CN107700477A - Pile cover waterborne hangs bottom technique - Google Patents

Pile cover waterborne hangs bottom technique Download PDF

Info

Publication number
CN107700477A
CN107700477A CN201710961933.0A CN201710961933A CN107700477A CN 107700477 A CN107700477 A CN 107700477A CN 201710961933 A CN201710961933 A CN 201710961933A CN 107700477 A CN107700477 A CN 107700477A
Authority
CN
China
Prior art keywords
steel
crossbeam
plank
pile
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710961933.0A
Other languages
Chinese (zh)
Inventor
安秀山
张喜林
李亮
李建明
娄雅冬
许琳丽
朱龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201710961933.0A priority Critical patent/CN107700477A/en
Publication of CN107700477A publication Critical patent/CN107700477A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of pile cover waterborne to hang bottom technique, including:Step 1: the both ends that two are hung bottom fastening bolt and are each individually fixed in crossbeam so that it is downward perpendicular to crossbeam to hang bottom fastening bolt;Step 2: channel-section steel to be fixed on to the lower section for hanging bottom fastening bolt, in the both ends of crossbeam, hang bottom fastening bolt and be respectively connected with channel-section steel;Step 3: determining the aperture of the center through hole of the first plank according to the external diameter of steel-pipe pile, the first plank is sheathed on outside steel-pipe pile, between the first plank then is arranged at into the channel-section steel of both sides, obtain hanging bottom prefabricated components;Step 4: crossbeam is arranged on steel-pipe pile, the center through hole of the first plank is passed through into steel-pipe pile so that hang bottom prefabricated components and be fixed on steel-pipe pile, bottom platform is hung as steel-pipe pile pile cover;Step 5: in steel-pipe pile hang the last laying of bottom platform second, third, the 4th and the 5th plank, form pile cover and hang end template;Poured Step 6: hanging progress armored concrete on end template in pile cover, complete pile cover waterborne and hang bottom.

Description

Pile cover waterborne hangs bottom technique
Technical field
The invention belongs to pontoon dock pile cover to implement technical field, is related to a kind of pile cover waterborne and hangs bottom technique.
Background technology
During over-water construction, the main body of many harbours or front-axle beam uses high-pile beam form, and preceding stake platform stake uses steel more Pile tube, the pile cover of steel-pipe pile use cast-in-situ steel reinforced concrete, its act on be in order to pile crown Burma jujube destroy and to steel-pipe pile in itself Perpendicularity be adjusted, can preferably be fixed on supporting course.During existing steel-pipe pile pile cover hangs bottom, adopt more Supported by the use of steel hoop as pile cover bed die, channel-section steel is installed on steel hoop, using channel-section steel as pile cover shop fixtures platform, however, steel is embraced Hoop can destroy steel-pipe pile surface anticorrosion Anti-crack layer, cause and anti-corrosion effect of anti-cracking is deteriorated, cause the corrosion of steel-pipe pile, meanwhile, steel The installation and dismounting of anchor ear are by tidal effect, and more arduously, and its quantity required is more, and construction speed is slow.Therefore, it is necessary to provide A kind of new pile cover waterborne hangs bottom technique, to reduce the damage to steel-pipe pile and improve efficiency of construction.
The content of the invention
It is an object of the invention to solve at least the above and/or defect, and provide at least will be described later it is excellent Point.
It is a still further object of the present invention to provide a kind of pile cover waterborne to hang bottom technique.
Therefore, technical scheme provided by the invention is:
A kind of pile cover waterborne hangs bottom technique, including:
Step 1: the both ends of a crossbeam are respectively opened up into one first screwed hole first, afterwards by with first screwed hole First nut of matching hangs two in first screwed hole at the both ends that bottom fastening bolt is each individually fixed in the crossbeam so that institute State that to hang bottom fastening bolt down-set perpendicular to the crossbeam;
Step 2: in opening up the second screwed hole on a channel-section steel, second screwed hole and the lower part for hanging bottom fastening bolt Matching, afterwards, the channel-section steel is fixed on the lower section for hanging bottom fastening bolt, the extension of the channel-section steel by second screwed hole Direction is perpendicular to the bearing of trend of the crossbeam, and in the both ends of the crossbeam, the bottom fastening bolt that hangs is respectively connected with the channel-section steel;
Step 3: obtaining the external diameter of steel-pipe pile, the center for determining one first plank according to the external diameter of the steel-pipe pile leads to The aperture in hole, first plank is sheathed on outside the steel-pipe pile, first plank is then arranged at both sides Between the channel-section steel, obtain one and hang bottom prefabricated components;
Step 4: the crossbeam is arranged on steel-pipe pile, and the center through hole of first plank is passed through into the steel Pile tube so that the bottom prefabricated components that hang are fixed on the steel-pipe pile, and bottom platform is hung as steel-pipe pile pile cover;
Step 5: hang the second plank of the last laying of bottom platform, the 3rd plank, the 4th plank and the 5th in the steel-pipe pile Plank, form pile cover and hang end template;
Poured Step 6: hanging progress armored concrete on end template in the pile cover, complete pile cover waterborne and hang bottom.
Preferably, described pile cover waterborne is hung in bottom technique, at least provided with two crossbeams on every steel-pipe pile.
Preferably, described pile cover waterborne is hung in bottom technique, and in step 1, two are respectively offered at the both ends of the crossbeam Individual first screwed hole, one end of the crossbeam, which is bolted with described in two, hangs bottom fastening bolt.
Preferably, described pile cover waterborne is hung in bottom technique, and the channel-section steel is with the crossbeam in the distance of vertical direction For 5~10cm.
Preferably, described pile cover waterborne is hung in bottom technique, and the thickness of first plank is equal to the channel-section steel and institute Crossbeam is stated in the distance in vertical direction.
Preferably, described pile cover waterborne is hung in bottom technique, center through hole and the steel-pipe pile of first plank It is additionally provided with rubber seal outside.
The present invention comprises at least following beneficial effect:
The present invention by by crossbeam, channel-section steel, hang bottom fastening bolt and the first plank is made one and hangs bottom prefabricated components on land, this Sample, when in use, it is directly mounted on steel-pipe pile, simple and fast, improves operating efficiency.Simultaneously as steel-pipe pile directly with First plank is contacted, and so, the anti-corrosion Anti-crack layer on steel-pipe pile surface will not be destroyed, and improved its corrosion stability, extended it Service life.Also, the bottom prefabricated components that hang of the present invention can be greatly enhanced by the direct stock of crane gear on steel-pipe pile Operating efficiency, and reduce material input, high financial profit, and equipment consolidates, drastically increase security.
Further advantage, target and the feature of the present invention embodies part by following explanation, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Embodiment
The present invention is described in further detail below, to make those skilled in the art being capable of evidence with reference to specification word To implement.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more The presence or addition of individual other elements or its combination.
The present invention provides a kind of pile cover waterborne and hangs bottom technique, including:
Step 1: the both ends of a crossbeam are respectively opened up into one first screwed hole first, afterwards by with first screwed hole First nut of matching hangs two in first screwed hole at the both ends that bottom fastening bolt is each individually fixed in the crossbeam so that institute State that to hang bottom fastening bolt down-set perpendicular to the crossbeam;
Step 2: in opening up the second screwed hole on a channel-section steel, second screwed hole and the lower part for hanging bottom fastening bolt Matching, afterwards, the channel-section steel is fixed on the lower section for hanging bottom fastening bolt, the extension of the channel-section steel by second screwed hole Direction is perpendicular to the bearing of trend of the crossbeam, and in the both ends of the crossbeam, the bottom fastening bolt that hangs is respectively connected with the channel-section steel;
Step 3: obtaining the external diameter of steel-pipe pile, the center for determining one first plank according to the external diameter of the steel-pipe pile leads to The aperture in hole, first plank is sheathed on outside the steel-pipe pile, first plank is then arranged at both sides Between the channel-section steel, obtain one and hang bottom prefabricated components;
Step 4: the crossbeam is arranged on steel-pipe pile, and the center through hole of first plank is passed through into the steel Pile tube so that the bottom prefabricated components that hang are fixed on the steel-pipe pile, and bottom platform is hung as steel-pipe pile pile cover;
Step 5: hang the second plank of the last laying of bottom platform, the 3rd plank, the 4th plank and the 5th in the steel-pipe pile Plank, form pile cover and hang end template;
Poured Step 6: hanging progress armored concrete on end template in the pile cover, complete pile cover waterborne and hang bottom.
The present invention by by crossbeam, channel-section steel, hang bottom fastening bolt and the first plank is made one and hangs bottom prefabricated components on land, this Sample, when in use, it is directly mounted on steel-pipe pile, simple and fast, improves operating efficiency.Simultaneously as steel-pipe pile directly with First plank is contacted, and so, the anti-corrosion Anti-crack layer on steel-pipe pile surface will not be destroyed, and improved its corrosion stability, extended it Service life.Also, the bottom prefabricated components that hang of the present invention can be greatly enhanced by the direct stock of crane gear on steel-pipe pile Operating efficiency, and reduce material input, high financial profit, and equipment consolidates, drastically increase security.
In a preferred embodiment, the pile cover waterborne is hung in bottom technique, at least provided with two institutes on every steel-pipe pile State crossbeam.
In a preferred embodiment, the pile cover waterborne is hung in bottom technique, each at the both ends of the crossbeam in step 1 Two the first screwed holes are offered, one end of the crossbeam, which is bolted with described in two, hangs bottom fastening bolt.
In a preferred embodiment, the pile cover waterborne is hung in bottom technique, and the channel-section steel is with the crossbeam in Vertical Square To distance be 5~10cm.
In a preferred embodiment, the pile cover waterborne is hung in bottom technique, and the thickness of first plank is equal to described Channel-section steel is with the crossbeam in the distance in vertical direction.
In a preferred embodiment, the pile cover waterborne is hung in bottom technique, the center through hole of first plank and institute State and be additionally provided with rubber seal outside steel-pipe pile.
In one of embodiment of the present invention, a kind of pile cover waterborne hangs bottom technique, comprises the following steps:
Step 1: the both ends of a crossbeam are respectively opened up into one first screwed hole first, afterwards by with first screwed hole First nut of matching hangs two in first screwed hole at the both ends that bottom fastening bolt is each individually fixed in the crossbeam so that institute State that to hang bottom fastening bolt down-set perpendicular to the crossbeam;Two the first screwed holes are respectively offered at the both ends of the crossbeam, it is described One end of crossbeam is bolted with described in two and hangs bottom fastening bolt.
Step 2: in opening up the second screwed hole on a channel-section steel, second screwed hole and the lower part for hanging bottom fastening bolt Matching, afterwards, the channel-section steel is fixed on the lower section for hanging bottom fastening bolt, the extension of the channel-section steel by second screwed hole Direction is perpendicular to the bearing of trend of the crossbeam, and in the both ends of the crossbeam, the bottom fastening bolt that hangs is respectively connected with the channel-section steel;Institute State channel-section steel and the crossbeam in the distance of vertical direction be 5~10cm.
Step 3: obtaining the external diameter of steel-pipe pile, the center for determining one first plank according to the external diameter of the steel-pipe pile leads to The aperture in hole, first plank is sheathed on outside the steel-pipe pile, first plank is then arranged at both sides Between the channel-section steel, obtain one and hang bottom prefabricated components;The thickness of first plank is equal to the channel-section steel with the crossbeam in vertical The upward distance of Nogata.The center through hole of first plank outside the steel-pipe pile with being additionally provided with rubber seal.
Step 4: the crossbeam is arranged on steel-pipe pile, and the center through hole of first plank is passed through into the steel Pile tube so that the bottom prefabricated components that hang are fixed on the steel-pipe pile, and bottom platform is hung as steel-pipe pile pile cover;
Step 5: hang the second plank of the last laying of bottom platform, the 3rd plank, the 4th plank and the 5th in the steel-pipe pile Plank, form pile cover and hang end template;At least provided with two crossbeams on every steel-pipe pile.
Poured Step 6: hanging progress armored concrete on end template in the pile cover, complete pile cover waterborne and hang bottom.
Module number and treatment scale described herein are the explanations for simplifying the present invention.Stake waterborne to the present invention Cap hangs the application of bottom technique, modifications and variations will be readily apparent to persons skilled in the art.
Although embodiment of the present invention is disclosed as above, it is not restricted in specification and embodiment listed With it can be applied to various suitable the field of the invention completely, can be easily for those skilled in the art Other modification is realized, therefore under the universal limited without departing substantially from claim and equivalency range, it is of the invention and unlimited In specific details.

Claims (6)

1. a kind of pile cover waterborne hangs bottom technique, it is characterised in that including:
Step 1: the both ends of a crossbeam are respectively opened up into one first screwed hole first, afterwards by being matched with first screwed hole The first nut two are hung in first screwed hole at the both ends that bottom fastening bolt is each individually fixed in the crossbeam so that it is described to hang Bottom fastening bolt is down-set perpendicular to the crossbeam;
Step 2: in opening up the second screwed hole on a channel-section steel, second screwed hole matches with the lower part for hanging bottom fastening bolt, Afterwards, the channel-section steel is fixed on the lower section for hanging bottom fastening bolt, the bearing of trend of the channel-section steel by second screwed hole Perpendicular to the bearing of trend of the crossbeam, in the both ends of the crossbeam, the bottom fastening bolt that hangs is respectively connected with the channel-section steel;
Step 3: obtaining the external diameter of steel-pipe pile, the center through hole of one first plank is determined according to the external diameter of the steel-pipe pile Aperture, first plank is sheathed on outside the steel-pipe pile, then first plank is arranged at described in both sides Between channel-section steel, obtain one and hang bottom prefabricated components;
Step 4: the crossbeam is arranged on steel-pipe pile, and the center through hole of first plank is passed through into the steel-pipe pile, So that the bottom prefabricated components that hang are fixed on the steel-pipe pile, bottom platform is hung as steel-pipe pile pile cover;
Step 5: hang the second plank of the last laying of bottom platform, the 3rd plank, the 4th plank and the 5th wood in the steel-pipe pile Plate, form pile cover and hang end template;
Poured Step 6: hanging progress armored concrete on end template in the pile cover, complete pile cover waterborne and hang bottom.
2. pile cover waterborne as claimed in claim 1 hangs bottom technique, it is characterised in that at least provided with two institutes on every steel-pipe pile State crossbeam.
3. pile cover waterborne as claimed in claim 1 hangs bottom technique, it is characterised in that in step 1, at the both ends of the crossbeam Two the first screwed holes are respectively offered, one end of the crossbeam, which is bolted with described in two, hangs bottom fastening bolt.
4. pile cover waterborne as claimed in claim 1 hangs bottom technique, it is characterised in that the channel-section steel is with the crossbeam in Vertical Square To distance be 5~10cm.
5. pile cover waterborne as claimed in claim 4 hangs bottom technique, it is characterised in that the thickness of first plank is equal to described Channel-section steel is with the crossbeam in the distance in vertical direction.
6. pile cover waterborne as claimed in claim 1 hangs bottom technique, it is characterised in that the center through hole of first plank and institute State and be additionally provided with rubber seal outside steel-pipe pile.
CN201710961933.0A 2017-10-16 2017-10-16 Pile cover waterborne hangs bottom technique Pending CN107700477A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710961933.0A CN107700477A (en) 2017-10-16 2017-10-16 Pile cover waterborne hangs bottom technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710961933.0A CN107700477A (en) 2017-10-16 2017-10-16 Pile cover waterborne hangs bottom technique

Publications (1)

Publication Number Publication Date
CN107700477A true CN107700477A (en) 2018-02-16

Family

ID=61184301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710961933.0A Pending CN107700477A (en) 2017-10-16 2017-10-16 Pile cover waterborne hangs bottom technique

Country Status (1)

Country Link
CN (1) CN107700477A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024469A (en) * 2018-06-09 2018-12-18 中交航局第工程有限公司 A kind of concrete segment and its hanging the application in bottom technique
CN111535242A (en) * 2020-04-24 2020-08-14 中交一航局第一工程有限公司 Steel pipe pile cap water bottom-hanging device and construction method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638588A (en) * 2017-01-18 2017-05-10 中交航局第工程有限公司 Steel pipe pile cap bottom lifting device and mounting method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638588A (en) * 2017-01-18 2017-05-10 中交航局第工程有限公司 Steel pipe pile cap bottom lifting device and mounting method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
槽向浦等: "现浇墩台施工工艺优化", 《中国水运》 *
陆刘平等: "精轧螺纹钢及扁担在墩台吊底中的应用", 《建筑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024469A (en) * 2018-06-09 2018-12-18 中交航局第工程有限公司 A kind of concrete segment and its hanging the application in bottom technique
CN109024469B (en) * 2018-06-09 2021-03-19 中交一航局第一工程有限公司 Concrete component and application thereof in bottom hanging process
CN111535242A (en) * 2020-04-24 2020-08-14 中交一航局第一工程有限公司 Steel pipe pile cap water bottom-hanging device and construction method thereof

Similar Documents

Publication Publication Date Title
CN206233102U (en) A kind of packaged type faces side operation work platform
CN101235649A (en) Covered digging system for pit
CN106638588A (en) Steel pipe pile cap bottom lifting device and mounting method thereof
CN107700477A (en) Pile cover waterborne hangs bottom technique
CN207659983U (en) A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure
CN103184722A (en) Large-span double-layer Bailey truss structure and construction method thereof
CN106567548B (en) Rectangular raw coal bucket is segmented installation method
CN106869507A (en) A kind of mounting process across spherical storehouse super large truss
CN202644399U (en) Sealing-type inhaul cable
CN204434116U (en) A kind of hanging device for interior courtyard lifting pipeline
CN113136853A (en) Assembly type drilling platform and process for reservoir bare rock group pile foundation
CN203144907U (en) Large-span dual-layer bailey truss structure
CN107503550A (en) A kind of semi-underground grain horizontal warehouse with pull bar system
CN206606552U (en) It is a kind of to prevent the frock of flange distortion
CN105926532A (en) Technology for constructing shoulder pole beam reversely-suspended bottom on abutment
CN207079897U (en) A kind of elevator combined large steel model operating platform
CN204899397U (en) A ring beam that is used for cable wire hydraulic lifting chimney steel inner tube
CN207228758U (en) A kind of anti-corrosion antitheft stayguy rod
CN108824448A (en) A kind of support system of deep basal pit
CN205604281U (en) Double entry rock long anchor rod formula foundation structure
CN205445091U (en) Steel sheet combined type concurrent
CN111379669A (en) Reinforcing device and reinforcing method for concrete table column of fan foundation
CN205716027U (en) A kind of buried go out family pipeline anti-settling system
KR20060085088A (en) Windmill installation method and device
CN205777810U (en) A kind of steel tower being applicable to high slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180216

RJ01 Rejection of invention patent application after publication