CN205224016U - Vertical mosaic structure of precast underground continuous wall - Google Patents

Vertical mosaic structure of precast underground continuous wall Download PDF

Info

Publication number
CN205224016U
CN205224016U CN201520913140.8U CN201520913140U CN205224016U CN 205224016 U CN205224016 U CN 205224016U CN 201520913140 U CN201520913140 U CN 201520913140U CN 205224016 U CN205224016 U CN 205224016U
Authority
CN
China
Prior art keywords
continuous wall
underground continuous
coercion underground
width
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520913140.8U
Other languages
Chinese (zh)
Inventor
胡坚尉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201520913140.8U priority Critical patent/CN205224016U/en
Application granted granted Critical
Publication of CN205224016U publication Critical patent/CN205224016U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a vertical mosaic structure of precast underground continuous wall, two ground link the wall about being used for connecting, two upper and lower ground even are equipped with assorted concave part and convex part respectively in the middle part of the abutting end of wall, the notch is seted up on two the upper and lower ground even both sides correspondence of the abutting end of wall, the concave part, convex part and four notches are arranged along di lianqiang's width direction total length respectively, the transversal triangle -shaped that personally submits of convex part, the drawknot muscle of the pre -buried evagination of difference in the both sides notch of one of them ground company wall, and the injected hole that is used for to notch slip casting is even still seted up in the both sides of wall in a following ground. Through setting up assorted convex part and concave part, through injected hole slip casting in to the cavity that the notch formed of upper and lower correspondence to and pre -buried in the notch drawknot muscle, two ground internal force of wall even about can effective transmission, two ground internal force of wall has even reduced single width the ground even length and the weight of wall simultaneously about can effective transmission, is fit for the transportation and hoists, has increased the applicable foundation ditch excavation depth of di lianqiang again.

Description

The vertical splicing construction of coercion underground continuous wall
Technical field
The utility model relates to the vertical splicing construction of a kind of coercion underground continuous wall, is specially adapted to coercion underground continuous wall as vertical splicing when bracing of foundation pit and outer wall of basement.
Background technology
At present, coercion underground continuous wall is based on cast in situs, and the utilization of coercion underground continuous wall is considerably less.This is because the coercion underground continuous wall length direction of routine does not establish seam, cause single width coercion underground continuous wall length long, weight is much, is not suitable for transport and lifting; Cause the coercion underground continuous wall excavation of foundation pit applicatory degree of depth very shallow, range of application is very limited, economical very poor, and this all greatly constrains the application of Precast Diaphragm Wall simultaneously.
Therefore, how to provide a kind of structure simple, easy construction, reliably effectively can transmit the internal force of upper and lower two width coercion underground continuous wall, separately can realize coercion underground continuous wall not do all the other process and directly as the vertical splicing construction of coercion underground continuous wall that outer wall of basement uses, can become the technical problem that building operations circle needs further improvement and optimization.
Utility model content
The purpose of this utility model is to provide a kind of coercion underground continuous wall vertical splicing construction, structure is simple, easy construction, reliably effectively can transmit the internal force of upper and lower two width coercion underground continuous wall, realize coercion underground continuous wall do not do all the other process can directly use as outer wall of basement.
For solving the problems of the technologies described above, the utility model provides following technical scheme:
The vertical splicing construction of a kind of coercion underground continuous wall, for connecting upper and lower two width coercion underground continuous wall, the middle part of the butt end of upper and lower two width coercion underground continuous wall is respectively equipped with the recess and protuberance that match, the both sides correspondence of the butt end of upper and lower two width coercion underground continuous wall offers notch, described recess, protuberance and four notches are arranged along the width total length of described coercion underground continuous wall respectively, the cross section of described protuberance is triangular in shape, the tension rib of pre-buried evagination respectively in notch described in the both sides of a wherein width coercion underground continuous wall, and the both sides of a width coercion underground continuous wall are also offered for the injected hole to described notch slip casting below.
Preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, described protuberance is arranged at and is positioned at below on a width coercion underground continuous wall.
Preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, the cross section of described protuberance is isosceles triangle.
Preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, two of described protuberance are domatic is above equipped with rubber packing respectively, and described rubber packing is arranged along the width total length of described coercion underground continuous wall.
Preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, a pre-buried vertical steel plate for sealing water in described protuberance, the bottom of described recess is provided with the rectangular channel stretched into for described steel plate for sealing water.
Preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, the top of described steel plate for sealing water is provided with hydro-expansive rubber band, and described hydro-expansive rubber band is arranged along the width total length of described coercion underground continuous wall.
Preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, after upper and lower two width coercion underground continuous wall vertically splice, described tension rib pre-buried in notch extends near the bottom land of corresponding notch.
From above disclosed technical scheme, compared with prior art, the beneficial effects of the utility model are as follows:
One, the vertical splicing construction of coercion underground continuous wall disclosed in the utility model, upper and lower two width coercion underground continuous wall are by the protuberance that is fastened togather and recess, slip casting in the cavity formed by the notch of injected hole to upper and lower correspondence, and be embedded in tension rib in notch in advance, effectively can transmit the internal force of upper and lower two width ground-connecting-walls, make between upper and lower two width coercion underground continuous wall, form reliable connection;
Two, the vertical splicing construction of coercion underground continuous wall disclosed in the utility model, because coercion underground continuous wall is provided separately, reduce length and the weight of single width coercion underground continuous wall, be applicable to transport and lifting, again because the size of spliced coercion underground continuous wall entirety can significantly increase, because this increasing the coercion underground continuous wall excavation of foundation pit degree of depth applicatory, making it to be applied to and comparing use in existing darker foundation ditch, there are good economic benefits.
Three, the vertical splicing construction of coercion underground continuous wall disclosed in the utility model, because the cross section of described protuberance is triangular in shape, not only make the docking of upper and lower two width coercion underground continuous wall convenient, the installation effectiveness of effective raising, and when the upper and lower two width coercion underground continuous wall of splicing, a width coercion underground continuous wall along the domatic automatic attaching precise positioning of described protuberance under the effect in deadweight, can ensure that installation accuracy above.
Four, the vertical splicing construction of coercion underground continuous wall disclosed in the utility model, by the steel plate for sealing water arranged along the width total length of coercion underground continuous wall, hydro-expansive rubber band and rubber packing, three road waterproofing courses are defined in the stitching portion of upper and lower two width coercion underground continuous wall, can effectively prevent the water of coercion underground continuous wall side from flowing into the opposite side of coercion underground continuous wall through the stitching portion of upper and lower width coercion underground continuous wall, be conducive to coercion underground continuous wall do not do all the other process can directly use as outer wall of basement, be conducive to popularization and the utilization of Precast Diaphragm Wall.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the vertical splicing structure of the utility model one embodiment two width coercion underground continuous wall.
Fig. 2 is that the utility model one embodiment two width coercion underground continuous wall vertically splices front sectional drawing.
Fig. 3 is that the utility model one embodiment two width coercion underground continuous wall vertically splices rear sectional drawing.
Three-dimensional exploded view when Fig. 4 is the splicing of the utility model one embodiment two width coercion underground continuous wall.
Indicate in figure: 1, hydro-expansive rubber band; 2, steel plate for sealing water; 3, recess; 4, protuberance; 5, tension rib; 6, wall chase mouth below; 7, injected hole; 8, rectangular channel; 9, wall chase mouth above; 10, rubber packing; 11, concrete.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the vertical splicing construction of the coercion underground continuous wall that the utility model proposes is described in further detail.According to the following describes and claims, advantage of the present utility model and feature will be clearer.It should be noted that, accompanying drawing all adopts the form that simplifies very much and all uses non-ratio accurately, only in order to object that is convenient, aid illustration the utility model embodiment lucidly.
Refer to Fig. 1 to Fig. 4, wherein, Fig. 1 is the schematic diagram of the vertical splicing structure of the utility model one embodiment two width coercion underground continuous wall; Fig. 2 is that the utility model one embodiment two width coercion underground continuous wall vertically splices front sectional drawing; Fig. 3 is that the utility model one embodiment two width coercion underground continuous wall vertically splices rear sectional drawing; And Fig. 4 be the utility model one embodiment two width coercion underground continuous wall splicing time three-dimensional exploded view.
Present embodiment discloses the vertical splicing construction of a kind of coercion underground continuous wall, for connecting upper and lower two width coercion underground continuous wall, the middle part of the butt end of upper and lower two width coercion underground continuous wall is respectively equipped with the recess 3 and protuberance 4 that match, in the present embodiment, described protuberance 4 is arranged at and is positioned at below on a width coercion underground continuous wall, the both sides correspondence of the butt end of upper and lower two width coercion underground continuous wall offers notch, described notch comprise be positioned at a width coercion underground continuous wall above two above wall chase mouth 9 be positioned at two of a width coercion underground continuous wall below wall chase mouths 6 below, described recess 3, protuberance 4 and four notches are arranged along the width total length of described coercion underground continuous wall respectively, the cross section of described protuberance is triangular in shape, described in this, the cross section of protuberance is parallel to the thickness direction of described coercion underground continuous wall, perpendicular to the width of described coercion underground continuous wall, in notch described in the both sides of a wherein width coercion underground continuous wall respectively the tension rib 5 of pre-buried evagination also referred to as beard muscle, that is, the tension rib 5 of pre-buried evagination respectively in notch described in the both sides of a width coercion underground continuous wall above, and the both sides of a width coercion underground continuous wall are also offered for the injected hole 7 to described notch slip casting below.
The vertical splicing construction of coercion underground continuous wall of the present utility model, on the one hand, upper and lower two width coercion underground continuous wall are fastened togather by protuberance 4 and recess 5, and slip casting in the cavity up and down corresponding notch formed by injected hole, and be embedded in this three measures of tension rib in notch in advance, effectively can transmit the internal force of upper and lower two width ground-connecting-walls, make between upper and lower two width coercion underground continuous wall, form reliable connection; On the other hand, because coercion underground continuous wall is provided separately, reduce length and the weight of single width coercion underground continuous wall, be applicable to transport and lifting, again because the size of spliced coercion underground continuous wall entirety can significantly increase, because this increasing the coercion underground continuous wall excavation of foundation pit degree of depth applicatory, making it to be applied to and comparing use in existing darker foundation ditch, there are good economic benefits; Again on the one hand, because the cross section of described protuberance is triangular in shape, therefore, when the upper and lower two width coercion underground continuous wall of splicing, a width coercion underground continuous wall can along the domatic automatic attaching of described protuberance under the effect in deadweight above, precise positioning, the installation effectiveness not only improved, and ensure that installation accuracy.
Stressed more even in order to what make between upper and lower two width coercion underground continuous wall, the cross section of described protuberance 4 is isosceles triangle.
Preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, two of described protuberance 4 are domatic is above equipped with rubber packing 10 respectively, and described rubber packing 10 is arranged along the width total length of described coercion underground continuous wall.Due to two of described protuberance 4 domatic on rubber packing 10 is set; that is rubber packing 10 is set on leg-of-mutton both sides; the oblique contact surface of upper and lower two width coercion underground continuous wall is made to form flexible contact; so; not only can protect upper and lower two width coercion underground continuous wall, and first waterproofing course can be formed between upper and lower two width coercion underground continuous wall.
Preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, a pre-buried vertical steel plate for sealing water 2 in described protuberance 4, the bottom of described recess 5 is provided with the rectangular channel 8 i.e. strip recess stretched into for described steel plate for sealing water 2.By arranging steel plate for sealing water, between upper and lower two width coercion underground continuous wall, forming second waterproofing course, can prevent the water of coercion underground continuous wall side from flowing into the opposite side of coercion underground continuous wall through the stitching portion of upper and lower width coercion underground continuous wall.
In order to improve the risk of leakage of the stitching portion of upper and lower two width coercion underground continuous wall further, preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, the top of described steel plate for sealing water 2 is provided with hydro-expansive rubber band 1, and described hydro-expansive rubber band 1 is arranged along the width total length of described coercion underground continuous wall.Described hydro-expansive rubber band 1 forms the 3rd road waterproofing course between upper and lower two width coercion underground continuous wall.
Therefore, by the steel plate for sealing water 2 arranged along the width total length of coercion underground continuous wall, hydro-expansive rubber band 1 and rubber packing 10, thus define three road waterproofing courses in the stitching portion of upper and lower two width coercion underground continuous wall, can effectively prevent the water of coercion underground continuous wall side from flowing into the opposite side of coercion underground continuous wall through the stitching portion of upper and lower width coercion underground continuous wall, be conducive to coercion underground continuous wall do not do all the other process can directly use as outer wall of basement, save construction cost, be conducive to popularization and the utilization of Precast Diaphragm Wall.
In addition, in the vertical splicing construction of above-mentioned coercion underground continuous wall, described protuberance 4 is arranged at and is positioned at below on a width coercion underground continuous wall, and due to the cross section of described protuberance triangular in shape, therefore, when the upper and lower two width coercion underground continuous wall of splicing, above a width coercion underground continuous wall can under the effect in deadweight along the described protuberance 4 of a width coercion underground continuous wall below described domatic on automatic attaching, precise positioning, so, the installation effectiveness not only improved, and ensure that installation accuracy.
In addition, in order to improve bonding strength between upper and lower two width coercion underground continuous wall and reliability, preferably, in the vertical splicing construction of above-mentioned coercion underground continuous wall, after upper and lower two width coercion underground continuous wall vertically splice, described tension rib 5 pre-buried in notch extends near the bottom land of corresponding notch.
Please continue to refer to Fig. 1 to Fig. 4, the construction method of the vertical splicing construction of coercion underground continuous wall of this enforcement is as follows:
The first step, a fixing width coercion underground continuous wall below.
Second step, the top of lifting width coercion underground continuous wall width coercion underground continuous wall below described above.
3rd step, above a width coercion underground continuous wall under the effect of deadweight along the domatic automatic attaching of described protuberance 4, precise positioning.
4th step, by injected hole 7 toward notch slip casting, concreting 11 in the chamber that notch corresponding is up and down formed, makes upper and lower two width coercion underground continuous wall compact siro spinning technology.Certainly need in advance to arrange template at two ports of notch.In addition, the slurries injected toward injected hole 7 can add additive, to increase the concrete intensity in stitching portion, improve the connection reliability between two width coercion underground continuous wall further.
The vertical splicing construction of coercion underground continuous wall of the present utility model, on the one hand, upper and lower two width coercion underground continuous wall are fastened togather by protuberance 4 and recess 5, and slip casting in the cavity up and down corresponding notch formed by injected hole, and be embedded in this three measures of tension rib in notch in advance, effectively can transmit the internal force of upper and lower two width ground-connecting-walls, make between upper and lower two width coercion underground continuous wall, form reliable connection; On the other hand, because coercion underground continuous wall is provided separately, reduce length and the weight of single width coercion underground continuous wall, be applicable to transport and lifting, again because the size of spliced coercion underground continuous wall entirety can significantly increase, because this increasing the coercion underground continuous wall excavation of foundation pit degree of depth applicatory, making it to be applied to and comparing use in existing darker foundation ditch, there are good economic benefits; Again on the one hand, because the cross section of described protuberance is triangular in shape, therefore, when the upper and lower two width coercion underground continuous wall of splicing, a width coercion underground continuous wall can along the domatic automatic attaching of described protuberance under the effect in deadweight above, precise positioning, the installation effectiveness not only improved, and ensure that installation accuracy.

Claims (7)

1. the vertical splicing construction of coercion underground continuous wall, for connecting upper and lower two width coercion underground continuous wall, it is characterized in that, the middle part of the butt end of upper and lower two width coercion underground continuous wall is respectively equipped with the recess and protuberance that match, the cross section of described protuberance is triangular in shape, the both sides correspondence of the butt end of upper and lower two width coercion underground continuous wall offers notch, described recess, protuberance and four notches are arranged along the width total length of described coercion underground continuous wall respectively, the tension rib of pre-buried evagination respectively in notch described in the both sides of a wherein width coercion underground continuous wall, and the both sides of a width coercion underground continuous wall are also offered for the injected hole to described notch slip casting below.
2. the vertical splicing construction of coercion underground continuous wall as claimed in claim 1, is characterized in that, described protuberance is arranged at and is positioned at below on a width coercion underground continuous wall.
3. the vertical splicing construction of coercion underground continuous wall as claimed in claim 1, it is characterized in that, the cross section of described protuberance is isosceles triangle.
4. the vertical splicing construction of coercion underground continuous wall as claimed in claim 1, is characterized in that, two of described protuberance are domatic is above equipped with rubber packing respectively, and described rubber packing is arranged along the width total length of described coercion underground continuous wall.
5. the vertical splicing construction of coercion underground continuous wall as claimed in claim 1, is characterized in that, a pre-buried vertical steel plate for sealing water in described protuberance, the bottom of described recess is provided with the rectangular channel stretched into for described steel plate for sealing water.
6. the vertical splicing construction of coercion underground continuous wall as claimed in claim 5, it is characterized in that, the top of described steel plate for sealing water is provided with hydro-expansive rubber band, and described hydro-expansive rubber band is arranged along the width total length of described coercion underground continuous wall.
7. the vertical splicing construction of coercion underground continuous wall as claimed in claim 1, it is characterized in that, after upper and lower two width coercion underground continuous wall vertically splice, described tension rib pre-buried in notch extends near the bottom land of corresponding notch.
CN201520913140.8U 2015-11-16 2015-11-16 Vertical mosaic structure of precast underground continuous wall Active CN205224016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520913140.8U CN205224016U (en) 2015-11-16 2015-11-16 Vertical mosaic structure of precast underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520913140.8U CN205224016U (en) 2015-11-16 2015-11-16 Vertical mosaic structure of precast underground continuous wall

Publications (1)

Publication Number Publication Date
CN205224016U true CN205224016U (en) 2016-05-11

Family

ID=55899091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520913140.8U Active CN205224016U (en) 2015-11-16 2015-11-16 Vertical mosaic structure of precast underground continuous wall

Country Status (1)

Country Link
CN (1) CN205224016U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350521A (en) * 2015-11-16 2016-02-24 上海市政工程设计研究总院(集团)有限公司 Vertical splicing structure and method of prefabricated underground diaphragm walls
CN107447747A (en) * 2017-06-30 2017-12-08 上海建工集团股份有限公司 A kind of coercion underground continuous wall and its construction method
CN107476351A (en) * 2017-08-21 2017-12-15 北京市轨道交通建设管理有限公司 The waterproof method of the assembled prefabricated side wall assembling construction seam in station
CN108104111A (en) * 2017-12-29 2018-06-01 章胜南 It is a kind of accurately to descend wall construction method
CN108149694A (en) * 2017-12-29 2018-06-12 章胜南 A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN108193667A (en) * 2018-01-09 2018-06-22 上海应用技术大学 A kind of water proof type spelling dress list three Room thin wall-type continuous underground wall structure of case and construction method
CN108221959A (en) * 2018-01-09 2018-06-29 上海应用技术大学 Vertical spliced diaphram wall and its construction method
CN108316522A (en) * 2018-02-24 2018-07-24 东南大学 The prefabricated double board wall units of one kind, assembly concrete shear wall and preparation method thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350521A (en) * 2015-11-16 2016-02-24 上海市政工程设计研究总院(集团)有限公司 Vertical splicing structure and method of prefabricated underground diaphragm walls
CN107447747A (en) * 2017-06-30 2017-12-08 上海建工集团股份有限公司 A kind of coercion underground continuous wall and its construction method
CN107447747B (en) * 2017-06-30 2019-08-30 上海建工集团股份有限公司 A kind of construction method of coercion underground continuous wall
CN107476351A (en) * 2017-08-21 2017-12-15 北京市轨道交通建设管理有限公司 The waterproof method of the assembled prefabricated side wall assembling construction seam in station
CN107476351B (en) * 2017-08-21 2018-08-21 北京市轨道交通建设管理有限公司 The waterproof method of the assembled prefabricated side wall assembling construction seam in station
CN108104111A (en) * 2017-12-29 2018-06-01 章胜南 It is a kind of accurately to descend wall construction method
CN108149694A (en) * 2017-12-29 2018-06-12 章胜南 A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN108104111B (en) * 2017-12-29 2019-09-24 章胜南 It is a kind of accurately to descend wall construction method
CN108149694B (en) * 2017-12-29 2019-10-18 章胜南 A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN108193667A (en) * 2018-01-09 2018-06-22 上海应用技术大学 A kind of water proof type spelling dress list three Room thin wall-type continuous underground wall structure of case and construction method
CN108221959A (en) * 2018-01-09 2018-06-29 上海应用技术大学 Vertical spliced diaphram wall and its construction method
CN108316522A (en) * 2018-02-24 2018-07-24 东南大学 The prefabricated double board wall units of one kind, assembly concrete shear wall and preparation method thereof

Similar Documents

Publication Publication Date Title
CN205224016U (en) Vertical mosaic structure of precast underground continuous wall
CN105350521A (en) Vertical splicing structure and method of prefabricated underground diaphragm walls
CN112144509A (en) Construction method of underground continuous wall, joint and connection structure thereof
CN206128049U (en) A waterproof construction for vertical mosaic structure of precast underground continuous wall
CN106284303B (en) A kind of prefabricated ground-connecting-wall and its construction method with the limit of angle steel connector
CN109281299A (en) A kind of construction method of water conservancy agricultural irrigation anti-seepage channel
CN211973568U (en) Precast concrete culvert pipe and prefabricated utility tunnel
CN106351208A (en) Prefabricated underground diaphragm wall vertical-splicing structure
CN106436691A (en) Prefabricated underground continuous wall vertical assembly method
CN207597394U (en) The horizontally-spliced structure of coercion underground continuous wall
CN216078765U (en) Pile foundation post-grouting pipeline joint
CN209323504U (en) A kind of continuous underground wall structure
CN113882360A (en) Pile connecting structure and method for pouring tubular pile transverse partition plates
CN109056649A (en) A kind of sheet pile combination shore protection and its construction method
CN212612906U (en) Prefabricated assembled escape canal
CN206941518U (en) A kind of fabricated rectangular canal
CN208545754U (en) A kind of argillaceous sandstone area deep foundation ditch steel plate pile structure
CN202577284U (en) Novel end plate
CN207727614U (en) Spliced piping lane sealing structure
CN213897194U (en) Filling type rubber joint pipe
CN217678884U (en) Ecological river bank protection
CN109403369A (en) A kind of production method of breast boards structure and breast boards structure
CN205530136U (en) Modular water conservancy ditch rapid prototyping device
CN211340674U (en) Link plate formula channel revetment reinforced structure
CN110607783B (en) Rope-threading lap joint type slope protection brick and slope protection formed by same

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant