CN108005256A - A kind of construction techniques for wall - Google Patents
A kind of construction techniques for wall Download PDFInfo
- Publication number
- CN108005256A CN108005256A CN201711302362.6A CN201711302362A CN108005256A CN 108005256 A CN108005256 A CN 108005256A CN 201711302362 A CN201711302362 A CN 201711302362A CN 108005256 A CN108005256 A CN 108005256A
- Authority
- CN
- China
- Prior art keywords
- wall
- processing room
- sand
- mortar
- sludge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C21/00—Disintegrating plant with or without drying of the material
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F11/00—Treatment of sludge; Devices therefor
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2303/00—Specific treatment goals
- C02F2303/02—Odour removal or prevention of malodour
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Ceramic Engineering (AREA)
- Organic Chemistry (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Water Supply & Treatment (AREA)
- Life Sciences & Earth Sciences (AREA)
- Electromagnetism (AREA)
- Food Science & Technology (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Physics & Mathematics (AREA)
- Materials Engineering (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
The invention discloses a kind of construction techniques for wall, comprise the following steps:(1)Build a wall:Correspond at the construction field (site) and reinforcing bar is set up at indoor wall, and brick wall is piled up outside reinforcing bar;(2)Wall embryo forming:The concrete perfusion into brick wall and reinforcing bar, forms wall embryo after concrete setting;(3)Plastering:Plastering operation is carried out on wall with mortar, the preparation method of the mortar is as follows:Rubble is made after breaker crushes using construction waste, then sand processed is carried out to rubble by sand making machine and obtains sand;Sand, cement, water are mixed mortar is made.The present invention directly manufactures sandstone by construction waste, effectively prevent the waste to non-renewable resources;Secondly, also directly avoid construction waste and ecological environment is polluted, further improve the protection to ecological environment;And eliminate every input of processing construction waste, effectively reduce engineering cost, at the same also can high degree reduction municipal administration expenditure.
Description
Technical field
The invention belongs to technical field of buildings, more particularly, to a kind of construction techniques for wall.
Background technology
Mortar be lay bricks in building construction process use cohere material, water is added by a certain proportion of sand and cementing material
With into.But since sand belongs to non-renewable resources, if always using the shortage for inherently causing resource.
And be difficult to ensure that by the flatness of the metope coated by mortar merely, so that coating emulsion paint or lime
Afterwards, degree of plainness for wall surface is low.
The content of the invention
The present invention is for the use for overcoming the deficiencies of the prior art and provide a kind of reduction wasting of resources, improving degree of plainness for wall surface
In the construction techniques of wall.
To achieve these goals, the present invention uses following technical scheme:A kind of construction techniques for wall, bag
Include following steps:
(1)Build a wall:Correspond at the construction field (site) and reinforcing bar is set up at indoor wall, and brick wall is piled up outside reinforcing bar;
(2)Wall embryo forming:The concrete perfusion into brick wall and reinforcing bar, forms wall embryo after concrete setting;
(3)Plastering:Plastering operation is carried out on wall with mortar, the preparation method of the mortar is as follows:Passed through using construction waste
Cross and rubble is made after breaker crushes, then sand processed is carried out to rubble by sand making machine and obtains sand;Sand, cement, water are mixed
Close stirring and mortar is made;
(4)Base wall:Treat step(3)In mortar drying after, screed is filled and led up by putty, realizes the levelling of metope;
(5)Apply wall:After putty drying, emulsion paint is coated on metope to form coating on metope.
The present invention directly manufactures sandstone by construction waste, so as to effectively prevent the waste to non-renewable resources, protects
Card ecological environment will not be destroyed, conservation of nature environment;Secondly, rubble is formed by the way that construction waste is directly crushed, then led to
Cross rubble manufacture sand, making it difficult to which the construction waste of processing also directly has the place to go of processing, avoids the occurrence of construction waste hardly possible
Situation about being accumulated everywhere with processing, avoids construction waste from polluting ecological environment, further improves to ecological environment
Protection;And eliminate every input of processing construction waste, effectively reduce engineering cost, at the same also can high degree reduction
Municipal administration expenditure;After mortar is coated, realized by coating putty to the good levelling of metope, ensure metope in coating emulsion paint
There can be good flatness before, ensure that finally formed degree of plainness for wall surface is high, good appearance.
Further, the raw material of the mortar further includes sludge, and the sludge, sand, cement, the weight ratio of water are 0.3-
0.8:2-4:1.5-2.5:2-3;Sludge is made full use of, realizes refuse reclamation, avoids the discharge of sludge to being ecology
Environment pollutes;And the addition of sludge can also effectively reduce the use of cement, further reduce the cost input, construction cost
It is low.
Further, the sludge, sand, cement, the weight ratio of water are 0.5:3:1.8:2.6;Under this kind of ratio, ensure
Mortar retention property in the case of with good adhesive force is stablized, and is not in excessively obvious during plastering
Granular sensation, strengthens the aesthetics of metope.
Further, the sludge is the sediment in sedimentation basin, and sludge with unclassified stores before mixing, it is necessary to carry out
Deodorization operates.
Further, the deodorization operation is as follows:After sediment is taken out by sedimentation basin bottom of pond, it is placed in mixer;It
Input activated carbon part in backward mixer, starts mixer and sediment and activated carbon part is mixed so that activated carbon part pair
The stink of sludge is adsorbed;Effectively the stink in sludge is adsorbed by activated carbon part, the mortar for adding sludge exists
Peculiar smell;And deodorisation process carries out in mixer, so that sediment can be contacted sufficiently with activated carbon, and ensure all precipitations
Thing can be touched with activated carbon, and for the situation of relative quiescent Contact-sorption, adsorption effect is more preferable, and deodorizing effect is more preferable.
Further, the activated carbon part includes the fiber cloth of outer layer and the activated carbon in fiber cloth, activated carbon
It is dimensioned to the mesh being more than in fiber cloth;By the setting of fiber cloth, activated carbon is assembled, so as to terminate in deodorization
Afterwards, directly activated carbon part can be taken out, cleaning can be reused after drying, and increased operation rate, economized on resources, avoid
Waste.
Further, into the sediment after deodorization with 1:1.5 ratio adds lime stone, and sludge is dehydrated
Processing.
Further, the secondary processing that the crushing plant includes primary Processing Room and is connected with the primary Processing Room
Room;The primary Processing Room includes housing and the interior Processing Room in housing, shape between the interior Processing Room and the housing
Into recovery approach;The primary Processing Room is equipped with the filtering for being used for that sieve leakage to be carried out to material with the secondary Processing Room connectivity part
Part;It is additionally provided with the primary Processing Room for the material being piled up in the filtration members to be moved to returning for the interior Processing Room
Receiving apparatus;Primary Processing Room and secondary Processing Room are provided with same equipment, and primary Processing Room is connected with secondary Processing Room
It is logical, so that after construction waste can carry out coarse crushing operation in primary Processing Room, fall directly into thin to continuation in secondary Processing Room
Broken operation, discharges after in small, broken bits to material progress, ensures that the material particles after equipment processing are smaller, easy to the later stage
Sand processed operation, avoid causing excessive damage to sand equipment processed;There is provided filtration members, it is ensured that meets the material of size in small, broken bits
It can just drop downward into being crushed in secondary Processing Room, effectively prevent the cutter in secondary Processing Room from crushing not meet its processing
The material of specification, reduces spoilage, the service life of further lifting means;And retracting device is provided with, it is not inconsistent when there is size
Close filter criteria and be filtered material when, retracting device can return to material again in interior Processing Room, to material into
Row reprocessing;The feed blocking for not meeting specification in small, broken bits is avoided in filtration members, avoids equipment from breaking down, reduces failure
Rate, improves work efficiency.
Further, the filtration members connect a vibrating member.
Further, the lower housing portion is equipped with discharge port, which passes through tapping channel and the secondary Processing Room
Top is connected;The tapping channel is equipped with opening, and the filtration members are inserted into the tapping channel by the opening.
Further, the interior Processing Room is connected by two connecting portions with the housing, the connecting portion side wall, interior Processing Room
Outer wall, inner walls, which are enclosed, is set as the recovery approach.
Further, the retracting device includes rotatable material push piece, the drive for driving the material push piece to rotate
Moving part portion, be engaged with the material push piece for drive movable part that the material push piece moves and on the connecting portion with should
The matched driving track of movable part;Movable part can be moved along the track of driving track, so as to drive material push piece to exist
Move back and forth in recovery approach, and then the material being deposited in filtration members will be moved under the promotion of material push piece, and
Finally be fed through by material push piece in interior Processing Room, re-start fragmentation procedure, reclaimer operation is easy, can with it is broken at the same time into
OK.
Further, the material push piece outer surface is equipped with multiple arcs convex portion, which is externally provided with for increasing
The flexible layer of frictional force greatly between the arc convex portion and material;Material push piece persistently keeps rotation during movement, when
When filtration members have the material being stuck in filter hole, material push piece can by rotation by material by being taken out of in filtration members, without hard
Property promote material and cause the damage of filtration members;Flexible layer is provided with arc convex portion, is flexible layer when carrying out aforesaid operations
It is in contact with material, frictional force between the two is big, is more easy to from filtration members take material out of, it is impaired to prevent filtration members
Situation;And material push piece remains rotation during movement, ensure that to be not in that tiny material is caught in material and pushes away
Gap between part and recovery approach inner wall and there is stuck situation, equipment failure rate is low.
Further, the driving part includes actuator and the reduction being connected with the actuator, the reduction and institute
State the drive connection of material push piece;By the setting of reduction, effectively avoid rotating speed of the material push piece during movement too fast,
Material push piece is avoided the occurrence of by the situation on the direct band of material to its opposite side.
Further, the movable part is equipped with the grafting chamber being connected with the material push piece, is set on the material push piece
There are the anti-falling piece coordinated with the movable part anticreep and the solution for releasing the cooperation of the anticreep between the anti-falling piece and the movable part
Lock assembly;By the setting of anti-falling piece, ensure that material push piece will not be deviate from from movable part during the work time, equipment failure rate
It is low;Meanwhile the setting for passing through unlocking part so that material push piece can be dismounted easily with respect to movable part, so as to work as thing
When material push piece occurs wearing or pounded the material damage fallen, directly material push piece can be replaced, reduce maintenance cost, dimension
Repair easy to operate.
Further, the unlocking part includes being arranged in the material push piece operating cavity, scalable action are arranged on
Casting die on the material push piece, the drive block arranged on the casting die lower part, Slave Block and the elastic component being connected with the anti-falling piece;
Described drive block one end is engaged with the casting die, and the other end coordinates with the elastic component anticreep;The drive block is equipped with the
One inclined plane, the Slave Block are equipped with and matched second inclined plane of first inclined plane;When pressing the casting die, institute
State drive block together to move down with casting die, due to the cooperation of the first inclined plane and the second inclined plane, drive block will drive described driven
Part is moved to the left so that the elastic component bends, so that anti-falling piece moves down, and then the anticreep unlocked between movable part is matched somebody with somebody
Close;So as to can quickly be realized to the anticreep unlock between material push piece and movable part, the dismounting of material push piece by pressing casting die
It is easy to operate.
Further, resilient stay is equipped with below the Slave Block, which includes fagging and be connected with the fagging
Spring;Fagging can be supported Slave Block, prevent Slave Block end from downwardly turning over, ensure the end of Slave Block all the time with institute
Actuator is stated to be engaged;Simultaneously because connecting spring on fagging, so that when actuator moves down, there is also the sky moved down for fagging
Between, so as to will not be impacted to the movement of actuator, ensure the normal operation of equipment.
In conclusion the present invention has the following advantages:Sandstone is directly manufactured by construction waste, effectively prevent to can not
The waste of regenerated resources;Secondly, also directly avoid construction waste and ecological environment is polluted, further improve to ecological ring
The protection in border;And every input of processing construction waste is eliminated, effectively reduce engineering cost, while also can high degree
Reduce municipal administration expenditure;After mortar is coated, realized by coating putty to the good levelling of metope, ensure metope in coating breast
There can be good flatness before shellac varnish, ensure that finally formed degree of plainness for wall surface is high, good appearance.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the structure diagram of retracting device in the present invention.
Fig. 4 is the enlarged drawing at B in Fig. 3.
Embodiment
In order to make those skilled in the art be better understood from the present invention program, below in conjunction with the embodiment of the present invention
Attached drawing, carries out the technical solution in the embodiment of the present invention clear, complete description.
A kind of construction techniques for wall, comprises the following steps:(1)Build a wall:Indoor wall is corresponded at the construction field (site)
Place sets up reinforcing bar, and brick wall is piled up outside reinforcing bar;(2)Wall embryo forming:The concrete perfusion into brick wall and reinforcing bar, treats that concrete coagulates
Gu wall embryo is formed after;(3)Plastering:Plastering operation is carried out on wall with mortar, the preparation method of the mortar is as follows:Using building
Build waste material and rubble is made after breaker crushes, then sand processed carries out rubble by sand making machine and obtains sand, the building
Waste material can use waste concrete block, brick, tile etc.;Afterwards by sludge, sand, cement, water using weight ratio as 0.5:3:
1.8:2.6 ratio is put into is made mortar to after being stirred in mixer, and specific weight is specified according to practical operation, herein
Do not limit;Wherein, the sludge is the sediment in sedimentation basin, and sludge with unclassified stores before mixing, it is necessary to be removed
Smelly operation;The deodorization operation is as follows:After sediment is taken out by sedimentation basin bottom of pond, it is placed in mixer;Backward mixer
Interior input activated carbon part, starts mixer and sediment and activated carbon part is mixed so that stink of the activated carbon part to sludge
Adsorbed;The activated carbon part includes the fiber cloth of outer layer and the activated carbon in fiber cloth, and the size of activated carbon is set
For more than the mesh in fiber cloth;Carry out deodorization operation and then into the sediment after deodorization with 1:1.5 ratio adds
Enter lime stone, sludge is carried out dehydrating, the specific weight of lime stone is specified according to practical operation, is not limited herein;Through
Cross the sludge after dehydration, you can the preparation as raw material input mortar;(4)Base wall:Treat step(3)In mortar drying
Afterwards, screed is filled and led up by putty, realizes the levelling of metope;(5)Apply wall:After putty drying, coated on metope
Emulsion paint completes the construction to metope with this to form coating on metope.
As shown in Figs 1-4, the breaker includes primary Processing Room 1 and secondary Processing Room 2, the secondary Processing Room 2 and
The primary Processing Room is connected;The primary Processing Room 1 includes housing 11 and the interior Processing Room 12 in housing, it is described in add
Recovery approach 13 is formed between work room 12 and the housing 11;Specifically, the left and right sides of the interior Processing Room 12 respectively on
Equipped with a connecting portion 6, two connecting portions 6 are connected with the inner walls, so that connecting portion side wall, interior processing chamber outer wall, shell
Internal wall, which encloses, has been set as the recovery approach 13;11 lower part of housing is equipped with discharge port, which passes through tapping channel 5
It is connected with secondary 2 top of Processing Room;The first breaker, first breaker are equipped with the primary Processing Room 1
15 are arranged on above discharge port including two crushing cutters 151 described in two crushing cutters 151 and two actuators, which can be by city
Directly it is commercially available on face, its structure is the prior art, the structure as disclosed in Chinese patent 105618221A;The actuator is
Obtained motor is directly purchased on the market, and crushing cutter can rotate under its driving, and the driving direction of two actuators is
Reversely so that two crushing cutters 151 rotate backward, so as to be crushed to material;It is broken that second is equipped with the secondary Processing Room 2
Device, the structure of the secondary Processing Room 2 is identical with the structure of primary Processing Room 1, and the structure of the second breaker is broken with first
The structure of crushing device is identical, no longer excessively repeats.
The primary Processing Room 1 is equipped with the filtration members for being used for that sieve leakage to be carried out to material with 2 connectivity part of the secondary Processing Room
3;Specifically, the filtration members 3 are the waffle slab directly bought on the market, the sizing grid of the waffle slab is sieved according to actual needs
The material size of filter is formulated, therefore is not specifically limited;In order to facilitate material filtering, which is also associated with a vibrating member
31, which is the vibrator being directly commercially available on the market, and waffle slab is vibrated by the vibrator, ensures thing
Material is well filtered;Preferably, 5 side wall of tapping channel is equipped with the opening of a bar shaped, the filtration members 3 can pass through
The opening is inserted into the tapping channel 5, easy to be replaced to filtration members.
Further, in order to be recycled to the material being piled up in the filtration members 3, re-moved to described interior
Crushed in Processing Room, we are provided with retracting device 4 in the primary Processing Room 1;Specifically, the retracting device 4
Including rotatable material push piece 41, for driving actuator portion 42 that the material push piece rotates, being engaged with the material push piece
For drive the material push piece move movable part 43 and on the connecting portion with the matched driving track of the movable part
44;Specifically, the movable part 43 is the primary of linear motor, the driving track 44 is the secondary of linear motor;And drive
Track 44 is the track of U-shaped structure, and a driving track 44 is respectively equipped with the connecting portion 6 at left and right sides of housing;The movable part
Move, i.e., moved in whole recovery approach along driving track 44;Further, the driving part 42 includes actuator
421 and reduction 422, the reduction 422 is the gear-box being directly commercially available on the market, and the actuator is straight on the market
The motor being commercially available is connect, the output shaft of the motor is connected with the gear-box;The material push piece 41 includes the body of cylindricality
With the connecting pole for being respectively arranged on body both ends, which is inserted into the movable part, when movable part is moved up in driving track
When dynamic, material push piece will be driven together to move, so as to promote the material that sieving is got off in filtration members to move by material push piece.
The movable part is arranged to two, and the actuator and reduction are located therein on a movable part, another movable part
43 are equipped with the grafting chamber 431 being connected with the material push piece, after the material push piece is inserted into the grafting chamber, the connecting pole
It is sequentially connected with the reduction 422, so that actuator can drive the material push piece to rotate;As preference, the thing
It is evenly spaced on 41 outer surface of material push piece to be equipped with multiple arcs convex portion 411, as preference, the arc convex portion 411 and thing
Material push piece is integrally formed and is made, preferably can by material push piece turning obtain;In order to increase between convex portion and material
Frictional force, we are provided with one layer of flexible layer 412 outside the arc convex portion 411, which is made of elastomeric material,
By being adhesively fixed on the outer surface of arc convex portion;By the setting of the flexible layer, it can effectively increase arc convex portion and material
Between frictional force.
Further, a controller is further included, which is PLC microcontrollers, and concrete structure is the prior art, no longer superfluous
State;The actuator, driving track and the controller are electrically connected;The housing upper inner wall is is obliquely installed, so that when material pushes away
When part is moved to the position, inclined inner wall is by pressing materials, so that during material push piece continues to move up, material will be by
It is pushed into primary Processing Room;Preferably, being set respectively on the inner wall on the left of housing and the inner wall on right side has a microswitch, this is micro-
Dynamic switch is also electrically connected with the controller;When material push piece, which is moved to, touches microswitch, the i.e. controllable driving of controller
Track is stopped, and movable part stops movement;Further, the actuator is the direct current generator that can carry out rotating, and should
The rotating time of motor is set in advance, is controlled by controller, is such as rotated forward after five minutes, is inverted 5 minutes, it
Rotate forward again afterwards 5 minutes, with this repeatedly, concrete principle is the prior art, is repeated no more;So as to which material push piece can be in recovery approach
Moved back and forth, always ceaselessly recycled the material that sieving in filtration members is got off;Certainly, the time of above-mentioned rotating
Can voluntarily it be adjusted according to being actually needed, not to the restriction of protection domain.
By being dropped out on movable part, we are provided with and the movable part material push piece on the material push piece 41 in order to prevent
The anti-falling piece 7 that anticreep coordinates, the anti-falling piece 7 are the cuboid plastic part that can partly extend out to material push piece outer surface;For side
Just material push piece is dismounted, we are also provided with unlocking part, which includes the operating cavity being arranged in the material push piece
81st, casting die 82, drive block 83, Slave Block 84 and elastic component 85;The casting die 82 is pressed to press the plastic part of switch shape
82 scalable action of part is arranged on the material push piece;The drive block 83 is made of plastics, the drive arranged on the casting die lower part
Motion block 83, volume are more than the casting die 82;As preference, the casting die 82 with drive block 83 by being made in integrated injection molding;
The elastic component 85 is the stainless steel plate of a strip, which is connected with anti-falling piece, the other end and the operating cavity
81 inner walls are connected;Described 84 one end of Slave Block is engaged with the casting die 82, and the other end coordinates with 85 anticreep of elastic component;Tool
Body, the Slave Block 84 and 85 matched one end of elastic component are equipped with an open slot, the middle part of the elastic component can be caught in
In the opening;And the thickness of open slot is slightly less than the thickness setting of elastic component, so as to match somebody with somebody between elastic component and open slot for interference
Close, be not easy to disengage;Further, the drive block 83 is equipped with the first inclined plane 831, the Slave Block 84 be equipped with this
Matched second inclined plane 841 of one inclined plane;When pressing casting die, casting die drives drive block to move down, the first inclined plane and the
Two inclined planes offset, and drive block moves down so that driven member is moved to the left so that elastic component deforms upon, in the middle part of elastic component outwards
Bending, so that the anti-falling piece for being connected to elastic component upper end is pulled down, so that in retraction operating cavity, material push piece can be by activity at this time
Disassembled on part.
Preferably, the lower section of the Slave Block 84 is equipped with resilient stay, the resilient stay including fagging 91 and with the fagging
Connected spring 92, the spring 92 are arranged to two, and the upper end of spring is connected with fagging, and lower end is consolidated with the operating cavity bottom wall
Even, so as to effectively prevent the end of Slave Block from downwardly turning over.
Obviously, described embodiment is only the part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment, should all belong to the scope of protection of the invention.
Claims (9)
1. a kind of construction techniques for wall, comprises the following steps:
Build a wall:Correspond at the construction field (site) and reinforcing bar is set up at indoor wall, and brick wall is piled up outside reinforcing bar;
Wall embryo forming:The concrete perfusion into brick wall and reinforcing bar, forms wall embryo after concrete setting;
Plastering:Plastering operation is carried out on wall with mortar, the preparation method of the mortar is as follows:Using construction waste by broken
Rubble is made after crushing in crushing device, then carries out sand processed to rubble by sand making machine and obtain sand;Sand, cement, water are mixed and stirred
Mixing obtains mortar;
Base wall:Treat step(3)In mortar drying after, screed is filled and led up by putty, realizes the levelling of metope;
Apply wall:After putty drying, emulsion paint is coated on metope to form coating on metope.
2. the construction techniques according to claim 1 for wall, it is characterised in that:The raw material of the mortar also wraps
Sludge is included, the sludge, sand, cement, the weight ratio of water are 0.3-0.8:2-4:1.5-2.5:2-3.
3. the construction techniques according to claim 2 for wall, it is characterised in that:The sludge, sand, water
Mud, the weight ratio of water are 0.5:3:1.8:2.6.
4. the construction techniques according to claim 2 for wall, it is characterised in that:The sludge is in sedimentation basin
Sediment, sludge with unclassified stores before mixing, it is necessary to carry out deodorization operation.
5. the construction techniques according to claim 4 for wall, it is characterised in that:The deodorization operation is as follows:
After sediment is taken out by sedimentation basin bottom of pond, it is placed in mixer;Backward mixer in input activated carbon part, start mixer
Sediment and activated carbon part are mixed so that activated carbon part adsorbs the stink of sludge.
6. the construction techniques according to claim 4 for wall, it is characterised in that:The activated carbon part includes outer
The fiber cloth of layer and the activated carbon in fiber cloth, the mesh for being dimensioned to be more than in fiber cloth of activated carbon.
7. the construction techniques according to claim 4 for wall, it is characterised in that:To the precipitation after deodorization
With 1 in thing:1.5 ratio adds lime stone, and sludge is carried out dehydrating.
8. the construction techniques according to claim 1 for wall, it is characterised in that:The breaker is included just
Level Processing Room(1)The secondary Processing Room being connected with the primary Processing Room(2);The primary Processing Room(1)Including housing
(11)With the interior Processing Room in housing(12);The interior Processing Room(12)With the housing(11)Between form recovery approach
(13);The primary Processing Room(1)With the secondary Processing Room(2)Connectivity part is equipped with the filtration members for being used for that sieve leakage to be carried out to material
(3);The primary Processing Room(1)Inside it is additionally provided with for the filtration members will to be piled up in(3)On material be moved to it is described in plus
The retracting device of work room(4).
9. the construction techniques according to claim 8 for wall, it is characterised in that:The interior Processing Room (12) is logical
Two connecting portions (6) are crossed with the housing (11) to be connected, the connecting portion side wall, interior processing chamber outer wall, inner walls enclose be set as it is described
Recovery approach (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711302362.6A CN108005256A (en) | 2017-12-10 | 2017-12-10 | A kind of construction techniques for wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711302362.6A CN108005256A (en) | 2017-12-10 | 2017-12-10 | A kind of construction techniques for wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108005256A true CN108005256A (en) | 2018-05-08 |
Family
ID=62057725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711302362.6A Withdrawn CN108005256A (en) | 2017-12-10 | 2017-12-10 | A kind of construction techniques for wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108005256A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989225A (en) * | 2017-12-11 | 2018-05-04 | 付小娟 | A kind of construction techniques of interior wall |
CN111873168A (en) * | 2018-07-24 | 2020-11-03 | 虞甜甜 | Equipment for processing household handicraft by recycling solid waste |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1944324A (en) * | 2006-10-19 | 2007-04-11 | 上海大学 | Method for treating city ditch mud |
CN101948280A (en) * | 2010-10-22 | 2011-01-19 | 山东建筑大学 | Method for preparing building mortar from waste concrete |
CN102477797A (en) * | 2010-11-24 | 2012-05-30 | 五冶集团上海有限公司 | Construction method for preventing crack of infilled wall |
CN206343218U (en) * | 2016-12-15 | 2017-07-21 | 靳艳芳 | A kind of building waste crushes retracting device |
US20170218642A1 (en) * | 2014-02-04 | 2017-08-03 | Thermagreen Systems, Inc. | Mold for modular units for insulating concrete forms |
-
2017
- 2017-12-10 CN CN201711302362.6A patent/CN108005256A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1944324A (en) * | 2006-10-19 | 2007-04-11 | 上海大学 | Method for treating city ditch mud |
CN101948280A (en) * | 2010-10-22 | 2011-01-19 | 山东建筑大学 | Method for preparing building mortar from waste concrete |
CN102477797A (en) * | 2010-11-24 | 2012-05-30 | 五冶集团上海有限公司 | Construction method for preventing crack of infilled wall |
US20170218642A1 (en) * | 2014-02-04 | 2017-08-03 | Thermagreen Systems, Inc. | Mold for modular units for insulating concrete forms |
CN206343218U (en) * | 2016-12-15 | 2017-07-21 | 靳艳芳 | A kind of building waste crushes retracting device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989225A (en) * | 2017-12-11 | 2018-05-04 | 付小娟 | A kind of construction techniques of interior wall |
CN107989225B (en) * | 2017-12-11 | 2019-09-10 | 深圳市金鹏建筑装饰工程有限公司 | A kind of construction techniques of interior wall |
CN111873168A (en) * | 2018-07-24 | 2020-11-03 | 虞甜甜 | Equipment for processing household handicraft by recycling solid waste |
CN111873168B (en) * | 2018-07-24 | 2022-09-13 | 虞甜甜 | Equipment for processing household handicraft by recycling solid waste |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107597244A (en) | A kind of broken sieve iron device of batch (-type) building concrete block | |
KR102525708B1 (en) | Construction equipment, drone, material, facility, measures | |
CN113600473B (en) | Device and method for preparing concrete from construction waste | |
CN108005256A (en) | A kind of construction techniques for wall | |
CN111514979A (en) | Automatic progressive screening device for concrete gravel aggregate | |
CN212284203U (en) | Production equipment for preparing recycled building material from building waste | |
CN111760630A (en) | Production equipment for preparing recycled building material from building waste | |
CN108672017A (en) | A kind of construction waste retracting device and method | |
CN108906299A (en) | A kind of efficient fixed-end forces device for building | |
CN109530062A (en) | A kind of building energy conservation environmental protection waste recovery processing unit | |
CN107989225A (en) | A kind of construction techniques of interior wall | |
CN107989373A (en) | A kind of construction method of interior architecture wall | |
CN108104470A (en) | A kind of construction method of construction wall | |
CN213376877U (en) | Engineering waste recycling divides sieve device | |
CN213611844U (en) | Building rubbish recycling device | |
CN108405123A (en) | Equipment for construction | |
CN107983503A (en) | Equipment for architectural engineering | |
CN108325670A (en) | Construction crushing plant | |
CN107961877B (en) | Architectural engineering equipment | |
CN218962856U (en) | Building rubbish regeneration coarse and fine aggregate concrete apparatus for producing | |
CN109833961A (en) | A kind of sand system processed | |
CN111215221A (en) | Construction waste treatment device | |
CN207769968U (en) | A kind of system for sand processed | |
CN216419715U (en) | Powder selecting device for cement production | |
CN208018751U (en) | Equipment for sand processed processing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180508 |