CN108316282A - The piecing devices and its construction method of diaphram wall - Google Patents

The piecing devices and its construction method of diaphram wall Download PDF

Info

Publication number
CN108316282A
CN108316282A CN201711475077.4A CN201711475077A CN108316282A CN 108316282 A CN108316282 A CN 108316282A CN 201711475077 A CN201711475077 A CN 201711475077A CN 108316282 A CN108316282 A CN 108316282A
Authority
CN
China
Prior art keywords
diaphram wall
baffle
piecing devices
wall
casting space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711475077.4A
Other languages
Chinese (zh)
Other versions
CN108316282B (en
Inventor
于海申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201711475077.4A priority Critical patent/CN108316282B/en
Publication of CN108316282A publication Critical patent/CN108316282A/en
Application granted granted Critical
Publication of CN108316282B publication Critical patent/CN108316282B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a kind of piecing devices of diaphram wall and its construction method, the wherein present apparatus includes:For being inserted in the casting space of diaphram wall and as the baffle of diaphram wall side form;It is fixedly arranged on the bulge-structure of the medial surface of the casting space on baffle close to diaphram wall, bulge-structure is equipped with the mounting groove for fixed sealing piece;And stay on the lateral surface of the casting space far from diaphram wall on baffle and shore structure, it shores structure and adjustably adjusts, the length of structure shored so that the baffle end side in a vertical shape for being tightly resisted against poured diaphram wall by telescopic adjustment.It ensure that pouring quality.It is reserved on diaphram wall using bulge-structure and forms joint groove, abutting joint is facilitated to position, ensured close connection, prevent leak.

Description

The piecing devices and its construction method of diaphram wall
Technical field
The present invention relates to the realm of building construction, the piecing devices and its construction method of espespecially a kind of diaphram wall.
Background technology
Diaphram wall is formed by many wall section spelling groups, to keep continuously constructing between wall section, prior art center tap Using locking notch pipe technique, i.e., before slot section concrete is perfused, a pre-inserted diameter and the equal steel of groove width in the end of slot section Steel pipe is extracted after concrete initial set, end is made to form half blind mortise shape structure by pipe, i.e. locking notch pipe slowly.Then lower secondary ground wall The tang of steel reinforcement cage puts down linking, and then two width wall section of casting concrete is just connected to form a whole whole.
General way is, after being inserted into the preparation joints such as locking notch pipe, fills aggregate chips or sand hill to fix the position of locking notch pipe It sets, but is not easy to hold out against between locking notch pipe and the end of slot section, cause joint leakiness, there are leakage hidden troubles.Locking notch pipe Both sides are respectively concrete and soil, squeeze the half blind mortise shape malformation extracted and formed after difficult or extraction for a long time.Aggregate chips Or sand hill dosage greatly, not can be recycled.
Invention content
It is an object of the invention to overcome the deficiencies of existing technologies, provide a kind of diaphram wall piecing devices and its Construction method solves the problems, such as that there are leakage hidden troubles for leakiness at underground continuous wall connector in the prior art.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides a kind of piecing devices of diaphram wall, including:
For being inserted in the casting space of diaphram wall and as the baffle of diaphram wall side form;
It is fixedly arranged on the bulge-structure of the medial surface of the casting space on the baffle close to the diaphram wall, it is described Bulge-structure is equipped with the mounting groove for fixed sealing piece;And
Stay on the lateral surface of the casting space far from the diaphram wall on the baffle shores structure, described It shores structure to adjustably adjust, by shoring the length of structure described in telescopic adjustment so that the baffle is in a vertical shape tightly Ground is resisted against the end side of poured diaphram wall.
The piecing devices of diaphram wall of the present invention further improvement lies in that, further include set on the baffle and described Shore the ruggedized construction between structure.
The piecing devices of diaphram wall of the present invention further improvement lies in that, the ruggedized construction be and the baffle Compatible babinet, the babinet are attached at the side of the casting space far from the diaphram wall on the baffle.
The piecing devices of diaphram wall of the present invention further improvement lies in that, it is described shore structure be interval setting and Stay on multiple jack of the ruggedized construction.
The piecing devices of diaphram wall of the present invention further improvement lies in that, the pedestal of the jack is sticked fixation There is top bracing plate|.
The piecing devices of diaphram wall of the present invention further improvement lies in that, the bulge-structure be convex structure.
The present invention also provides a kind of construction method of the piecing devices of diaphram wall, the construction method includes such as Lower step:
Baffle is provided, the casting space of diaphram wall is excavated, sky is poured by what the baffle was inserted in diaphram wall It is interior to be used as diaphram wall side form;
Bulge-structure is provided, the bulge-structure is fixedly arranged on pouring close to the diaphram wall on the baffle The medial surface in space;
Structure is shored in offer, and the structure of shoring is stayed on pouring far from the diaphram wall on the baffle The lateral surface in space;
The casting concrete in the casting space, by shoring the length of structure described in telescopic adjustment so that described The baffle end side in a vertical shape for being tightly resisted against poured diaphram wall;
The bulge-structure is taken out after concrete initial set, is formed with and the protrusion to the end of diaphram wall The compatible joint groove of structure.
The construction method of the piecing devices of diaphram wall of the present invention further improvement lies in that,
Further include that ruggedized construction is provided, the ruggedized construction is set to the baffle and described is shored between structure.
The construction method of the piecing devices of diaphram wall of the present invention further improvement lies in that,
It includes providing multiple jack that structure is shored described in offer, and the multiple jack interval is arranged and is stayed on The ruggedized construction.
The construction method of the piecing devices of diaphram wall of the present invention further improvement lies in that,
Further include that top bracing plate| is provided, the top bracing plate| is sticked and is fixed on the pedestal of the jack.
The piecing devices of diaphram wall of the present invention and its advantageous effect of construction method:
The present apparatus is used as diaphram wall side form by the way that baffle to be inserted in the casting space of diaphram wall.It is pouring During building, the medial surface of baffle is unstable by the pressure of concrete, and the length pair of structure can be shored by telescopic adjustment The lateral surface of baffle exerts a force so that the baffle end side in a vertical shape for being tightly resisted against poured diaphram wall ensure that Pouring quality.In the medial surface fixed lobe structure of baffle, can be existed using bulge-structure after being poured in casting space It is reserved on the diaphram wall of initial set and forms joint groove, thus can when being spliced two adjacent diaphram walls Spliced using this joint groove, abutting joint is facilitated to position, can ensure the close of two adjacent diaphram walls Connection, solves the problems, such as to pour the joint leakiness for the two neighboring wall section to be formed and there are leakage hidden troubles.Facilitate installation And dismounting, it can be used in turn.
Description of the drawings
Fig. 1 is the structural schematic diagram of the piecing devices of diaphram wall of the present invention.
Fig. 2 is the vertical view for being installed on slot section of the piecing devices of diaphram wall of the present invention.
Fig. 3 is the side view for being installed on slot section of the piecing devices of diaphram wall of the present invention.
Fig. 4 is the front view for being installed on slot section of the piecing devices of diaphram wall of the present invention.
Fig. 5 is the pre-hardening rear baffle of the piecing devices of diaphram wall of the present invention and the main view that bulge-structure part is extracted Figure.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments.
Refering to fig. 1, it is shown that the structural schematic diagram of the piecing devices of diaphram wall of the present invention.Referring to Fig.2, showing The vertical view for being installed on slot section of the piecing devices of diaphram wall of the present invention.In conjunction with shown in Fig. 1 and Fig. 2, usually, underground Diaphragm wall is formed by many wall section spelling groups, and to keep continuously constructing between wall section, first construction forms under one and is placed with steel reinforcement cage Slot section, the present apparatus is fixed on to the end of slot section, in slot section casting concrete formed wall section, by the present apparatus after initial set It takes out, it, in this way can be by the joint groove and the wall when pouring adjacent wall section to form joint groove in wall section Section splicing connection, two such wall section is just connected to form a whole whole.
The piecing devices of diaphram wall of the present invention include:For being inserted in the casting space 10 of diaphram wall and making For the baffle 20 of diaphram wall side form;It is fixedly arranged on the medial surface of the casting space 10 on baffle 20 close to diaphram wall Bulge-structure 30, bulge-structure 30 are equipped with the mounting groove 31 for fixed sealing piece;And under staying on baffle 20 remotely The lateral surface of the casting space 10 of diaphragm wall shores structure 40, shores structure 40 and adjustably adjusts, is shored by telescopic adjustment The length of structure 40 is so that the end side in a vertical shape for being tightly resisted against poured diaphram wall of baffle 20.The present apparatus It is used as diaphram wall side form by the way that baffle to be inserted in the casting space of diaphram wall.In casting process, baffle Medial surface is unstable by the pressure of concrete, and the length that structure can be shored by telescopic adjustment applies the lateral surface of baffle Power so that the baffle end side in a vertical shape for being tightly resisted against poured diaphram wall ensure that pouring quality.It is keeping off The medial surface fixed lobe structure of plate can utilize bulge-structure to connect in the underground of initial set after being poured in casting space It is reserved on continuous wall and forms joint groove, to this connector be utilized recessed when being spliced two adjacent diaphram walls Slot is spliced, and abutting joint is facilitated to position, and can ensure the close connection of two adjacent diaphram walls, solve and pour It builds the joint leakiness for the two neighboring wall section to be formed and there are problems that leakage hidden trouble.It is easy for installation and removal, can have enough to meet the need It uses.
One better embodiment of the piecing devices as diaphram wall of the present invention, refering to Fig. 3, it is shown that the present invention The side view for being installed on slot section of the piecing devices of diaphram wall.Refering to Fig. 4, it is shown that diaphram wall of the present invention connects The front view for being installed on slot section of head device.In conjunction with shown in Fig. 1 to Fig. 4, the present apparatus further includes being set to baffle 20 and shoring structure Ruggedized construction 50 between 40.In this way, the lateral surface in baffle 20 is arranged using ruggedized construction 50, to discontinuity arrangement Multiple structures 40 of shoring directly exert a force to ruggedized construction 50, and then utility ruggedized construction 50 passes to baffle 20 uniformly Power ensures 20 uniform force of baffle, keeps stablizing during casting concrete, ensures construction quality.It prevents from directly utilizing When discontinuity arrangement multiple shore structure 40 and exert a force to baffle 20, due to cannot be guaranteed that multiple forces for shoring structure 40 are big It is small identical so that 20 unbalance stress of baffle, it cannot be guaranteed that stability, influences construction quality.
In the present embodiment, ruggedized construction 50 is babinet compatible with baffle 20, and babinet is attached at separate on baffle 20 The side of the casting space 10 of diaphram wall.Babinet has the function of the verticality of extruding, confinement and regulating fender 20.Case Body need to have enough rigidity, and steel plate is pliable and the section thickness of steel plate is too small, above-mentioned required effect is not achieved, so case Body cannot be replaced with steel plate.
One better embodiment of the piecing devices as diaphram wall of the present invention is shored in conjunction with shown in Fig. 1 to Fig. 4 Structure 40 is interval setting and stays on multiple jack of ruggedized construction 50.In casting process, the oil of jack is utilized Cylinder stretches to shore babinet.The pedestal of jack, which is sticked, is fixed with top bracing plate| 60.Top bracing plate| 60 is resisted against the earthwork 70, thus It is stretched using the oil cylinder of jack come during shoring babinet, top bracing plate| 60 increases connecing between jack and the earthwork 70 Contacting surface is accumulated, and reduces the pressure of the earthwork 70, the pedestal of jack is prevented to be directly inserted into the earthwork, to ensure that jack pair babinet has There is enough pressure.
One better embodiment of the piecing devices as diaphram wall of the present invention, after casting concrete, protrusion Structure 30 can stay the joint groove set out corresponding to bulge-structure 30 on diaphram wall, facilitate adjacent diaphram wall Carry out buckle linking.In the present embodiment, bulge-structure 30 is convex structure, thus finally after casting concrete, ground Can be stayed on lower diaphragm wall set out corresponding to bulge-structure 30 joint groove be convex structure.In terms of waterproof, tied by protrusion The joint groove that structure 30 is formed has longer perimeter of section compared with flat face, to work as flow connecing from diaphram wall During head groove passes through wall, need to flow through longer path, i.e. flow is not easy to pass through wall from joint groove Body, that is to say, that joint groove increases the path that flow passes through wall, enhances water resistance.
The joint groove of convex structure can further limit the position of an adjacent wall section, prevent two neighboring wall The relative movement of section ensure that the stability of two neighboring wall section connection.Mounting groove 31 can very easily fix sealing piece, In casting concrete and after taking out joint structure, sealing piece is just embedded in the end of wall section, ensure that the pre-buried position of sealing piece It sets and fixation, to enhance water resistance using sealing piece.
The present invention also provides a kind of construction methods of the piecing devices of diaphram wall, refering to Fig. 5, it is shown that for this The front view that the pre-hardening rear baffle of the piecing devices of invention diaphram wall and bulge-structure part are extracted.In conjunction with Fig. 1 to Fig. 5 Shown, construction method includes the following steps:
Baffle 20 is provided, the casting space 10 of diaphram wall is excavated, baffle 20 is inserted in pouring for diaphram wall Diaphram wall side form is used as in space 10;
Bulge-structure 30 is provided, bulge-structure 30 is fixedly arranged on the casting space 10 on baffle 20 close to diaphram wall Medial surface;
Structure 40 is shored in offer, will be shored structure 40 and is stayed on the casting space 10 far from diaphram wall on baffle 20 Lateral surface;
The casting concrete in casting space 10 shores the length of structure 40 so that baffle 20 is in by telescopic adjustment Vertical shape is tightly resisted against the end side of poured diaphram wall;
Bulge-structure 30 is taken out after concrete initial set, is formed with and bulge-structure 30 to the end of diaphram wall Compatible joint groove.
Specifically, it is first constructed grooving according to design standard, banding steel cage is transferred to steel reinforcement cage in slot along slot, shape At the casting space 10 for being placed with steel reinforcement cage under one.The baffle 20 of the present apparatus is inserted in the end of casting space 10, and is utilized It shores structure 40 and stays on baffle 20.
Then the casting concrete into casting space 10, in casting process, baffle 20 is impacted by from concrete Power and vertical stable state cannot be always maintained at, shore structure 40 by telescopic adjustment is in by baffle 20 from the outside of baffle 20 Vertical shape is tightly resisted against the end side of poured diaphram wall.
The present apparatus is taken out after initial set, to forming joint groove on diaphram wall, in this way pour it is adjacent When diaphram wall can by the joint groove and the diaphram wall splicing connection, two such diaphram wall even It connects to form an entirety, the stitching portion of two wall sections is completely embedded, and ensure that good waterproof effect, the present apparatus are recyclable And it is used in turn.
One better embodiment of the construction method of the piecing devices as diaphram wall of the present invention further includes providing Ruggedized construction 50 is set to baffle 20 and shored between structure 40 by ruggedized construction 50.In the present embodiment, ruggedized construction 50 is Babinet.That is, making baffle 20 not directly by multiple power for shoring structure 40 using babinet, but shored multiple The power of structure 40 is applied on babinet, is formed relatively uniform power to be transmitted to baffle 20 again, be ensure that the position of baffle 20 It is secured and stablize.
One better embodiment of the construction method of the piecing devices as diaphram wall of the present invention, provides and shores knot Structure 40 includes providing multiple jack, and multiple jack intervals are arranged and stay on ruggedized construction 50.Utilize jack Telescopic adjustment squeezes babinet, to squeeze baffle 20, ensure that baffle 20 is in a vertical shape and is tightly resisted against poured ground The end side of lower diaphragm wall.
One better embodiment of the construction method of the piecing devices as diaphram wall of the present invention further includes providing Top bracing plate| 60 is sticked and is fixed on the pedestal of jack by top bracing plate| 60.Jack and the earthwork 70 are increased using top bracing plate| 60 Contact area reduces pressure.
The piecing devices of diaphram wall of the present invention and its having the beneficial effect that for construction method:
The present apparatus is used as diaphram wall side form by the way that baffle to be inserted in the casting space of diaphram wall.It is pouring During building, the medial surface of baffle is unstable by the pressure of concrete, and the length pair of structure can be shored by telescopic adjustment The lateral surface of baffle exerts a force so that the baffle end side in a vertical shape for being tightly resisted against poured diaphram wall ensure that Pouring quality.In the medial surface fixed lobe structure of baffle, can be existed using bulge-structure after being poured in casting space It is reserved on the diaphram wall of initial set and forms joint groove, thus can when being spliced two adjacent diaphram walls Spliced using this joint groove, abutting joint is facilitated to position, can ensure the close of two adjacent diaphram walls Connection, solves the problems, such as to pour the joint leakiness for the two neighboring wall section to be formed and there are leakage hidden troubles.Facilitate installation And dismounting, it can be used in turn.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can basis Above description makes many variations example to the present invention.Thus, certain details in embodiment should not constitute the limit to the present invention Fixed, the present invention will be using the range that the appended claims define as protection scope of the present invention.

Claims (10)

1. a kind of piecing devices of diaphram wall, which is characterized in that including:
For being inserted in the casting space of diaphram wall and as the baffle of diaphram wall side form;
It is fixedly arranged on the bulge-structure of the medial surface of the casting space on the baffle close to the diaphram wall, the protrusion knot Structure is equipped with the mounting groove for fixed sealing piece;And
Stay on the lateral surface of the casting space far from the diaphram wall on the baffle shores structure, described to shore knot Structure adjustably adjusts, by shoring the length of structure described in telescopic adjustment so that the baffle is in a vertical shape is tightly resisted against The end side of the diaphram wall poured.
2. the piecing devices of diaphram wall as described in claim 1, which is characterized in that further include being set to the baffle and institute State the ruggedized construction between shoring structure.
3. the piecing devices of diaphram wall as claimed in claim 2, which is characterized in that
The ruggedized construction is babinet compatible with the baffle, and the babinet is attached on the baffle far from the underground The side of the casting space of diaphragm wall.
4. the piecing devices of diaphram wall as claimed in claim 2, which is characterized in that
The structure of shoring is interval setting and stays on multiple jack of the ruggedized construction.
5. the piecing devices of diaphram wall as claimed in claim 4, which is characterized in that
The pedestal of the jack, which is sticked, is fixed with top bracing plate|.
6. the piecing devices of diaphram wall as described in claim 1, which is characterized in that the bulge-structure is convex knot Structure.
7. a kind of construction method of the piecing devices of diaphram wall, which is characterized in that the construction method includes the following steps:
Baffle is provided, the casting space of diaphram wall is excavated, the baffle is inserted in the casting space of diaphram wall As diaphram wall side form;
Bulge-structure is provided, the bulge-structure is fixedly arranged on the casting space on the baffle close to the diaphram wall Medial surface;
Structure is shored in offer, and the structure of shoring is stayed on the casting space far from the diaphram wall on the baffle Lateral surface;
The casting concrete in the casting space, by shoring the length of structure described in telescopic adjustment so that the baffle is in Vertical shape is tightly resisted against the end side of poured diaphram wall;
The bulge-structure is taken out after concrete initial set, is formed with and the bulge-structure phase to the end of diaphram wall The joint groove of adaptation.
8. the construction method of the piecing devices of diaphram wall as claimed in claim 7, which is characterized in that
Further include that ruggedized construction is provided, the ruggedized construction is set to the baffle and described is shored between structure.
9. the construction method of the piecing devices of diaphram wall as claimed in claim 8, which is characterized in that
It includes providing multiple jack that structure is shored described in offer, and the multiple jack interval is arranged and is stayed on described Ruggedized construction.
10. the construction method of the piecing devices of diaphram wall as claimed in claim 9, which is characterized in that
Further include that top bracing plate| is provided, the top bracing plate| is sticked and is fixed on the pedestal of the jack.
CN201711475077.4A 2017-12-29 2017-12-29 Joint device of underground continuous wall and construction method thereof Active CN108316282B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711475077.4A CN108316282B (en) 2017-12-29 2017-12-29 Joint device of underground continuous wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711475077.4A CN108316282B (en) 2017-12-29 2017-12-29 Joint device of underground continuous wall and construction method thereof

Publications (2)

Publication Number Publication Date
CN108316282A true CN108316282A (en) 2018-07-24
CN108316282B CN108316282B (en) 2020-10-13

Family

ID=62893403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711475077.4A Active CN108316282B (en) 2017-12-29 2017-12-29 Joint device of underground continuous wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN108316282B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359483A (en) * 2019-08-22 2019-10-22 陈泽 A kind of sealing earth-retaining apparatus and system for environmentally friendly cut-pff wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2103447C1 (en) * 1996-07-08 1998-01-27 Всеволод Иоакимович Минаев Method and device for trenchless laying of underground service lines
CN202865755U (en) * 2012-08-31 2013-04-10 中交第二航务工程局有限公司 Immersed tunnel pipe joint axis positioning system
CN103410174A (en) * 2013-08-23 2013-11-27 上海隧道工程股份有限公司 GXJ underground continuous wall rubber waterproof connector tool and construction method thereof
CN205205875U (en) * 2015-12-10 2016-05-04 上海隧道工程有限公司 Underground continuous wall rubber tape water joint case

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2103447C1 (en) * 1996-07-08 1998-01-27 Всеволод Иоакимович Минаев Method and device for trenchless laying of underground service lines
CN202865755U (en) * 2012-08-31 2013-04-10 中交第二航务工程局有限公司 Immersed tunnel pipe joint axis positioning system
CN103410174A (en) * 2013-08-23 2013-11-27 上海隧道工程股份有限公司 GXJ underground continuous wall rubber waterproof connector tool and construction method thereof
CN205205875U (en) * 2015-12-10 2016-05-04 上海隧道工程有限公司 Underground continuous wall rubber tape water joint case

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359483A (en) * 2019-08-22 2019-10-22 陈泽 A kind of sealing earth-retaining apparatus and system for environmentally friendly cut-pff wall
CN110359483B (en) * 2019-08-22 2024-05-14 陈泽 Sealed soil retaining device and system for environment-friendly impervious wall

Also Published As

Publication number Publication date
CN108316282B (en) 2020-10-13

Similar Documents

Publication Publication Date Title
CN205224016U (en) Vertical mosaic structure of precast underground continuous wall
CN102535441A (en) Construction method of underground diaphragm wall
CN103343538A (en) A kind of high stream is moulded the steel sheet pile construction method for supporting under the soft base of deep layer
CN108035337B (en) The construction method of a kind of diaphram wall and applied to the connector in this method
CN112144509A (en) Construction method of underground continuous wall, joint and connection structure thereof
CN108316282A (en) The piecing devices and its construction method of diaphram wall
WO2009005244A2 (en) Method for burying hume pipes and support block used in the method
CN211113603U (en) Underground continuous wall construction structure
CN209653132U (en) One kind is based on strip leakage-proof structure between prefabricated board
CN106284303B (en) A kind of prefabricated ground-connecting-wall and its construction method with the limit of angle steel connector
CN102434718B (en) Method for reinforcing originating end of push bench
CN210263026U (en) Anti structure that floats of hole-forming bored concrete pile steel sleeve is protected to mud dado of going out terrace
CN206529764U (en) A kind of reinforced concrete sheet pile and diaphram wall
CN113882360A (en) Pile connecting structure and method for pouring tubular pile transverse partition plates
CN105926585B (en) Device applied to the demoulding of ground wall locking notch pipe pushing tow
CN210658405U (en) Wall-separated drainage structure
CN210482388U (en) Underground continuous wall seam leak protection water structure
CN110158662A (en) A kind of construction method and structure of diaphram wall seam preventing water leakage
CN113373904A (en) Water-stop type angle lug steel sheet pile and construction method
CN221402059U (en) Connection structure of pipeline and cut-off wall
CN109137887A (en) A kind of continuous underground wall structure passing through solution cavity, construction method and suspension device
CN110778028A (en) Grouting sleeve assembly and construction method thereof
CN110847960A (en) Three-arch tunnel drainage device and construction method thereof
CN213978920U (en) Butt joint of underground continuous wall and connecting structure thereof
CN218374475U (en) Vertical post-cast strip water leakage treatment system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant