CN108316240A - A kind of component that can quickly form disaster relief dike - Google Patents
A kind of component that can quickly form disaster relief dike Download PDFInfo
- Publication number
- CN108316240A CN108316240A CN201810240737.9A CN201810240737A CN108316240A CN 108316240 A CN108316240 A CN 108316240A CN 201810240737 A CN201810240737 A CN 201810240737A CN 108316240 A CN108316240 A CN 108316240A
- Authority
- CN
- China
- Prior art keywords
- outside plate
- component
- curling
- receipts
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 17
- 239000000463 material Substances 0.000 claims abstract description 17
- 239000010959 steel Substances 0.000 claims abstract description 17
- 238000003860 storage Methods 0.000 claims abstract description 12
- 235000005121 Sorbus torminalis Nutrition 0.000 claims description 29
- 244000152100 Sorbus torminalis Species 0.000 claims description 29
- 239000004575 stone Substances 0.000 claims description 11
- 239000002689 soil Substances 0.000 claims description 10
- 239000002184 metal Substances 0.000 claims description 8
- 239000004567 concrete Substances 0.000 claims description 7
- 239000000203 mixture Substances 0.000 claims description 7
- 238000009958 sewing Methods 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 4
- 150000001875 compounds Chemical class 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- -1 sandstone Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 229920000742 Cotton Polymers 0.000 claims description 2
- 239000007779 soft material Substances 0.000 claims description 2
- 230000005540 biological transmission Effects 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 11
- 238000005516 engineering process Methods 0.000 description 6
- 241000209094 Oryza Species 0.000 description 5
- 235000007164 Oryza sativa Nutrition 0.000 description 5
- 235000009566 rice Nutrition 0.000 description 5
- 235000013351 cheese Nutrition 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000009172 bursting Effects 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000011017 operating method Methods 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 241001233242 Lontra Species 0.000 description 1
- 210000003484 anatomy Anatomy 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 238000001727 in vivo Methods 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/106—Temporary dykes
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
A kind of component that can quickly form disaster relief dike, component includes outside plate and inner panel;It is characterized in that:Component further includes receiving body of curling up, and the construction for receiving body of curling up, which is cuboid rectangular tube lower end, has bottom plate back cover to form barrel-shaped body, can receive the waterproof leakage material curled up and be made;Receipts body left and right ends outer wall of curling up is both provided with outside plate, and receipts body left and right ends inner wall of curling up is respectively arranged with inner panel, and staving, outside plate and inner panel are tightly fixed as one by lead screw, form component;When transporting or when storage assembly for storing, component inwardly be used force compresses, is fixed with screw or rope, component forms handle type;The larger material of proportion is added in multiple groups of body expansion, and multiple groups of bodies are chained together to form strip flood bank or fort bank with screw or steel plate folder;The invention belongs to the technical fields of building products and rescue and relief work product;The beneficial effects of the invention are as follows:Component energy boil down to handle type, convenience in transport or storage, component energy Rapid Combination is at flood bank or Bao Kan, the generation that prevents natural disaster.
Description
Technical field
The present invention relates to a kind of components that can quickly form disaster relief dike, belong to the technology neck of building products and rescue and relief work product
Domain.
Background technology
The disaster relief, which refers to state and society, to prevent and saves natural calamity and damage carried out struggle caused by human society,
The result that the disaster relief generates must quickly and efficiently reduce minimum loss, be the groundwork that mankind nowadays society must pay attention to,
It is the groundwork for ensureing people's life and the safety of property;Dike includes flood bank and Bao Kan, and flood bank refers to water in order to prevent
It is the dykes and dams for spreading unchecked and building, flood bank has early just occurred in ancient times, and it is in grow that ancient times flood bank, which is typically by soil or building stones stacking,
Now, there is concrete material flood bank, flood bank is continuous along river, lake or ocean sometimes with the development of science and technology in bar shaped
Prolong several kilometers;Flood bank can protect the people in waterfront far from big flood, from human loss and property loss;Fort bank is to use again
The elongated bank that strip building material, such as stone is built up, mainly soil protection structure are not destroyed, prevent erosion, and prevent mountain
Ground comes down and the disaster of mud-rock flow, the construction from human loss and property loss, some fort banks are identical to flood bank;But it controls flood
Dike and the insufficient aspects of Bao Kan are that flood bank may burst, and also build flood bank and need several years or several months, and forecast has flood
Disaster is come temporarily, separately to build flood bank with regard to too late soon;It also builds Bao Kan and also needs several years or several months, when forecast has mountain
The phenomenon that fast landslide in ground or mud-rock flow, fort bank is separately built with regard to too late.
Invention content
In order to overcome the shortcomings of above-mentioned technology, it is special that the present invention provides a kind of technology for the component that can quickly form disaster relief dike
Sign, a kind of component that can quickly form disaster relief dike, component energy boil down to handle type, convenience in transport or storage, component can be quick groups
Synthesize flood bank or Bao Kan, the generation to prevent natural disaster;
In order to achieve the above objectives, what the present invention adopts the following technical solutions to realize;A kind of group that can quickly form disaster relief dike
Part, the component include outside plate and inner panel, it is characterised in that;
The construction for receiving body of curling up, which is cuboid rectangular tube lower end, has bottom plate back cover to form barrel-shaped body, and receipts curl up body by that can receive the waterproof curled up leakage
Material is made;
Receipts body left and right ends of curling up are symmetrically arranged with multiple screw hole A;Receipts body left and right ends outer wall of curling up is both provided with outside plate, and outside plate is high
Degree, which is equal to, receives the height of body of curling up, and the width of outside plate is more than the width for receiving body of curling up, and outside plate rear and front end, which is stretched out to receive, curls up front and back the two of body
End;
Outer plate surfaces are provided with anti-skid chequer, and outside plate rear and front end is provided with multiple Philip's head screw holes and round hole;
Receipts body left and right ends inner wall of curling up is respectively arranged with inner panel, and inner panel height is equal to the height for receiving internal wall of curling up, the width of inner panel
Equal to the width for receiving internal wall of curling up, or the width for internal wall of curling up slightly smaller than is received, inner panel is provided with screw hole corresponding with screw hole A
B, multiple lead screw one end are welded in outside plate after being each passed through screw hole B and screw hole A, and the lead screw other end is fixed with nut,
Staving, outside plate and inner panel are tightly fixed as one, component is formed;
When transporting or when storage assembly for storing, component inwardly be used force compresses, is fixed with screw or rope, component forms handle type;
Multiple components are carried out to receive to curl up is added the larger material of proportion in vivo, and multiple groups of bodies are chained together with screw or steel plate folder
Form strip flood bank or fort bank;
The beneficial effects of the invention are as follows:Component energy boil down to handle type, convenience in transport or storage, component energy Rapid Combination is at flood bank
Or Bao Kan, the generation to prevent natural disaster.
Description of the drawings
Fig. 1, the present invention receive body left and right ends outer wall of curling up and are both provided with outer panel structure schematic diagram;
Fig. 2, the present invention receive body left and right ends of curling up and are symmetrically arranged with multiple screw hole A structural schematic diagrams;
Fig. 3, outer plate surfaces of the present invention are provided with anti-skid chequer A, Philip's head screw hole and circular holes pore structure schematic diagram;
Fig. 4, Philip's head screw pore structure schematic diagram of the present invention;
Fig. 5, the present invention receive curl up body, outside plate and inner panel and are tightly fixed as one to form component anatomical structure schematic diagram;
Fig. 6, the multiple components of the present invention outside plate mutually successively close to attachment structure schematic diagram;
Fig. 7, steel plate clamping structure schematic diagram of the present invention;
Fig. 8, steel plate sandwiched of the present invention are equipped with elongated screw hole structure schematic diagram;
Fig. 9, the present invention receive body rear and front end of curling up and backplate are added, and the round hole in multiple left and right is inserted at the left and right end of multiple horizontal stripes respectively
Structural schematic diagram;
In Figure 10, present example three, the structural transform for receiving body of curling up is net form barrel structure schematic diagram;
In Figure 11, present example four, the structural schematic diagram of saddle clip;
In figure:Receipts are curled up body 1, screw hole A1-1, outside plate 2, anti-skid chequer A201, Philip's head screw hole 202, elongated hole 20201, round
Plate 20202, round hole 203, inner panel 3, lead screw 4, collision mat 5, screw A6, steel plate folder 7, upper clamp 701, lower folder
Body 702, circular discs 704, anti-skid chequer B, elongated screw hole 705, screw B706, horizontal stripe 8, backplate 9, is ridden at hinge 703
Horse card 10.
Specific implementation mode
The present invention is illustrated further below by way of examples and with reference to the accompanying drawings;
Example one
A kind of component that can quickly form disaster relief dike, the component include outside plate 2 and inner panel 3;It is characterized in that, in Fig. 1 and Fig. 2
In,
The construction for receiving body 1 of curling up, which is cuboid rectangular tube lower end, has bottom plate back cover to form barrel-shaped body, and receipts curl up body 1 by that can receive the waterproof curled up
Leakage material is made, and it includes expanding rubber or non-telescoping rubber that waterproof, which leaks material,;
Receipts 1 left and right ends of body of curling up are symmetrically arranged with multiple screw hole A101;Receipts 1 left and right ends outer wall of body of curling up is both provided with outside plate 2,
Outside plate 2 is metal rectangular plate, and 2 height of outside plate is equal to the height for receiving body 1 of curling up, and the width of outside plate 2 is more than the width for receiving body 1 of curling up, outside
The rear and front end for receiving body 1 of curling up is stretched out in 2 rear and front end of plate;
In figure 3,2 surface of outside plate is provided with anti-skid chequer A201, and the construction of anti-skid chequer A201 is that multiple geomeries are identical small
For type bossy body in proper alignment in length and breadth, 2 rear and front end of outside plate is provided with multiple Philip's head screw holes 202 and round hole 203;
In Fig. 4, the construction in Philip's head screw hole 202 is:Two elongated holes 20201 report to the leadship after accomplishing a task to be formed in cross, two elongated holes
20201 places of reporting to the leadship after accomplishing a task have circular slab 20202 to reinforce connection;
In Figure 5, it receives 1 left and right ends inner wall of body of curling up and is respectively arranged with inner panel 3, inner panel 3 is metal rectangular plate, 3 height of inner panel etc.
In the height for receiving 1 inner wall of body of curling up, the width of inner panel 3 is equal to or slightly less than the width for receiving 1 inner wall of body of curling up, and the thickness of inner panel 3 is less than
The thickness of outside plate 2, inner panel 3 are provided with screw hole B corresponding with screw hole A101, and 4 one end of multiple lead screw is each passed through screw
Outside plate 2 is welded in after hole B and screw hole A101,4 other end of lead screw is fixed with nut, and receipts are curled up body 1, outside plate 2 and inner panel 3 tightly
It fastens and is integrated, form component;
Operating procedure
One, the storage and transport of body of curling up are received
When transporting or when storage assembly for storing, left and right outside plate 2 is inwardly used force compresses, curl up body 1 since component contains receipts, component is natural
It can shrink to form cheese, then penetrating 2 corresponding Philip's head screw hole 202 of left and right outside plate with screw connects fixation, makes its group
Part can keep cheese for a long time, occupy little space, convenience in transport or storage, since Philip's head screw hole 202 is to be in by two elongated holes
Cross reports to the leadship after accomplishing a task to be formed, and when left and right outside plate 2 inwardly uses force compresses, the corresponding Philip's head screw hole 202 of left and right outside plate 2 slightly misplaces,
Screw equally can conveniently penetrate Philip's head screw hole 202 and be attached fixation, or left and right outside plate 2 is bundled in one using rope
It rises, it is cheese that can equally keep component for a long time;
Two, the composition of flood bank
When forecast has the flood damage either original flood bank that arrives soon to have the phenomenon that soon bursting or original flood bank
It has burst, it is necessary to build new flood bank in the shortest time, ensure the safety of people's life material production, component is transported to new
The place of flood bank is built, in figure 6,1 oral area of body of curling up is received and erects expansion upwards, the outside plate 2 of multiple components is mutually close successively
Connection, outside plate 2 and the connecting sewing of outside plate 2 are filled using collision mat 5, keep its outside plate 2 and the connecting sewing of outside plate 2 water-tight,
The construction of collision mat 5 is rectangular slab, and the thickness of collision mat 5 is less than the thickness of outside plate 2, and the width of collision mat 5 is equal to the width of outside plate 2
Degree, the height of collision mat 5 are equal to the height of outside plate 2, and collision mat 5 includes that sheet rubber or other waterproof soft boards, screw A6 penetrate phase
Adjacent Philip's head screw hole 202, and collision mat 5 is punched into break-through, multiple component string fixeds are set to strip flood bank shape, by
It is influenced in by orographic condition, some components can be slightly higher, and some components can be slightly lower, and corresponding Philip's head screw hole 202 can be caused slightly wrong
Position, since Philip's head screw hole 202 is to be reported to the leadship after accomplishing a task to be formed in cross by two elongated holes, screw A6 equally can conveniently penetrate Philip's head screw
Hole 202 is attached fixation;
When corresponding Philip's head screw hole 202 misplaces too big, inconvenience screw A6 connections, using multiple steel plates folder 7 will it is adjacent outside
2 front and back end of plate tightly clamping connection is together;In figures 7 and 8, the construction of steel plate folder 7 is:The tail of upper clamp 701 and lower clamp 702
End is connected with hinge 703, and upper clamp 701 and 702 front end of lower clamp are extended with circular discs 704 up and down, 704 end face of circular discs respectively
It is provided with anti-skid chequer B, the construction and size of anti-skid chequer B are identical to anti-skid chequer A201, when anti-skid chequer B contacts anti-skid chequer A201,
Steel plate folder 7 has anti-skid chequer B and anti-skid chequer A201 reinforcings not to allow loosening of skidding, 702 adjacent circular disk of upper clamp 701 and lower clamp
704 are respectively arranged with elongated screw hole 705, and the construction of elongated screw hole 705 is long rectangular opening, and screw B706 penetrates elongated screw
Hole 705, when screw B706 tightenings are closed, adjacent outside plate 2 and collision mat 5 are tightly fixed to together, receive by upper and lower circular discs 704
It curls up and water source, soil, sandstone, concrete paddle or the larger material of other proportions is added in body 1, when receipts body 1 of curling up has bulging phenomenon, multiple cross
The left end of item 8 is inserted into multiple left round holes 203 respectively and right end is inserted into multiple right round holes 203 respectively, alternatively, in Fig. 9
In, it receives 1 rear and front end of body of curling up and backplate 9 is added, 9 structure of backplate is rectangular slab, and the height of backplate 9, which is equal to or slightly less than, receives body 1 of curling up
Highly, the width of backplate 9 is equal to or slightly less than the distance between left outside plate 1 and right outside plate 1, and the left end of multiple horizontal stripes 8 is inserted respectively
Enter multiple left round holes 203 and right end is inserted into multiple right round holes 203 respectively, its backplate 9 is made not rouse receipts body control of curling up
Go out;New flood bank, which is just quickly built, to be finished, and when component A is erect built on the sand, easy inclination is supported with support column, or will flood control
Dike is built to be built for multilayer or two flood bank standoff distances, with soil or the filling of building stones or concrete paddle between two flood banks
Form compound flood bank;
When to build higher flood bank, corresponding overlapping, multiple outside plates 2 correspond to overlapping, steel plate to multiple components up and down naturally up and down
Folder 7 rides the connecting sewing into upper and lower outside plate 2 by 2 reinforcement by connection of upper and lower outside plate in together;
When the contact surface on flood bank and ground has drainage, blocked with soil, cotton or other waterproof soft materials;
Since component is containing body 1 of curling up is received, flood bank conveniently is built in rough location, also conveniently builds Curved flood bank;
Three, the composition of fort bank
When there is massif to have soon landslide phenomenon, component string is linked as guarantor's bank shape by the composition connection method of above-mentioned flood bank,
Then soil, sandstone, concrete paddle or the larger material of other proportions are added in body 1 receiving to curl up, fort bank;
Example two
A kind of component that can quickly form disaster relief dike, the component include outside plate 2 and inner panel 3;It is characterized in that,
In fig. 1 and 2, the construction for receiving body 1 of curling up, which is cuboid rectangular tube lower end, has bottom plate back cover to form barrel-shaped body, rectangular tube and
The thickness of bottom plate is respectively 0.4 centimetre to 1 centimetre, receives body 1 of curling up and is made by that can receive the waterproof curled up leakage material, and waterproof leakage material includes
Expanding rubber or non-telescoping rubber;The height for receiving body 1 of curling up is 200 centimetres, and length and width is 100 centimetres;
Receipts 1 left and right ends of body of curling up are symmetrically arranged with multiple screw hole A101, and receipts 1 left and right ends outer wall of body of curling up is both provided with outside plate 2,
Outside plate 2 is metal rectangular plate, and 2 height of outside plate is equal to the height for receiving body 1 of curling up, and the width of outside plate 2 is 140 centimetres to 150 centimetres, outside
The thickness of plate 2 is 0.5 centimetre to 1 centimetre, and 2 rear and front end of outside plate is equidistant to stretch out the rear and front end for receiving body 1 of curling up;
In figure 3,2 surface of outside plate is provided with anti-skid chequer 201, and the construction of anti-skid chequer 201 is that multiple geomeries are identical small-sized
For bossy body in proper alignment in length and breadth, the construction of bossy body includes cuboid, cylinder, hemisphere, convex when bossy body is rectangle
It is 0.05 centimetre to 0.1 centimetre to go out the length and width of body and height, and when bossy body is cylinder, the height of bossy body is 0.1 li
Rice, a diameter of 0.12 centimetre, when bossy body is hemisphere, the height of bossy body is 0.1 centimetre, and maximum gauge is 0.15 li
Rice, 2 rear and front end of outside plate are provided with multiple Philip's head screw holes 202 and round hole 2-3,
In Fig. 4, the construction in Philip's head screw hole 202 is:Two elongated holes 20201 report to the leadship after accomplishing a task to be formed in cross, two elongated holes
20201 places of reporting to the leadship after accomplishing a task have circular slab 20202 to reinforce connection;The thickness of circular slab 20202 is identical to the thickness of outside plate 2;Other technologies
Feature same instance 1, effect is consistent;
Example three
A kind of component that can quickly form disaster relief dike, the component include outside plate 2 and inner panel 3;It is characterized in that, in Fig. 10,
The construction for receiving body 1 of curling up, which is net form pipe lower end, has net form bottom plate back cover to form net form bucket, and net form board structure is as broad as long square
Shape web plate, net form pipe and net form bottom plate are to be reported to the leadship after accomplishing a task to be knitted to form in length and breadth by stone dead wire respectively;When receipts curl up 1 oral area of body extend up for
When rectangle net form bucket, receipts curl up the length of body 1 and it is wide be 90 centimetres, be highly 180 centimetres, receipts curl up 1 left and right ends of body be respectively connected with it is outer
Plate 2, outside plate 2 are metal rectangular plate, and 2 height of outside plate is equal to the height for receiving body 1 of curling up, and the width of outside plate 2 is 130 centimetres to 140 lis
The thickness of rice, outside plate 2 is 0.6 centimetre to 1.2 centimetres, and 2 rear and front end of outside plate is equidistant to stretch out the rear and front end for receiving body 1 of curling up;
In figure 3,2 surface of outside plate is provided with anti-skid chequer 201, and the construction of anti-skid chequer 201 is that multiple geomeries are identical small-sized
For bossy body in proper alignment in length and breadth, the construction of bossy body includes cuboid, cylinder, hemisphere, convex when bossy body is rectangle
It is 0.06 centimetre to 0.12 centimetre to go out the length and width of body and height, and when bossy body is cylinder, the height of bossy body is 0.12 li
Rice, a diameter of 0.13 centimetre, when bossy body is hemisphere, the height of bossy body is 0.1 centimetre, and maximum gauge is 0.16 li
Rice, 2 rear and front end of outside plate are provided with multiple Philip's head screw holes 202 and round hole 203;
In Fig. 4, the construction in Philip's head screw hole 202 is:Two elongated holes 20201 report to the leadship after accomplishing a task to be formed in cross, two elongated holes
20201 places of reporting to the leadship after accomplishing a task have circular slab 20202 to reinforce connection;The thickness of circular slab 20202 be equal to or no more than outside plate 2 thickness;
In Figure 5, it receives and is respectively arranged with inner panel 3 in 1 left and right ends of body of curling up, inner panel 3 is metal rectangular plate, and 3 height of inner panel is equal to
The height curled up in body 1 is received, the width of inner panel 3 is equal to the width received and curled up in body 1;
The mesh that body 1 of curling up is received in the alignment of inner panel 3 is provided with multiple screw hole B, 4 one end of multiple lead screw be each passed through screw hole B and
Receipts curl up and are welded in outside plate 2 after 1 mesh of body, and 4 other end of lead screw is fixed with nut, and curl up body 1, outside plate 2 and inner panel 3 of receipts is tightly solid
It is set to one, forms component;
Operating procedure
One, the storage and transport of body of curling up are received
The storage technical characteristic same instance one for body of curling up is received, effect is consistent;
Two, the composition of flood bank
When to have flood damage to come soon when interim either original flood bank has the phenomenon that soon bursting or original anti-for forecast
When big vast dike has burst, it is necessary to build new flood bank in the shortest time, ensure the safety of people's life material production, component is transported
Extremely newly to build the place of flood bank, in figure 6, receipts 1 oral area of body of curling up erects expansion upwards, the outside plates 2 of multiple components mutually according to
It is secondary that close to connection, screw A6 penetrates adjacent Philip's head screw hole 2-2, multiple components is fixed as strip flood bank shape, by
It is influenced in by orographic condition, some components can be slightly higher, and some components can be slightly lower, and adjacent Philip's head screw hole 202 can be caused slightly wrong
Position, since Philip's head screw hole 202 is to be reported to the leadship after accomplishing a task to be formed in cross by two elongated holes, screw A6 equally can conveniently penetrate Philip's head screw
Hole 202 is attached fixation;When the adjacent dislocation of Philip's head screw hole 202 is too big, inconvenience screw A6 connections, using multiple steel plates
Folder 7 by adjacent 2 front and back end of outside plate tightly clamping connection together;In figures 7 and 8, the construction of steel plate folder 7 is:701 He of upper clamp
The tail end of lower clamp 702 is connected with hinge 703, and upper clamp 701 and 702 front end of lower clamp are extended with circular discs 704 up and down respectively,
704 end face of circular discs is provided with anti-skid chequer B, and the construction and size of anti-skid chequer B are identical to anti-skid chequer A201, when anti-skid chequer B is contacted
When anti-skid chequer A201, steel plate folder 7 has anti-skid chequer B and anti-skid chequer A201 reinforcings not to allow skid loosening, upper clamp 701 and lower clamp
702 adjacent circular disks 704 are respectively arranged with elongated screw hole 705, and the construction of elongated screw hole 705 is long rectangular opening, screw
B706 penetrates elongated screw hole 705, and when screw B706 tightenings are closed, adjacent outside plate 2 is tightly fixed to by upper and lower circular discs 704
Together, it receives to curl up and stone, brick, concrete block or the larger block shape material of other proportions is added in body 1, when receipts body 1 of curling up has bulging phenomenon,
The left end of multiple horizontal stripes 8 is inserted into multiple left round holes 203 respectively and right end is inserted into multiple right round holes 203 respectively, alternatively,
In fig.9, it receives 1 rear and front end of body of curling up and backplate 9 is added, 9 structure of backplate is rectangular slab, and the height of backplate 9 is high equal to body 1 of curling up is received
Degree, the width of backplate 9 are equal to or slightly less than the distance between left outside plate 1 and right outside plate 1, and the left end of multiple horizontal stripes 8 is inserted into respectively
Multiple left round holes 203 and right end are inserted into multiple right round holes 203 respectively, its backplate 9 is made not rouse the receipts control of body 1 of curling up
Go out, using waterproof cloth packing flood bank, keeps its flood bank water-tight;New flood bank, which is just quickly built, to be finished, when component is erect not
It is firm, it is easy to tilt, flood bank is built and is built for multilayer or two flood bank standoff distances, is padded between two flood banks
Upper waterproof cloth continues to be filled to form compound flood bank with soil or stone;
When to build higher flood bank, corresponding overlapping, multiple outside plates 2 correspond to overlapping, steel plate to multiple components up and down naturally up and down
Folder 7 rides the connecting sewing into upper and lower outside plate 2 by 2 reinforcement by connection of upper and lower outside plate in together;
Since component is containing body 1 of curling up is received, flood bank conveniently is built in rough location, also conveniently builds Curved flood bank;
Three, the composition of fort bank
When there is massif to have soon landslide phenomenon, component is connected as guarantor's bank shape by the composition connection method of above-mentioned flood bank;
Example four
A kind of component that can quickly form disaster relief dike, the component include receiving curl up body 1 and outside plate 2;It is characterized in that, in Figure 10
In, receive curl up body 1 construction be net form pipe lower end have net form bottom plate back cover formed net form bucket, net form board structure be it is as broad as long
Rectangular otter board, net form pipe and net form bottom plate are to be reported to the leadship after accomplishing a task to be knitted to form in length and breadth by stone dead wire respectively;When receipts 1 oral area of body of curling up extends up
For rectangle net form bucket when, receipts curl up body 1 length and it is wide be 80 centimetres, be highly 160 centimetres;The outside plate 2 is metal rectangular plate, outside
2 height of plate, which is equal to, receives the height of body 1 of curling up, and the width of outside plate 2 is 120 centimetres to 130 centimetres, the thickness of outside plate 2 be 0.6 centimetre extremely
1 centimetre;
1 left and right ends of body of curling up of receiving are both provided with left and right outside plate 2, and multiple saddle clips 10 are simultaneously welded in outside plate 2 inside in left and right relatively
Or receipts body 1 of curling up is attached fixation by steel wire hook, in fig. 11, the structure of saddle clip 10 is that semicircular pipe left and right ends connect
It is connected to rectangular slab, when the stone dead wire for receiving body 1 of curling up is packed into semicircular pipe, both ends rectangular slab is welded in outside plate 2, and saddle clip 10 is by metal
Material is made;When using linking up with, the stone dead wire for body 1 of curling up is received in the mouth hanging connection of hook, and the hook other end is welded in outside plate 2;It is left
2 rear and front end of right outside plate is equidistant to stretch out the rear and front end for receiving body 1 of curling up;Other technical solution same instances three, effect is consistent.
Claims (8)
1. a kind of component that can quickly form disaster relief dike, component construction includes outside plate(2)And inner panel(3);It is characterized in that, group
Part construction further includes having receipts to curl up body(1), receive body of curling up(1)Construction to be that cuboid rectangular tube lower end has bottom plate back cover to be formed barrel-shaped
Body receives body of curling up(1)It is made by the waterproof curled up leakage material can be received, it includes expanding rubber or non-telescoping rubber that waterproof, which leaks material,;
Receipts 1 left and right ends of body of curling up are symmetrically arranged with multiple screw hole A(101);Receipts are curled up body(1)Left and right ends outer wall is both provided with outer
Plate(2), outside plate(2)Height, which is equal to, receives body of curling up(1)Height, outside plate(2)Width be more than to receive and curl up body(1)Width, outside plate(2)
Rear and front end, which is stretched out, receives body of curling up(1)Rear and front end;
Outside plate(2)Surface is provided with anti-skid chequer A(201), anti-skid chequer A(201)Construction be that multiple geomeries are identical small-sized
Bossy body is in proper alignment in length and breadth, outside plate(2)Rear and front end is provided with multiple Philip's head screw holes(202)With round hole(203);
Receipts are curled up body(1)Left and right ends inner wall is respectively arranged with inner panel(3), inner panel(3)For metal rectangular plate, inner panel(3)Height etc.
It curls up body in receipts(1)The height of inner wall, inner panel(3)Width be equal to or slightly less than to receive and curl up body(1)The width of inner wall, inner panel(3)If
It is equipped with and screw hole A(101)Corresponding screw hole B, multiple lead screw(4)One end is each passed through screw hole B and screw hole A
(101)After be welded in outside plate(2), lead screw(4)The other end is fixed with nut, and receipts are curled up body(1), outside plate(2)And inner panel(3)Tightly
It fastens and is integrated, form component.
2. a kind of component that can quickly form disaster relief dike according to claim 1, which is characterized in that Philip's head screw hole
(202)Construction be:Two elongated holes(20201)It reports to the leadship after accomplishing a task to be formed in cross, two elongated holes(20201)There is circular slab at the place of reporting to the leadship after accomplishing a task
(20202)Reinforce connection.
3. a kind of component that can quickly form disaster relief dike according to claim 1, which is characterized in that the storage of component and fortune
Transmission method is:When to transport or when storage assembly for storing, by left and right outside plate(2)Force compresses are inwardly used, it is outer then to penetrate left and right with screw
Plate(2)Corresponding Philip's head screw hole(202)Fixation is connected, or uses rope by left and right outside plate(2)It is bundled in together.
4. a kind of component that can quickly form disaster relief dike according to claim 1, which is characterized in that the composition side of flood bank
Method is:Receipts are curled up body(1)Oral area erects expansion, the outside plate of multiple components upwards(2)Mutually successively close to connection, outside plate(2)With it is outer
Plate(2)Connecting sewing use collision mat(5)It is filled, screw A(6)Penetrate adjacent Philip's head screw hole(202), and by waterproof
Pad(5)Break-through is punched, multiple component string fixeds are set to strip flood bank shape;Or the multiple steel plates of application press from both sides(7)By phase
Adjacent outside plate(2)Together, multiple component string fixeds are set to strip flood bank shape to front and back end tightly clamping connection;
Receipts are curled up body(1)It is interior that water source, soil, sandstone, concrete paddle or the larger material of other proportions is added, when receipts are curled up body(1)There is bulging
Phenomenon, multiple horizontal stripes(8)Left end be inserted into multiple left round holes respectively(203)It is inserted into multiple right round holes respectively with right end
(203), or receive body of curling up(1)Backplate is added in rear and front end(9), multiple horizontal stripes(8)Left end be inserted into multiple left circular holes respectively
Hole(203)It is inserted into multiple right round holes respectively with right end(203), either flood bank is built and is controlled flood for multilayer or two
Dike standoff distance is built, and fills to form compound flood bank with soil or building stones or concrete paddle between two flood banks;
When to build higher flood bank, multiple components are corresponding up and down to be overlapped, multiple outside plates(2)Naturally corresponding overlapping up and down, steel
Plate presss from both sides(7)It rides into outside plate up and down(2)Connecting sewing by upper and lower outside plate(2)Reinforcement by connection is in together;
When the contact surface on flood bank and ground has drainage, blocked with soil, cotton or other waterproof soft materials;
Body of curling up is received since component contains(1), it is convenient to build flood bank in rough location, also conveniently build Curved flood control
Dike.
5. a kind of component that can quickly form disaster relief dike according to claim 4, which is characterized in that backplate(9)Structure is
Rectangular slab, backplate(9)Height be equal to or slightly less than to receive and curl up body(1)Highly, backplate(9)Width be equal to or slightly less than left outside plate
(1)With right outside plate(1)The distance between.
6. a kind of component that can quickly form disaster relief dike according to claim 4, which is characterized in that collision mat(5)Structure
It makes as rectangular slab, collision mat(5)Thickness be less than outside plate(2)Thickness, collision mat(5)Width be equal to outside plate(2)Width,
Collision mat(5)Height be equal to outside plate(2)Height, collision mat(5)Including sheet rubber or other waterproof soft boards.
7. a kind of component that can quickly form disaster relief dike according to claim 4, which is characterized in that steel plate presss from both sides(7)Structure
Making is:Upper clamp(701)And lower clamp(702)Tail end hinge(703)Connection, upper clamp(701)And lower clamp(702)Before
End is extended with circular discs up and down respectively(704), circular discs(704)End face is provided with anti-skid chequer B, upper clamp(701)And lower clamp
(702)Adjacent circular disk(704)It is respectively arranged with elongated screw hole(705), elongated screw hole(705)Construction be long rectangle
Hole.
8. a kind of component that can quickly form disaster relief dike, component construction includes outside plate(2)And inner panel(3);It is characterized in that, group
Part further includes receiving body of curling up(1), receive body of curling up(1)Construction be:Net form pipe lower end has net form bottom plate back cover to form net form bucket, net form pipe
It is to be reported to the leadship after accomplishing a task to be knitted to form in length and breadth by stone dead wire respectively with net form bottom plate;When receipts are curled up body(1)Oral area extends up as rectangle net form bucket
When, receive body of curling up(1)Left and right ends are respectively connected with outside plate(2), outside plate(2)For metal rectangular plate, outside plate(2)Height, which is equal to, receives body of curling up
(1)Height, outside plate(2)Body of curling up is received in the equidistant stretching in rear and front end(1)Rear and front end;
Outside plate(2)Surface is provided with anti-skid chequer(201), anti-skid chequer(201)Construction be that multiple geomeries are identical small-sized convex
Go out body in proper alignment in length and breadth, 2 rear and front end of outside plate is provided with multiple Philip's head screw holes 202 and round hole 203;
Receipts are curled up body(1)Inner panel is respectively arranged in left and right ends(3), inner panel(3)Height, which is equal to, receives body of curling up(1)Interior height, it is interior
Plate(3)Width be equal to receive and curl up body(1)Interior width;
Inner panel(3)Body of curling up is received in alignment(1)Mesh be provided with multiple screw hole B, multiple lead screw(4)One end is each passed through screw
Hole B and receipts are curled up body(1)Outside plate is welded in after mesh(2), lead screw(4)The other end is fixed with nut, and receipts are curled up body(1), outside plate
(2)And inner panel(3)It is tightly fixed as one, forms component.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810240737.9A CN108316240A (en) | 2018-03-22 | 2018-03-22 | A kind of component that can quickly form disaster relief dike |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810240737.9A CN108316240A (en) | 2018-03-22 | 2018-03-22 | A kind of component that can quickly form disaster relief dike |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108316240A true CN108316240A (en) | 2018-07-24 |
Family
ID=62898808
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810240737.9A Pending CN108316240A (en) | 2018-03-22 | 2018-03-22 | A kind of component that can quickly form disaster relief dike |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108316240A (en) |
Citations (45)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0816572A2 (en) * | 1996-07-03 | 1998-01-07 | VALSELLA MECCANOTECNICA S.p.A. | Quickly installed modular protection system |
CN2414109Y (en) * | 1999-08-17 | 2001-01-10 | 谢一宗 | Assembling type flood protection installation |
CA2333815A1 (en) * | 2001-01-30 | 2002-07-30 | Christopher Robert | Temporary, portable dam |
US20040156680A1 (en) * | 2003-02-08 | 2004-08-12 | Gibbs Richard A. | Beach stabilizing blocks |
US20050169712A1 (en) * | 2004-02-04 | 2005-08-04 | Young Clifford R. | Rapid deployment flood control system |
CN2880910Y (en) * | 2006-01-17 | 2007-03-21 | 罗刚 | Water bag type flood fight dam |
US20070125568A1 (en) * | 2004-01-30 | 2007-06-07 | Sanyo Chemical Industries, Ltd. | Water-swellable waterproof sealant |
GB2435666A (en) * | 2006-03-03 | 2007-09-05 | Peter Robert Steel | Flood defence wall comprising interlocking plastic blocks |
CN201254712Y (en) * | 2008-08-14 | 2009-06-10 | 徐运海 | Combination water baffle for check dam |
CN101761051A (en) * | 2009-12-23 | 2010-06-30 | 春晓 | Assembled water pocket dam body |
CN102061679A (en) * | 2010-08-16 | 2011-05-18 | 章韵英 | Assemblable ecological river flood bank |
CN201962399U (en) * | 2011-01-27 | 2011-09-07 | 中山市宝悦嘉电子有限公司 | Printed circuit board (PCB) fixture used in PCB electroplating process |
CN102304909A (en) * | 2011-07-18 | 2012-01-04 | 中国人民解放军63983部队 | Folding protection wall capable of being removed quickly |
CN202224949U (en) * | 2011-08-11 | 2012-05-23 | 栾川县电业局 | Quick metal plate perforating device used during butt joint of lead with copper core and lead with aluminum core |
CN202245719U (en) * | 2011-09-27 | 2012-05-30 | 贵州赤天化股份有限公司 | Steel plate fixture for lifting and overturning steel plate |
CN102477731A (en) * | 2010-11-27 | 2012-05-30 | 吴金有 | Breakwater caisson and caisson breakwater |
CN202268491U (en) * | 2011-10-09 | 2012-06-06 | 成都创图科技有限公司 | Wire connecting clamp |
CN102767158A (en) * | 2012-08-15 | 2012-11-07 | 新乡克瑞重型机械科技股份有限公司 | Flood protective dam and framework thereof |
CN202596037U (en) * | 2012-05-11 | 2012-12-12 | 广东澳美高新科技有限公司 | Wave plate clamp |
US20130022404A1 (en) * | 2011-07-21 | 2013-01-24 | Norm Stinson | Method and system for creating a flood barrier |
CN202924594U (en) * | 2012-11-13 | 2013-05-08 | 山东宏盛达板业有限公司 | Novel steel plate fixture |
CN203514654U (en) * | 2013-09-06 | 2014-04-02 | 贾军强 | Roof panel clamp |
CN203545360U (en) * | 2013-07-18 | 2014-04-16 | 安徽德马泰格起重机械有限公司 | Steel plate lifting device |
CN203569526U (en) * | 2013-12-07 | 2014-04-30 | 林鹏 | Flood prevention device with flexible water bag |
US20140226918A1 (en) * | 2012-10-12 | 2014-08-14 | Beau G. Adams | Multi-part reusable levee bag with biodegradable portions |
CN104250950A (en) * | 2014-09-19 | 2014-12-31 | 江苏凸创科技开发有限公司 | Quickly-paved river-crossing floating bridge device |
CN104452663A (en) * | 2013-09-13 | 2015-03-25 | 易日权 | Anti-seepage and anti-scouring flood preventing and dam protecting device |
CN204626333U (en) * | 2015-05-20 | 2015-09-09 | 李清华 | A kind of Novel portable structure of flood bank |
CN204876102U (en) * | 2015-07-17 | 2015-12-16 | 长兴鑫祥新能源科技有限公司 | Various steel sheet anchor clamps with glass glues |
CN204938745U (en) * | 2015-09-18 | 2016-01-06 | 吉宝(南通)重工有限公司 | A kind of bulb flat hoisting clamp |
EP2971365A1 (en) * | 2013-03-15 | 2016-01-20 | Fluvial Innovations Ltd | Self-filling modular barrier |
CN105555681A (en) * | 2013-08-29 | 2016-05-04 | 海斯科堡垒有限公司 | Flood defence barrier |
CN205296063U (en) * | 2016-01-04 | 2016-06-08 | 安徽理工大学 | Steel reinforcement cage for flood -fighting |
CN205329632U (en) * | 2015-12-24 | 2016-06-22 | 天津大学 | Utilize geotechnique to fill provisional manger plate dykes and dams of irritating bag and construction of steelframe support system |
CN105780724A (en) * | 2016-03-14 | 2016-07-20 | 河北五星电力设备有限公司 | Mobile folding type quick-setting water-retaining wall |
CN205555876U (en) * | 2016-04-22 | 2016-09-07 | 赵月玲 | Hoist and mount are with lifting by crane anchor clamps |
CN205576833U (en) * | 2015-10-30 | 2016-09-14 | 马克菲尔(长沙)新型支档科技开发有限公司 | Assemble convenient speedily carrying out rescue work and use flexible box with a net |
CN205711964U (en) * | 2016-04-27 | 2016-11-23 | 谢铁冬 | A kind of mechanization emergency disaster relief special pocket type protecting wall |
CN205975492U (en) * | 2016-08-22 | 2017-02-22 | 曾彬 | Dykes and dams flood control device |
CN106638468A (en) * | 2017-02-14 | 2017-05-10 | 中国水利水电科学研究院 | Assembled type flood control sub-dam interlocking bag and assembling and disassembling method thereof |
CN106702958A (en) * | 2015-11-17 | 2017-05-24 | 翟鼎文 | Water blocking and wind preventing movable dyke convenient to use |
CN206266087U (en) * | 2016-11-25 | 2017-06-20 | 江苏博德维环境技术有限公司 | Pneumatic membrane building fixture and suspension apparatus |
CN107034851A (en) * | 2017-06-12 | 2017-08-11 | 方松科 | A kind of dike breach pouch-shaped plugging device |
CN107034850A (en) * | 2017-06-12 | 2017-08-11 | 方松科 | A kind of plugging device suitable for the small-sized breach of dykes and dams |
CN107747296A (en) * | 2017-10-19 | 2018-03-02 | 张译心 | A kind of city flood protection device |
-
2018
- 2018-03-22 CN CN201810240737.9A patent/CN108316240A/en active Pending
Patent Citations (45)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0816572A2 (en) * | 1996-07-03 | 1998-01-07 | VALSELLA MECCANOTECNICA S.p.A. | Quickly installed modular protection system |
CN2414109Y (en) * | 1999-08-17 | 2001-01-10 | 谢一宗 | Assembling type flood protection installation |
CA2333815A1 (en) * | 2001-01-30 | 2002-07-30 | Christopher Robert | Temporary, portable dam |
US20040156680A1 (en) * | 2003-02-08 | 2004-08-12 | Gibbs Richard A. | Beach stabilizing blocks |
US20070125568A1 (en) * | 2004-01-30 | 2007-06-07 | Sanyo Chemical Industries, Ltd. | Water-swellable waterproof sealant |
US20050169712A1 (en) * | 2004-02-04 | 2005-08-04 | Young Clifford R. | Rapid deployment flood control system |
CN2880910Y (en) * | 2006-01-17 | 2007-03-21 | 罗刚 | Water bag type flood fight dam |
GB2435666A (en) * | 2006-03-03 | 2007-09-05 | Peter Robert Steel | Flood defence wall comprising interlocking plastic blocks |
CN201254712Y (en) * | 2008-08-14 | 2009-06-10 | 徐运海 | Combination water baffle for check dam |
CN101761051A (en) * | 2009-12-23 | 2010-06-30 | 春晓 | Assembled water pocket dam body |
CN102061679A (en) * | 2010-08-16 | 2011-05-18 | 章韵英 | Assemblable ecological river flood bank |
CN102477731A (en) * | 2010-11-27 | 2012-05-30 | 吴金有 | Breakwater caisson and caisson breakwater |
CN201962399U (en) * | 2011-01-27 | 2011-09-07 | 中山市宝悦嘉电子有限公司 | Printed circuit board (PCB) fixture used in PCB electroplating process |
CN102304909A (en) * | 2011-07-18 | 2012-01-04 | 中国人民解放军63983部队 | Folding protection wall capable of being removed quickly |
US20130022404A1 (en) * | 2011-07-21 | 2013-01-24 | Norm Stinson | Method and system for creating a flood barrier |
CN202224949U (en) * | 2011-08-11 | 2012-05-23 | 栾川县电业局 | Quick metal plate perforating device used during butt joint of lead with copper core and lead with aluminum core |
CN202245719U (en) * | 2011-09-27 | 2012-05-30 | 贵州赤天化股份有限公司 | Steel plate fixture for lifting and overturning steel plate |
CN202268491U (en) * | 2011-10-09 | 2012-06-06 | 成都创图科技有限公司 | Wire connecting clamp |
CN202596037U (en) * | 2012-05-11 | 2012-12-12 | 广东澳美高新科技有限公司 | Wave plate clamp |
CN102767158A (en) * | 2012-08-15 | 2012-11-07 | 新乡克瑞重型机械科技股份有限公司 | Flood protective dam and framework thereof |
US20140226918A1 (en) * | 2012-10-12 | 2014-08-14 | Beau G. Adams | Multi-part reusable levee bag with biodegradable portions |
CN202924594U (en) * | 2012-11-13 | 2013-05-08 | 山东宏盛达板业有限公司 | Novel steel plate fixture |
EP2971365A1 (en) * | 2013-03-15 | 2016-01-20 | Fluvial Innovations Ltd | Self-filling modular barrier |
CN203545360U (en) * | 2013-07-18 | 2014-04-16 | 安徽德马泰格起重机械有限公司 | Steel plate lifting device |
CN105555681A (en) * | 2013-08-29 | 2016-05-04 | 海斯科堡垒有限公司 | Flood defence barrier |
CN203514654U (en) * | 2013-09-06 | 2014-04-02 | 贾军强 | Roof panel clamp |
CN104452663A (en) * | 2013-09-13 | 2015-03-25 | 易日权 | Anti-seepage and anti-scouring flood preventing and dam protecting device |
CN203569526U (en) * | 2013-12-07 | 2014-04-30 | 林鹏 | Flood prevention device with flexible water bag |
CN104250950A (en) * | 2014-09-19 | 2014-12-31 | 江苏凸创科技开发有限公司 | Quickly-paved river-crossing floating bridge device |
CN204626333U (en) * | 2015-05-20 | 2015-09-09 | 李清华 | A kind of Novel portable structure of flood bank |
CN204876102U (en) * | 2015-07-17 | 2015-12-16 | 长兴鑫祥新能源科技有限公司 | Various steel sheet anchor clamps with glass glues |
CN204938745U (en) * | 2015-09-18 | 2016-01-06 | 吉宝(南通)重工有限公司 | A kind of bulb flat hoisting clamp |
CN205576833U (en) * | 2015-10-30 | 2016-09-14 | 马克菲尔(长沙)新型支档科技开发有限公司 | Assemble convenient speedily carrying out rescue work and use flexible box with a net |
CN106702958A (en) * | 2015-11-17 | 2017-05-24 | 翟鼎文 | Water blocking and wind preventing movable dyke convenient to use |
CN205329632U (en) * | 2015-12-24 | 2016-06-22 | 天津大学 | Utilize geotechnique to fill provisional manger plate dykes and dams of irritating bag and construction of steelframe support system |
CN205296063U (en) * | 2016-01-04 | 2016-06-08 | 安徽理工大学 | Steel reinforcement cage for flood -fighting |
CN105780724A (en) * | 2016-03-14 | 2016-07-20 | 河北五星电力设备有限公司 | Mobile folding type quick-setting water-retaining wall |
CN205555876U (en) * | 2016-04-22 | 2016-09-07 | 赵月玲 | Hoist and mount are with lifting by crane anchor clamps |
CN205711964U (en) * | 2016-04-27 | 2016-11-23 | 谢铁冬 | A kind of mechanization emergency disaster relief special pocket type protecting wall |
CN205975492U (en) * | 2016-08-22 | 2017-02-22 | 曾彬 | Dykes and dams flood control device |
CN206266087U (en) * | 2016-11-25 | 2017-06-20 | 江苏博德维环境技术有限公司 | Pneumatic membrane building fixture and suspension apparatus |
CN106638468A (en) * | 2017-02-14 | 2017-05-10 | 中国水利水电科学研究院 | Assembled type flood control sub-dam interlocking bag and assembling and disassembling method thereof |
CN107034851A (en) * | 2017-06-12 | 2017-08-11 | 方松科 | A kind of dike breach pouch-shaped plugging device |
CN107034850A (en) * | 2017-06-12 | 2017-08-11 | 方松科 | A kind of plugging device suitable for the small-sized breach of dykes and dams |
CN107747296A (en) * | 2017-10-19 | 2018-03-02 | 张译心 | A kind of city flood protection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109338996B (en) | Throw plugging device of hanging dykes and dams burst | |
US20060099033A1 (en) | Fluid fillable multi-compartment bladder for flow and flood control | |
US20120207545A1 (en) | Rapid Deployment, Self-Inflating, Interlocking, Modular Flood-Water Barrier Wall System | |
CN107034850B (en) | A kind of plugging device suitable for the small-sized breach of dykes and dams | |
CN206554020U (en) | A kind of combined type disaster relief dam and interim pontoon bridge | |
CN108316240A (en) | A kind of component that can quickly form disaster relief dike | |
CN105256765B (en) | A kind of waterwall unit and waterwall and dash method | |
CN205035762U (en) | Waterwall unit and waterwall | |
JPS61169509A (en) | Sand bag and its application | |
CN109338989A (en) | A method of quick blocking of fighting flood and relieve victims embankment bursts | |
CN204023490U (en) | A kind of reinforcement type stereoscopic member | |
CN105274964A (en) | Reinforced type stereoscopic member | |
CN217231653U (en) | River levee breach pre-plugging device | |
CN203487506U (en) | Water-absorbing rapid-hardening water retaining auxiliary dike | |
CN202007397U (en) | Large-volume sand-filling soil engineering pillow bag used for riverbank collapse treatment | |
CN207987861U (en) | A kind of flood control sub-embankment | |
CN206143739U (en) | Emergent flood discharge protection is filled up | |
CN209854655U (en) | Water-swelling flood control bag | |
CN2426491Y (en) | Water bag for combating flood and going to rescue hurriedly | |
CN204849682U (en) | Flood fighting water bag | |
CN2342019Y (en) | Emergency dike for fighting flood and protecting dam | |
CN205024640U (en) | Solid bag dams | |
CN215165224U (en) | Water-blocking sandbag | |
CN215857531U (en) | Hydraulic engineering is with high-efficient durable flood bank | |
CN2559681Y (en) | Flood prevention bag |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180724 |