CN103410174A - GXJ underground continuous wall rubber waterproof connector tool and construction method thereof - Google Patents

GXJ underground continuous wall rubber waterproof connector tool and construction method thereof Download PDF

Info

Publication number
CN103410174A
CN103410174A CN2013103743232A CN201310374323A CN103410174A CN 103410174 A CN103410174 A CN 103410174A CN 2013103743232 A CN2013103743232 A CN 2013103743232A CN 201310374323 A CN201310374323 A CN 201310374323A CN 103410174 A CN103410174 A CN 103410174A
Authority
CN
China
Prior art keywords
groove section
joint
leading portion
construction groove
water proof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103743232A
Other languages
Chinese (zh)
Other versions
CN103410174B (en
Inventor
祝强
姜民傅
杨武厂
王峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TUNNEL FOUNDATION ENGINEERING CO., LTD.
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunnel Engineering Co Ltd
Priority to CN201310374323.2A priority Critical patent/CN103410174B/en
Publication of CN103410174A publication Critical patent/CN103410174A/en
Application granted granted Critical
Publication of CN103410174B publication Critical patent/CN103410174B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a GXJ underground continuous wall rubber waterproof connector. The GXJ underground continuous wall rubber waterproof connector comprises a connector box and a rubber waterproof strip, wherein an end face with a continuous turning curve is formed at the end of the connector box close to a front construction groove section along the width direction of the groove section, and a groove is further formed at the end close to the front construction groove section along the length direction of the groove section; a first end of the rubber waterproof strip is embedded in the groove, and a second end of the rubber waterproof strip is exposed out of the groove. According to the GXJ underground continuous wall rubber waterproof connector, an underground water seepage line which may occur is prolonged through the horizontal continuous turning curve of the connector box and the longitudinally arranged rubber waterproof strip. The connector box is taken out after front construction groove section concrete pouring is finished, one end of the rubber waterproof strip is fixed on a concrete side wall, the other protruded end is embedded in concrete when concrete of an adjacent groove section is poured, and the waterproof sealing effects are achieved.

Description

GXJ diaphragm wall rubber water proof joint tool and job practices thereof
Technical field
The present invention, about a kind of construction technology of diaphragm wall, refers in particular to a kind of GXJ diaphragm wall rubber water proof joint tool and job practices thereof.
Background technology
The sixties in 20th century, underground continuous wall construction technique was introduced into China, rigidity is large, the anti-leakage performance is good owing to having, can load-bearing and characteristics such as friction, noiseless during construction, and can and be suitable in multiple soil layer construction near the building edge, thereby be widely used in subway station, more in the engineerings such as Jiang Tongdao, High-Rise Building Deep Foundation and antiseepage dam, become the space enclosing structure of excavation of foundation pit or the part of permanent structure.
The body of wall joint of subterranean wall refers to and sets when current construction groove section is built walls concrete, the vertical jointing combined with walls concrete that the adjacent channels section is built.Though diaphragm wall is called " diaphragm wall ", but be minute grooving of groove section and a concreting during construction, during the groove section of formerly constructing construction, how at groove section two ends, to place joint tool to form well-formed's joint, make it avoid becoming approach and the intensity hidden danger point of percolating water.Therefore, the joint construction quality of diaphragm wall is very crucial.
Whole nation deep foundation ditch diaphragm wall is gone along with sb. to guard him all ubiquity percolating water phenomenons of engineering, and diaphragm wall percolating water also can cause the underground structure infiltration, and the annual underground construction leaking-stoppage fees such as basement, subway station that are used for are with countless.And diaphragm wall percolating water is mainly in joint, on market underground wall joint have common flexible joint that locking notch pipe joint, joint pile joint are arranged, exempt to brush the wall composite-joint, the multi-form joint such as the nested rigid joint of reinforcing cage, these joints increase if dealt with the probability that all can make percolating water improperly.
Summary of the invention
Because the problems referred to above the invention provides a kind of GXJ diaphragm wall rubber water proof joint tool, leading portion construction groove section and back segment construction groove section be used to connecting described diaphragm wall comprise:
One joint case, described joint case forms an end face with continuous turnover curve near the end of described leading portion construction groove section along the width of groove section, and along the length direction of groove section, further is formed with a groove near the end of described leading portion construction groove section;
One rubber water proof band, the first end of described rubber water proof band is embedded in described groove, and the second end of described rubber water proof band is exposed at outside described groove.
The further improvement of this joint tool is, described joint case is connected with a partition panel near the end of described back segment construction groove section, and the width of described partition panel is less than the width of described leading portion construction groove section.
The further improvement of this joint tool is, the two ends of described rubber water proof band are embedded with respectively a steel sheet.
The present invention also provides a kind of construction method of underground continuous wall that utilizes this GXJ diaphragm wall rubber water proof joint tool, comprises the following steps:
(1), by the described leading portion construction of grooving equipment excavation groove section, near the end of the back segment construction groove section of also not excavating, place a joint tool in leading portion construction groove section;
(2), after slurry is changed in clear hole, put into reinforcing cage in leading portion construction groove section, and concreting;
(3) after the concrete setting of leading portion construction groove section, excavation back segment construction groove section;
(4) behind clear hole, take out the joint case of joint tool, form the joint with continuous turnover curve, and the second end of described rubber water proof band is embedded in the concrete of completed leading portion construction groove section admittedly;
(5) in back segment construction groove section, place a joint tool near the end of the adjacent slot section of also not excavating;
(6), after slurry is changed in clear hole, put into reinforcing cage in back segment construction groove section, and concreting, with the concrete of completed leading portion construction groove section, be connected;
(7) after the concrete setting of back segment construction groove section, the first end of described rubber water proof band is embedded in this section concrete admittedly, completes leading portion construction groove section and constructs being connected of groove section concrete with back segment;
(8) the described adjacent slot section of excavation, behind clear hole, take out the joint case of joint tool, and repeating step (5)~(7), until complete the construction of whole diaphragm wall.
The further improvement of the method is, described joint case is connected with a partition panel near the end of described back segment construction groove section, and the width of described partition panel is less than the width of described leading portion construction groove section.
The further improvement of the method is, the two ends of the corresponding described partition panel of described grooving equipment are respectively equipped with a buckle ear, and described grooving equipment fastens described partition panel by described buckle ear, and the joint case of described joint tool is taken out.
GXJ diaphragm wall rubber water proof joint tool of the present invention, extended the seepage action of ground water circuit that may occur by the laterally continuous turnover curve of joint case and the rubber water proof band vertically arranged.Similar with other joint forms on job practices, just different on the time at the taking-up joint tool, in the construction of general joint, after the concreting that has completed leading portion construction groove section, the method adopted is first to take out joint tool, then excavate back segment construction groove section, and the method that the present invention adopts is, first excavate back segment construction groove section, then take out joint tool, like this, when excavation back segment construction groove section, just can not have influence on the concrete quality of the leading portion construction groove section completed.After taking out joint tool, one end of rubber water proof band is fixed in the concrete of completed leading portion construction groove section, and, the other end be exposed is fixed on when building the concrete of back segment construction groove section in, realize the effect of water proof sealing, form the joint with stagnant water effect.
The accompanying drawing explanation
Fig. 1 is the section structure schematic diagram of GXJ diaphragm wall rubber water proof joint tool of the present invention.
Fig. 2 is the section structure schematic diagram of joint case of the present invention.
Fig. 3 is the section structure schematic diagram of rubber water proof band of the present invention.
Fig. 4 is the sectional schematic diagram before construction method of underground continuous wall leading portion construction groove section concrete of the present invention is built.
Fig. 5 is the sectional schematic diagram after construction method of underground continuous wall leading portion construction groove section concrete of the present invention is built.
Fig. 6 takes out the sectional schematic diagram of joint tool after construction method of underground continuous wall back segment construction groove section excavation of the present invention.
Fig. 7 is the sectional schematic diagram after construction method of underground continuous wall of the present invention takes out joint tool.
Fig. 8 is the sectional schematic diagram before construction method of underground continuous wall back segment construction groove section concrete of the present invention is built.
Fig. 9 is the sectional schematic diagram after construction method of underground continuous wall back segment construction groove section concrete of the present invention is built.
The specific embodiment
In order to make purpose of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
Cooperation is extremely shown in Figure 4 referring to Fig. 1, GXJ diaphragm wall rubber water proof joint tool 1 of the present invention, and leading portion construction groove section 2 and back segment construction groove section 3 for connecting underground continuous wall comprise:
One joint case 10, described joint case 10 has the end face of continuous turnover curve 110 near the end of described leading portion construction groove section 2 along the width formation one of groove section, and the end of close described leading portion construction groove section 2 further is formed with a groove 120 along the length direction of groove section, described joint case 10 is connected with a partition panel 130 near the end of back segment construction groove section 3, and the width of this partition panel 130 is less than the width of described leading portion construction groove section 2.
One rubber water proof band 20, the first end of this rubber water proof band 20 are embedded in described groove 120, and the second end of this rubber water proof band 20 is exposed at outside described groove 120.The two ends of this rubber water proof band 20 also are embedded with respectively a steel sheet 210.
Cooperation to shown in Figure 9, utilizes the construction method of underground continuous wall of this GXJ diaphragm wall rubber water proof joint tool 1 referring to Fig. 4, comprises the following steps:
(1) in conjunction with shown in Figure 4, by the described leading portion construction of 30 excavation of grooving equipment as shown in Figure 6 groove section 2, leading portion construction groove section 2 near also not the end of the back segments of excavation construction groove section 3 place a joint tool 1;
Wherein, grooving is cut the earth and is selected the grooving equipment 30 that vertical precision is high, and the shape that its grab bucket is cut the earth should be rectangle, continues to monitor, rectifies a deviation in the whole operation of grooving, guarantees the continuous wall trench underground precision.
(2) in conjunction with shown in Figure 5, after slurry is changed in clear hole, put into reinforcing cage 40 in leading portion construction groove section 2, and concreting;
(3) after the concrete setting of leading portion construction groove section 2, excavation back segment construction groove section 3;
(4) in conjunction with Fig. 6, shown in Figure 7, behind clear hole, take out the joint case 10 of joint tool 1, form the joint 50 with continuous turnover curve 110, and the second end of described rubber water proof band 20 is embedded in admittedly in the concrete of completed leading portion construction groove section 2;
Wherein, the two ends of the corresponding described partition panel 130 of grooving equipment 30 are respectively equipped with a buckle ear 31, and grooving equipment 30 fastens described partition panel 130 by buckle ear 31, and the joint case of described joint tool 1 10 is taken out.
(5), in conjunction with shown in Figure 8, place a joint tool 1 in back segment construction groove section 3 ends near the adjacent slot section 4 of also not excavating;
(6), after slurry is changed in clear hole, put into reinforcing cage 40 in back segment construction groove section 3, and concreting, with the concrete of completed leading portion construction groove section 2, be connected;
(7) in conjunction with shown in Figure 9, after the concrete setting of back segment construction groove section 3, the first end of described rubber water proof band 20 is embedded in this section concrete admittedly, completes concrete connection the with leading portion construction groove section 2;
(8) the described adjacent slot section 4 of excavation, behind clear hole, take out the joint case 10 of joint tool 1, and repeating step (5)~(7), until complete the construction of whole diaphragm wall.
This job practices is after the construction that completes leading portion construction groove section 2, need not move or pull up joint case 10, continue by the grooving equipment 30 excavations back segment construction groove section 3 adjacent with leading portion construction groove section 2, when grooving equipment 30 is grabbed soil like this, can not collide the joint formed, and have influence on the concrete quality of the leading portion construction groove section 2 completed.
After back segment construction groove section 3 has been excavated, joint case 10 is taken out from the concrete of completed leading portion construction groove section 2, after joint case 10 takes out, one end of rubber water proof band 20 is fixed in the concrete of completed leading portion construction groove section 2, and the other end be exposed is fixed on when building the concrete of back segment construction groove section 3 in, realize the effect of water proof sealing, form the joint with stagnant water effect.
Further, the joint case 10 of joint tool 1 has enough rigidity, guarantees in being removed process, do not deform and damage, and the percolation path that the continuous turnover curve 110 that its shape forms can extend water, play waterproof action preferably.The length of joint case 10 is identical with the degree of depth of diaphragm wall, and every 15 meters arrange a joint, with bolt, is connected with pin between every joint.The width of the partition panel 130 of joint case 10 is than the little 30mm of the thickness of diaphragm wall, and the buckle ear 31 of being convenient on grooving equipment 30 fastens.
Rubber water proof band 20 is by being used timber wedge to be temporarily fixed on joint case 10, wherein the thickness of steel sheet 210 is 0.8mm, insert depth is 30mm, can guarantee can not destroy rubber water proof band 20 when taking out joint case 10, after guaranteeing again to take out joint case 10, rubber water proof band 20 firmly is anchored with completed concrete wall, thereby the joint waterproofing effect is increased greatly.
For joint case 10 is convenient, take out, also can on joint case 10, arrange and pull hole, after concrete casting completes with jack by side direction taking-up again after joint case 10 top pines.
The above is only preferred embodiment of the present invention, not the present invention is done to any pro forma restriction, although the present invention discloses as above with preferred embodiment, yet not in order to limit the present invention, any those skilled in the art, in the scope that does not break away from technical solution of the present invention, when the technology contents that can utilize above-mentioned announcement is made a little change or is modified to the equivalent embodiment of equivalent variations, in every case be the content that does not break away from technical solution of the present invention, any simple modification that foundation technical spirit of the present invention is done above embodiment, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (6)

1. GXJ diaphragm wall rubber water proof joint tool, be used to the leading portion construction groove section and the back segment that the connect described diaphragm wall groove section of constructing, is characterized in that comprising:
One joint case, described joint case forms an end face with continuous turnover curve near the end of described leading portion construction groove section along the width of groove section, and along the length direction of groove section, further is formed with a groove near the end of described leading portion construction groove section;
One rubber water proof band, the first end of described rubber water proof band is embedded in described groove, and the second end of described rubber water proof band is exposed at outside described groove.
2. GXJ diaphragm wall rubber water proof joint tool as claimed in claim 1, is characterized in that described joint case is connected with a partition panel near the end of described back segment construction groove section, and the width of described partition panel is less than the width of described leading portion construction groove section.
3. GXJ diaphragm wall rubber water proof joint tool as claimed in claim 1 or 2, is characterized in that the two ends of described rubber water proof band are embedded with respectively a steel sheet.
4. a utilization such as right will be removed the construction method of underground continuous wall of 1 described GXJ diaphragm wall rubber water proof joint tool, it is characterized in that comprising the following steps:
(1), by the described leading portion construction of grooving equipment excavation groove section, near the end of the back segment construction groove section of also not excavating, place a joint tool in leading portion construction groove section;
(2), after slurry is changed in clear hole, put into reinforcing cage in leading portion construction groove section, and concreting;
(3) after the concrete setting of leading portion construction groove section, excavation back segment construction groove section;
(4) behind clear hole, take out the joint case of joint tool, form the joint with continuous turnover curve, and the second end of described rubber water proof band is embedded in the concrete of completed leading portion construction groove section admittedly;
(5) in back segment construction groove section, place a joint tool near the end of the adjacent slot section of also not excavating;
(6), after slurry is changed in clear hole, put into reinforcing cage in back segment construction groove section, and concreting, with the concrete of completed leading portion construction groove section, be connected;
(7) after the concrete setting of back segment construction groove section, the first end of described rubber water proof band is embedded in this section concrete admittedly, completes leading portion construction groove section and constructs being connected of groove section concrete with back segment;
(8) the described adjacent slot section of excavation, behind clear hole, take out the joint case of joint tool, and repeating step (5)~(7), until complete the construction of whole diaphragm wall.
5. job practices as claimed in claim 4, is characterized in that described joint case is connected with a partition panel near the end of described back segment construction groove section, and the width of described partition panel is less than the width of described leading portion construction groove section.
6. job practices as claimed in claim 5, is characterized in that the two ends of the corresponding described partition panel of described grooving equipment are respectively equipped with a buckle ear, and described grooving equipment fastens described partition panel by described buckle ear, and the joint case of described joint tool is taken out.
CN201310374323.2A 2013-08-23 2013-08-23 GXJ underground diaphragm wall rubber is every water joint tool and constructional method thereof Active CN103410174B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310374323.2A CN103410174B (en) 2013-08-23 2013-08-23 GXJ underground diaphragm wall rubber is every water joint tool and constructional method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310374323.2A CN103410174B (en) 2013-08-23 2013-08-23 GXJ underground diaphragm wall rubber is every water joint tool and constructional method thereof

Publications (2)

Publication Number Publication Date
CN103410174A true CN103410174A (en) 2013-11-27
CN103410174B CN103410174B (en) 2016-06-01

Family

ID=49603212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310374323.2A Active CN103410174B (en) 2013-08-23 2013-08-23 GXJ underground diaphragm wall rubber is every water joint tool and constructional method thereof

Country Status (1)

Country Link
CN (1) CN103410174B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328805A (en) * 2014-11-13 2015-02-04 中冶天工集团有限公司 Steel-edged water stop fixing device and using method thereof
CN104831759A (en) * 2015-05-27 2015-08-12 上海隧道工程有限公司 GXJ steel rubber waterstop connector box connection device
CN104895117A (en) * 2015-05-27 2015-09-09 上海隧道工程有限公司 GXJ steel rubber water stop band connector box lateral stripping device and construction method thereof
CN104929158A (en) * 2015-06-19 2015-09-23 上海建工二建集团有限公司 Connector box used for underground diaphragm wall steel-rubber connector and construction method
CN106013086A (en) * 2016-06-23 2016-10-12 程华清 Construction method for processing underground continuous wall joint through boss type I-steel joint box
CN108149675A (en) * 2016-12-02 2018-06-12 北京市地质工程公司 Using the construction method of underground continuous wall of assembled locking notch pipe water sealing structure
CN108316282A (en) * 2017-12-29 2018-07-24 中国建筑第八工程局有限公司 The piecing devices and its construction method of diaphram wall
CN109944232A (en) * 2019-04-09 2019-06-28 上海市机械施工集团有限公司 A kind of construction method of underground continuous wall connector case
CN111424681A (en) * 2020-04-27 2020-07-17 中铁上海工程局集团华海工程有限公司 Waterproof joint structure under sectional application condition of underground continuous wall and cast-in-place pile and construction method thereof
CN115369924A (en) * 2022-08-02 2022-11-22 中国建筑第八工程局有限公司 Construction method of underground continuous wall joint

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2221055Y (en) * 1994-12-28 1996-02-28 上海宝钢冶金建设公司第五工程公司 Underground continuous wall waterproof connecting device
US20070062134A1 (en) * 2005-09-22 2007-03-22 Chung Wen Y Cellularcrete wall system
CN201125396Y (en) * 2007-11-05 2008-10-01 上海市第二市政工程有限公司 Underground continuous wall water stop joint device
CN101705697A (en) * 2009-10-23 2010-05-12 广东省基础工程公司 Diaphragm wall joint flexible water stop installing device and method
CN201554042U (en) * 2009-10-23 2010-08-18 广东省基础工程公司 Installer for diaphragm wall connector flexible water stops

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2221055Y (en) * 1994-12-28 1996-02-28 上海宝钢冶金建设公司第五工程公司 Underground continuous wall waterproof connecting device
US20070062134A1 (en) * 2005-09-22 2007-03-22 Chung Wen Y Cellularcrete wall system
CN201125396Y (en) * 2007-11-05 2008-10-01 上海市第二市政工程有限公司 Underground continuous wall water stop joint device
CN101705697A (en) * 2009-10-23 2010-05-12 广东省基础工程公司 Diaphragm wall joint flexible water stop installing device and method
CN201554042U (en) * 2009-10-23 2010-08-18 广东省基础工程公司 Installer for diaphragm wall connector flexible water stops

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
许和平: "富水软土地区单墙衬砌地铁车站防水技术", 《铁道工程学报》 *
陈航等: "DWS型接头板的设计与应用", 《第八次水利水电地基与基础工程学术会议论文集》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328805A (en) * 2014-11-13 2015-02-04 中冶天工集团有限公司 Steel-edged water stop fixing device and using method thereof
CN104895117B (en) * 2015-05-27 2017-03-29 上海隧道工程有限公司 The lateral stripping off device of GXJ steel rubber water-proof belt lacing casees and its construction method
CN104831759A (en) * 2015-05-27 2015-08-12 上海隧道工程有限公司 GXJ steel rubber waterstop connector box connection device
CN104895117A (en) * 2015-05-27 2015-09-09 上海隧道工程有限公司 GXJ steel rubber water stop band connector box lateral stripping device and construction method thereof
CN104831759B (en) * 2015-05-27 2016-06-08 上海隧道工程有限公司 The connecting device of the joint case of GXJ steel rubber fastening band
CN104929158A (en) * 2015-06-19 2015-09-23 上海建工二建集团有限公司 Connector box used for underground diaphragm wall steel-rubber connector and construction method
CN106013086A (en) * 2016-06-23 2016-10-12 程华清 Construction method for processing underground continuous wall joint through boss type I-steel joint box
CN108149675A (en) * 2016-12-02 2018-06-12 北京市地质工程公司 Using the construction method of underground continuous wall of assembled locking notch pipe water sealing structure
CN108149675B (en) * 2016-12-02 2019-10-25 北京市地质工程公司 Using the construction method of underground continuous wall of assembled locking notch pipe water sealing structure
CN108316282A (en) * 2017-12-29 2018-07-24 中国建筑第八工程局有限公司 The piecing devices and its construction method of diaphram wall
CN109944232A (en) * 2019-04-09 2019-06-28 上海市机械施工集团有限公司 A kind of construction method of underground continuous wall connector case
CN111424681A (en) * 2020-04-27 2020-07-17 中铁上海工程局集团华海工程有限公司 Waterproof joint structure under sectional application condition of underground continuous wall and cast-in-place pile and construction method thereof
CN111424681B (en) * 2020-04-27 2024-03-08 中铁上海工程局集团华海工程有限公司 Waterproof joint structure under condition of segmented application of underground diaphragm wall and cast-in-place pile and construction method thereof
CN115369924A (en) * 2022-08-02 2022-11-22 中国建筑第八工程局有限公司 Construction method of underground continuous wall joint
CN115369924B (en) * 2022-08-02 2023-11-21 中国建筑第八工程局有限公司 Construction method of underground diaphragm wall joint

Also Published As

Publication number Publication date
CN103410174B (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN103410174A (en) GXJ underground continuous wall rubber waterproof connector tool and construction method thereof
CN104088295B (en) The embedded connecting structure of enclosure wall and middle plate and construction method thereof in covered back-digging
CN203334322U (en) Seepage-prevention slurry blocking device of underground continuous wall
CN103981898A (en) Integral open-excavation node top-down underground engineering construction method
CN107542115A (en) Underground project waterproof structure and its construction method
CN110438988A (en) A kind of prefabricated bulkhead and pore digging method
CN201103127Y (en) Water stop locking notch tube of underground continuous wall
CN112144509A (en) Construction method of underground continuous wall, joint and connection structure thereof
KR101524303B1 (en) The wall members and underground wall, underground wall construction method using the same
US6749372B2 (en) Underground shell-pile continuous wall job practice and its special drill
CN104499489B (en) Foundation pit construction method
CN210151660U (en) Embedded concrete antiskid tenon grout stone retaining wall
CN201874008U (en) Discontinuous concrete grouting pile and wall structure
CN108104112B (en) A kind of underground wall body construction method based on the slurrying of original soil original position
CN108149694B (en) A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN104480945A (en) Inversed construction method for foundation pit
CN110387875A (en) Connector cutting device and its construction method
CN213267910U (en) Ultra-deep foundation pit enclosure water stop structure
CN104895117A (en) GXJ steel rubber water stop band connector box lateral stripping device and construction method thereof
CN113373904A (en) Water-stop type angle lug steel sheet pile and construction method
CN210766887U (en) Face combination underground groove type structure forever
CN107059839B (en) A kind of construction method of armored concrete waveform sheet pile underground structure
CN205604304U (en) Leakage structure is prevented to basement reverse construction method shear force wall
CN106854874B (en) Underground spliced wall and precast concrete pile for same
CN210636450U (en) Foundation ditch stagnant water curtain secant pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151217

Address after: 200232 Shanghai city Xuhui District Wanping Road No. 1099 5 floor

Applicant after: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Applicant after: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Address before: 200082 No. 118, Dalian Road, Shanghai, Yangpu District

Applicant before: Shanghai Tunnel Engineering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190711

Address after: 200000 5th Floor, No. 1099 Wanping South Road, Xuhui District, Shanghai

Co-patentee after: Shanghai Tunnel Engineering Co., Ltd.

Patentee after: SHANGHAI TUNNEL ENGINEERING CO., LTD.

Co-patentee after: SHANGHAI TUNNEL FOUNDATION ENGINEERING CO., LTD.

Address before: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai

Co-patentee before: Shanghai Tunnel Engineering Co., Ltd.

Patentee before: SHANGHAI TUNNEL ENGINEERING CO., LTD.