CN108330837B - Set up the construction method of girder steel - Google Patents

Set up the construction method of girder steel Download PDF

Info

Publication number
CN108330837B
CN108330837B CN201810112644.8A CN201810112644A CN108330837B CN 108330837 B CN108330837 B CN 108330837B CN 201810112644 A CN201810112644 A CN 201810112644A CN 108330837 B CN108330837 B CN 108330837B
Authority
CN
China
Prior art keywords
floating body
girder steel
bracket
water
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810112644.8A
Other languages
Chinese (zh)
Other versions
CN108330837A (en
Inventor
向敏
杨从娟
张亚磊
王念辉
李甜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Tiedao University
Original Assignee
Shijiazhuang Tiedao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Tiedao University filed Critical Shijiazhuang Tiedao University
Priority to CN201810112644.8A priority Critical patent/CN108330837B/en
Publication of CN108330837A publication Critical patent/CN108330837A/en
Application granted granted Critical
Publication of CN108330837B publication Critical patent/CN108330837B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of construction methods for setting up girder steel, belong to technical field of bridge construction, with at floating body transportation by driving to temporary rest pier after bracket assembly, water filling makes floating body sink in floating body, bracket is fallen on temporary rest pier, withdraw from floating body, then girder steel is installed on bracket, after steel girder erection, girder steel is lifted with support device, it is separated with bracket, floating body is dragged under bracket, extraction water makes floating body float, it holds up bracket and is detached from temporary rest pier, and at transportation by driving bracket to next steel bridge construction, the construction method provided by the invention for setting up girder steel, floating body can simple and fast realization rise and fall movement, bracket is transported into interim bridge pier by floating body, bracket is moved to another operating point with floating body after erection girder steel, continue to use bracket, this mode simplifies the course of work for setting up girder steel, it improves and sets up girder steel Stability.

Description

Set up the construction method of girder steel
Technical field
The invention belongs to technical field of bridge construction, are to be related to a kind of construction method for setting up girder steel more specifically.
Background technique
Steel bridge because its rigidity is big, the construction period is short, be easy to the features such as repairing due to built extensively, in water set up girder steel it is normal With method has dilatory method to set a roof beam in place, raft support method is set a roof beam in place, Floating Method is set a roof beam in place.Wherein, it is longer to draw method construction period;Man Tangzhi Frame assembly girder steel, needs to be arranged between spanning temporary rest pier, such as squeezes into multirow steel tubes stake, and need to repeatedly beat and pull out steel-pipe pile and dismounting Bracket, falsework are costly;Floating Method, which is set a roof beam in place, to be needed to lift girder steel into certain altitude, and stability not can guarantee.
Summary of the invention
The purpose of the present invention is to provide a kind of construction methods for setting up girder steel, are applied with solving erection girder steel in the prior art The technical problem that work is cumbersome, stability is poor.
To achieve the above object, the technical solution adopted by the present invention is that: provide it is a kind of set up girder steel construction method, including Four bridge piers are set needing to set up at girder steel, temporary rest pier, each temporary rest pier are respectively set on the inside of each bridge pier On be equipped with bearing beam, the temporary rest pier stretches out the water surface;
Floating body is assembled into using buoyancy tank, the assembling support on the floating body passes through the assembled good bracket described floating Body transportation by driving is between the temporary rest pier;
The bracket is connect with the bearing beam, water filling in Xiang Suoshu buoyancy tank, the floating body sinks, and falls in the bracket On the bearing beam;
After the floating body is separated with the bracket, the floating body is removed, is placed on the bracket and the bridge pier more A temporary support, the upper end surface of each temporary support is in same plane;
The girder steel is supported on the temporary support;
The girder steel is propped by support device, removes the temporary support, and the floating body is moved to the branch Below frame;
Remove the connection between the bracket and the bearing beam, extract the water in the buoyancy tank out, make the floating body float to Hold up the bracket;
The floating body and the bracket are removed to subsequent work point, permanent support is installed on the bridge pier, makes the steel Beam is fixedly connected with the bridge pier, and removes the support device.
Further, the bracket is connect with the bearing beam, water filling in Xiang Suoshu buoyancy tank, the floating body sinks, and makes institute It states bracket to fall on the bearing beam, water filling is symmetrical arranged more by the way of symmetrical flooding on floating body in Xiang Suoshu buoyancy tank A water pumper, water pumper extract in the water injection buoyancy tank in river, start each water pumper when water filling simultaneously.
Further, the connection between the bracket and the bearing beam is removed, extracts the water in the buoyancy tank out, is made described floating Body floats to holding up in the bracket, extracts the water in the buoyancy tank out by the way of symmetrically drawing water.
Further, the floating body is equipped with multiple symmetrically placed water pumps.
Further, after the floating body is separated with the bracket, after the floating body is removed, use the floating body as institute The pre-splicing field of girder steel is stated, crane barge waterborne one assembled first and crane barge waterborne two, the crane barge one waterborne lift the list of the girder steel A rod piece, the crane barge two waterborne lifts pre-splicing good rod piece group, and is hung on the bracket.
Further, the support device includes more jack, and each jack is symmetrically mounted on the girder steel Lower section jacks up the girder steel, is detached from the girder steel and the temporary support.
Further, the support device further includes the control module with each jack connection.
Further, the floating body is equipped with the positioning for measuring the floating body and the temporary rest pier positional relationship and fills It sets.
Further, the safety net of the girder steel being surrounded by for protecting worker safety.
Further, the floating body is equipped with multiple for transporting returning for the defective work generated during the erection girder steel Receive case.
The beneficial effect of the construction method provided by the invention for setting up girder steel is: compared with prior art, frame of the present invention If the construction method of girder steel, floating body can simple and fast realization rise and fall movement, by using floating body by bracket transportation by driving to bearing beam On, and so that floating body is sunk using filling the water into floating body, while floating intracorporal water by extraction, increase floating body, and bracket is moved Continue to use bracket to another operating point out, this mode simplifies the course of work for setting up girder steel, improves work Stability.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is to indulge bridge direction view after the first step of the construction method provided in an embodiment of the present invention for setting up girder steel is constructed;
Fig. 2 is to indulge bridge direction view after the second step of the construction method provided in an embodiment of the present invention for setting up girder steel is constructed;
Fig. 3 is to indulge bridge direction view after the third step of the construction method provided in an embodiment of the present invention for setting up girder steel is constructed;
Fig. 4 is to indulge bridge direction view after the 4th step of the construction method provided in an embodiment of the present invention for setting up girder steel is constructed;
Fig. 5 is to indulge bridge direction view after the 5th step of the construction method provided in an embodiment of the present invention for setting up girder steel is constructed;
Fig. 6 is to indulge bridge direction view after the 6th step of the construction method provided in an embodiment of the present invention for setting up girder steel is constructed;
Fig. 7 is to indulge bridge direction view after the 7th step of the construction method provided in an embodiment of the present invention for setting up girder steel is constructed;
Fig. 8 is to indulge bridge direction view after the 8th step of the construction method provided in an embodiment of the present invention for setting up girder steel is constructed.
Wherein, each appended drawing reference in figure:
1- bridge pier;2- temporary rest pier;3- bearing beam;4- bracket;5- floating body;6- temporary support;7- girder steel;8- jack;9- Permanent support.
Specific embodiment
In order to which technical problems, technical solutions and advantages to be solved are more clearly understood, tie below Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only To explain the present invention, it is not intended to limit the present invention.
It should be noted that it can be directly another when element is referred to as " being fixed on " or " being set to " another element On one element or indirectly on another element.When an element is known as " being connected to " another element, it can To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" "inner", "outside" is that orientation based on the figure or position are closed System, is merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning must have Specific orientation is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.In the description of the present invention, the meaning of " plurality " is two or more, Unless otherwise specifically defined.
Also referring to Fig. 1 to Fig. 8, now the construction method provided by the invention for setting up girder steel is illustrated.A kind of frame If the construction method of girder steel, four bridge piers 1 are set needing to set up at girder steel 7, temporary rest pier is respectively set on the inside of each bridge pier 1 2, bearing beam 3 is placed on temporary rest pier 2, temporary rest pier 2 stretches out the water surface;
Floating body 5 is formed using buoyancy tank assembly, then the assembling support 4 on floating body 5, assembled good bracket 4 is passed through into floating body 5 Transportation by driving is between temporary rest pier 2;
Bracket 4 is connect with bearing beam 3, is filled the water into buoyancy tank, floating body 5 sinks, and bracket 4 is fallen on bearing beam 3;
After floating body 5 is separated with bracket 4, floating body 5 is removed, multiple temporary supports 6 are placed on bracket 4 and bridge pier 1, are respectively faced When support 6 upper end surface in same plane;
Girder steel 7 is supported on temporary support 6;
Girder steel 7 after the installation is completed, by support device props girder steel 7, removes temporary support 6, and floating body 5 is moved to 4 lower section of bracket;
The water in buoyancy tank is extracted in connection between striking 4 and bearing beam 3 out, floats floating body 5 to picking-up bracket 4;
Floating body 5 and bracket 4 are removed to subsequent work point, permanent support 9 is installed in the bottom surface of girder steel 7, makes girder steel 7 and bridge pier 1 is fixedly connected, and removes support device.
It is provided by the invention set up girder steel construction method, compared with prior art, by floating body 5 by 4 transportation by driving of bracket extremely Temporary rest pier 2, and injecting water ballast into floating body 5 makes floating body 5 sink, and is placed in bracket 4 is stable on temporary rest pier 2, in steel After the completion of beam 7 is set up, by extracting water ballast out floating body 5, increase floating body 5, bracket 4 is removed, and bracket 4 is transported to down One operating point, this stability in such a way that floating body 5 transports bracket 4 is high, and strong operability avoids the erection work of girder steel 7 Cumbersome repetition dismounts work, while solving the problems, such as that Floating Method sets up girder steel 7 stability difference and to fall elevation difference beam big.
When setting up girder steel 7, it can choose damp flood tide and ebb tide realized the rising of floating body 5 and fallen, and then to control The disengaging temporary rest pier 2 of bracket 4, which is perhaps fallen on temporary rest pier 2, does not need that floating body 5 is drawn water or filled the water, and alleviates floating The weight bearing of body 5 makes the more flexible carry out transport of floating body 5, improves the working efficiency of floating body 5, also reduces production cost. This method whether there is or not the rivers of tidal range, shallow sea can be used, also extend in the erection of continuous beam.
Further, Fig. 1 to Fig. 8 is please referred to, one kind as the construction method provided by the invention for setting up girder steel is specific Bracket 4 connect with bearing beam 3, fills the water into buoyancy tank by embodiment, and floating body 5 sinks, and bracket 4 is fallen on bearing beam 3, to buoyancy tank Interior water filling is symmetrical arranged multiple same model water pumpers by the way of symmetrical flooding on floating body 5, and water pumper extracts in river Water injects in buoyancy tank, starts each water pumper simultaneously when water filling, and after bracket 4 is fallen on bearing beam 3, holding is drawn water continuation machine operation one The section time is simultaneously stopped each water pumper, using the side of symmetrical flooding after so that bracket 4 and floating body 5 is completely separated and is had certain distance Formula declines floating body 5 smoothly, and then bracket 4 is smoothly fallen on temporary rest pier 2, reduce due to bracket 4 decline it is unstable and Cause bracket 4 that skew occurs relative to temporary rest pier 2, even results in bracket 4 and fall into the water.
Further, Fig. 1 to Fig. 8 is please referred to, one kind as the construction method provided by the invention for setting up girder steel is specific The water in buoyancy tank is extracted in embodiment, the connection between striking 4 and bearing beam 3 out, floats floating body 5 into picking-up bracket 4, The water in buoyancy tank is extracted out by the way of symmetrically drawing water, multiple same model water pumpers are symmetrical arranged on floating body 5, book machine is taken out and extracts Water in buoyancy tank is evacuated in river, when drawing water, while starting each water pumper, and after floating body 5 holds up bracket 4, water pumper is continued to run For a period of time, make bracket 4 and after bearing beam 3 is completely separated and has certain distance, be simultaneously stopped each water pumper, using symmetric mode from It draws water in buoyancy tank, guarantees that the upper surface of floating body 5 is in stable state, the contact stable with bracket 4 of floating body 5 always, and will prop up Frame 4 is held up, and bracket 4 is finally transported to subsequent work point, the case where making a fault this approach reduces the course of work, makes frame If 7 work safety of girder steel is rapidly performed by.
Further, Fig. 1 to Fig. 8 is please referred to, one kind as the construction method provided by the invention for setting up girder steel is specific Embodiment, floating body 5 be equipped with multiple symmetrically placed water pumps or water pumper, since floating body 5 is larger, if only one jiao into Row take out water ballast perhaps infuse water ballast will lead to floating body 5 occur skew bracket 4 decline or jack-up bracket 4 it is unstable, in floating body Multiple water pumps are symmetrically used on 5, and perhaps water pumper rises or declines to guarantee that floating body 5 remains horizontal.
Further, Fig. 1 to Fig. 8 is please referred to, one kind as the construction method provided by the invention for setting up girder steel is specific Embodiment after floating body 5 is separated with bracket 4, after floating body 5 is removed, uses floating body 5 as the pre-splicing field of girder steel 7, assembled first Crane barge one and crane barge waterborne two waterborne on the single rod piece to floating body 5 of one hoisting steel beam 7 of crane barge waterborne, are spelled on floating body 5 Rod piece group is dressed up, crane barge two waterborne lifts pre-splicing good rod piece group, and is hung on bracket 4, and floating body 5 is both used as a transport work Tool, it is also as the pre-splicing field of girder steel 7, component needed for girder steel 7 is assembled good on floating body 5, it is directly transported on bracket 4.Point Not Zu Zhuan two crane barges waterborne, be respectively intended to lifting and need the assembled assembled good rod piece group of single rod piece and lifting, improve work Make efficiency.
Further, Fig. 1 to Fig. 8 is please referred to, one kind as the construction method provided by the invention for setting up girder steel is specific Embodiment, support device include more jack 8, and girder steel 7 is jacked up, made by the bottom surface that each jack 8 is symmetrically mounted on girder steel 7 Girder steel 7 and temporary support 6 are detached from, and 8 small volume of jack flexibly can be moved and be installed, jack 8 is symmetrically arranged on The tetrapod of girder steel 7 or four side bottoms, make 7 uniform force of girder steel, and stable rising avoids occurring due to unbalance stress Skew, or even collapse.
Further, Fig. 1 to Fig. 8 is please referred to, one kind as the construction method provided by the invention for setting up girder steel is specific Embodiment, support device further include having control module with each 8 connection of jack, are being jacked up girder steel 7 using jack 8 During, it is ensured that each jack 8 rises simultaneously, and the rate of climb is identical, and manual control is inaccurate, by each jack 8 Connect with control module, jack 8 controlled by control module, reach each jack 8 it is stable support girder steel 7.
Further, Fig. 1 to Fig. 8 is please referred to, one kind as the construction method provided by the invention for setting up girder steel is specific Embodiment, floating body 5 are equipped with the positioning device for determining floating body 5 Yu 2 positional relationship of temporary rest pier, bracket 4 are placed on It needs more accurately to position on temporary rest pier 2, it is time saving and energy saving to reduce excessive personnel's handling work, accelerate working efficiency, Floating body 5 is used as handbarrow, and positioning device is arranged on floating body 5, and precise positioning may be implemented, and guarantees that bracket 4 can be smoothly It is placed on girder steel 7.Positioning device can also be set on bracket 4.
Further, Fig. 1 to Fig. 8 is please referred to, one kind as the construction method provided by the invention for setting up girder steel is specific Embodiment, the safety net of girder steel 7 being surrounded by for protecting worker safety, when setting up girder steel 7, often building ring Border is poor, and the safety problem that girder steel 7 just needs to consider staff is set up on river, and safety net is arranged in the surrounding of girder steel 7 The security risk of staff can be effectively reduced, even if staff falls down from girder steel 7, will not be fallen into water, But fall on safety net, protection staff preserves from.
Further, Fig. 1 to Fig. 8 is please referred to, one kind as the construction method provided by the invention for setting up girder steel is specific Embodiment, floating body 5 is equipped with the recycling bins of multiple defective works that is used to transport and generate during erection girder steel 7, in floating body 5 Multiple recycling bins are arranged in two sides, and the discarded material generated during a few thing, rubbish and other items are transported back on the bank in time, subtracted Few pollution to environment, decreases the occupied space of these defective works, increases the working range of staff, improves work Make efficiency.
The above is merely preferred embodiments of the present invention, be not intended to limit the invention, it is all in spirit of the invention and Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within principle.

Claims (10)

1. a kind of construction method for setting up girder steel characterized by comprising
Four bridge piers are set needing to set up at girder steel, temporary rest pier is respectively set on the inside of each bridge pier, it is each described interim Bearing beam is equipped on buttress, the temporary rest pier stretches out the water surface;
Floating body is assembled into using buoyancy tank, the assembling support on the floating body floats the assembled good bracket by the floating body It is transported between the temporary rest pier;
The bracket is connect with the bearing beam, water filling in Xiang Suoshu buoyancy tank, the floating body sinks, and falls in the bracket described On bearing beam;
After the floating body is separated with the bracket, the floating body is removed, places multiple face on the bracket and the bridge pier When support, the upper end surface of each temporary support is in same plane;
The girder steel is supported on the temporary support;
The girder steel is propped by support device, removes the temporary support, and the floating body is moved under the bracket Side;
The connection between the bracket and the bearing beam is removed, extracts the water in the buoyancy tank out, floats the floating body to picking-up The bracket;
The floating body and the bracket are removed to subsequent work point, permanent support is installed on the bridge pier, make the girder steel with The bridge pier is fixedly connected, and removes the support device.
2. setting up the construction method of girder steel as described in claim 1, it is characterised in that: connect the bracket and the bearing beam It connects, water filling in Xiang Suoshu buoyancy tank, the floating body sinks, and falls in the bracket on the bearing beam, water filling in Xiang Suoshu buoyancy tank By the way of symmetrical flooding, multiple water pumpers are symmetrical arranged on floating body, water pumper extracts in the water injection buoyancy tank in river, Start each water pumper when water filling simultaneously.
3. setting up the construction method of girder steel as claimed in claim 2, it is characterised in that: remove the bracket and the bearing beam it Between connection, extract the water in the buoyancy tank out, float the floating body to holding up in the bracket, extract the water in the buoyancy tank out By the way of symmetrically drawing water.
4. setting up the construction method of girder steel as described in claim 1, it is characterised in that: the floating body is symmetrically put equipped with multiple The water pump set.
5. setting up the construction method of girder steel as described in claim 1, it is characterised in that: the floating body is separated with the bracket Afterwards, the floating body will be used as the pre-splicing field of the girder steel after the floating body removes, crane barge waterborne one assembled first and waterborne Crane barge two, the crane barge one waterborne lift the single rod piece of the girder steel, and the crane barge two waterborne lifts pre-splicing good rod piece group, And it is hung on the bracket.
6. setting up the construction method of girder steel as described in claim 1, it is characterised in that: the support device includes more very heavy Top, the lower section that each jack is symmetrically mounted on the girder steel jack up the girder steel, make the girder steel and the interim branch Seat is detached from.
7. setting up the construction method of girder steel as claimed in claim 6, it is characterised in that: the support device further includes and each institute State the control module of jack connection.
8. setting up the construction method of girder steel as described in claim 1, it is characterised in that: the floating body is equipped with for measuring State the positioning device of floating body Yu the temporary rest pier positional relationship.
9. setting up the construction method of girder steel as described in claim 1, it is characterised in that: the girder steel is surrounded by for protecting Protect the safety net of worker safety.
10. such as the construction method of the described in any item erection girder steels of claim 1-9, it is characterised in that: the floating body is equipped with more It is a to be used to transport the recycling bins for setting up the defective work that the girder steel generates in the process.
CN201810112644.8A 2018-02-05 2018-02-05 Set up the construction method of girder steel Active CN108330837B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810112644.8A CN108330837B (en) 2018-02-05 2018-02-05 Set up the construction method of girder steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810112644.8A CN108330837B (en) 2018-02-05 2018-02-05 Set up the construction method of girder steel

Publications (2)

Publication Number Publication Date
CN108330837A CN108330837A (en) 2018-07-27
CN108330837B true CN108330837B (en) 2019-11-05

Family

ID=62926911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810112644.8A Active CN108330837B (en) 2018-02-05 2018-02-05 Set up the construction method of girder steel

Country Status (1)

Country Link
CN (1) CN108330837B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978486B (en) * 2018-09-14 2024-01-30 苏交科集团股份有限公司 Automatic beam falling device and construction method thereof
CN111411587A (en) * 2019-09-27 2020-07-14 张家港宏昌钢板有限公司 Method for erecting large-span steel structure gallery bridge by utilizing tidal range
CN113774936A (en) * 2021-09-23 2021-12-10 中铁十一局集团第一工程有限公司 Floating transportation, positioning and sinking construction method for double-wall steel cofferdam with pile foundation firstly and cofferdam secondly

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5539554B1 (en) * 2013-02-04 2014-07-02 黒沢建設株式会社 Girder bridge connection structure and girder bridge structure
JP2014201963A (en) * 2013-04-04 2014-10-27 鹿島建設株式会社 Method for changing over direction of carriage
CN105735133A (en) * 2016-03-17 2016-07-06 王燏斌 Pier sinking and floating construction method
CN205934739U (en) * 2016-08-17 2017-02-08 中铁二十局集团有限公司 Support system is used to eccentric construction by formula steel case tied arch bridge float towing to one side of large -span
CN106677075A (en) * 2017-03-01 2017-05-17 中国五冶集团有限公司 Method for cofferdam pile suspension of pier construction and flood protection
CN107244388A (en) * 2017-05-17 2017-10-13 中铁十九局集团有限公司 Floating towboat and bridge erection system, method for installing girder steel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5539554B1 (en) * 2013-02-04 2014-07-02 黒沢建設株式会社 Girder bridge connection structure and girder bridge structure
JP2014201963A (en) * 2013-04-04 2014-10-27 鹿島建設株式会社 Method for changing over direction of carriage
CN105735133A (en) * 2016-03-17 2016-07-06 王燏斌 Pier sinking and floating construction method
CN205934739U (en) * 2016-08-17 2017-02-08 中铁二十局集团有限公司 Support system is used to eccentric construction by formula steel case tied arch bridge float towing to one side of large -span
CN106677075A (en) * 2017-03-01 2017-05-17 中国五冶集团有限公司 Method for cofferdam pile suspension of pier construction and flood protection
CN107244388A (en) * 2017-05-17 2017-10-13 中铁十九局集团有限公司 Floating towboat and bridge erection system, method for installing girder steel

Also Published As

Publication number Publication date
CN108330837A (en) 2018-07-27

Similar Documents

Publication Publication Date Title
CN108330837B (en) Set up the construction method of girder steel
CN105603881A (en) Integral erecting system for large sea-crossing arch bridge and construction method thereof
DE2452560A1 (en) DEVICE AND METHOD FOR REDUCING THE FORCE ON EXTENDABLE SUPPORT OF A FLOATING SHIP
US2657540A (en) Method of erecting and positioning marine structures
CN109736343A (en) Offshore wind power foundation, its installation method and wind power generating set
WO2023071518A1 (en) Method for building platform for construction of cast-in-place piles of high-piled wharf
CN204676584U (en) A kind of high stake truss-like offshore wind turbine foundation structure
CN110055984B (en) Lowering construction method for double-wall deformed steel cofferdam
CN216194719U (en) Dam gap plugging equipment with piles
CN109024660B (en) Pile foundation dismantling method for offshore foundation and offshore foundation dismantling method
CN204626377U (en) W shaped steel plate pile structure
CN110409378A (en) Repair method of not cutting off the water for large channel
CN206052522U (en) A kind of steelframe channel platform
CN104805828A (en) W-shaped steel sheet pile structure
CN102587377B (en) Drop hammer type pile sinking device and pile sinking method thereof
CN205046592U (en) Building foundation consolidates stake
CN207092045U (en) The stage apparatus of marine pile connection construction
CN115976955A (en) Method for synchronously constructing distribution beam and steel pipe pile of trestle in shallow water area
CN204875664U (en) A retaining wall structure for interim pier in bay
CN105401564A (en) Construction method for fixing tidal current energy power generation device to water bottom and tidal current energy power generation device
CN204898696U (en) Telescopic steel cofferdam
CN208844593U (en) Latch type steel pipe pile cofferdam construction device
CN105804111A (en) Unequal-length-leg offshore wind power jacket foundation and construction method thereof
CN208039210U (en) A kind of boulder bed large-sized deep water foundation construction platform
CN206784354U (en) A kind of U-shaped casing seal installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant