CN107740575A - Stair concrete draw and insert-type template construction engineering method - Google Patents

Stair concrete draw and insert-type template construction engineering method Download PDF

Info

Publication number
CN107740575A
CN107740575A CN201711023483.7A CN201711023483A CN107740575A CN 107740575 A CN107740575 A CN 107740575A CN 201711023483 A CN201711023483 A CN 201711023483A CN 107740575 A CN107740575 A CN 107740575A
Authority
CN
China
Prior art keywords
template
stair
construction
insert
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711023483.7A
Other languages
Chinese (zh)
Inventor
许红英
陈飞鹏
吴勇
曾云
李力勋
石丙进
但亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Jian Jian Eleventh Construction Co Ltd
Original Assignee
Yunnan Jian Jian Eleventh Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Jian Jian Eleventh Construction Co Ltd filed Critical Yunnan Jian Jian Eleventh Construction Co Ltd
Priority to CN201711023483.7A priority Critical patent/CN107740575A/en
Publication of CN107740575A publication Critical patent/CN107740575A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/062Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/104Treads
    • E04F11/116Treads of stone, concrete or like material or with an upper layer of stone or stone like material, e.g. ceramics, concrete; of glass or with an upper layer of glass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F2011/0203Miscellaneous features of stairways not otherwise provided for
    • E04F2011/0205Stairways characterised by the use of specific materials for the supporting structure of the treads
    • E04F2011/021Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass
    • E04F2011/0212Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete
    • E04F2011/0214Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to technical field of buildings.Purpose is to provide the stair concrete draw and insert-type template construction engineering method that construction cost is low, easily operated, casting quality is good.The technical solution adopted in the present invention is:Stair concrete draw and insert-type template construction engineering method, comprises the following steps:A, formwork-support is set up.Stair template is installed B,:It is multiple construction sections by stair classifying rationally, determines construction joint position.Then side template, template of marking time and end template, side template and end template the once mounting shaping of whole stair are installed, template of marking time is installed before construction section cast.In the installation process of end template, construction section end template at upper level construction section construction joint is arranged to collapsible form.C, construction joint is cleared up.D, concrete is poured into a mould.The present invention can be cleared up easily the construction joint in stair work progress, and then the effective organoleptic properties and casting quality for improving stair.

Description

Stair concrete draw and insert-type template construction engineering method
Technical field
The present invention relates to technical field of buildings, more particularly to stair concrete draw and insert-type template construction engineering method.
Background technology
During building engineering main body construction, the processing of concrete construction joint, especially stair concrete construction The processing of seam, it is the key point for ensureing construction quality.In stair concrete construction, in the concrete seam of priority construction The slag that would generally be disabled due to the confined bed of stair both sides and bottom template is difficult to clean out and the quality such as slag inclusion, spillage occur normal Problem is seen, it is necessary to which follow-up chisels and repair, and material and artificial waste occurs, it would therefore be desirable to explore advanced construction Technique is perfect to carry out.Traditional stair concrete construction process, after the preceding paragraph stair casting complete, often leave more Residue, such as:Unnecessary mortar, crushed stone etc., because template both sides and bottom plate are all closings in existing way, residue cleaning When there is no drain passage, cause residue cleaning it is unnet, its consequence is that the common quality problems such as concrete finished product slag inclusion, spillage compare Generally, so cause at Construction Joint coincide property it is bad, the physical property and impression quality of stair are poor.
The content of the invention
It is an object of the invention to provide the stair concrete draw and insert-type that construction cost is low, easily operated, casting quality is good Template construction engineering method.
For achieving the above object, the technical solution adopted in the present invention is:Stair concrete draw and insert-type template construction Engineering method, comprise the following steps:
A, formwork-support is set up:Steel bracket is set up, then some flitches are set at the top of steel bracket, flitch is along stair soffit Length direction extends, the support member using flitch as stair end template;
Stair template is installed B,:By stair classifying rationally it is multiple construction sections according to the design total length of stair, determines construction joint Position;Then side template, template of marking time and end template are installed, the side template and end template once mounting of whole stair are molded, often The template of marking time of individual construction section is installed before construction section cast;In the installation process of end template, each construction section leans on End template at the construction joint of nearly upper level construction section is arranged to collapsible form;Remaining is straight in addition to collapsible form in all end templates Connect and fixed with flitch;
C, construction joint is cleared up:Before each construction section carries out concrete cast, first the collapsible form of the construction section is moved up, Overlap on end template above, then construction joint is cleared up;Construction joint is moved during clearing up with collapsible form The breach left after opening is used for the discharge of impurity as cleanout, cleanout;After the completion of construction joint cleaning, collapsible form is moved down Reset, close cleanout;
D, concrete is poured into a mould.
Preferably, some openings are set on the side template, and the opening and the ladder facade of stair correspond;It is described The Access Division on template of marking time edge including plate body and on plate body both sides, the Access Division is engaged with opening.
Preferably, some positive stop strips are provided with the side template, the positive stop strip is fixed using iron nail and side template, limit Position bar is between two adjacent openings;Two adjacent opening installations are marked time after template, and the both ends of positive stop strip are respectively held against Mark time template.
Preferably, the size of the collapsible form is the width of 300-400mm* stair.
Preferably, the section of the flitch is 80mm*50mm, and adjacent two flitches spacing is 200mm.
Preferably, in step C, construction joint cleaning includes:The matching surface of concrete is chiselled, cleared up with edge of a knife brush Residue, purged with hair-dryer, enter water-filling with giant and wash away.
Preferably, during chiselling, chiselled again after first being moistened with water, avoid airborne dust.
Preferably, during formwork-support is set up, bar-mat reinforcement of the synchronous braiding along the extension of stair slope aspect, bar-mat reinforcement Stair template is installed again after the completion of braiding.
Beneficial effects of the present invention embody a concentrated reflection of:Easily the construction joint in stair work progress can be carried out clear Reason, and then the effective organoleptic properties and casting quality for improving stair.Specifically, the bottom due to the present invention at construction joint Template neither influences the stability of template integral installation by the way of collapsible form, while after collapsible form is removed, can A cleanout is left, the convenient impurity by construction joint scale removal process is discharged, and avoids impurity from being mixed in the concrete of cast. On the one hand the overall organoleptic properties of casting complete back stairs are improved, on the other hand also enhance the monolithic stability of concrete staircase Property, make the junction of construction joint more firm.And the present invention, it is simple to operate, the rehabilitation expense in later stage greatly reduces, makees Industry cost is low, has fabulous economic benefit.
Brief description of the drawings
Fig. 1 is structural representation when collapsible form closes cleanout;
Fig. 2 is structural representation when cleanout is opened;
Fig. 3 is the structural representation of side template;
Fig. 4 is top view of the structure after model sheetinstallat of marking time shown in Fig. 3;
Fig. 5 is the structural representation of template of marking time.
Embodiment
Stair concrete draw and insert-type template construction engineering method with reference to shown in Fig. 1-5, comprises the following steps:
A, formwork-support is set up:Steel bracket 1 is set up, steel bracket 1 is generally made up of steel pipe, including standpipe vertically, Along the first transverse tube of stairway width direction extension, the second transverse tube extended along the length direction of stair vertical projection, some it is used for Connect the down tube that each flitch 2 connects standpipe with the 3rd transverse tube of reinforcement structure intensity and diagonally.Pass through steel between each steel pipe Clip is attached.Then some flitches 2 are set at the top of steel bracket 1, by steel clamping band or utilize steel between steel pipe and flitch Tied silk is attached.Length direction extension of the flitch 2 along stair soffit, as shown in fig. 1, that is, flitch 2 is along lower-left to the right side On direction extension, the support member using flitch 2 as stair end template 5.The size of flitch 2 is configured according to the actual requirements, Usually section 80mm*50mm, during arrangement, the spacing of adjacent two flitch 2 should also be carried out flitch 2 according to actual conditions Set.The wide stair such as 1.2m, using 5 sectional dimension 80mm*50mm flitch 2, the spacing between adjacent two flitches 2 is 200mm.To ensure the structural strength of cast-in-place concrete staircase, during formwork-support is set up, edge can be synchronously woven The bar-mat reinforcement 11 of stair slope aspect extension, bar-mat reinforcement 11 install stair template again after the completion of weaving.
Stair template is installed B,:By stair classifying rationally it is multiple construction sections according to the design total length of stair, it is determined that applying Work stitches position, such as:Construction section is 3 sections, then construction joint is 2, that is to say, that construction section is natural number n, then construction joint quantity For n-1.Then side template 3, template of marking time 4 and end template 5 be installed, the side templates 3 of whole stair and the once mounting of end template 5 into Type, the template 4 of marking time of each construction section are installed before construction section cast, that is to say, that side template 3 and end template 5 are whole Individual stair are installed simultaneously, can largely reduce construction period, and effectively ensure the accuracy of installation site between template.Mark time Template 4 can be installed again because the size of itself is relatively small before corresponding construction section cast.In the installation of end template 5 Cheng Zhong, end template 5 of each construction section at the construction joint of upper level construction section are arranged to collapsible form 6, that is to say, that living Moving platen 6 is not stressed directly with flitch 2 and formwork-support, can be dragged, be lifted.And except work in other all end templates 5 Remaining is directly fixed with flitch 2 outside moving platen 6, and fixed mode is usually to clench or tighten.The size of the collapsible form 6 is The width of 300-400mm* stair.That is, the width of collapsible form 6 is equal to width, the length 300-400mm of stair, Thickness with woodwork plate thickness.
C, construction joint is cleared up:With reference to shown in Fig. 1 and 2, before each construction section carries out concrete cast, first by the construction section Collapsible form 6 move up, overlap on end template 5 above, then construction joint cleared up;Construction joint is cleared up During removed using collapsible form 6 after the breach that leaves be used as cleanout 7, cleanout 7 is used for the discharge of impurity;Construction joint is clear After the completion of reason, collapsible form 6 is moved down into reset, closes cleanout 7;Form complete end template 5, it should be noted that collapsible form 6 need to fit like a glove with cleanout 7, avoid spillage, situations such as misplacing after the reset of collapsible form 6.The present invention is to construction joint The step of cleaning, includes:The matching surface of concrete is chiselled, residue is cleared up with edge of a knife brush, is purged with hair-dryer, used Giant enters water-filling and washed away.During chiselling, chiselled again after first being moistened with water, avoid airborne dust.
D, before pouring into a mould construction section, the template 4 of marking time of this section is installed, for the ease of the installation for template 4 of marking time, such as Fig. 3-5 Shown, more preferable way is that some openings 8 are set on the side template 3, a pair of the ladder facade 1 of the opening 8 and stair Should;The Access Division 9 on the template 4 of marking time edge including plate body and on plate body both sides, the Access Division 9 is engaged with opening 8. Using Access Division 9 will mark time template 4 be connected to opening 8 in, convenience quick for installation, accurate positioning.Opening is opened up on side template 3 It should be noted that opening 8 need to keep high verticality during 8.Because after concrete is poured into a mould, the pressure between template of marking time 4 increases Greatly, it is the deflection for the template 4 that avoids marking time, more preferable way is that some positive stop strips 10, the limit are provided with the side template 3 Position bar 10 is fixed using iron nail and side template 3, and positive stop strip 10 is between two adjacent openings 8;Two adjacent peaces of opening 8 Dress is marked time after template 4, and the both ends of positive stop strip 10 are respectively held against template 4 of marking time, and the support reinforcing of template 4 of marking time is used as using positive stop strip 10 Part.Concrete is poured into a mould after the installation of template 4 of marking time.
Because end template 5 of the present invention at construction joint is by the way of collapsible form 6, template integral installation is neither influenceed Stability, while after collapsible form 6 is removed, a cleanout 7 can be left, it is convenient will be miscellaneous in construction joint scale removal process Matter is discharged, and avoids impurity from being mixed in the concrete of cast.On the one hand the overall organoleptic properties of casting complete back stairs are improved, On the other hand the resistance to overturning of concrete staircase is also enhanced, makes the junction of construction joint more firm.And the present invention, behaviour Make it is simple, after one-shot forming, without carry out again it is follow-up chiselling and repairing, the rehabilitation expense in later stage, operation greatly reduces Cost is low, has fabulous economic benefit.

Claims (8)

1. stair concrete draw and insert-type template construction engineering method, it is characterised in that:Comprise the following steps:
A, formwork-support is set up:Set up steel bracket(1), then in steel bracket(1)Top sets some flitches(2), flitch(2) Extend along the length direction of stair soffit, with flitch(2)As stair end template(5)Support member;
Stair template is installed B,:By stair classifying rationally it is multiple construction sections according to the design total length of stair, determines construction joint Position;Then side template is installed(3), template of marking time(4)And end template(5), the side template of whole stair(3)And end template(5) Once mounting is molded, the template of marking time of each construction section(4)Installed before construction section cast;In end template(5)Peace During dress, end template of each construction section at the construction joint of upper level construction section(5)It is arranged to collapsible form(6);Institute There is end template(5)In remove collapsible form(6)It is outer remaining directly and flitch(2)It is fixed;
C, construction joint is cleared up:Before each construction section carries out concrete cast, first by the collapsible form of the construction section(6)To moving up It is dynamic, overlap end template above(5)On, then construction joint is cleared up;With activity during construction joint cleaning Template(6)The breach left after removing is as cleanout(7), cleanout(7)Discharge for impurity;Construction joint cleaning is completed Afterwards, by collapsible form(6)Reset is moved down, closes cleanout(7);
D, concrete is poured into a mould.
2. stair concrete draw and insert-type template construction engineering method according to claim 1, it is characterised in that:The side template (3)It is upper that some openings are set(8), the opening(8)Corresponded with the ladder facade of stair;The template of marking time(4)Including Plate body and on plate body both sides edge Access Division(9), the Access Division(9)With opening(8)It is engaged.
3. stair concrete draw and insert-type template construction engineering method according to claim 2, it is characterised in that:The side template (3)On be provided with some positive stop strips(10), the positive stop strip(10)Utilize iron nail and side template(3)It is fixed, positive stop strip(10)Position In two adjacent openings(8)Between;Two adjacent openings(8)Template of marking time is installed(4)Afterwards, positive stop strip(10)Both ends point Template of marking time is not propped up(4).
4. stair concrete draw and insert-type template construction engineering method according to claim 3, it is characterised in that:The collapsible form (6)Size be 300-400mm* stair width.
5. stair concrete draw and insert-type template construction engineering method according to claim 4, it is characterised in that:The flitch(2) Section be 80mm*50mm, adjacent two flitch(2)Spacing is 200mm.
6. stair concrete draw and insert-type template construction engineering method according to claim 5, it is characterised in that:In step C, apply Work seam cleaning includes:The matching surface of concrete is chiselled, residue is cleared up with edge of a knife brush, is purged with hair-dryer, with height Pressure hydraulic giant enters water-filling and washed away.
7. stair concrete draw and insert-type template construction engineering method according to claim 6, it is characterised in that:In the process chiselled In, chiselled again after first being moistened with water, avoid airborne dust.
8. stair concrete draw and insert-type template construction engineering method according to claim 6, it is characterised in that:Setting up template branch During support, bar-mat reinforcement of the synchronous braiding along the extension of stair slope aspect(11), bar-mat reinforcement(11)Building is installed again after the completion of braiding Terraced template.
CN201711023483.7A 2017-10-26 2017-10-26 Stair concrete draw and insert-type template construction engineering method Pending CN107740575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711023483.7A CN107740575A (en) 2017-10-26 2017-10-26 Stair concrete draw and insert-type template construction engineering method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711023483.7A CN107740575A (en) 2017-10-26 2017-10-26 Stair concrete draw and insert-type template construction engineering method

Publications (1)

Publication Number Publication Date
CN107740575A true CN107740575A (en) 2018-02-27

Family

ID=61238372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711023483.7A Pending CN107740575A (en) 2017-10-26 2017-10-26 Stair concrete draw and insert-type template construction engineering method

Country Status (1)

Country Link
CN (1) CN107740575A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763648A (en) * 2019-03-11 2019-05-17 中建四局第四建筑工程有限公司 The method and device of sundries in a kind of cleaning stair template
CN110306795A (en) * 2019-07-11 2019-10-08 上海建工七建集团有限公司 Clean-out hatch opening and closing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241474Y (en) * 2008-05-30 2009-05-20 浙江省一建建设集团有限公司 Mounting and drawing bottom formwork structure of cast-in-situ stair construction joint
CN102747837A (en) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 Cleaning method for cast-in-place reinforced concrete stair segment timber template
CN204492182U (en) * 2015-03-30 2015-07-22 广西建工集团第一建筑工程有限责任公司 Steel and wood composite formula band step plate cast-in-place concrete stair mould
CN105133833A (en) * 2015-09-15 2015-12-09 成都市第四建筑工程公司 Stair formwork and stair construction method adopting same
CN205206316U (en) * 2015-11-30 2016-05-04 孔庆节 Stair template
CN206368534U (en) * 2016-12-30 2017-08-01 湛双庆 A kind of concrete staircase mould of marking time

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241474Y (en) * 2008-05-30 2009-05-20 浙江省一建建设集团有限公司 Mounting and drawing bottom formwork structure of cast-in-situ stair construction joint
CN102747837A (en) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 Cleaning method for cast-in-place reinforced concrete stair segment timber template
CN204492182U (en) * 2015-03-30 2015-07-22 广西建工集团第一建筑工程有限责任公司 Steel and wood composite formula band step plate cast-in-place concrete stair mould
CN105133833A (en) * 2015-09-15 2015-12-09 成都市第四建筑工程公司 Stair formwork and stair construction method adopting same
CN205206316U (en) * 2015-11-30 2016-05-04 孔庆节 Stair template
CN206368534U (en) * 2016-12-30 2017-08-01 湛双庆 A kind of concrete staircase mould of marking time

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763648A (en) * 2019-03-11 2019-05-17 中建四局第四建筑工程有限公司 The method and device of sundries in a kind of cleaning stair template
CN110306795A (en) * 2019-07-11 2019-10-08 上海建工七建集团有限公司 Clean-out hatch opening and closing device

Similar Documents

Publication Publication Date Title
CN100469995C (en) Construction method for after-pouring band beam-slab template
CN106320691A (en) Aluminum-wood formwork construction method
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN104947719A (en) Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof
CN110821156A (en) Sinking type toilet hanging die structure and construction method thereof
CN107023160A (en) A kind of assembly concrete shear wall structure dedicated aluminium alloy template
CN208534025U (en) Floor slab back casting band separate support formwork erecting structure
CN107740575A (en) Stair concrete draw and insert-type template construction engineering method
CN109577377A (en) Basement post-pouring zone structure and its construction method
CN108678193B (en) Post-cast strip and construction method thereof
CN114215347A (en) Template for chiseling-free post-cast strip and construction joint and construction method
CN105155836B (en) Aluminum alloy mould plate for building and its using method
CN104831932A (en) Construction technology for high-grade concrete column base
CN108952148A (en) A kind of formwork reinforcement system and its construction method
CN207048310U (en) A kind of alter-pouring strips mould plate support system
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN106906747A (en) A kind of column and bent cap splicing structure
CN104594654B (en) A kind of concrete structure reinforcement scheme generation method
CN109025275A (en) A kind of shear wall side regularization stair punching block and installation method
CN209244242U (en) A kind of fixed device of half tool-type U-bolt of the shaped steel suspension scaffolding
CN209443765U (en) A kind of steel form of the pouring after settlement shear wall for banketing in advance
CN108265897A (en) A kind of improved stair construction joint processing construction method
CN206438766U (en) One kind is without support beam board post poured band template system
CN109457960A (en) One kind is marked time overall assembled adjustable universal mold for cast-in-situ stair

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180227