CN210152287U - Multifunctional floor split heads - Google Patents

Multifunctional floor split heads Download PDF

Info

Publication number
CN210152287U
CN210152287U CN201920887701.XU CN201920887701U CN210152287U CN 210152287 U CN210152287 U CN 210152287U CN 201920887701 U CN201920887701 U CN 201920887701U CN 210152287 U CN210152287 U CN 210152287U
Authority
CN
China
Prior art keywords
split heads
utility
model
handle
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920887701.XU
Other languages
Chinese (zh)
Inventor
刘家俊
王尧
唐世杰
胡梅梅
朱仁义
何志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Fifth Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority to CN201920887701.XU priority Critical patent/CN210152287U/en
Application granted granted Critical
Publication of CN210152287U publication Critical patent/CN210152287U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a multifunctional floor split heads, which is formed by welding steel bars and comprises a horizontally placed square frame, wherein, a supporting leg is respectively arranged below four corners of the square frame, and the bottoms of the four supporting legs are flush; protective layer control blocks are arranged on two of the supporting legs; the top of one of the support legs extends out to form a handle, and the handle is provided with an elevation control groove. The utility model discloses not only guarantee the protective steel bar layer thickness, can also utilize multi-functional floor split heads as the interim operation platform's of concrete support and control concrete elevation control tool, just the utility model discloses it is many to have enough to meet the need the number of times on standard layer, and the facility is demolishd in the installation.

Description

Multifunctional floor split heads
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a multi-functional floor split heads.
Background
At present, various split heads, including welded steel bar split heads, bent steel bar split heads, cement prefabricated split heads and the like are adopted in cast-in-place concrete floor slab construction.
In cast-in-place concrete floor, the split heads mainly play a role in supporting reinforcing mesh sheets at the top of the floor and ensuring the thickness of the minimum protective layer of reinforcing steel bars at the top of concrete, and generally adopt cement prefabricated split heads or bent reinforcing steel bar split heads. The cement prefabricated split heads are adopted, so that the cement prefabricated split heads are easy to be treaded down and cannot achieve the expected effect due to the reasons that the strength does not reach the standard or is too low and the like; the split heads welded and bent by the steel bars are all processed manually on site, the processing height of the split heads has certain errors, labor is consumed, raw materials of the steel bars are wasted, if the split heads are not firmly fixed, the split heads are easy to move, the thickness of a steel bar protective layer cannot be effectively guaranteed, the split heads are easy to be pasted by the steel bars close to the top plate, and the phenomenon of top plate rib leakage is easy to occur; other finished product materials are adopted, if the quality of the materials cannot be guaranteed, the materials are easy to deform, and the functions of the split heads cannot be achieved; however, the adopted split heads are disposable and cannot be reused, which wastes materials.
In addition, in order to protect the finished steel bars, a concrete temporary operation platform needs to be erected, the existing split heads cannot provide support for the concrete temporary operation platform, and other supports need to be adopted as the support for the concrete temporary operation platform.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a multi-functional floor split heads in order to solve above-mentioned technical problem.
The utility model adopts the following technical scheme:
a multifunctional floor split heads is formed by welding steel bars and comprises a horizontally placed square frame, a supporting leg is arranged below each of four corners of the square frame, and the bottoms of the four supporting legs are flush; protective layer control blocks are arranged on two of the supporting legs; the top of one of the support legs extends out to form a handle, and the handle is provided with an elevation control groove.
Compared with the prior art, the utility model has simple structure and convenient use, and only needs to put the upper layer steel bars on the protective layer control steel bars of the multifunctional floor split heads in the process of binding the steel bars, and arrange the multifunctional floor split heads in place according to requirements; after the steel bars are bound, erecting a concrete temporary operation platform; in the concrete pouring process, the elevation of the concrete is controlled by the stay wire through the groove on the multifunctional floor split heads handle; and after the concrete is strickled off before initial setting, taking out the multifunctional floor split heads while performing first troweling, cleaning, and waiting for next reuse. The utility model discloses not only guarantee the protective steel bar layer thickness, can also utilize multi-functional floor split heads as the interim operation platform's of concrete support and control concrete elevation control tool, just the utility model discloses it is many to have enough to meet the need the number of times on standard layer, and the facility is demolishd in the installation.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
The labels in the figures are: 1-supporting leg, 2-protective layer control block, 3-square frame, 4-handle and 5-elevation control line groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The embodiment of the utility model provides a:
as shown in fig. 1, the split heads are formed by welding steel bars and comprise a horizontally placed square frame 3, a supporting leg 1 is respectively arranged below four corners of the square frame 3, and the bottoms of the four supporting legs 1 are flush; protective layer control blocks 2 are arranged on two of the supporting legs 1; one of the legs 1 extends out of the top to form a handle 4, and an elevation control groove 5 is formed in the handle 4.
Four landing legs 1 adopt the diameter to be 14mmHRB400 reinforcing bars, reinforcing bar length carries out the unloading according to the board thickness, the reinforcing bar root is polished smoothly), protective layer control block 2 adopts the reinforcing bar welding on landing leg 1, the reinforcing bar adopts length to be 40mm, the diameter is 18mmHRB400 reinforcing bars, square frame 3 adopts length to be 200mm, the diameter is 14mmHRB400 reinforcing bar welding and forms, handle 4 adopts length to be 150mm, the diameter is 14mmHRB400 reinforcing bars, and cut out a recess of 3mm of depth as elevation control line recess 5 around the reinforcing bar in 100 mm's position.
All parts all adopt electric welding, wherein the welding of protective layer control block 2 is on two landing legs 1 of 1 both sides at the landing leg of handle 4 place, and the distance of protective layer control block 2 upper end apart from square frame 3 upper end is upper portion upper steel bar diameter + reinforcing bar protective layer thickness.
The using method comprises the following steps: in the process of binding the steel bars, the upper-layer steel bars at the upper part are erected on the protective layer control block 2 of the multifunctional floor split heads, and the multifunctional floor split heads are arranged in place according to requirements; after the steel bars are bound, erecting a concrete temporary operation platform; in the concrete pouring process, the elevation of the concrete is controlled by a stay wire through an elevation control line groove 5 on a multifunctional floor split heads handle; and after the concrete is strickled off before initial setting, taking out the multifunctional floor split heads while performing first troweling, cleaning, and waiting for next reuse.
The utility model discloses guarantee the protective steel bar layer thickness, can also utilize multi-functional floor split heads as the interim operation platform's of concrete support and control concrete elevation control tool, and it is many to have enough to meet the need the number of times on standard layer, and the facility is demolishd in the installation, reduces the waste of material.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (1)

1. The utility model provides a multi-functional floor split heads which characterized in that: the split heads are formed by welding reinforcing steel bars and comprise a horizontally placed square frame (3), a supporting leg (1) is arranged below each of four corners of the square frame (3), and the bottoms of the four supporting legs (1) are flush; protective layer control blocks (2) are arranged on two of the supporting legs (1); the top of one of the supporting legs (1) extends out to form a handle (4), and the handle (4) is provided with an elevation control groove (5).
CN201920887701.XU 2019-06-13 2019-06-13 Multifunctional floor split heads Expired - Fee Related CN210152287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920887701.XU CN210152287U (en) 2019-06-13 2019-06-13 Multifunctional floor split heads

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920887701.XU CN210152287U (en) 2019-06-13 2019-06-13 Multifunctional floor split heads

Publications (1)

Publication Number Publication Date
CN210152287U true CN210152287U (en) 2020-03-17

Family

ID=69762712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920887701.XU Expired - Fee Related CN210152287U (en) 2019-06-13 2019-06-13 Multifunctional floor split heads

Country Status (1)

Country Link
CN (1) CN210152287U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282078A (en) * 2020-11-27 2021-01-29 北京市市政工程研究院 Concrete connecting piece and integrated surface layer connecting process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282078A (en) * 2020-11-27 2021-01-29 北京市市政工程研究院 Concrete connecting piece and integrated surface layer connecting process thereof

Similar Documents

Publication Publication Date Title
CN105178487B (en) Assembled laminated floor slab
CN102561681B (en) Casting molding template and casting molding process for constructional columns of infilled walls
CN107130791A (en) Combining aluminum alloy mould plate is used for the construction method of assembly concrete precast construction
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN107605065A (en) A kind of fabricated shear wall plate, wallboard connecting structure and its construction method
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN210152287U (en) Multifunctional floor split heads
CN206844138U (en) A kind of bar construction of domatic isolated footing
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN207988292U (en) Prefabricated stacking floor
CN102936958A (en) Construction method for positioning upper reinforcements of concrete floor slab by using tool type supports
CN212103528U (en) Assembly module for temporary road
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN211850813U (en) Cast-in-place concrete floor structure falls board construction mould
CN210597794U (en) Connecting device of prefabricated plate
WO2018126950A1 (en) Modular stairway
CN104131635B (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN110761562A (en) Auxiliary tool for pouring concrete and using method
CN203285056U (en) Stair formwork supporting base
CN203782984U (en) Horse stool rib capable of controlling elevation and flatness of slab surface
CN201826539U (en) Reusable support frame for steel bar construction
CN104631675B (en) A kind of two-sided prefabricated superimposed sheet
CN108396900A (en) A kind of double Shell roof boarding and its construction method
CN101240569A (en) In-situ integrated placing construction method for aerated concrete wall
CN207436515U (en) The hoisting beam of efficient construction of precast floorslab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200317