CN108256598A - A kind of construction monitoring method - Google Patents
A kind of construction monitoring method Download PDFInfo
- Publication number
- CN108256598A CN108256598A CN201711466438.9A CN201711466438A CN108256598A CN 108256598 A CN108256598 A CN 108256598A CN 201711466438 A CN201711466438 A CN 201711466438A CN 108256598 A CN108256598 A CN 108256598A
- Authority
- CN
- China
- Prior art keywords
- construction
- personnel
- identity information
- monitoring
- construction site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Economics (AREA)
- Data Mining & Analysis (AREA)
- Multimedia (AREA)
- Signal Processing (AREA)
- General Engineering & Computer Science (AREA)
- Emergency Alarm Devices (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses a kind of construction monitoring methods, include the following steps:Step 1:All construction personnel's identity information registrations;Step 2:Identify construction personnel's identity information, construction personnel enters construction area;Step 3:The treatment of the earth of construction site is recorded, divides safety zone, the structural security risk of real-time monitoring field;Step 4:Long-range monitoring construction site, commander's construction;Step 5:It tracks and shoots work progress, analyze construction information in real time and automatic clustering achieves.It can be compared by the electronic tag and presupposed information for including construction personnel's identity information, the construction personnel for entering construction site is accurately managed, convenient for the remote management of construction site, the security risk of monitoring construction site in real time, record, analysis work progress in real time, increase the safety of construction site, pass through voice communication and infrared camera to a certain extent, technical staff and administrative staff is facilitated to be linked up with scene, avoid the issuable error of simple speech exchange.
Description
Technical field
The present invention relates to a kind of construction site management method more particularly to a kind of construction monitoring methods.
Background technology
Construction site now is all often that construction personnel voluntarily constructs on-site, and technical staff and administrative staff
It is less to reconnoitre or supervise to construction site, but often action and environment are all complex for construction site, to technical and
Safety has very high requirement, is even effectively instructed according to specific action.At present, technical staff or pipe
When reason personnel are not had at the scene, the mode that generally use is made a phone call is linked up or is instructed, and simple voice communication easily has
Deviation in understanding, it tends to be difficult to get a desired effect.In addition, construction site belongs to the higher place of danger coefficient, it is non-to apply
Worker person enters construction site not only there are great security risk, but also influences construction speed.It being capable of essence so lacking one kind at present
It really manages and convenient for communication, and can ensure the method for the site operation supervision of construction safety to a certain extent.
Invention content
To solve the deficiencies in the prior art, the present invention provides a kind of construction monitoring method, can by monitoring device into
The construction personnel for entering construction site accurately manages, meanwhile, the security risk of construction site is monitored in real time, is recorded in real time, analysis is applied
Work process, and technical staff and administrative staff is facilitated to be linked up with scene.
To achieve the above object, using following technical scheme:
A kind of construction monitoring method, which is characterized in that include the following steps:
Step 1:All construction personnel's identity information registrations;
Step 2:Identify construction personnel's identity information, construction personnel enters construction area;
Step 3:The treatment of the earth of construction site is recorded, divides safety zone, the structural safety of real-time monitoring field is hidden
Suffer from;
Step 4:Long-range monitoring construction site, commander's construction;
Step 5:It tracks and shoots work progress, analyze construction information in real time and automatic clustering achieves.
Further, step 1 specifically includes:
1a:The identity information of all construction personnel is registered, including basic identity information, identity class information;
1b:Unique corresponding electronic tag is formulated according to the identity information of registration.
Further, the electronic tag in 1b is radio frequency chip card.
Further, in step 2, construction personnel uses the electronic tag of carrying before any one construction area is entered
It is contacted with the identification device of monitoring device, identity information included in monitoring device identification electronic tag, when identity grade is believed
When breath reaches the access qualification in the region, construction personnel can enter the construction area, and record the basic identity of construction personnel
Information;By identity grade, construction personnel intelligently enters corresponding construction area, and the management of construction site can be allowed more to advise
Model, while the safety of construction site is increased to a certain extent.
Further, step 3 includes:
3a:Monitoring device records the treatment of the earth of construction site when each construction starts again, marks off safety zone,
And safe escape route is formulated, it is stored after Security Officer confirms;
3b:The structural security risk of construction site is monitored in real time, construction site occurs sending out alarm during dangerous situation.
The treatment of the earth of construction site is recorded again, and formulate safe escape route so that be in when construction starts every time
Existing escape way can be properer with live actual conditions.
Further, in step 4, commander's construction is carried out by speech talkback and video, avoids simple speech exchange can
The error that can be generated.
Further, it in step 5, is tracked using infrared camera and shoots work progress, divided in real time by image analysis
The operation of construction personnel is analysed, construction speed is recorded, prompt message is sent out when violation operation occurs in construction personnel;By applying for shooting
It is preserved after the classification of work procedural information.
Beneficial effects of the present invention:
1. it can be compared by the electronic tag and presupposed information for including construction personnel's identity information, it is existing to entering construction
The construction personnel of field accurately manages, convenient for the remote management of construction site.
2. the security risk of monitoring construction site in real time, record, analysis work progress, increase to a certain extent in real time
The safety of construction site.
3. by voice communication and infrared camera, technical staff and administrative staff is facilitated to be linked up with scene, avoid list
The issuable error of pure speech exchange.
Description of the drawings
Fig. 1 is a kind of flow diagram of construction monitoring method of the present invention;
Specific embodiment
With reference to shown in Fig. 1, a kind of construction monitoring method, which is characterized in that include the following steps:
Step 1:All construction personnel's identity information registrations;Step 1 specifically includes:
1a:The identity information of all construction personnel is registered, including basic identity information, identity class information;
1b:Unique corresponding electronic tag is formulated according to the identity information of registration, includes construction personnel's in electronic tag
Identity information.
Step 2:Identify construction personnel's identity information, construction personnel enters construction area;
Step 3:The treatment of the earth of construction site is recorded, divides safety zone, the structural safety of real-time monitoring field is hidden
Suffer from;Step 3 specifically includes:
3a:Monitoring device records the treatment of the earth of construction site when each construction starts again, marks off safety zone,
And safe escape route is formulated, it is stored after Security Officer confirms;
3b:The structural security risk of construction site is monitored in real time, construction site occurs sending out alarm during dangerous situation;
Structural security risk refers to mechanical equipment, fabric structure and security risk existing for other facilities in kind.
Step 4:Long-range monitoring construction site, commander's construction;
Step 5:It tracks and shoots work progress, analyze construction information in real time and automatic clustering achieves.
Preferably, the electronic tag in 1b is radio frequency chip card, which is contact chip card, in chip card
Basic identity information comprising construction personnel and identity class information.
Preferably, in step 2, construction personnel enter any one construction area before, using carrying electronic tag with
The identification device contact of monitoring device, identity information included in monitoring device identification electronic tag, when identity class information
When reaching the access qualification in the region, construction personnel can enter the construction area;If the identity registration that electronic tag is included
The access qualification in the not no region of information, then corresponding construction personnel cannot enter the region, and record into the construction area
Construction personnel basic identity information.
Preferably, in step 4, commander's construction is carried out by speech talkback and video, during speech talkback and video,
Construction personnel and remote technician can see construction site picture, but construction personnel cannot see that remote technician draws
Face.
Preferably, it in step 5, is tracked using infrared camera and shoots work progress, analyzed in real time by image analysis
The operation of construction personnel records construction speed, prompt message is sent out when violation operation occurs in construction personnel;By the construction of shooting
It is preserved after procedural information classification, image is captured at scene when classification normal construction procedural image, violation operation image, danger occur.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should
Understand, the invention is not limited in any way above-described embodiment, all to be obtained by the way of equivalent substitution or equivalent transformation
Technical solution is all fallen in protection scope of the present invention.
Claims (7)
1. a kind of construction monitoring method, which is characterized in that include the following steps:
Step 1:All construction personnel's identity information registrations;
Step 2:Identify construction personnel's identity information, construction personnel enters construction area;
Step 3:The treatment of the earth of construction site is recorded, divides safety zone, the structural security risk of real-time monitoring field;
Step 4:Long-range monitoring construction site, commander's construction;
Step 5:It tracks and shoots work progress, analyze construction information in real time and automatic clustering achieves.
2. construction monitoring method according to claim 1, which is characterized in that step 1 includes:
1a:The identity information of all construction personnel is registered, including basic identity information, identity class information;
1b:Unique corresponding electronic tag is formulated according to the identity information of registration.
3. construction monitoring method according to claim 2, it is characterised in that:Electronic tag in 1b is radio frequency chip card.
4. construction monitoring method according to claim 2, it is characterised in that:In step 2, construction personnel is entering arbitrarily
It before one construction area, is contacted using the electronic tag of carrying with the identification device of monitoring device, monitoring device identification electronics mark
Identity information included in label, when identity class information reaches the access qualification in the region, construction personnel can enter should
Construction area, and record the basic identity information of construction personnel.
5. construction monitoring method according to claim 4, which is characterized in that step 3 includes:
3a:Monitoring device records the treatment of the earth of construction site when each construction starts again, marks off safety zone, and make
The full escape route in Dingan County, stores after Security Officer confirms;
3b:The structural security risk of construction site is monitored in real time, construction site occurs sending out alarm during dangerous situation.
6. construction monitoring method according to claim 5, it is characterised in that:In step 4, pass through speech talkback and video
Carry out commander's construction.
7. construction monitoring method according to claim 6, it is characterised in that:In step 5, tracked using infrared camera
And work progress is shot, it analyzes the operation of construction personnel in real time by image analysis, records construction speed, when construction personnel occurs
Prompt message is sent out during violation operation;It is preserved after the work progress information of shooting is classified.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711466438.9A CN108256598A (en) | 2017-12-28 | 2017-12-28 | A kind of construction monitoring method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711466438.9A CN108256598A (en) | 2017-12-28 | 2017-12-28 | A kind of construction monitoring method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108256598A true CN108256598A (en) | 2018-07-06 |
Family
ID=62724344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711466438.9A Pending CN108256598A (en) | 2017-12-28 | 2017-12-28 | A kind of construction monitoring method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108256598A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109118054A (en) * | 2018-07-18 | 2019-01-01 | 青岛地铁集团有限公司运营分公司 | A kind of metro operation construction dispatching management system |
CN109459966A (en) * | 2018-12-07 | 2019-03-12 | 合肥诺必达信息技术有限责任公司 | A kind of construction safety intelligent management system |
CN109688386A (en) * | 2019-01-31 | 2019-04-26 | 广州轨道交通建设监理有限公司 | A kind of video monitoring method, system and equipment |
CN109905675A (en) * | 2019-03-13 | 2019-06-18 | 武汉大学 | A kind of mine personnel monitoring system based on computer vision and method |
CN110009261A (en) * | 2019-04-27 | 2019-07-12 | 何铖 | A kind of power transmission project construction field real time commanding system |
CN111290342A (en) * | 2018-12-07 | 2020-06-16 | 国网山西省电力公司运城供电公司 | Safety monitoring method for power grid engineering construction site |
CN111652147A (en) * | 2020-06-04 | 2020-09-11 | 中电建路桥集团有限公司 | Monitoring system and method for construction process of load reduction component in hollow floor system of underground garage |
CN111667597A (en) * | 2020-06-05 | 2020-09-15 | 李建华 | Constructor monitoring system based on big data and task presetting |
CN112542027A (en) * | 2020-12-04 | 2021-03-23 | 国网浙江德清县供电有限公司 | Construction site personnel safety warning system based on image recognition |
CN114037299A (en) * | 2021-11-15 | 2022-02-11 | 广西科技大学 | Monitoring method for building bridge construction |
CN114927001A (en) * | 2022-04-19 | 2022-08-19 | 天津二建建筑工程有限公司 | Video monitoring method, system, intelligent terminal and storage medium |
CN115619204A (en) * | 2022-12-20 | 2023-01-17 | 天津建设发展集团有限公司 | Engineering field monitoring method and system based on wireless Internet of things |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116926A (en) * | 2013-01-30 | 2013-05-22 | 上海城建市政工程(集团)有限公司 | Real-time monitoring system based on RFID (Radio Frequency Identification Devices) safety helmet and application method thereof |
CN104329120A (en) * | 2014-10-17 | 2015-02-04 | 成都四为电子信息股份有限公司 | Tunnel construction safety monitoring and management system and tunnel construction safety monitoring and management method |
CN105847769A (en) * | 2016-06-16 | 2016-08-10 | 苏州安控物联网科技有限公司 | Construction site behavior analysis system and analysis method |
-
2017
- 2017-12-28 CN CN201711466438.9A patent/CN108256598A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116926A (en) * | 2013-01-30 | 2013-05-22 | 上海城建市政工程(集团)有限公司 | Real-time monitoring system based on RFID (Radio Frequency Identification Devices) safety helmet and application method thereof |
CN104329120A (en) * | 2014-10-17 | 2015-02-04 | 成都四为电子信息股份有限公司 | Tunnel construction safety monitoring and management system and tunnel construction safety monitoring and management method |
CN105847769A (en) * | 2016-06-16 | 2016-08-10 | 苏州安控物联网科技有限公司 | Construction site behavior analysis system and analysis method |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109118054A (en) * | 2018-07-18 | 2019-01-01 | 青岛地铁集团有限公司运营分公司 | A kind of metro operation construction dispatching management system |
CN109459966A (en) * | 2018-12-07 | 2019-03-12 | 合肥诺必达信息技术有限责任公司 | A kind of construction safety intelligent management system |
CN111290342A (en) * | 2018-12-07 | 2020-06-16 | 国网山西省电力公司运城供电公司 | Safety monitoring method for power grid engineering construction site |
CN109688386A (en) * | 2019-01-31 | 2019-04-26 | 广州轨道交通建设监理有限公司 | A kind of video monitoring method, system and equipment |
CN109905675A (en) * | 2019-03-13 | 2019-06-18 | 武汉大学 | A kind of mine personnel monitoring system based on computer vision and method |
CN110009261A (en) * | 2019-04-27 | 2019-07-12 | 何铖 | A kind of power transmission project construction field real time commanding system |
CN111652147A (en) * | 2020-06-04 | 2020-09-11 | 中电建路桥集团有限公司 | Monitoring system and method for construction process of load reduction component in hollow floor system of underground garage |
CN111667597A (en) * | 2020-06-05 | 2020-09-15 | 李建华 | Constructor monitoring system based on big data and task presetting |
CN112542027A (en) * | 2020-12-04 | 2021-03-23 | 国网浙江德清县供电有限公司 | Construction site personnel safety warning system based on image recognition |
CN114037299A (en) * | 2021-11-15 | 2022-02-11 | 广西科技大学 | Monitoring method for building bridge construction |
CN114037299B (en) * | 2021-11-15 | 2022-05-31 | 广西科技大学 | Monitoring method for building bridge construction |
CN114927001A (en) * | 2022-04-19 | 2022-08-19 | 天津二建建筑工程有限公司 | Video monitoring method, system, intelligent terminal and storage medium |
CN114927001B (en) * | 2022-04-19 | 2023-09-26 | 天津二建建筑工程有限公司 | Video monitoring method, system, intelligent terminal and storage medium |
CN115619204A (en) * | 2022-12-20 | 2023-01-17 | 天津建设发展集团有限公司 | Engineering field monitoring method and system based on wireless Internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108256598A (en) | A kind of construction monitoring method | |
CN207301750U (en) | Power grid construction intelligence control platform system | |
US10812761B2 (en) | Complex hardware-based system for video surveillance tracking | |
CN106412501B (en) | A kind of the construction safety behavior intelligent monitor system and its monitoring method of video | |
CN109214276A (en) | A kind of system and method for the target person track following based on face recognition technology | |
CN112396658B (en) | Indoor personnel positioning method and system based on video | |
CN104463174A (en) | Multi-angle dynamic people recognition and behavior prediction system | |
CN107944838A (en) | A kind of intelligent barrier gate Field Monitoring System and method | |
CN108364374A (en) | Face access control device based on deep learning and method | |
CN105427528B (en) | A kind of monitoring method and system | |
CN112488483A (en) | AI technology-based EHS transparent management system and management method | |
CN103920270B (en) | Fire-fighting equipment inspection video monitoring method and system | |
TW201911118A (en) | Method for tracing track of target in cross regions, and data processing method, apparatus and system | |
CN113408683A (en) | Construction site safety supervision method and system | |
CN107426533A (en) | A kind of video monitoring image recognition system based on video-encryption compression and image identification | |
CN110490126B (en) | Safe deposit box safety control system based on artificial intelligence | |
CN103021053A (en) | Security system for human face recognition | |
CN111259682B (en) | Method and device for monitoring safety of construction site | |
CN110599129A (en) | Campus attendance checking method, device, identification terminal and system based on image tracking | |
CN110264723A (en) | A kind of traffic engineering construction intelligent Warning Systrm and method | |
CN110738691A (en) | Luggage tracking system based on online intelligent visual network | |
CN115512304A (en) | Subway station safety monitoring system based on image recognition | |
CN109019213A (en) | A kind of personal safety early warning elevator implementation method and its system | |
CN111383409A (en) | Safety video monitoring device for intelligent building and use method thereof | |
CN110602453A (en) | Internet of things big data intelligent video security monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180706 |