CN209443765U - A kind of steel form of the pouring after settlement shear wall for banketing in advance - Google Patents

A kind of steel form of the pouring after settlement shear wall for banketing in advance Download PDF

Info

Publication number
CN209443765U
CN209443765U CN201821907352.5U CN201821907352U CN209443765U CN 209443765 U CN209443765 U CN 209443765U CN 201821907352 U CN201821907352 U CN 201821907352U CN 209443765 U CN209443765 U CN 209443765U
Authority
CN
China
Prior art keywords
steel
stupefied
steel form
plank sheathing
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821907352.5U
Other languages
Chinese (zh)
Inventor
游建华
刘晓宇
杨维国
黄腾
刘新光
戴朝红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
Third Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Third Engineering Division filed Critical Third Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201821907352.5U priority Critical patent/CN209443765U/en
Application granted granted Critical
Publication of CN209443765U publication Critical patent/CN209443765U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a kind of steel form of pouring after settlement shear wall for banketing in advance, steel form including shear wall side is arranged in, the channel steel master of the medial surface surrounding setting of steel form is stupefied, the channel steel time being laterally arranged along steel form length direction is stupefied, it is characterized by: the shear wall other side is equipped with the plank sheathing being correspondingly arranged with steel form, the plank sheathing other side is equipped with the main back cord of double steel pipe, multiple wooden a tree, used in making timber for boats time back cords are equipped between plank sheathing and the main back cord of double steel pipe, it is equipped with that multiple one end and channel steel are secondary stupefied to be connected between steel form and plank sheathing, the water-stop opposite-pulling screw rod that the other end is connected after plank sheathing and the main back cord of double steel pipe with the main back cord of double steel pipe.Steel template structure provided by the utility model is simple, easy for installation, simultaneously also mitigate the labor intensity of construction personnel, improve construction efficiency, it can be achieved that pouring after settlement region operation of banketing in advance, better condition is created for construction site layout, belongs to technical field of building construction.

Description

A kind of steel form of the pouring after settlement shear wall for banketing in advance
Technical field
The utility model relates to technical field of building construction more particularly to a kind of pouring after settlement for banketing in advance to cut The steel form of power wall.
Background technique
In construction, the narrow situation in construction site is frequently encountered, at this point, if can realize outer wall of basement as early as possible Side is banketed, and can effectively solve the problems, such as place anxiety.But usually, pouring after settlement needs owner's body construction to be built It finishes and after building settlement meets code requirement, can block.
It bankets to realize to mention in advance, current usual way is: building brick fetal membrane on the outside of shear wall, reached to masonry panel Plastering, waterproof, waterproof protective layer, fill construction after to some strength.The main problem of this way has: one, when basement buries When deep larger, generally requiring to reinforce by increasing the modes such as brick fetal membrane thickness, setting constructional column, collar tie beam, time-consuming for integral construction, It is artificial to expend greatly;Two, it needs to wait for a period of time after constructing, after brick fetal membrane reaches certain intensity, can enter next Process is walked, can further extend the construction time in this way;Three, lateral pressure of banketing is deepened with buried depth greatly and is increased, and lower part brick fetal membrane holds Easily there is deformation, collapse, the problems such as so as to cause waterproof damage layer, and after there is the above problem, repairing construction difficulty is big.
Therefore, it under the premise of can guarantee post empiricism quality, finds and a kind of be easy to construct and safe and reliable pour band Protecting formwork is our striving direction.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of pouring after settlement shear wall for banketing in advance Steel form, there is the advantage that the processing is simple, easy for installation, safe and reliable.
To achieve the above objectives, the present invention provides the following technical solutions:
A kind of steel form of the pouring after settlement shear wall for banketing in advance, the punching block including shear wall side is arranged in The channel steel master of the medial surface surrounding setting of plate, steel form is stupefied, and the channel steel time being laterally arranged along steel form length direction is stupefied, described to cut The power wall other side is equipped with the plank sheathing being correspondingly arranged with steel form, and the plank sheathing other side is equipped with disposed in parallel with plank sheathing The main back cord of double steel pipe, between the plank sheathing and the main back cord of double steel pipe be equipped with multiple both ends respectively with plank sheathing and the main back of double steel pipe The stupefied connected wooden a tree, used in making timber for boats time back cord, be equipped between the steel form and plank sheathing multiple one end and channel steel it is secondary it is stupefied be connected, the other end passes through Wear the water-stop opposite-pulling screw rod being connected after plank sheathing and the main back cord of double steel pipe with the main back cord of double steel pipe.
In the above-mentioned technical solutions, the steel form of a kind of pouring after settlement shear wall for banketing in advance, Be characterized in that: one end of the water-stop opposite-pulling screw rod be welded on steel form channel steel it is time stupefied on, the water-stop opposite-pulling screw rod it is another One end is equipped with mountain type card and double hex nuts and is passing through mountain type card and double hexagonal spiral shells after plank sheathing and the main back cord of double steel pipe Water-stop opposite-pulling screw rod is connected by mother with the main back cord fastening of double steel pipe.
In the above-mentioned technical solutions, the steel form of a kind of pouring after settlement shear wall for banketing in advance, Be characterized in that: the stupefied model 10# channel steel of the channel steel master, the channel steel master is stupefied to be welded on steel form, and the channel steel master is stupefied Outer side edges are flushed with steel form side.
In the above-mentioned technical solutions, the steel form of a kind of pouring after settlement shear wall for banketing in advance, Be characterized in that: the stupefied model 10# channel steel of the channel steel time, the channel steel time is stupefied to be welded on steel form, and the channel steel time is stupefied Both ends and the stupefied welding of channel steel master.
In the above-mentioned technical solutions, the steel form of a kind of pouring after settlement shear wall for banketing in advance, Be characterized in that: the steel form side is set there are two round steel hanging ring.
In the above-mentioned technical solutions, the steel form of a kind of pouring after settlement shear wall for banketing in advance, Be characterized in that: the steel form with a thickness of 10mm, the plank sheathing with a thickness of 18mm.
The beneficial effects of the utility model are: one, can process in advance, after scene has execution conditions, can complete to hang immediately Dress is in place, is substantially shorter the construction time;Two, intensity and globality are more preferable, are not susceptible to deform, to influence pouring after settlement Integral construction quality;Three, manpower consumption can be greatlyd save, the labor intensity of construction personnel is alleviated;Four, heavy for later period closing Drop post-cast strip provides a kind of arrangement and method for construction, and difficulty of construction reduces.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the horizontal profile schematic diagram that the utility model steel form and plank sheathing are reinforced;
Fig. 3 is the vertical cross section schematic diagram that the utility model steel form and plank sheathing are reinforced.
As shown in the figure: 1- steel form, 2- channel steel master is stupefied, stupefied, the 4- water-stop opposite-pulling screw rod of 3- channel steel time, 5- round steel hanging ring, 6- The right screw rod of sealing, 7- plank sheathing, 8- wood a tree, used in making timber for boats time back cord, the main back cord of 9- double steel pipe, 10- plastic spacer, the mountain 11- type card, 12- Double hex nuts, 13- shear wall, 14- structure reinforcing bars, 15- pouring after settlement.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe.
A kind of steel form of pouring after settlement shear wall for banketing in advance as shown in Figs. 1-3, including setting are being cut The channel steel master stupefied 2 of the medial surface surrounding setting of the steel form 1, steel form 1 of 13 side of power wall, it is lateral along 1 length direction of steel form The channel steel time stupefied 3 of setting, 13 other side of shear wall are equipped with the plank sheathing 7 being correspondingly arranged with steel form 1, the plank sheathing 7 The other side be equipped with the main back cord 9 of the double steel pipe disposed in parallel of plank sheathing 7, set between the plank sheathing 7 and the main back cord 9 of double steel pipe The wooden a tree, used in making timber for boats time back cord 8 for thering are multiple both ends to be connected respectively with plank sheathing 7 and the main back cord 9 of double steel pipe, the steel form 1 and plank sheathing 7 Between be equipped with multiple one end and channel steel times stupefied 3 be connected, the other end run through after plank sheathing 7 and the main back cord 9 of double steel pipe with double steel pipe master The connected water-stop opposite-pulling screw rod 4 of back cord 9.
One end of the water-stop opposite-pulling screw rod 4 is welded on the channel steel time stupefied 3 of steel form 1, the water-stop opposite-pulling screw rod 4 The other end is equipped with mountain type card 11 and double hex nuts 12 and is passing through mountain type card 11 after plank sheathing 7 and the main back cord 9 of double steel pipe Water-stop opposite-pulling screw rod 4 is connected with the main fastening of back cord 9 of double steel pipe with double hex nuts 12.
The shear wall 13 is pouring after settlement shear wall, and middle part is pouring after settlement 15,15 two sides of pouring after settlement There is shear wall, is equipped with the structure reinforcing bars 14 for connecting its both ends shear wall in pouring after settlement 15.
Specifically, the steel plate that the steel form 1 is selected with a thickness of 10mm, two sides are 200mm wider than pouring after settlement 15; The plank sheathing 7 with a thickness of 18mm, two sides are 500mm wider than pouring after settlement 15.Plank sheathing 7 and each sealing are to drawing spiral shell The place that bar 4 contacts is equipped with the plastic spacer 10 of 15mm thickness.
Specifically, the model 10# channel steel of the channel steel master stupefied 2, the channel steel master stupefied 2 is welded on steel form 1, described Stupefied 2 outer side edges of channel steel master are flushed with 1 side of steel form.
Specifically, two round steel hanging rings 5 are arranged on the channel steel master stupefied 2 of 1 side of steel form, round steel hanging ring 5 is selected The round steel of diameter 20mm makes.
The model 10# channel steel of the channel steel time stupefied 3, the channel steel time stupefied 3 are welded on steel form 1, the channel steel Stupefied 3 both ends and channel steel master stupefied 2 weld, and the spacing between each channel steel time stupefied 3 is unequal and spacing is by round steel hanging ring 5 one The other end to steel form 1 is held successively to become smaller.
Specifically, the water-stop opposite-pulling screw rod 4 selects the water-stop opposite-pulling screw rod of φ 14mm, it is welded on channel steel time stupefied 3, It is welded simultaneously with the structure reinforcing bars 14 of pouring after settlement.
The steel form 1, channel steel master are stupefied 2, channel steel time stupefied 3 does antiseptic and rustproof processing before use.
When in use, 13 concrete strength of shear wall of pouring after settlement two sides reaches steel form provided in this embodiment After 100%, on the outside in place by 1 handling of steel form, then water-stop opposite-pulling screw rod 4 and the structure reinforcing bars 14 of pouring after settlement are welded Fixation is connect, round steel hanging ring 5,1 lateral surface of steel form and the equal construction waterproof layer of outer wall of basement structure lateral surface, waterproofing protection are cut off Layer bankets.
After pouring after settlement reaches sealing condition, pours be installed in place plank sheathing 7 on the inside of the shear wall of band after settling.Root According to the position of water-stop opposite-pulling screw rod 4 pre-buried on the water-stop opposite-pulling screw rod 4 and shear wall 13 on steel form 1, in advance in plank sheathing 7 Upper aperture, it is ensured that water-stop opposite-pulling screw rod 4 can pass through.Wooden a tree, used in making timber for boats time back cord 8, the main back cord 9 of double steel pipe, mountain type card are successively installed 11, then fastened with double hex nuts 12.Enter next process after acceptance(check).
After pouring after settlement concreting finishes and reaches demoulding condition, the double of 7 side of plank sheathing only need to be reversely unscrewed Hex nut 12 successively removes mountain type card 11, the main back cord 9 of double steel pipe, the wooden a tree, used in making timber for boats time back cord 8 and plank sheathing 7.It also needs to remove and mould Backing strap piece 10, and exposed water-stop opposite-pulling screw rod 4 is cut off.
The present embodiment provides the steel form for the pouring after settlement shear wall that one kind is banketed in advance, installations simple with structure Convenient advantage, while the labor intensity of construction personnel is also mitigated, construction efficiency is improved, pouring after settlement region is realized Banket in advance, create better condition for construction site layout.
The above description is only the embodiments of the present invention, and therefore it does not limit the scope of the patent of the utility model, all Using equivalent structure or equivalent flow shift made by the utility model description, it is applied directly or indirectly in other phases The technical field of pass, is also included in the patent protection scope of the utility model.

Claims (6)

1. a kind of steel form of the pouring after settlement shear wall for banketing in advance, including the steel in shear wall (13) side is arranged Template (1), the channel steel master of the medial surface surrounding of steel form (1) setting are stupefied (2), and along steel form (1), length direction is laterally arranged Channel steel time stupefied (3), it is characterised in that: shear wall (13) other side is equipped with the plank sheathing being correspondingly arranged with steel form (1) (7), plank sheathing (7) other side is equipped with and the main back cord of plank sheathing (7) double steel pipe disposed in parallel (9), the plank sheathing (7) The wooden a tree, used in making timber for boats that multiple both ends are connected with plank sheathing (7) and the main back cord of double steel pipe (9) respectively is equipped between the main back cord of double steel pipe (9) Back cord (8), multiple one end are equipped between the steel form (1) and plank sheathing (7), and stupefied (3) are connected, the other end runs through with channel steel time The water-stop opposite-pulling screw rod (4) that plank sheathing (7) and the main back cord of double steel pipe (9) are connected with the main back cord of double steel pipe (9) afterwards.
2. a kind of steel form of pouring after settlement shear wall for banketing in advance according to claim 1, feature exist In: on the channel steel time stupefied (3) that one end of the water-stop opposite-pulling screw rod (4) is welded on steel form (1), the water-stop opposite-pulling screw rod (4) the other end is equipped with mountain type card (11) and double hex nuts (12) and is running through plank sheathing (7) and the main back cord of double steel pipe (9) Water-stop opposite-pulling screw rod (4) is connected with the main back cord of double steel pipe (9) fastening by mountain type card (11) and double hex nuts (12) afterwards.
3. a kind of steel form of pouring after settlement shear wall for banketing in advance according to claim 1, feature exist In: the model 10# channel steel of the channel steel master stupefied (2), the channel steel master stupefied (2) are welded on steel form (1), the channel steel master Stupefied (2) outer side edges are flushed with steel form (1) side.
4. a kind of steel form of pouring after settlement shear wall for banketing in advance according to claim 1, feature exist In: the model 10# channel steel of the channel steel time stupefied (3), the channel steel time stupefied (3) are welded on steel form (1), the channel steel The both ends and channel steel master stupefied (2) of stupefied (3) are welded.
5. a kind of steel form of pouring after settlement shear wall for banketing in advance according to claim 1, feature exist Set that there are two round steel hanging ring (5) in: steel form (1) side.
6. a kind of steel form of pouring after settlement shear wall for banketing in advance according to claim 1, feature exist In: the steel form (1) with a thickness of 10mm, the plank sheathing (7) with a thickness of 18mm.
CN201821907352.5U 2018-11-20 2018-11-20 A kind of steel form of the pouring after settlement shear wall for banketing in advance Expired - Fee Related CN209443765U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821907352.5U CN209443765U (en) 2018-11-20 2018-11-20 A kind of steel form of the pouring after settlement shear wall for banketing in advance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821907352.5U CN209443765U (en) 2018-11-20 2018-11-20 A kind of steel form of the pouring after settlement shear wall for banketing in advance

Publications (1)

Publication Number Publication Date
CN209443765U true CN209443765U (en) 2019-09-27

Family

ID=68012750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821907352.5U Expired - Fee Related CN209443765U (en) 2018-11-20 2018-11-20 A kind of steel form of the pouring after settlement shear wall for banketing in advance

Country Status (1)

Country Link
CN (1) CN209443765U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609736A (en) * 2020-12-19 2021-04-06 中建四局第六建设有限公司 Basement waterproof shear wall post-cast strip construction method
CN115198806A (en) * 2022-07-18 2022-10-18 中国二十二冶集团有限公司 Underground wall post-cast strip template reinforcing and installing construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609736A (en) * 2020-12-19 2021-04-06 中建四局第六建设有限公司 Basement waterproof shear wall post-cast strip construction method
CN115198806A (en) * 2022-07-18 2022-10-18 中国二十二冶集团有限公司 Underground wall post-cast strip template reinforcing and installing construction method

Similar Documents

Publication Publication Date Title
CN104947719B (en) The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip
CN209443765U (en) A kind of steel form of the pouring after settlement shear wall for banketing in advance
CN107119901A (en) The cast-in-place system of formwork structure and shear wall and construction method of shear wall angle node
CN103953361A (en) Clearance strengthening system for serious cracks of existing tunnel arch lining
CN107642179A (en) Assembled frame-shear structure steel plate keyway attachment structure and assembling method
CN108118690A (en) A kind of integral hoisting formula coercion underground continuous wall structure and its prefabricated and construction method
CN206888506U (en) The cast-in-place system of formwork structure and shear wall of shear wall angle node
CN206956685U (en) A kind of tunnel multi-purpose type sealing fixing device
CN203835404U (en) Non-clearance strengthening system for serious cracking of existing tunnel lining arch
CN103953362A (en) Clearance-free strengthening system for serious cracks of existing tunnel arch lining
CN203685208U (en) End-shaping steel template for double-lining trolley for tunnel
CN106592645A (en) Super-thick base plate post-cast strip formwork construction method
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN206071601U (en) The device that a kind of prevention tunnel double-lining vault comes to nothing
CN209989847U (en) Shear force wall post-cast strip prefabricated plate closing device
CN204800838U (en) A built -up plate for parapet production
CN204418213U (en) A kind of combined collapsible arch top board
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN215212387U (en) Basement outer wall template reinforced structure
CN105604339A (en) Secondary structure column reinforcing method
CN205206055U (en) Basement outer wall post -cast strip thickening anti -seepage waterstop structure
CN208854833U (en) A kind of prefabricated components reserve the grouting of hanging ring hole and use formwork structure
CN107143137A (en) Cast-in-situ template structure and construction method at a kind of sandwich exterior wall J-shaped wall of prefabricated concrete structure

Legal Events

Date Code Title Description
GR01 Patent grant