readable storage medium | |
CN106289341A (en) | A kind of measuring instrument with message notifying function | |
CN104635592A (en) | Resistance output instrument, testing system and method for outputting different resistance values |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |