CN100469995C - Construction method for after-pouring band beam-slab template - Google Patents

Construction method for after-pouring band beam-slab template Download PDF

Info

Publication number
CN100469995C
CN100469995C CNB2007101131700A CN200710113170A CN100469995C CN 100469995 C CN100469995 C CN 100469995C CN B2007101131700 A CNB2007101131700 A CN B2007101131700A CN 200710113170 A CN200710113170 A CN 200710113170A CN 100469995 C CN100469995 C CN 100469995C
Authority
CN
China
Prior art keywords
template
pouring
sides
post
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2007101131700A
Other languages
Chinese (zh)
Other versions
CN101144328A (en
Inventor
毕敬一
谷浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG WANXIN CONSTRUCTION CO Ltd
Original Assignee
SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG WANXIN CONSTRUCTION CO Ltd filed Critical SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority to CNB2007101131700A priority Critical patent/CN100469995C/en
Publication of CN101144328A publication Critical patent/CN101144328A/en
Application granted granted Critical
Publication of CN100469995C publication Critical patent/CN100469995C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a construction method of a post-pouring strip beam slab template, and is characterized in that the invention comprises the following procedures in sequence: the axial line is rechecked, the beam slab template support is erected, the template of 800 mm-1000 mm width is erected on the both sides of the post-pouring strip, and the reinforcing bar is arranged, the template support becomes an independent system, a concrete beam slab is poured and cured, firstly, the template is removed after the strength of the pouring concrete beam slab reaches the requirement of the template removal, the template on the both sides of the post-pouring strip and the support are not removed, the roughening in the construction joint is cleaned and wetted, the post-pouring strip template is arranged, the epithelium elevation and the smoothness of the pouring strip template after being checked are fixed with the adjacent template at both sides. The invention ensures the wholeness of a post-pouring strip beam slab structure on the both sides, the performance quality of the concrete cast-in-situ at a concrete joint is effectively ensured, in particular to the clean water concrete. Because the method of the invention can not repeatedly remove the post-pouring strip template support system, the mass labor force is saved during the construction, and the construction speed is accelerated, as well as the engineering cost is reduced.

Description

The job practices of after-pouring band beam-slab template
Technical field
The invention belongs to the job practices of construction formwork, particularly the job practices of after-pouring band beam-slab template in the monolithic reinforced concrete structure.
Background technology
At present, in construction work, for the needs of function with solve the shrinkage strain of settlement difference between high-rise main body and podium, steel concrete and problem such as concrete thermal stresses, the ater-casting method has obtained using widely in construction work.
The traditional handicraft of after-pouring band beam-slab template construction is identical with common beam slab mold method, promptly adopts and shores reinforcing.The time whole beam-slab template (comprising the position, ater-casting) is installed in construction as a whole, concreting beam slab and maintenance then, concrete beam plate intensity to be built reaches form removal and requires the back form removal, supports both sides, ater-casting beam slab more again.It is discontinuous, untimely when both sides, ater-casting beam-slab template supports; inevitably there is little sedimentation and deformation in the upper frame system in the concreting process of ater-casting; the new-old concrete seam crossing is difficult to accomplish smooth unification; the phenomenon that occurs the spillage faulting of slab ends in the construction through regular meeting; promptly influenced the concrete architecture quality in ater-casting, caused on the impression undesirable again.Structure construction more and more tends to clear-water concrete now, do not do in addition to plaster and whitewash, so the quality of alter-pouring strips mould plate fabrication and installation will directly have influence on the inherent quality and the apparent mass of concrete work.Strengthen the quality managemant and the process modification of alter-pouring strips mould plate engineering, have great significance improving concrete workmanship.
Summary of the invention
Technical problem to be solved by this invention provides a kind of job practices of improved after-pouring band beam-slab template, and is simple to operate, and the concrete finished product rigidity and the intensity of constructing is good, resistance to overturning is strong, reduces engineering cost.
The job practices of after-pouring band beam-slab template of the present invention, it is characterized in that in turn including the following steps: the beam-slab template support is checked, set up to axis, the both sides, ater-casting install the template of width 800mm~1000mm and reinforcing bar is installed, this place template supports and alone becomes an individual system, concreting beam slab and maintenance, first concreting beam slab intensity and reach form removal after the form removal requirement, the template of both sides, ater-casting and support are not removed, the cleaning of constuction joint cutter hair is preserved moisture, and alter-pouring strips mould plate, inspection alter-pouring strips mould plate epithelium absolute altitude and planeness are installed and connect solid with adjacent two side templates.
Major technique characteristics of the present invention are that ater-casting two side templates alone become an individual system when installing the beam slab of striding at place, ater-casting one, the both sides, ater-casting respectively install the wide beam-slab template of 800mm~1000mm, this independent system is not removed when removing beam-slab template, when installing alter-pouring strips mould plate, connect alter-pouring strips mould plate and both sides, ater-casting adjacent forms solid.Other process step is with the known technology mode.Both sides, ater-casting of the present invention are respectively stayed the wide template of 800mm~1000mm and are supported and do not remove, guaranteed the globality of both sides, ater-casting beam and slab structure, prevent from after the form removal untimelyly to cause that both sides, ater-casting beam slab is sagging (may to be caused beam slab face root cracking when serious, destroy because of shoring, influence the safety of total), secondly owing to alter-pouring strips mould plate and ater-casting two side templates are connected when installing alter-pouring strips mould plate and consolidate, guaranteed the apparent mass of concrete seam concrete cast-in-situ effectively, especially to clear-water concrete.Because the inventive method need not be torn an alter-pouring strips mould plate support system repeatedly open, has saved a large amount of labours in construction, has accelerated speed of application.
Braced structures of the present invention and support technology require with the known technology mode, generally are made up of stull, upright support and gripper shoe.The template of both sides, ater-casting 800mm~1000mm and support system are with layer beam-slab template and installing, and spacing is definite according to design.When removing beam-slab template, a top and the template of both sides, ater-casting are not removed, and before the construction of ater-casting, alter-pouring strips mould plate installs with its assembly unit tight, and planeness≤2mm at the bottom of the plate is with concreting difference of height≤2mm.
The present invention is simple to operate, and rigidity and intensity are better, resistance to overturning is stronger, installs and reinforces simply, and concrete finished product surfacing, the verticality of constructing are guaranteed, need not plaster leveling, can direct spread coated paint.This method has been saved the man power and material, has reduced the consumption of labour and machinery, has reduced engineering cost, and economic benefit and production efficiency are considerable.
Description of drawings
Fig. 1 pours into a mould place, preceding ater-casting template braced structures schematic diagram for ater-casting of the present invention;
Place, ater-casting template braced structures schematic diagram when Fig. 2 pours into a mould for the invention process ater-casting.
Among the figure: 3 templates, 4 lumps of wood, 5 upright support 6 stulls 7 frame columns 8 alter-pouring strips mould plates of 1 beam slab, 2 ater-castings
The specific embodiment
The technological process of the job practices of after-pouring band beam-slab template of the present invention is: axis check → set up beam slab 1 template support (same known technology) → install 2 liang of side templates 3 in ater-casting and reinforcing bar → concreting beam slab 1 and maintenance → first concreting intensity reach after the form removal requirement form removal (removing wide template of both sides, ater-casting 800mm~1000mm and support) → constuction joint cutter hair cleaning preserve moisture install alter-pouring strips mould plate 8 → inspections alter-pouring strips mould plate 8 epithelium absolute altitudes and planeness → with adjacent forms 3 even admittedly, support system is seen Fig. 1, Fig. 2.
It is templates 3 that 2 both sides install width 800mm~1000mm in the ater-casting that ater-casting two side templates 3 wherein are installed.Ater-casting two side templates and supporting with layer beam-slab template and install, spacing is definite according to design.When removing beam-slab template, ater-casting supported on both sides and template are not removed, and before the construction of ater-casting, alter-pouring strips mould plate 8 installs with its assembly unit tight, and planeness≤2mm at the bottom of the plate is with concreting difference of height≤2mm.
Other processing step is with the prior art mode.

Claims (1)

1, a kind of job practices of after-pouring band beam-slab template, it is characterized in that in turn including the following steps: the beam-slab template support is checked, set up to axis, the both sides, ater-casting install the template of width 800mm~1000mm and reinforcing bar is installed, this place template supports and alone becomes an individual system, concreting beam slab and maintenance, first concreting beam slab intensity and reach form removal after the form removal requirement, the template of both sides, ater-casting and support are not removed, the cleaning of constuction joint cutter hair is preserved moisture, and alter-pouring strips mould plate, inspection alter-pouring strips mould plate epithelium absolute altitude and planeness are installed and connect solid with adjacent two side templates.
CNB2007101131700A 2007-10-17 2007-10-17 Construction method for after-pouring band beam-slab template Expired - Fee Related CN100469995C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007101131700A CN100469995C (en) 2007-10-17 2007-10-17 Construction method for after-pouring band beam-slab template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007101131700A CN100469995C (en) 2007-10-17 2007-10-17 Construction method for after-pouring band beam-slab template

Publications (2)

Publication Number Publication Date
CN101144328A CN101144328A (en) 2008-03-19
CN100469995C true CN100469995C (en) 2009-03-18

Family

ID=39207040

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007101131700A Expired - Fee Related CN100469995C (en) 2007-10-17 2007-10-17 Construction method for after-pouring band beam-slab template

Country Status (1)

Country Link
CN (1) CN100469995C (en)

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832026B (en) * 2010-04-07 2011-07-13 南通建工集团股份有限公司 Construction method of sole plate post-poured strip form bracing system
CN101892741B (en) * 2010-04-12 2012-06-20 龙建路桥股份有限公司 Construction method for preventing beam bottom from leaking slurry
CN101864836B (en) * 2010-06-11 2011-08-03 中国二十二冶集团有限公司 Construction method for supporting template at construction joint of frame structure
CN101871262A (en) * 2010-06-25 2010-10-27 中天建设集团有限公司天津分公司 Method for constructing beam plate supporting system having post-cast strip
CN101956458B (en) * 2010-11-05 2012-01-11 中国建筑第八工程局有限公司 Construction method of overlong and superhigh single-side fair-faced concrete wall
CN102477745A (en) * 2010-11-28 2012-05-30 中建七局第四建筑有限公司 Split construction method of beam slab structure
CN102535839A (en) * 2010-12-29 2012-07-04 山西四建集团有限公司 Method for supporting and jacking reinforced concrete post-poured strip by using four pipe supports of horizontal members on two sides of post-poured strip
CN102619329B (en) * 2011-01-26 2015-01-07 甘肃省第八建筑工程公司 Expansion restraint construction method for post-pouring belt
CN102561690A (en) * 2012-03-12 2012-07-11 中天建设集团有限公司 Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN102587659A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN102691411A (en) * 2012-06-21 2012-09-26 中国建筑第五工程局有限公司 Beam plate post-cast strip template support system and construction method thereof
CN103015717B (en) * 2012-12-01 2016-01-06 中国建筑第七工程局有限公司 Rear superelevation steel pipe column outsourcing Construction technology of fair-faced concrete closed by a kind of floor
CN103174249B (en) * 2013-03-18 2015-01-07 浙江华厦建设集团有限公司 Plate post-poured strip disassembling-free concrete prefabricated side form
CN103556826B (en) * 2013-11-18 2015-08-26 山东万鑫建设有限公司 The superstructure region supports system construction method of region, ater-casting and both sides thereof
CN103615053B (en) * 2013-11-27 2016-09-28 温州宏源水电建设有限公司 Monolithic reinforced concrete structure post empiricism engineering method
CN104131583A (en) * 2014-07-30 2014-11-05 中建四局第五建筑工程有限公司 Novel post-cast strip supporting structure and construction technology thereof
CN104727549B (en) * 2015-03-26 2016-08-31 广东电白建设集团有限公司 Confined space liftable integral installation form removal system construction installation method
CN106193588B (en) * 2016-08-25 2018-10-30 中建四局第一建筑工程有限公司 A kind of method pouring building post-cast strip and pour mould
CN106499174A (en) * 2016-12-09 2017-03-15 绍兴明煌建材科技有限公司 A kind of floor seam steel brick placing installation and its construction method
CN107938717B (en) * 2017-12-02 2019-06-28 江苏惠淳建设有限公司 Basement post-pouring zone waterproof construction and its construction method
CN108755984A (en) * 2018-04-16 2018-11-06 五冶集团上海有限公司 Late poured band support construction method based on concrete square column
CN113107192A (en) * 2021-03-31 2021-07-13 中国五冶集团有限公司 Post-cast strip supporting method
CN113374245B (en) * 2021-06-29 2022-11-25 中冶建工集团有限公司 Construction method for temporary support of post-cast strip of beam plate

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
后浇带施工中的几项措施. 孙元保.中国科技信息,第12期. 2005
后浇带施工中的几项措施. 孙元保.中国科技信息,第12期. 2005 *
后浇带施工应注意的几个问题. 唐杰明.建筑技术,第30卷第5期. 1999
后浇带施工应注意的几个问题. 唐杰明.建筑技术,第30卷第5期. 1999 *
后浇带施工的几项构造措施. 金万成.建筑技术,第34卷第7期. 2003
后浇带施工的几项构造措施. 金万成.建筑技术,第34卷第7期. 2003 *

Also Published As

Publication number Publication date
CN101144328A (en) 2008-03-19

Similar Documents

Publication Publication Date Title
CN100469995C (en) Construction method for after-pouring band beam-slab template
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN110172924B (en) Integral hydraulic box girder template construction method
CN104372952A (en) Unstressed permeating washing scabbling technology
CN208072950U (en) A kind of combination set shaped steel formwork
CN106592966A (en) Support-beam-plate-free post-cast strip formwork system and construction method thereof
CN104153508A (en) Floor construction structure and method
CN207988490U (en) A kind of easy device that deformation joint shear wall formwork installs
CN106522282B (en) A kind of liftable post-cast strip template structure and system and its construction method
CN102493647B (en) Construction method for high-rise concrete structure
CN208534025U (en) Floor slab back casting band separate support formwork erecting structure
CN102808507A (en) Formwork system and construction method using same
CN107060323A (en) A kind of pulling-on piece structure aluminum alloy mould plate early tears system and construction method open
CN107514141A (en) A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam
CN202831624U (en) Template for deformation joint of shear wall
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN206418523U (en) A kind of liftable post-cast strip template structure and system
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN112412013A (en) Construction method for plugging reserved hole of structural outer wall
CN208219844U (en) A kind of prefabrication system
CN207999071U (en) A kind of wall column root concrete capping tools
CN207934054U (en) A kind of prefabricated assembled raft foundation
CN203200982U (en) Steel bar truss buckling hanging type floor support plate
CN206438766U (en) One kind is without support beam board post poured band template system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090318

Termination date: 20131017