CN107844102A - Production plan management method and system - Google Patents

Production plan management method and system Download PDF

Info

Publication number
CN107844102A
CN107844102A CN201710905827.0A CN201710905827A CN107844102A CN 107844102 A CN107844102 A CN 107844102A CN 201710905827 A CN201710905827 A CN 201710905827A CN 107844102 A CN107844102 A CN 107844102A
Authority
CN
China
Prior art keywords
production
plan
information
schedule information
production schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710905827.0A
Other languages
Chinese (zh)
Other versions
CN107844102B (en
Inventor
卢吉
潘振鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heyuan Hongjia Agricultural Technology Co ltd
Original Assignee
Shenzhen Chunmuyuan Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Chunmuyuan Holdings Co Ltd filed Critical Shenzhen Chunmuyuan Holdings Co Ltd
Priority to CN201710905827.0A priority Critical patent/CN107844102B/en
Publication of CN107844102A publication Critical patent/CN107844102A/en
Application granted granted Critical
Publication of CN107844102B publication Critical patent/CN107844102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method and a system for managing a production plan, wherein the method for managing the production plan comprises the following steps: receiving production plan information sent by a server; determining preset time node information according to preset production data information and production plan information; acquiring and displaying actual production data information in real time; determining actual time node information according to the actual production data information; and comparing the preset time node information with the actual time node information, and calculating and displaying the time difference of each time node of the preset time node information and the actual time node information. The method for managing the production plan, provided by the invention, is convenient for management personnel to know the actual production progress condition and the difference between the actual production progress condition and the preset progress, reasonably manages the production plan, coordinates various matters in the actual production process according to the plan, and thus ensures that the production is better carried out.

Description

A kind of method and system of production planning management
Technical field
The present invention relates to project management technique field, in particular to a kind of method and system of production planning management.
Background technology
As agricultural planting modernizes, the development of scale, agricultural planting has increasing need for the pipe for becoming more meticulous, standardizing Reason, the unordered plantation occurred in planting process, lack plantation standard, lack quality generation of the problems such as planned to crops Greatly influence.Therefore, planting scheme and manufacturing schedule are specified, batch management system is established, solves nothing in production process The problem of sequence produces is urgently to be resolved hurrily.
The content of the invention
It is contemplated that at least solves one of technical problem present in prior art or correlation technique.
Therefore, the first aspect of the invention is to propose a kind of method of production planning management.
The second aspect of the invention is to propose a kind of system of production planning management.
In view of this, according to the first aspect of the invention, it is proposed that a kind of method of production planning management, including:Connect Receive the production schedule information that server is sent;According to default creation data information and production schedule information, preset time section is determined Point information;Actual production data message is obtained in real time;According to actual production data message, real time nodal information is determined;Than Compared with preset time nodal information and real time nodal information, the time difference of the two each timing node is calculated and be shown.
The method of production planning management provided by the invention, first, the production schedule information that the reception server is sent, according to Production schedule information and stored default creation data, make prediction to timing node corresponding to each link in production process Generate preset time nodal information, preset time nodal information reflect the links of the production schedule estimated time of commencement and Estimated Time Of Completion;Secondly, actual production data message is obtained in real time, and actual production is determined according to actual production data message The actual time started of each link and actual finish time, i.e. real time nodal information in journey, wherein, because actual production number It is believed that breath is Real-time Feedback in actual production process, so of the number of real time node no more than preset time node Number, finally, preset time nodal information and real time nodal information are compared, are calculated and be shown in default production process The time difference of the timing node of each link and the timing node of each link in corresponding actual production process, so as to the condition of production Carry out control.In addition, real-time display is carried out to actual production data message simultaneously obtaining actual production data message in real time, just In the progresses in real time situation for accurately understanding current link.The present invention by determining the preset time nodal information in production process, The timing node of each link of the production schedule is specify that, and obtains actual production data, and calculates each ring in default production process The time difference of the timing node of section and the timing node of each link in corresponding actual production process, be easy to understand actual progress with The gap of default progress, to the reasonable management and control of the production schedule, according to plan coordination actual production process items matters, so as to ensure to give birth to Production is preferably carried out.
According to the method for the above-mentioned production planning management of the present invention, there can also be following technical characteristic:
In the above-mentioned technical solutions, it is preferable that according to default creation data information and production schedule information, it is determined that when default The step of intermediate node information, in addition to:According to preset time nodal information, assignment instructions are sent, for instructing actual production.
In the technical scheme, when the plan that preset time nodal information contains each link in production process starts Between, corresponding assignment instructions are issued in the planned start time of each link according to the information, are easy to make actual production on finger Lead, ensure that production is preferably carried out.
In any of the above-described technical scheme, it is preferable that before the step of receiving production schedule information, in addition to:Obtain new Build production schedule information;Newly-built production schedule information is sent to server, so that server is stored;Wherein, the production schedule Information is that server by the newly-built production schedule information of the whole of storage, classified to obtain according to plan by batch.
In the technical scheme, server stores to each newly-built production schedule information received, and will be all Newly-built production schedule information classify by batch after fed back.
In any of the above-described technical scheme, it is preferable that send newly-built production schedule information and carried out to server for server After storage, before the production schedule information that the reception server is sent, in addition to:Screening conditions are sent to server;Obtain simultaneously The production schedule information for meeting screening conditions that display server is sent;Wherein, screening conditions include it is following at least one or its Combination:Plan classification, intended batch, planned start time and planned end time.
In the technical scheme, server can terminate according to plan classification, intended batch, planned start time and plan The conditions such as time are screened to production schedule information and are fed back the information after screening.
In any of the above-described technical scheme, it is preferable that production schedule information includes following at least one or its combination:Plan Settling time, plan title, plan classification, intended batch, plan ownership place, planned start time, planned end time, plan Seedlings nursing plate number, plan field planting number and plan seedling bed resource;Actual production data message includes following at least one or its combination: Plan settling time, plan classification, plan ownership place and resource service condition.
In the technical scheme, production schedule information can include plan settling time, plan title, plan classification, meter Draw batch, plan ownership place, planned start time, planned end time, plan seedlings nursing plate number, plan field planting number and plan nursery Bed resource etc., to carry out reasonable management and control to the production schedule;Actual production data message can include plan settling time, plan Classification, plan ownership place and resource service condition etc., to be understood with practical condition and control.
The second aspect of the invention, it is proposed that a kind of system of production planning management, including:First receiving unit, use In the production schedule information that the reception server is sent;First determining unit, based on according to default creation data information and production Information is drawn, determines preset time nodal information;First acquisition unit, for obtaining in real time and showing actual production data message; Second determining unit, for according to actual production data message, determining real time nodal information;Computing unit, for comparing Preset time nodal information and real time nodal information, calculate the time difference of the two each timing node;First display unit, use In the display time difference.
The system of production planning management provided by the invention, first, the production schedule information that the reception server is sent, according to Production schedule information and stored default creation data, make prediction to timing node corresponding to each link in production process Generate preset time nodal information, preset time nodal information reflect the links of the production schedule estimated time of commencement and Estimated Time Of Completion;Secondly, actual production data message is obtained and shown in real time, is determined according to actual production data message actual The actual time started of each link and actual finish time, i.e. real time nodal information in production process, wherein, because actual Creation data information is Real-time Feedback in actual production process, so the number of real time node is not more than preset time section The number of point, finally, preset time nodal information and real time nodal information are compared, default production is calculated and be shown During each link timing node and the timing node of each link in corresponding actual production process time difference, so as to life Production situation carries out control.The present invention specify that each ring of the production schedule by determining the preset time nodal information in production process The timing node of section, and obtain actual production data, and calculate in default production process the timing node of each link with it is corresponding Actual production process in each link timing node time difference, be easy to understand the gap of actual progress and default progress, it is right The reasonable management and control of the production schedule, according to plan coordination actual production process items matters, so as to ensure that production is preferably carried out.
According to the system of the above-mentioned production planning management of the present invention, there can also be following technical characteristic:
In the above-mentioned technical solutions, it is preferable that the first determining unit, specifically include:First transmitting element, for according to pre- If timing node information, assignment instructions are sent, for instructing actual production.
In the technical scheme, when the plan that preset time nodal information contains each link in production process starts Between, corresponding assignment instructions are issued in the planned start time of each link according to the information, are easy to make actual production on finger Lead, ensure that production is preferably carried out.
In any of the above-described technical scheme, it is preferable that second acquisition unit, for before production schedule information is received, Obtain newly-built production schedule information;Second transmitting element, for sending newly-built production schedule information to server, for server Stored;Wherein, production schedule information is that by the newly-built production schedule information of the whole of storage, batch is carried out server according to plan What classification obtained.
In the technical scheme, server stores to each newly-built production schedule information received, and will be all Newly-built production schedule information classify by batch after fed back.
In any of the above-described technical scheme, it is preferable that the 3rd transmitting element, for sending newly-built production schedule information to clothes After business device is stored for server, before the production schedule information that the reception server is sent, screening conditions are sent to service Device;3rd acquiring unit, for obtaining the production schedule information for meeting screening conditions of server transmission;Second display unit, Meet the production schedule information of screening conditions for showing;Wherein, screening conditions include following at least one or its combination:Plan Classification, intended batch, planned start time and planned end time.
In the technical scheme, server can terminate according to plan classification, intended batch, planned start time and plan The conditions such as time are screened to production schedule information and are fed back the information after screening.
In any of the above-described technical scheme, it is preferable that production schedule information includes following at least one or its combination:Plan Settling time, plan title, plan classification, intended batch, plan ownership place, planned start time, planned end time, plan Seedlings nursing plate number, plan field planting number and plan seedling bed resource;Actual production data message includes following at least one or its combination: Plan settling time, plan classification, plan ownership place and resource service condition.
In the technical scheme, production schedule information can include plan settling time, plan title, plan classification, meter Draw batch, plan ownership place, planned start time, planned end time, plan seedlings nursing plate number, plan field planting number and plan nursery Bed resource etc., to carry out reasonable management and control to the production schedule;Actual production data message can include plan settling time, plan Classification, plan ownership place and resource service condition etc., to be understood with practical condition and control.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become in the description from combination accompanying drawings below to embodiment Substantially and it is readily appreciated that, wherein:
Fig. 1 shows the method flow schematic diagram of the production planning management of one embodiment of the present of invention;
Fig. 2 shows the method flow schematic diagram of the production planning management of an alternative embodiment of the invention;
Fig. 3 shows the method flow schematic diagram of the production planning management of yet another embodiment of the present invention;
Fig. 4 shows the method flow schematic diagram of the production planning management of yet another embodiment of the present invention;
Fig. 5 a show the system schematic block diagram of the production planning management of one embodiment of the present of invention;
Fig. 5 b show the system schematic block diagram of the production planning management of an alternative embodiment of the invention;
Fig. 5 c show the system schematic block diagram of the production planning management of yet another embodiment of the present invention;
Fig. 5 d show the system schematic block diagram of the production planning management of another embodiment of the present invention.
Embodiment
It is below in conjunction with the accompanying drawings and specific real in order to be more clearly understood that the above objects, features and advantages of the present invention Mode is applied the present invention is further described in detail.It should be noted that in the case where not conflicting, the implementation of the application Feature in example and embodiment can be mutually combined.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still, the present invention may be used also To be different from other modes described here using other to implement, therefore, protection scope of the present invention is not limited to following public affairs The limitation for the specific embodiment opened.
The embodiment of first aspect present invention, proposes a kind of method of production planning management, and Fig. 1 shows the one of the present invention The method flow schematic diagram of the production planning management of individual embodiment, the method for production planning management, including:
Step 102, the production schedule information that the reception server is sent;
Step 104, according to default creation data information and production schedule information, preset time nodal information is determined;
Step 106, actual production data message is obtained in real time;
Step 108, according to actual production data message, real time nodal information is determined;
Step 110, compare preset time nodal information and real time nodal information, be calculated and be shown the two it is each when segmentum intercalaris The time difference of point.
The method of production planning management provided by the invention, first, the production schedule information that the reception server is sent, according to Production schedule information and stored default creation data, make prediction to timing node corresponding to each link in production process Generate preset time nodal information, preset time nodal information reflect the links of the production schedule estimated time of commencement and Estimated Time Of Completion;Secondly, actual production data message is obtained in real time, and actual production is determined according to actual production data message The actual time started of each link and actual finish time, i.e. real time nodal information in journey, wherein, because actual production number It is believed that breath is Real-time Feedback in actual production process, so of the number of real time node no more than preset time node Number, finally, preset time nodal information and real time nodal information are compared, are calculated and be shown in default production process The time difference of the timing node of each link and the timing node of each link in corresponding actual production process, so as to the condition of production Carry out control.In addition, real-time display is carried out to actual production data message simultaneously obtaining actual production data message in real time, just In the progresses in real time situation for accurately understanding current link.The present invention by determining the preset time nodal information in production process, The timing node of each link of the production schedule is specify that, and obtains actual production data, and calculates each ring in default production process The time difference of the timing node of section and the timing node of each link in corresponding actual production process, be easy to understand actual progress with The gap of default progress, to the reasonable management and control of the production schedule, according to plan coordination actual production process items matters, so as to ensure to give birth to Production is preferably carried out.
Fig. 2 shows the method flow schematic diagram of the production planning management of an alternative embodiment of the invention.
As shown in Fig. 2 the method for production planning management, including:
Step 202, the production schedule information that the reception server is sent;
Step 204, according to default creation data information and production schedule information, preset time nodal information is determined;
Step 206, according to preset time nodal information, assignment instructions are sent, for instructing actual production;
Step 208, actual production data message is obtained in real time;
Step 210, according to actual production data message, real time nodal information is determined;
Step 212, compare preset time nodal information and real time nodal information, be calculated and be shown the two it is each when segmentum intercalaris The time difference of point.
In this embodiment, preset time nodal information contains the planned start time of each link in production process, Preset time nodal information is issued to the task list of system, task list receives in the planned start time of each link Automatically the assignment instructions triggered, and assignment instructions are responded and carry out corresponding task operating.
Fig. 3 shows the method flow schematic diagram of the production planning management of yet another embodiment of the present invention.
As shown in figure 3, the method for production planning management, including:
Step 302, newly-built production schedule information is sent to server, so that server is stored;
Wherein, production schedule information is that server by the newly-built production schedule information of the whole of storage, divided according to plan by batch What class obtained;
Step 304, the production schedule information that the reception server is sent;
Step 306, according to default creation data information and production schedule information, preset time nodal information is determined;
Step 308, according to preset time nodal information, assignment instructions are sent, for instructing actual production;
Step 310, actual production data message is obtained in real time;
Step 312, according to actual production data message, real time nodal information is determined;
Step 314, compare preset time nodal information and real time nodal information, be calculated and be shown the two it is each when segmentum intercalaris The time difference of point.
In this embodiment, keeper with the newly-built production schedule and can be uploaded onto the server with after account number login system, clothes Business device stores to each newly-built production schedule information received, and by all newly-built production schedule informations by batch point Fed back after class.
Fig. 4 shows the method flow schematic diagram of the production planning management of yet another embodiment of the present invention.
As shown in figure 4, the method for production planning management, including:
Step 402, newly-built production schedule information is sent to server, so that server is stored;
Wherein, production schedule information is that server by the newly-built production schedule information of the whole of storage, divided according to plan by batch What class obtained;
Step 404, screening conditions are sent to server;
Step 406, the production schedule information for meeting screening conditions that simultaneously display server is sent is obtained;
Wherein, screening conditions include following at least one or its combination:Plan classification, intended batch, planned start time And planned end time;
Step 408, the production schedule information that the reception server is sent;
Step 410, according to default creation data information and production schedule information, preset time nodal information is determined;
Step 412, according to preset time nodal information, assignment instructions are sent, for instructing actual production;
Step 414, actual production data message is obtained in real time;
Step 416, according to actual production data message, real time nodal information is determined;
Step 418, compare preset time nodal information and real time nodal information, be calculated and be shown the two it is each when segmentum intercalaris The time difference of point.
In this embodiment, at the end of server can be according to plan classification, intended batch, planned start time and plan Between etc. condition production schedule information is screened and is fed back the information after screening, also, screening operation can be with office When between carry out, in order to which administrative staff inquire about inter-related task information at any time.
In one embodiment of the invention, it is preferable that production schedule information includes following at least one or its combination:Meter Draw settling time, plan title, plan classification, intended batch, plan ownership place, planned start time, planned end time, meter Draw seedlings nursing plate number, plan field planting number and plan seedling bed resource;Actual production data message includes following at least one or its group Close:Plan settling time, plan classification, plan ownership place and resource service condition.
In this embodiment, production schedule information can include plan settling time, plan title, plan classification, plan Batch, plan ownership place, planned start time, planned end time, plan seedlings nursing plate number, plan field planting number and plan seedling bed Resource etc., to carry out reasonable management and control to the production schedule;Actual production data message can include plan settling time, plan class Not, ownership place and resource service condition etc. are planned, to be understood with practical condition and control.
The embodiment of second aspect of the present invention, proposes a kind of system of production planning management, and Fig. 5 a show the present invention's The system schematic block diagram of the production planning management of one embodiment.The system 500 of production planning management includes:
First receiving unit 502, the production schedule information sent for the reception server;
First determining unit 504, for according to default creation data information and production schedule information, determining preset time section Point information;
First acquisition unit 506, for obtaining actual production data message in real time;
Second determining unit 508, for according to actual production data message, determining real time nodal information;
Computing unit 510, for comparing preset time nodal information and real time nodal information, calculate the two each time The time difference of node;
First display unit 512, for showing the time difference.
The system of production planning management provided by the invention, first, the production schedule information that the reception server is sent, according to Production schedule information and stored default creation data, make prediction to timing node corresponding to each link in production process Generate preset time nodal information, preset time nodal information reflect the links of the production schedule estimated time of commencement and Estimated Time Of Completion;Secondly, actual production data message is obtained and shown in real time, is determined according to actual production data message actual The actual time started of each link and actual finish time, i.e. real time nodal information in production process, wherein, because actual Creation data information is Real-time Feedback in actual production process, so the number of real time node is not more than preset time section The number of point, finally, preset time nodal information and real time nodal information are compared, default production is calculated and be shown During each link timing node and the timing node of each link in corresponding actual production process time difference, so as to life Production situation carries out control.In addition, actual production data message is carried out in real time simultaneously obtaining actual production data message in real time It has been shown that, it is easy to the accurate progresses in real time situation for understanding current link.The present invention is by determining the preset time section in production process Point information, the timing node of each link of the production schedule is specify that, and obtain actual production data, and calculate default production process In the timing node of each link and the time difference of the timing node of each link in corresponding actual production process, be easy to understand actual The gap of progress and default progress, to the reasonable management and control of the production schedule, according to plan coordination actual production process items matters, so as to Ensure that production is preferably carried out.
Fig. 5 b show the system schematic block diagram of the production planning management of an alternative embodiment of the invention.
As shown in Figure 5 b, the system 500 of production planning management includes:
First receiving unit 502, the production schedule information sent for the reception server;
First determining unit 504, for according to default creation data information and production schedule information, determining preset time section Point information;
First acquisition unit 506, for obtaining actual production data message in real time;
Second determining unit 508, for according to actual production data message, determining real time nodal information;
Computing unit 510, for comparing preset time nodal information and real time nodal information, calculate the two each time The time difference of node;
First display unit 512, for showing the time difference;
First determining unit 504, is specifically included:
First transmitting element 5042, for according to preset time nodal information, assignment instructions being sent, for instructing actual life Production.
In this embodiment, preset time nodal information contains the planned start time of each link in production process, Preset time nodal information is issued to the task list of system, task list receives in the planned start time of each link Automatically the assignment instructions triggered, and assignment instructions are responded and carry out corresponding task operating.
Fig. 5 c show the system schematic block diagram of the production planning management of yet another embodiment of the present invention.
As shown in Figure 5 c, the system 500 of production planning management includes:
First receiving unit 502, the production schedule information sent for the reception server;
First determining unit 504, for according to default creation data information and production schedule information, determining preset time section Point information;
First acquisition unit 506, for obtaining actual production data message in real time;
Second determining unit 508, for according to actual production data message, determining real time nodal information;
Computing unit 510, for comparing preset time nodal information and real time nodal information, calculate the two each time The time difference of node;
First display unit 512, for showing the time difference;
First determining unit 504, is specifically included:
First transmitting element 5042, for according to preset time nodal information, assignment instructions being sent, for instructing actual life Production;
Second acquisition unit 514, for before production schedule information is received, obtaining newly-built production schedule information;
Second transmitting element 516, for sending newly-built production schedule information to server, so that server is stored;
Wherein, production schedule information is that server by the newly-built production schedule information of the whole of storage, divided according to plan by batch What class obtained.
In this embodiment, keeper with the newly-built production schedule and can be uploaded onto the server with after account number login system, clothes Business device stores to each newly-built production schedule information received, and by all newly-built production schedule informations by batch point Fed back after class.
Fig. 5 d show the system schematic block diagram of the production planning management of another embodiment of the present invention.
As fig 5d, the system 500 of production planning management includes:
First receiving unit 502, the production schedule information sent for the reception server;
First determining unit 504, for according to default creation data information and production schedule information, determining preset time section Point information;
First acquisition unit 506, for obtaining actual production data message in real time;
Second determining unit 508, for according to actual production data message, determining real time nodal information;
Computing unit 510, for comparing preset time nodal information and real time nodal information, calculate the two each time The time difference of node;
First display unit 512, for showing the time difference;
First determining unit 504, is specifically included:
First transmitting element 5042, for according to preset time nodal information, assignment instructions being sent, for instructing actual life Production;
Second acquisition unit 514, for before production schedule information is received, obtaining newly-built production schedule information;
Second transmitting element 516, for sending newly-built production schedule information to server, so that server is stored;
Wherein, production schedule information is that server by the newly-built production schedule information of the whole of storage, divided according to plan by batch What class obtained;
3rd transmitting element 518, for sending after newly-built production schedule information stored to server for server, Before the production schedule information that the reception server is sent, screening conditions are sent to server;
3rd acquiring unit 520, for obtaining the production schedule information for meeting screening conditions of server transmission;
Second display unit 522, the production schedule information of screening conditions is met for showing;
Wherein, screening conditions include following at least one or its combination:Plan classification, intended batch, planned start time And planned end time.
In this embodiment, at the end of server can be according to plan classification, intended batch, planned start time and plan Between etc. condition production schedule information is screened and is fed back the information after screening, also, screening operation can be with office When between carry out, in order to which administrative staff inquire about inter-related task information at any time.
In one embodiment of the invention, it is preferable that production schedule information includes following at least one or its combination:Meter Draw settling time, plan title, plan classification, intended batch, plan ownership place, planned start time, planned end time, meter Draw seedlings nursing plate number, plan field planting number and plan seedling bed resource;Actual production data message includes following at least one or its group Close:Plan settling time, plan classification, plan ownership place and resource service condition.
In this embodiment, production schedule information can include plan settling time, plan title, plan classification, plan Batch, plan ownership place, planned start time, planned end time, plan seedlings nursing plate number, plan field planting number and plan seedling bed Resource etc., to carry out reasonable management and control to the production schedule;Actual production data message can include plan settling time, plan class Not, ownership place and resource service condition etc. are planned, to be understood with practical condition and control.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc. Mean to combine at least one reality that specific features, structure, material or the feature that the embodiment or example describe are contained in the present invention Apply in example or example.In this manual, identical embodiment or reality are not necessarily referring to the schematic representation of above-mentioned term Example.Moreover, description specific features, structure, material or feature can in any one or more embodiments or example with Suitable mode combines.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

  1. A kind of 1. method of production planning management, it is characterised in that including:
    The production schedule information that the reception server is sent;
    According to default creation data information and the production schedule information, preset time nodal information is determined;
    Actual production data message is obtained in real time;
    According to the actual production data message, real time nodal information is determined;
    Compare the preset time nodal information and the real time nodal information, the two each timing node is calculated and be shown Time difference.
  2. 2. the method for production planning management according to claim 1, it is characterised in that the basis presets creation data letter Breath and the production schedule information, the step of determining preset time nodal information, in addition to:
    According to the preset time nodal information, assignment instructions are sent, for instructing actual production.
  3. 3. the method for production planning management according to claim 1, it is characterised in that the reception production schedule information Before step, in addition to:
    Obtain newly-built production schedule information;
    The newly-built production schedule information is sent to the server, so that the server is stored;
    Wherein, the production schedule information is that the server criticizes the whole of the storage newly-built production schedule information according to plan It is secondary to be classified what is obtained.
  4. 4. the method for production planning management according to claim 3, it is characterised in that send the newly-built production schedule letter After breath is stored to the server for the server, before the production schedule information that the reception server is sent, also wrap Include:
    Screening conditions are sent to the server;
    Obtain and show the production schedule information for meeting the screening conditions that the server is sent;
    Wherein, the screening conditions include following at least one or its combination:Plan classification, intended batch, planned start time And planned end time.
  5. 5. the method for production planning management according to any one of claim 1 to 4, it is characterised in that
    The production schedule information includes following at least one or its combination:Plan settling time, plan title, plan classification, Intended batch, plan ownership place, planned start time, planned end time, plan seedlings nursing plate number, plan field planting number and plan are educated Seedbed resource;
    The actual production data message includes following at least one or its combination:The plan settling time, the plan class Not, the plan ownership place and resource service condition.
  6. A kind of 6. system of production planning management, it is characterised in that including:
    First receiving unit, the production schedule information sent for the reception server;
    First determining unit, for according to default creation data information and the production schedule information, determining preset time node Information;
    First acquisition unit, for obtaining actual production data message in real time;
    Second determining unit, for according to the actual production data message, determining real time nodal information;
    Computing unit, for the preset time nodal information and the real time nodal information, calculate the two it is each when The time difference of intermediate node;
    First display unit, for showing the time difference.
  7. 7. the system of production planning management according to claim 6, it is characterised in that first determining unit, specifically Including:
    First transmitting element, for according to the preset time nodal information, assignment instructions being sent, for instructing actual production.
  8. 8. the system of production planning management according to claim 6, it is characterised in that also include:
    Second acquisition unit, for before the reception production schedule information, obtaining newly-built production schedule information;
    Second transmitting element, for sending the newly-built production schedule information to the server, so that the server is carried out Storage;
    Wherein, the production schedule information is that the server criticizes the whole of the storage newly-built production schedule information according to plan It is secondary to be classified what is obtained.
  9. 9. the system of production planning management according to claim 8, it is characterised in that also include:
    3rd transmitting element, stored for sending the newly-built production schedule information to the server for the server Afterwards, before the production schedule information that the reception server is sent, screening conditions are sent to the server;
    3rd acquiring unit, the production schedule information for meeting the screening conditions sent for obtaining the server;
    Second display unit, for showing the production schedule information for meeting the screening conditions;
    Wherein, the screening conditions include following at least one or its combination:Plan classification, intended batch, planned start time And planned end time.
  10. 10. the system of the production planning management according to any one of claim 6 to 9, it is characterised in that
    The production schedule information includes following at least one or its combination:Plan settling time, plan title, plan classification, Intended batch, plan ownership place, planned start time, planned end time, plan seedlings nursing plate number, plan field planting number and plan are educated Seedbed resource;
    The actual production data message includes following at least one or its combination:The plan settling time, the plan class Not, the plan ownership place and resource service condition.
CN201710905827.0A 2017-09-29 2017-09-29 Production plan management method and system Active CN107844102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710905827.0A CN107844102B (en) 2017-09-29 2017-09-29 Production plan management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710905827.0A CN107844102B (en) 2017-09-29 2017-09-29 Production plan management method and system

Publications (2)

Publication Number Publication Date
CN107844102A true CN107844102A (en) 2018-03-27
CN107844102B CN107844102B (en) 2020-11-24

Family

ID=61661510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710905827.0A Active CN107844102B (en) 2017-09-29 2017-09-29 Production plan management method and system

Country Status (1)

Country Link
CN (1) CN107844102B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111626531A (en) * 2019-02-28 2020-09-04 贵阳海信网络科技有限公司 Risk control method, device, system and storage medium
CN112396329A (en) * 2020-11-23 2021-02-23 上海宝临电气集团有限公司 Intelligent production management method, system, intelligent terminal and storage medium
CN112580997A (en) * 2020-12-24 2021-03-30 特劢丝软件科技(上海)有限公司 Data collection method and system, SPC system and computer storage medium
CN117114628A (en) * 2023-10-20 2023-11-24 广东电网有限责任公司梅州供电局 Temporary plan identification method, device, equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102668899A (en) * 2012-03-28 2012-09-19 北京师范大学 Crop planting mode recognition method
CN104866970A (en) * 2015-05-26 2015-08-26 徐吉祥 Intelligent plantation management method and intelligent plantation equipment
CN105427178A (en) * 2015-12-16 2016-03-23 安徽景徽菜篮子电子商务有限公司 System for large cherry refined plantation management and method of same
CN105844408A (en) * 2016-03-24 2016-08-10 苏州绿色植物全栈信息科技有限公司 Plant management system and method for garden and landscape engineering based on two-dimensional codes
CN106780080A (en) * 2016-11-29 2017-05-31 深圳前海弘稼科技有限公司 The computational methods of planting progress, computing device and server

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102668899A (en) * 2012-03-28 2012-09-19 北京师范大学 Crop planting mode recognition method
CN104866970A (en) * 2015-05-26 2015-08-26 徐吉祥 Intelligent plantation management method and intelligent plantation equipment
CN105427178A (en) * 2015-12-16 2016-03-23 安徽景徽菜篮子电子商务有限公司 System for large cherry refined plantation management and method of same
CN105844408A (en) * 2016-03-24 2016-08-10 苏州绿色植物全栈信息科技有限公司 Plant management system and method for garden and landscape engineering based on two-dimensional codes
CN106780080A (en) * 2016-11-29 2017-05-31 深圳前海弘稼科技有限公司 The computational methods of planting progress, computing device and server

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘耿: "《生产现场管理细化量与过程控制》", 31 October 2009, 广东经济出版社 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111626531A (en) * 2019-02-28 2020-09-04 贵阳海信网络科技有限公司 Risk control method, device, system and storage medium
CN111626531B (en) * 2019-02-28 2023-09-05 贵阳海信网络科技有限公司 Risk control method, apparatus, system and storage medium
CN112396329A (en) * 2020-11-23 2021-02-23 上海宝临电气集团有限公司 Intelligent production management method, system, intelligent terminal and storage medium
CN112580997A (en) * 2020-12-24 2021-03-30 特劢丝软件科技(上海)有限公司 Data collection method and system, SPC system and computer storage medium
CN112580997B (en) * 2020-12-24 2021-07-27 上海赛美特软件科技有限公司 Data collection method and system, SPC system and computer storage medium
CN117114628A (en) * 2023-10-20 2023-11-24 广东电网有限责任公司梅州供电局 Temporary plan identification method, device, equipment and storage medium
CN117114628B (en) * 2023-10-20 2024-02-13 广东电网有限责任公司梅州供电局 Temporary plan identification method, device, equipment and storage medium

Also Published As

Publication number Publication date
CN107844102B (en) 2020-11-24

Similar Documents

Publication Publication Date Title
CN107844102A (en) Production plan management method and system
CN103123700B (en) Event data treating apparatus
CN101031934B (en) The management of laboratory equipment device information and control network
US20160291590A1 (en) Agriculture support system
CN109543992A (en) Intelligent polling method, device, intelligent terminal and server
CN109508376A (en) It can online the error correction intension recognizing method and device that update
DE102006020150B4 (en) System and method for test probe management
CN110070343A (en) A kind of prospecting project management system and method
CN109870991A (en) Configuration method, the device and system of device parameter
US8474010B2 (en) System and method for facilitating the transfer of information relating to quality of an organization
CN107909241A (en) Dispatching method, device, equipment and the readable storage medium storing program for executing of agricultural machinery key element
US10684890B2 (en) Network deployment for cellular, backhaul, fiber optic and other network infrastructure
CN105916042A (en) Virtual article giving method, user terminal, and network live broadcast platform and system
CN106251092A (en) Field operation managing and control system based on operation template
CN107330676A (en) A kind of design of the development reviewing method and estimating and examining system of hardware intermediate item
CN107978362A (en) The inquiry of data distribution is utilized in hospital network
CN109376167A (en) Selection of specialists method, apparatus and server
CN109377172A (en) Project cost progress control system
CN115600861A (en) Real-time engineering progress supervision system suitable for construction site and operation method thereof
CN107527148A (en) The building site project management system of power network wisdom building site control platform
KR101076419B1 (en) Project management method using activity based project management system
AU2018201304A1 (en) A model management system
CN110198522A (en) Data transmission method and device, electronic equipment and computer readable storage medium
CN116796947A (en) Intelligent scheduling method for team management technicians
CN106443242A (en) Automatic test systematic framework for automobile electronic products and test method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220511

Address after: 517025 room 317-1, enterprise service center building, No. 8, Longling Third Road, Longling Industrial Park, Yuancheng District, Heyuan City, Guangdong Province

Patentee after: HEYUAN HONGJIA AGRICULTURAL TECHNOLOGY CO.,LTD.

Address before: 518052 Room 201, building A, No. 1, Qian Wan Road, Qianhai Shenzhen Hong Kong cooperation zone, Shenzhen, Guangdong (Shenzhen Qianhai business secretary Co., Ltd.)

Patentee before: SHENZHEN SPRINGWOODS HOLDING Co.,Ltd.

TR01 Transfer of patent right