CN107702939B - Large undisturbed loess model preparation method - Google Patents

Large undisturbed loess model preparation method Download PDF

Info

Publication number
CN107702939B
CN107702939B CN201710942172.4A CN201710942172A CN107702939B CN 107702939 B CN107702939 B CN 107702939B CN 201710942172 A CN201710942172 A CN 201710942172A CN 107702939 B CN107702939 B CN 107702939B
Authority
CN
China
Prior art keywords
model
steel
bearing platform
soil body
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710942172.4A
Other languages
Chinese (zh)
Other versions
CN107702939A (en
Inventor
蒲小武
王兰民
王平
徐舜华
孙平定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Seismological Bureau
Original Assignee
Gansu Seismological Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Seismological Bureau filed Critical Gansu Seismological Bureau
Priority to CN201710942172.4A priority Critical patent/CN107702939B/en
Publication of CN107702939A publication Critical patent/CN107702939A/en
Application granted granted Critical
Publication of CN107702939B publication Critical patent/CN107702939B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/04Devices for withdrawing samples in the solid state, e.g. by cutting

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses a large undisturbed loess model preparation method, which comprises the steps of processing a soil model, fixing the soil model by using a plastic foam plate, reserving a certain distance at the bottom, sleeving a model box on the soil model, filling and compacting gaps between the rear of the model box and the rear of the soil model by loess; placing steel rails close to two sides of a model box, placing a steel plate bearing platform on the steel rails, arranging a convex pushing component at the front edge of the steel plate bearing platform, clamping upright plates at two sides on the steel rails, sawing the bottom of a soil body model by using a steel saw, and pushing the steel plate bearing platform by using a digging machine while sawing so that soil body falls on the steel plate bearing platform; lifting the model soil body to an automobile by using a lifting appliance, connecting a steel wire rope with a lifting ring of the model box after the model soil body is transported indoors, and adjusting the model box to enable the whole soil body model to be completely displayed. The invention has the beneficial effects that the large loess sample can be obtained under the condition of not damaging the soil structure, thereby meeting the experimental requirements.

Description

Large undisturbed loess model preparation method
Technical Field
The invention belongs to the technical field of geotechnical engineering, and relates to a large undisturbed loess model preparation method.
Background
As special soil, loess has the characteristics of weak cementation and low strength, the taking and preparation of a large undisturbed loess model is a worldwide problem in the geotechnical engineering field all the time, and is restricted by loess characteristics and the prior art conditions, scientific researchers at various universities at present replace the loess model by remolded soil models or take and prepare smaller undisturbed loess models, the taking and preparation method is also a five-flower eight door, and only the undisturbed loess models with the length and width of 1m multiplied by 1m can be taken and prepared at present, so the current situation greatly restricts the research work of the loess in the geotechnical engineering field.
Disclosure of Invention
The invention aims to provide a large undisturbed loess model preparation method, which solves the problem that the loess sample is smaller and cannot meet the experimental requirement due to the characteristics of weak cementation and low strength in the prior art.
The invention relates to a preparation method of a large undisturbed loess model, which comprises the following steps:
step 1: firstly leveling a field, sampling two sides of a soil body, and excavating working areas front and back;
step 2: processing the soil body model, namely processing front, back, left, right and upper top surfaces of the soil body model to be smooth, and connecting the bottom of the soil body model with raw soil;
step 3: fixing the periphery of the processed soil body model by using a plastic foam plate, reserving a certain distance at the bottom, wrapping the plastic foam plate by using an adhesive tape, sleeving a model box on the soil body model, wherein the model box is a cuboid without a top surface and a bottom surface, keeping the front of the model box clinging to the front of the soil body model, and filling and compacting gaps between the rear of the model box and the rear of the soil body model by using loess;
step 4: placing steel rails close to two sides of the model box, and fixing the steel rails on the ground by steel nails;
step 5: the steel plate bearing platform is placed on the steel rail, the steel plate bearing platform is rectangular, a protruding pushing component is arranged at the front edge of the steel plate bearing platform, vertical plates on two sides of the steel plate bearing platform are clamped on the steel rail, when the pushing component is stressed, the steel plate bearing platform slides on the steel rail, bearing platform lifting rings are arranged at four corners of the steel plate bearing platform, and the bearing platform lifting rings are located outside the vertical plates; the hacksaw comprises a strip-shaped square steel, a saw blade is welded on one side of the strip-shaped square steel, and handles are arranged at two ends of the strip-shaped square steel; sawing the bottom of the soil body model by using a hacksaw, and pushing the steel plate bearing platform by using a digging machine while sawing so that the soil body falls on the steel plate bearing platform;
step 6: lifting the model soil body to an automobile by using a lifting appliance, wherein the lifting appliance consists of a frame body and a steel wire rope, one end of the steel wire rope is connected with the frame body, the other end of the steel wire rope is connected with a bearing platform lifting ring on a steel plate bearing platform, the steel wire rope is connected with a model box lifting ring after being transported indoors, and the model box is adjusted to be separated, so that the whole soil body model is completely presented.
Further, the front part of the saw blade forms an included angle of 45 degrees with the square steel, and the rear part forms an included angle of 135 degrees with the square steel.
Further, the width of the cutting edge of the saw blade is the same as the thickness of the steel plate bearing platform.
The invention has the beneficial effects that the large loess sample can be obtained under the condition of not damaging the soil structure, thereby meeting the experimental requirements.
Drawings
FIG. 1 is a schematic diagram of a model box structure;
FIG. 2 is a schematic view of a soil model placed on a steel plate bearing platform;
FIG. 3 is a schematic view of a hacksaw;
FIG. 4 is a schematic view of lifting a lifting appliance;
fig. 5 is a schematic view of the bottom of a steel plate bearing platform insert model box.
In the figure, a model box 1, a steel plate bearing platform 2, steel rails 3, a steel saw 4, a lifting appliance 5, a model box lifting ring 101, a propelling part 201, a vertical plate 202, a bearing platform lifting ring 203, a strip-shaped square steel 401, a saw blade 403, a handle 501, a frame body 502 and a steel wire rope.
Detailed Description
The present invention will be described in detail with reference to the following embodiments.
As shown in figures 1 to 5, the invention firstly levels the site on the selected site by using the digging machine so as to facilitate construction operation, and digs out working areas with the width of about 0.8 meter at the two sides of the sampled soil body, the length is 6-8 m, and the height is 1-2.6 m. And processing soil models on the soil sampling site, wherein the front, back, left, right and upper top surfaces are processed smoothly, and the bottom is connected with original soil. Fixing the periphery of the processed soil body model by using a plastic foam plate, keeping a certain distance from the bottom of the soil body model to 4-6 mm, and wrapping the plastic foam plate by using an adhesive tape. The model box 1 is sleeved on the soil body model, the model box 1 is a cuboid without a top surface and a bottom surface, model box hanging rings 101 are arranged at four corners of the top of the model box 1, the front of the model box 1 is kept to be clung to the front of the soil body model, and gaps between the rear of the model box 1 and the rear of the soil body model are filled with loess and compacted. The loess is filled so that the soil model can give enough reaction force to the model box 1 in the pushing process of the steel plate bearing platform 2, and the soil model is prevented from being sheared off later. Model box hanging rings 101 are arranged at four corners of the top of the model box 1.
The steel rail 3 is placed in parallel close to the two sides of the model box 1, and the steel rail 3 is fixed on the ground by steel nails.
The steel plate bearing platform 2 is placed on the steel rail 3, the steel plate bearing platform 2 is rectangular, the front edge is provided with a convex pushing component 201, and the vertical plates 202 on two sides of the steel plate bearing platform 2 are clamped on the steel rail to prevent the steel plate bearing platform 2 from deflecting when being pushed. The four corners of the steel plate bearing platform 2 are provided with bearing platform lifting rings 203, and the bearing platform lifting rings 203 are positioned outside the vertical plates 202; the hacksaw 4 comprises a strip-shaped square steel 401, a saw blade 402 is welded on one side of the strip-shaped square steel 401, the front part of the saw blade 402 forms an included angle of 45 degrees with the square steel 401, and the rear part forms an included angle of 135 degrees with the square steel 401. Handles 403 are arranged at two ends of the strip-shaped square steel 401; the bottom of the soil body model is sawed by a hacksaw 4, and the steel plate bearing platform 2 is pushed by a digging machine while sawing, so that the soil body falls on the steel plate bearing platform 2.
The model soil body is hoisted to an automobile by using a lifting appliance 5, the lifting appliance 5 consists of a frame body 501 and a steel wire rope 502, one end of the steel wire rope is connected with the frame body 501, the other end of the steel wire rope is connected with a bearing platform lifting ring 203 on a steel plate bearing platform 2, the steel wire rope 502 is connected with the model box lifting ring 101 after being transported indoors, and the model box 1 is adjusted to enable the whole soil body model to be completely presented.
The invention has the advantages that the method can completely prepare large undisturbed loess with length, width and height of 2m multiplied by 1.1m multiplied by 1m, saves time and labor in the soil sampling process, saves labor, can furthest reserve undisturbed soil samples, does not damage soil structures, and can meet the research needs of loess engineering.
The foregoing description is only of the preferred embodiments of the present invention, and is not intended to limit the invention in any way, and any simple modification, equivalent variation and modification made to the above embodiments according to the technical substance of the present invention falls within the scope of the technical solution of the present invention.

Claims (2)

1. A method for preparing a large undisturbed loess model is characterized by comprising the following steps:
step 1: firstly leveling a field, sampling two sides of a soil body, and excavating working areas front and back;
step 2: processing the soil body model, namely processing front, back, left, right and upper top surfaces of the soil body model to be smooth, and connecting the bottom of the soil body model with raw soil;
step 3: fixing the periphery of the processed soil body model by using a plastic foam plate, reserving a certain distance at the bottom, wrapping the plastic foam plate by using an adhesive tape, sleeving a model box on the soil body model, wherein the model box is a cuboid without a top surface and a bottom surface, keeping the front of the model box clinging to the front of the soil body model, and filling and compacting gaps between the rear of the model box and the rear of the soil body model by using loess;
step 4: placing steel rails close to two sides of the model box, and fixing the steel rails on the ground by steel nails;
step 5: the steel plate bearing platform is placed on the steel rail, the steel plate bearing platform is rectangular, a protruding pushing component is arranged at the front edge of the steel plate bearing platform, vertical plates on two sides of the steel plate bearing platform are clamped on the steel rail, when the pushing component is stressed, the steel plate bearing platform slides on the steel rail, bearing platform lifting rings are arranged at four corners of the steel plate bearing platform, and the bearing platform lifting rings are located outside the vertical plates; the steel saw comprises a strip-shaped square steel, a saw blade is welded on one side of the strip-shaped square steel, the front part of the saw blade forms an included angle of 45 degrees with the square steel, the rear part forms an included angle of 135 degrees with the square steel, and handles are arranged at two ends of the strip-shaped square steel; sawing the bottom of the soil body model by using a hacksaw, and pushing the steel plate bearing platform by using a digging machine while sawing so that the soil body falls on the steel plate bearing platform;
step 6: lifting the model soil body to an automobile by using a lifting appliance, wherein the lifting appliance consists of a frame body and a steel wire rope, one end of the steel wire rope is connected with the frame body, the other end of the steel wire rope is connected with a bearing platform lifting ring on a steel plate bearing platform, the steel wire rope is connected with a model box lifting ring after being transported indoors, and the model box is adjusted to be separated, so that the whole soil body model is completely presented.
2. The method for preparing a large undisturbed loess model as set forth in claim 1, wherein: the width of the cutting edge of the saw blade is the same as the thickness of the steel plate bearing platform.
CN201710942172.4A 2017-10-11 2017-10-11 Large undisturbed loess model preparation method Active CN107702939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710942172.4A CN107702939B (en) 2017-10-11 2017-10-11 Large undisturbed loess model preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710942172.4A CN107702939B (en) 2017-10-11 2017-10-11 Large undisturbed loess model preparation method

Publications (2)

Publication Number Publication Date
CN107702939A CN107702939A (en) 2018-02-16
CN107702939B true CN107702939B (en) 2024-02-20

Family

ID=61183571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710942172.4A Active CN107702939B (en) 2017-10-11 2017-10-11 Large undisturbed loess model preparation method

Country Status (1)

Country Link
CN (1) CN107702939B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663589A (en) * 2021-01-13 2021-04-16 南京工业大学 Large-size sample sampling device for undisturbed soil at bottom of foundation pit and using method thereof
CN113237691B (en) * 2021-05-08 2022-04-15 西安建筑科技大学 Structural undisturbed soil sampling device and sampling method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110076390A (en) * 2009-12-29 2011-07-06 거산산업주식회사 Manufacturing device for yellow soil panel
CN202002818U (en) * 2011-03-25 2011-10-05 中国科学院桃源农业生态试验站 Large undisturbed-soil sampling equipment
CN204374010U (en) * 2014-12-25 2015-06-03 西南交通大学 A kind of top-loaded system of shaking table lamination shear test soil case
CN106978824A (en) * 2017-03-09 2017-07-25 大连理工大学 A kind of soil body preparation device of simulated sea bottom complex slope and preparation method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110076390A (en) * 2009-12-29 2011-07-06 거산산업주식회사 Manufacturing device for yellow soil panel
CN202002818U (en) * 2011-03-25 2011-10-05 中国科学院桃源农业生态试验站 Large undisturbed-soil sampling equipment
CN204374010U (en) * 2014-12-25 2015-06-03 西南交通大学 A kind of top-loaded system of shaking table lamination shear test soil case
CN106978824A (en) * 2017-03-09 2017-07-25 大连理工大学 A kind of soil body preparation device of simulated sea bottom complex slope and preparation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
悬挂式层状多向剪切变形模型箱的研制;李霞;许成顺;杜修力;;地震工程与工程振动;20160215(第01期);全文 *

Also Published As

Publication number Publication date
CN107702939A (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN107702939B (en) Large undisturbed loess model preparation method
CN104215469A (en) Specimen box of sandy soil monolith, and apparatus and method for preparing monolith
CN102854046B (en) Device and method for preparing undisturbed soil sample of ring cutter
CN109752211A (en) A kind of lime-soil compaction pile sampler and method
CN204894175U (en) Precast concrete reinforcing bar side stake mould
CN106639305B (en) Slidable lifting type constructional column steel formwork and construction method thereof
CN107916823A (en) A kind of electric pole aids in fixing bracket
CN204125952U (en) The outfitting tool of bank protection Cast-in-place concrete construction
CN203798639U (en) Device for preparing compaction soil sample in geotechnical test
CN211439831U (en) Multipurpose auxiliary drilling device
CN213015403U (en) Adjustable pin-connected panel L type side form steel form
CN212956496U (en) Soft soil foundation treatment structure
CN211415672U (en) Flat pile extruder
CN210152287U (en) Multifunctional floor split heads
CN203808082U (en) Slope-cast planting eco-concrete anti-overflow device
CN203226099U (en) Novel convenient pedal type seedling lifter
CN211080227U (en) Auxiliary device for piling machinery
CN203133066U (en) Large-scale compactor hammering system
CN207634087U (en) A kind of tamping equipment for tunnel vault lining cutting
CN105064430A (en) Miniature soil excavator for engineering
CN203219768U (en) Cylindrical plant lifter
CN206205457U (en) A kind of steel reinforcement cage aids in colligation frame
CN203365201U (en) Movable type multifunctional on-site rock mass test piece preparation device
CN212030984U (en) Ring cutter taking-out device
CN113463661B (en) Slope fixing method for construction deep foundation pit support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant