CN107487747A - A kind of petroleum pipeline conveying arrangement - Google Patents

A kind of petroleum pipeline conveying arrangement Download PDF

Info

Publication number
CN107487747A
CN107487747A CN201710694790.1A CN201710694790A CN107487747A CN 107487747 A CN107487747 A CN 107487747A CN 201710694790 A CN201710694790 A CN 201710694790A CN 107487747 A CN107487747 A CN 107487747A
Authority
CN
China
Prior art keywords
petroleum pipeline
fixed block
directive wheel
fix bar
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710694790.1A
Other languages
Chinese (zh)
Other versions
CN107487747B (en
Inventor
赵卫祥
黄垂灿
陈希婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cixi Taixin Metal Products Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710694790.1A priority Critical patent/CN107487747B/en
Publication of CN107487747A publication Critical patent/CN107487747A/en
Application granted granted Critical
Publication of CN107487747B publication Critical patent/CN107487747B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
  • Handcart (AREA)

Abstract

The present invention relates to a kind of conveying arrangement, more particularly to a kind of petroleum pipeline conveying arrangement.The technical problem to be solved in the present invention is to provide a kind of can not only transport in the horizontal plane transporting petroleum pipeline and will not damage in transportation the petroleum pipeline conveying arrangement on petroleum pipeline surface on the ground for having certain slope.In order to solve the above-mentioned technical problem, the invention provides such a petroleum pipeline conveying arrangement, placing frame etc. is included;Placing frame is placed with ground, the first fixed block is connected with the top of placing frame, elevating mechanism is connected with the top of the first fixed block, drive mechanism is connected with placing frame.Be subject to crushing invention prevents petroleum pipeline surface when compressing, prevent petroleum pipeline during transport and fallen down because of very loose, the illuminating lamp of setting cause the conveying arrangement night or light dark place can also carry out the transport of petroleum pipeline.

Description

A kind of petroleum pipeline conveying arrangement
Technical field
The present invention relates to a kind of conveying arrangement, more particularly to a kind of petroleum pipeline conveying arrangement.
Background technology
One of oil, the main object of geological prospecting, it is a kind of sticky, dark brown liquid, is referred to as " industrial blood Liquid ".There is petroleum storage upper crustal some areas.Main component is the mixture of various alkane, cycloalkane, aromatic hydrocarbon.
Pipeline be with pipe, pipe connector and valve etc. be connected into be used for convey gas, liquid or with solid particle Fluid device.Generally, fluid flows to low pressure after the supercharging such as air blower, compressor, pump and boiler at the high pressure of pipeline Place, pressure or the gravity conveying of fluid itself can also be used.Having many uses for pipeline is general, be used primarily in feedwater, draining, heat supply, Give gas, in long distance delivery oil and natural gas, agricultural irrigation, hydraulic engineering and various commercial plants.
It is fast-developing in modern economy, under the ever-increasing background of yield of petroleum gas, for the defeated of oil-gas pipeline Feed technique it is also proposed higher requirement, however at present petroleum pipeline conveying device on the market be not also it is very perfect, it is current Petroleum pipeline conveying device can only typically be transported in the horizontal plane, and the ground that have certain slope can not be conveyed, And in course of conveying also damaged easily petroleum pipeline surface.
Therefore need research and development badly a kind of can not only can also transport and transport on the ground for having certain slope in the horizontal plane During will not damage the petroleum pipeline conveying arrangement on petroleum pipeline surface, can only be transported in the horizontal plane in the prior art to overcome It is defeated and transporting petroleum pipeline and petroleum pipeline surface can not be easily damaged in transportation on the ground for having certain slope Shortcoming.
The content of the invention
(1) technical problems to be solved
The present invention in order to overcome can only transport in the horizontal plane in the prior art and can not be on the ground for having certain slope The shortcomings that transporting and petroleum pipeline surface is easily damaged in transportation, the technical problem to be solved in the present invention is to provide one Kind can not only transport in the horizontal plane can also on the ground for having certain slope transporting petroleum pipeline and will not in transportation Damage the petroleum pipeline conveying arrangement on petroleum pipeline surface.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a petroleum pipeline conveying arrangement, placement is included Frame, the first fixed block, elevating mechanism and drive mechanism, placing frame is placed with ground, the first fixation is connected with the top of placing frame Block, the first fixed block top are connected with elevating mechanism, drive mechanism are connected with placing frame.
Preferably, elevating mechanism includes bull stick, the first slide rail, the first sliding block, placement plate, baffle plate and the first directive wheel, The first fixed block is connected with the top of placing frame, rotary type is connected with bull stick at the top of the first fixed block, and first is connected with front side of bull stick Slide rail, the equal slidingtype in both sides is connected with the first sliding block to the first slide rail up and down, and placement plate is connected with when being rotated on the left of the first sliding block, Baffle plate is connected between on the inside of the placement plate of upper and lower both sides, the first directive wheel is connected with the top of bull stick.
Preferably, drive mechanism includes motor, reel, battery, the first steel wire rope, the first fix bar and arm-tie, Right side is provided with motor in placing frame, and reel is connected with the output shaft of motor, and left side is connected with battery in placing frame, stores Battery is connected with motor by electric wire connected mode, and the first slider top of upside is connected with the first steel wire rope, the first steel wire rope Around the first directive wheel, the first steel wire rope bottom is wound on reel, is connected with the first fix bar on the upside of bull stick right wall, and first Fix bar right wall rotary type is connected with arm-tie.
Preferably, also include the second slide rail, the second sliding block, the first spring, the first block rubber, flap, the second block rubber, Second fix bar and drawstring, the placement plate inner side of the left and right sides are respectively connected with the second slide rail, and slidingtype is connected with the second slide rail Second sliding block, the first spring is respectively connected between the second slider bottom and placement plate, is turned on the inside of the second sliding block of the left and right sides Dynamic formula is connected with flap, and the flap bottom of the left and right sides is respectively connected with the second block rubber, the first block rubber is connected with the top of baffle plate, The flap inside top of the left and right sides is respectively connected with the second fix bar, and drawstring is connected with second fix bar in left side, and drawstring is right End is wound in second fix bar on right side.
Preferably, also include the 3rd fix bar, head rod and illuminating lamp, the 3rd fixation is connected with the top of bull stick Bar, the 3rd fix bar left upper portion are connected with head rod, and head rod bottom left is connected with illuminating lamp.
Preferably, the second fixed block, the 3rd fixed block, second spring and inserted link, the flap top right in left side are also included Side is connected with the second fixed block, and first through hole is provided with the second fixed block, the 3rd fixed block is connected with the top of the flap on right side, the Three fixed block left lowers are provided with third through-hole, and the 3rd fixed block upper right is provided with the second through hole, is provided with and inserts in third through-hole Bar, inserted link pass through the second through hole, and the left side of inserted link is located in first through hole, on the downside of inserted link right wall and under the 3rd fixed block inner right wall Second spring is connected between side.
Preferably, the second directive wheel, the second connecting rod, the 3rd directive wheel and the second steel wire rope, bull stick right wall are also included Downside is connected with the second connecting rod, and the 3rd directive wheel is connected with the second connecting rod, the second guiding is connected with the downside of bull stick right wall Wheel, the second directive wheel be located at below the 3rd directive wheel, and the first slider bottom is connected with the second steel wire rope, and the second steel wire rope bypasses the Three directive wheels and the second directive wheel, the second wirerope-winding is on reel.
Operation principle:When user of service is needed using the device come transporting petroleum pipeline, user of service is by petroleum pipeline It is positioned in placing frame, controls drive mechanism afterwards, drive mechanism will drives elevating mechanism to transport petroleum pipeline.
Because elevating mechanism includes bull stick, the first slide rail, the first sliding block, placement plate, baffle plate and the first directive wheel, place Arch is connected with the first fixed block, and rotary type is connected with bull stick at the top of the first fixed block, and the first slide rail is connected with front side of bull stick, The equal slidingtype in both sides is connected with the first sliding block to first slide rail up and down, is connected with placement plate when being rotated on the left of the first sliding block, up and down Baffle plate is connected between on the inside of the placement plates of both sides, the first directive wheel is connected with the top of bull stick, when needing to transport petroleum pipeline During to the ground for having certain slope, user of service starts drive mechanism, and drive mechanism will drive the first sliding block upward sliding, so as to Drive and place plate upward sliding, then the petroleum pipeline placed on placement plate can be just transported on the ground on certain slope.
Because drive mechanism includes motor, reel, battery, the first steel wire rope, the first fix bar and arm-tie, place Motor is installed on the right side of inframe, reel is connected with the output shaft of motor, left side is connected with battery, battery in placing frame It is connected with motor by electric wire connected mode, the first slider top of upside is connected with the first steel wire rope, and the first steel wire rope bypasses First directive wheel, the first steel wire rope bottom are wound on reel, and the first fix bar is connected with the upside of bull stick right wall, and first fixes Bar right wall rotary type is connected with arm-tie, when placement plate to be made carry out petroleum pipeline transport when, user of service enable motor cause around Line wheel rotates counterclockwise, and now reel, which rotates counterclockwise, will reel the first steel wire rope, and the first steel wire rope pulls on upside First sliding block upward sliding, plate upward sliding transporting petroleum pipeline is placed so as to drive, made when petroleum pipeline transports completion needs When placement plate returns to initial position, user of service enables motor so that reel rotates clockwise, and now reel turns clockwise Dynamic to unclasp the first steel wire rope, in the case where placing the gravity of plate itself, home position will be slid back downward into by placing plate, work as water When plane needs transporting petroleum pipeline, because the first fixed block with bull stick is that rotary type is connected, user of service can be by bar rotation To horizontal plane parallel to the ground, now arm-tie is positioned on ground level by user of service, and the first fix bar, which will support, to be turned Bar, so as to support placement plate, the first fix bar and arm-tie of setting can be stabilized by its when placing plate transporting petroleum pipeline, The petroleum pipeline for preventing from causing to place on plate because of crank is fallen down, and the first fixed block and bull stick of setting to put Petroleum pipeline transport can be carried out on the ground of different gradient by putting plate.
Because also include the second slide rail, the second sliding block, the first spring, the first block rubber, flap, the second block rubber, Two fix bars and drawstring, are respectively connected with the second slide rail on the inside of the placement plate of the left and right sides, and slidingtype is connected with the on the second slide rail Two sliding blocks, the first spring is respectively connected between the second slider bottom and placement plate, is rotated on the inside of the second sliding block of the left and right sides Formula is connected with flap, and the flap bottom of the left and right sides is respectively connected with the second block rubber, the first block rubber is connected with the top of baffle plate, left The flap inside top of right both sides is respectively connected with the second fix bar, and drawstring, drawstring right-hand member are connected with second fix bar in left side It is wound in second fix bar on right side, when needing to be positioned over petroleum pipeline in placement plate, user of service will be wound in the right side The drawstring of the fix bar of side second is untied, afterwards the flap at left and right sides of the second fix bar by pulling up the left and right sides It is opened, the second block rubber also followed by flap and be opened, and now the first spring is stretched, and user of service will need to transport afterwards Petroleum pipeline be positioned on the first block rubber, when place complete when, user of service decontrol the left and right sides the second fix bar, this When the first spring will restore to the original state so that the flap of the left and right sides moves down, the second block rubber will be extruded and is positioned over Petroleum pipeline on first block rubber, afterwards user of service again by the right-hand member of drawstring be wound in right side the second fix bar on, in The petroleum pipeline being disposed in the first block rubber and the second block rubber is compacted, the first block rubber and the second block rubber of setting Protective effect is served to the petroleum pipeline being positioned in placement plate, it is therefore prevented that petroleum pipeline surface is subject to crushing when compressing, if The drawstring put make it that being positioned over the petroleum pipeline placed in plate is compacted, and prevents petroleum pipeline during transport because very loose Dissipate and fall down.
Because also including the 3rd fix bar, head rod and illuminating lamp, the 3rd fix bar is connected with the top of bull stick, the Three fix bar left upper portions are connected with head rod, and head rod bottom left is connected with illuminating lamp, the illuminating lamp of setting So that the conveying arrangement night or light dark place can also carry out the transport of petroleum pipeline.
Because also including the second fixed block, the 3rd fixed block, second spring and inserted link, the flap top right side in left side connects The second fixed block is connected to, first through hole is provided with the second fixed block, the 3rd fixed block is connected with the top of the flap on right side, the 3rd is solid Determine block left lower and be provided with third through-hole, the 3rd fixed block upper right is provided with the second through hole, inserted link is provided with third through-hole, inserts Bar passes through the second through hole, and the left side of inserted link is located in first through hole, on the downside of inserted link right wall and the 3rd fixed block inner right wall downside Between be connected with second spring, when placing petroleum pipeline, user of service can pull inserted link to the right, now second spring compress, insert The left side of bar will be moved out of first through hole, and user of service can be by pulling the second fixed block to beat flap afterwards Open, then the petroleum pipeline for needing to transport is positioned over above the first block rubber placed in plate, when petroleum pipeline, which is placed, to be completed, User of service decontrols inserted link, and now second spring restores to the original state, and inserted link will be driven to be moved to the left, when second spring recovers former completely During shape, the left side of inserted link will be returned in first through hole, and the first through hole and inserted link of setting can more stably fix flap, so as to The more stably petroleum pipeline in fixed placement plate.
Because also including the second directive wheel, the second connecting rod, the 3rd directive wheel and the second steel wire rope, on the downside of bull stick right wall The second connecting rod is connected with, the 3rd directive wheel is connected with the second connecting rod, the second directive wheel is connected with the downside of bull stick right wall, the Two directive wheels are located at below the 3rd directive wheel, and the first slider bottom is connected with the second steel wire rope, and the second steel wire rope is led around the 3rd To wheel and the second directive wheel, the second wirerope-winding is on reel, when horizontal plane needs to use the device to carry out petroleum transportation When, user of service enables motor so that reel rotates counterclockwise, so that reel reels the first steel wire rope, and first slides It will be unclasped on the downside of block and around the first steel wire rope at the second directive wheel and the 3rd directive wheel, the first steel wire rope will pull First sliding block moves right, so that plate transporting petroleum pipeline to the right is placed, when transport completion needs placement plate to return to initially Position when, user of service enables motor so that reel rotates clockwise so that reel unclasps the first steel wire rope, and It will be reeled on the downside of first sliding block and around the first steel wire rope at the second directive wheel and the 3rd directive wheel, the first steel wire rope will The first sliding block can be pulled to left movement, so that placing plate returns to initial position, the second directive wheel of setting and the 3rd are oriented to Wheel make it that placing plate can still return to the device in the presence of no self gravitation when horizontal plane carries out petroleum pipeline conveying Initial position.
(3) beneficial effect
The present invention devises a kind of petroleum pipeline conveying arrangement, and the first fixed block and bull stick of setting to place plate not Ground with the gradient can carry out petroleum pipeline transport, and the first block rubber and the second block rubber of setting are placed in plate to being positioned over Petroleum pipeline serve protective effect, it is therefore prevented that petroleum pipeline surface compress when be subject to crushing, the drawstring of setting to place It is compacted in the petroleum pipeline placed in plate, prevents petroleum pipeline during transport and fallen down because of very loose, if The illuminating lamp put cause the conveying arrangement night or light dark place can also carry out the transport of petroleum pipeline, setting First through hole and inserted link can more stably fix flap, so as to the more stably petroleum pipeline in fixed placement plate, the of setting Two directive wheels and the 3rd directive wheel cause the device when horizontal plane carries out petroleum pipeline conveying, to place plate in no self gravitation In the presence of can still return to initial position.
Brief description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the main structure diagram of elevating mechanism of the present invention.
Fig. 3 is the main structure diagram of drive mechanism of the present invention.
Fig. 4 is the first part main structure diagram of the present invention.
Fig. 5 is second of part main structure diagram of the present invention.
Fig. 6 is the third part main structure diagram of the present invention.
Fig. 7 is the 4th kind of part main structure diagram of the present invention.
Mark in accompanying drawing for:1- placing frames, 2- ground, the fixed blocks of 3- first, 4- elevating mechanisms, 41- bull sticks, 42- One slide rail, the sliding blocks of 43- first, 44- place plate, 45- baffle plates, the directive wheels of 46- first, 5- drive mechanisms, 51- motors, 52- coilings Wheel, 53- batteries, the steel wire ropes of 54- first, the fix bars of 55- first, 56- arm-ties, the slide rails of 6- second, the sliding blocks of 7- second, 8- first Spring, the block rubbers of 9- first, 10- flaps, the block rubbers of 11- second, the fix bars of 12- second, 13- drawstrings, the fix bars of 14- the 3rd, 15- head rods, 16- illuminating lamps, the fixed blocks of 17- second, 18- first through hole, the fixed blocks of 19- the 3rd, the through holes of 20- second, 21- second springs, 22- inserted links, 23- third through-holes, the directive wheels of 24- second, the connecting rods of 25- second, the directive wheels of 26- the 3rd, 27- Second steel wire rope.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of petroleum pipeline conveying arrangement, as shown in figs. 1-7, include placing frame 1, the first fixed block 3, elevating mechanism 4 With drive mechanism 5, placing frame 1 is placed with ground 2, the top of placing frame 1 is connected with the first fixed block 3, the top of the first fixed block 3 Elevating mechanism 4 is connected with, drive mechanism 5 is connected with placing frame 1.
Embodiment 2
A kind of petroleum pipeline conveying arrangement, as shown in figs. 1-7, include placing frame 1, the first fixed block 3, elevating mechanism 4 With drive mechanism 5, placing frame 1 is placed with ground 2, the top of placing frame 1 is connected with the first fixed block 3, the top of the first fixed block 3 Elevating mechanism 4 is connected with, drive mechanism 5 is connected with placing frame 1.
Elevating mechanism 4 includes bull stick 41, the first slide rail 42, the first sliding block 43, placement plate 44, baffle plate 45 and first and is oriented to Wheel 46, the top of placing frame 1 are connected with the first fixed block 3, and the top rotary type of the first fixed block 3 is connected with bull stick 41, before bull stick 41 Side is connected with the first slide rail 42, the first slide rail about 42 the equal slidingtype in both sides be connected with the first sliding block 43, the left side of the first sliding block 43 It is connected with when rotating and places plate 44, baffle plate 45 is connected between the inner side of placement plate 44 of upper and lower both sides, the top of bull stick 41 connects There is the first directive wheel 46.
Embodiment 3
A kind of petroleum pipeline conveying arrangement, as shown in figs. 1-7, include placing frame 1, the first fixed block 3, elevating mechanism 4 With drive mechanism 5, placing frame 1 is placed with ground 2, the top of placing frame 1 is connected with the first fixed block 3, the top of the first fixed block 3 Elevating mechanism 4 is connected with, drive mechanism 5 is connected with placing frame 1.
Elevating mechanism 4 includes bull stick 41, the first slide rail 42, the first sliding block 43, placement plate 44, baffle plate 45 and first and is oriented to Wheel 46, the top of placing frame 1 are connected with the first fixed block 3, and the top rotary type of the first fixed block 3 is connected with bull stick 41, before bull stick 41 Side is connected with the first slide rail 42, the first slide rail about 42 the equal slidingtype in both sides be connected with the first sliding block 43, the left side of the first sliding block 43 It is connected with when rotating and places plate 44, baffle plate 45 is connected between the inner side of placement plate 44 of upper and lower both sides, the top of bull stick 41 connects There is the first directive wheel 46.
Drive mechanism 5 includes motor 51, reel 52, battery 53, the first steel wire rope 54, the first fix bar 55 and drawn Plate 56, the interior right side of placing frame 1 are provided with motor 51, reel 52 are connected with the output shaft of motor 51, and left side connects in placing frame 1 Battery 53 is connected to, battery 53 is connected with motor 51 by electric wire connected mode, and the top of the first sliding block 43 of upside is connected with First steel wire rope 54, the first steel wire rope 54 bypass the first directive wheel 46, and the bottom of the first steel wire rope 54 is wound on reel 52, turn The first fix bar 55 is connected with the upside of the right wall of bar 41, the right wall rotary type of the first fix bar 55 is connected with arm-tie 56.
Embodiment 4
A kind of petroleum pipeline conveying arrangement, as shown in figs. 1-7, include placing frame 1, the first fixed block 3, elevating mechanism 4 With drive mechanism 5, placing frame 1 is placed with ground 2, the top of placing frame 1 is connected with the first fixed block 3, the top of the first fixed block 3 Elevating mechanism 4 is connected with, drive mechanism 5 is connected with placing frame 1.
Elevating mechanism 4 includes bull stick 41, the first slide rail 42, the first sliding block 43, placement plate 44, baffle plate 45 and first and is oriented to Wheel 46, the top of placing frame 1 are connected with the first fixed block 3, and the top rotary type of the first fixed block 3 is connected with bull stick 41, before bull stick 41 Side is connected with the first slide rail 42, the first slide rail about 42 the equal slidingtype in both sides be connected with the first sliding block 43, the left side of the first sliding block 43 It is connected with when rotating and places plate 44, baffle plate 45 is connected between the inner side of placement plate 44 of upper and lower both sides, the top of bull stick 41 connects There is the first directive wheel 46.
Drive mechanism 5 includes motor 51, reel 52, battery 53, the first steel wire rope 54, the first fix bar 55 and drawn Plate 56, the interior right side of placing frame 1 are provided with motor 51, reel 52 are connected with the output shaft of motor 51, and left side connects in placing frame 1 Battery 53 is connected to, battery 53 is connected with motor 51 by electric wire connected mode, and the top of the first sliding block 43 of upside is connected with First steel wire rope 54, the first steel wire rope 54 bypass the first directive wheel 46, and the bottom of the first steel wire rope 54 is wound on reel 52, turn The first fix bar 55 is connected with the upside of the right wall of bar 41, the right wall rotary type of the first fix bar 55 is connected with arm-tie 56.
Also include the second slide rail 6, the second sliding block 7, the first spring 8, the first block rubber 9, flap 10, the second block rubber 11st, the second fix bar 12 and drawstring 13, the inner side of placement plate 44 of the left and right sides are respectively connected with the second slide rail 6, slided on the second slide rail 6 Dynamic formula is connected with the second sliding block 7, the bottom of the second sliding block 7 and places the first spring 8 is respectively connected between plate 44, and the of the left and right sides The inner side of two sliding block 7 rotary type is connected with flap 10, and the bottom of flap 10 of the left and right sides is respectively connected with the second block rubber 11, baffle plate 45 tops are connected with the first block rubber 9, and the inside top of flap 10 of the left and right sides is respectively connected with the second fix bar 12, and the of left side Drawstring 13 is connected with two fix bars 12, the right-hand member of drawstring 13 is wound in second fix bar 12 on right side.
Also include the 3rd fix bar 14, head rod 15 and illuminating lamp 16, the top of bull stick 41 is connected with the 3rd fixation Bar 14, the left upper portion of the 3rd fix bar 14 are connected with head rod 15, and the bottom left of head rod 15 is connected with illuminating lamp 16。
Also include the second fixed block 17, the 3rd fixed block 19, second spring 21 and inserted link 22, the top of flap 10 in left side Right side is connected with the second fixed block 17, is provided with first through hole 18 in the second fixed block 17, and the top of flap 10 on right side is connected with the Three fixed blocks 19, the left lower of the 3rd fixed block 19 are provided with third through-hole 23, and it is logical that the upper right of the 3rd fixed block 19 is provided with second Hole 20, third through-hole 23 is interior to be provided with inserted link 22, and inserted link 22 passes through the second through hole 20, and the left side of inserted link 22 is located at first through hole 18 It is interior, it is connected with second spring 21 between the inner right wall of the 3rd fixed block 19 downside on the downside of the right wall of inserted link 22.
Also include the second directive wheel 24, the second connecting rod 25, the 3rd directive wheel 26 and the second steel wire rope 27, bull stick 41 is right The second connecting rod 25 is connected with the downside of wall, the 3rd directive wheel 26 is connected with the second connecting rod 25, is connected on the downside of the right wall of bull stick 41 There is the second directive wheel 24, the second directive wheel 24 is located at the lower section of the 3rd directive wheel 26, and the bottom of the first sliding block 43 is connected with the second steel wire Rope 27, the second steel wire rope 27 bypasses the 3rd directive wheel 26 and the second directive wheel 24, and the second steel wire rope 27 is wound on reel 52.
Operation principle:When user of service is needed using the device come transporting petroleum pipeline, user of service is by petroleum pipeline It is positioned in placing frame 1, controls drive mechanism 5 afterwards, drive mechanism 5 will drives elevating mechanism 4 to transport petroleum pipeline.
Because elevating mechanism 4 includes bull stick 41, the first slide rail 42, the first sliding block 43, placement plate 44, baffle plate 45 and first Directive wheel 46, the top of placing frame 1 are connected with the first fixed block 3, and the top rotary type of the first fixed block 3 is connected with bull stick 41, bull stick 41 front sides are connected with the first slide rail 42, the first slide rail about 42 the equal slidingtype in both sides be connected with the first sliding block 43, the first sliding block 43 It is connected with when left side rotates and places plate 44, baffle plate 45, the top of bull stick 41 is connected between the inner side of placement plate 44 of upper and lower both sides The first directive wheel 46 is connected with, when needing petroleum pipeline transporting the ground 2 on certain slope, user of service starts driving Mechanism 5, drive mechanism 5 will drive the upward sliding of the first sliding block 43, the upward sliding of plate 44 be placed so as to drive, then with regard to that will can put The petroleum pipeline placed on plate 44 is put to transport on the ground 2 on certain slope.
Because drive mechanism 5 includes motor 51, reel 52, battery 53, the first steel wire rope 54, the first fix bar 55 With arm-tie 56, right side is provided with motor 51 in placing frame 1, is connected with reel 52 on the output shaft of motor 51, left in placing frame 1 Side is connected with battery 53, and battery 53 is connected with motor 51 by electric wire connected mode, and the top of the first sliding block 43 of upside connects The first steel wire rope 54 is connected to, the first steel wire rope 54 bypasses the first directive wheel 46, and the bottom of the first steel wire rope 54 is wound in reel 52 On, the first fix bar 55 is connected with the upside of the right wall of bull stick 41, and the right wall rotary type of the first fix bar 55 is connected with arm-tie 56, when making When placing plate 44 and carrying out petroleum pipeline transport, user of service enables motor 51 so that reel 52 rotates counterclockwise, now coiling Wheel 52, which rotates counterclockwise, will reel the first steel wire rope 54, and the first sliding block 43 that the first steel wire rope 54 pulls on upside slides up It is dynamic, the upward sliding transporting petroleum pipeline of plate 44 is placed so as to drive, returns to placement plate 44 when petroleum pipeline transports completion needs During initial position, user of service enables motor 51 so that reel 52 rotates clockwise, and now reel 52 rotates clockwise just The first steel wire rope 54 can be unclasped, in the case where placing plate 44 gravity of itself, home position will be slid back downward into by placing plate 44, when When horizontal plane needs transporting petroleum pipeline, because the first fixed block 3 with bull stick 41 is that rotary type is connected, user of service can be by bull stick 41 turn to the horizontal plane parallel with ground 2, and now arm-tie 56 is positioned on ground level by user of service, and the first fix bar 55 will Bull stick 41 can be supported, plate 44 is placed so as to support, the first fix bar 55 and arm-tie 56 of setting are placing the transport stone of plate 44 Can be stabilized by its during oil-piping, the petroleum pipeline for preventing from causing to place on plate 44 because of crank is fallen down, and is set The first fixed block 3 and bull stick 41 cause place plate 44 can carry out petroleum pipeline transport on the ground 2 of different gradient.
Because also include the second slide rail 6, the second sliding block 7, the first spring 8, the first block rubber 9, flap 10, the second rubber Block 11, the second fix bar 12 and drawstring 13, the inner side of placement plate 44 of the left and right sides are respectively connected with the second slide rail 6, on the second slide rail 6 Slidingtype is connected with the second sliding block 7, and the first spring 8 is respectively connected between the bottom of the second sliding block 7 and placement plate 44, the left and right sides The inner side of second sliding block 7 rotary type is connected with flap 10, and the bottom of flap 10 of the left and right sides is respectively connected with the second block rubber 11, gear The top of plate 45 is connected with the first block rubber 9, and the inside top of flap 10 of the left and right sides is respectively connected with the second fix bar 12, left side It is connected with drawstring 13 in second fix bar 12, the right-hand member of drawstring 13 is wound in second fix bar 12 on right side, when needing oil When pipeline is positioned in placement plate 44, the drawstring 13 that user of service will be wound in the second fix bar 12 of right side is untied, and is passed through afterwards The second fix bar 12 of the left and right sides is pulled up so that the flap 10 of the left and right sides is opened, the second block rubber 11 also followed by Flap 10 is opened, and now the first spring 8 is stretched, and the petroleum pipeline for needing to transport is positioned over the first rubber by user of service afterwards On blob of viscose 9, when placing completion, user of service decontrols the second fix bar 12 of the left and right sides, and now the first spring 8 will recover original Shape, so that the flap 10 of the left and right sides moves down, the second block rubber 11, which will extrude, to be positioned on the first block rubber 9 Petroleum pipeline, afterwards user of service the right-hand member of drawstring 13 is wound in second fix bar 12 on right side again, in being disposed on the Petroleum pipeline in one block rubber 9 and the second block rubber 11 is compacted, and the first block rubber 9 and the second block rubber 11 of setting are to putting It is placed in the petroleum pipeline placed in plate 44 and serves protective effect, it is therefore prevented that petroleum pipeline surface is subject to crushing when compressing, and is set Drawstring 13 make it that being positioned over the petroleum pipeline placed in plate 44 is compacted, and prevents petroleum pipeline during transport because very Loosely fall down.
Because also including the 3rd fix bar 14, head rod 15 and illuminating lamp 16, the top of bull stick 41 is connected with the 3rd Fix bar 14, the left upper portion of the 3rd fix bar 14 are connected with head rod 15, and the bottom left of head rod 15 is connected with photograph Bright lamp 16, the illuminating lamp 16 of setting cause the conveying arrangement night or light dark place can also carry out petroleum pipeline Transport.
Because also including the second fixed block 17, the 3rd fixed block 19, second spring 21 and inserted link 22, the flap 10 in left side Top right side is connected with the second fixed block 17, and first through hole 18 is provided with the second fixed block 17, and the top of flap 10 on right side connects There is the 3rd fixed block 19, the left lower of the 3rd fixed block 19 is provided with third through-hole 23, and the upper right of the 3rd fixed block 19 is provided with Two through holes 20, third through-hole 23 is interior to be provided with inserted link 22, and inserted link 22 passes through the second through hole 20, and the left side of inserted link 22 is located at first through hole In 18, second spring 21 is connected between the inner right wall of the 3rd fixed block 19 downside on the downside of the right wall of inserted link 22, is placing petroleum pipeline During road, user of service can pull inserted link 22 to the right, and now second spring 21 is compressed, and the left side of inserted link 22 will be from first through hole 18 Inside it is moved, user of service can be opened flap 10 by the second fixed block 17 of pulling afterwards, then the stone that needs are transported Oil-piping is positioned over above the first block rubber 9 placed in plate 44, and when petroleum pipeline, which is placed, to be completed, user of service decontrols inserted link 22, now second spring 21 restore to the original state, by drive inserted link 22 be moved to the left, when second spring 21 restores to the original state completely, insert The left side of bar 22 will be returned in first through hole 18, and the first through hole 18 and inserted link 22 of setting can more stably fix flap 10, So as to the more stably petroleum pipeline in fixed placement plate 44.
Because also include the second directive wheel 24, the second connecting rod 25, the 3rd directive wheel 26 and the second steel wire rope 27, bull stick The second connecting rod 25 is connected with the downside of 41 right walls, the 3rd directive wheel 26, the right wall of bull stick 41 downside are connected with the second connecting rod 25 The second directive wheel 24 is connected with, the second directive wheel 24 is located at the lower section of the 3rd directive wheel 26, and the bottom of the first sliding block 43 is connected with second Steel wire rope 27, the second steel wire rope 27 bypass the 3rd directive wheel 26 and the second directive wheel 24, and the second steel wire rope 27 is wound in reel On 52, when horizontal plane needs to use the device to carry out petroleum transportation, user of service enables motor 51 and causes the inverse time of reel 52 Pin rotates, so that reel 52 reels the first steel wire rope 54, and the downside of the first sliding block 43 and bypasses the He of the second directive wheel 24 The first steel wire rope 54 at 3rd directive wheel 26 will be unclasped, and the first steel wire rope 54 will pull the first sliding block 43 to transport to the right It is dynamic, so that placing the transporting petroleum pipeline to the right of plate 44, when transport is completed to need placement plate 44 to return to initial position, make Motor 51 is enabled with personnel so that reel 52 rotates clockwise, so that reel 52 unclasps the first steel wire rope 54, and It will be reeled on the downside of one sliding block 43 and around the first steel wire rope 54 at the second directive wheel 24 and the 3rd directive wheel 26, the first steel Cord 54 will pull the first sliding block 43 to left movement, so that placing plate 44 returns to initial position, the second of setting is oriented to The directive wheel 26 of wheel 24 and the 3rd causes the device when horizontal plane carries out petroleum pipeline conveying, to place plate 44 in no self gravitation In the presence of can still return to initial position.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. a kind of petroleum pipeline conveying arrangement, it is characterised in that include placing frame (1), the first fixed block (3), elevating mechanism (4) placing frame (1) and drive mechanism (5), is placed with ground (2), the first fixed block (3) is connected with the top of placing frame (1), the Elevating mechanism (4) is connected with the top of one fixed block (3), drive mechanism (5) is connected with placing frame (1).
2. a kind of petroleum pipeline conveying arrangement according to claim 1, it is characterised in that elevating mechanism (4), which includes, to be turned Bar (41), the first slide rail (42), the first sliding block (43), placement plate (44), baffle plate (45) and the first directive wheel (46), placing frame (1) top is connected with the first fixed block (3), and rotary type is connected with bull stick (41), bull stick (41) front side at the top of the first fixed block (3) The first slide rail (42) is connected with, the equal slidingtype in both sides is connected with the first sliding block (43), the first sliding block to the first slide rail (42) up and down (43) it is connected with when left side rotates and places plate (44), baffle plate (45) is connected between placement plate (44) inner side of upper and lower both sides, The first directive wheel (46) is connected with the top of bull stick (41).
3. a kind of petroleum pipeline conveying arrangement according to claim 2, it is characterised in that drive mechanism (5) includes electricity Machine (51), reel (52), battery (53), the first steel wire rope (54), the first fix bar (55) and arm-tie (56), placing frame (1) right side is provided with motor (51) in, and reel (52) is connected with the output shaft of motor (51), and left side connects in placing frame (1) Battery (53) is connected to, battery (53) is connected with motor (51) by electric wire connected mode, the first sliding block (43) top of upside Portion is connected with the first steel wire rope (54), and the first steel wire rope (54) bypasses the first directive wheel (46), and the first steel wire rope (54) bottom twines It is around on reel (52), the first fix bar (55) is connected with the upside of bull stick (41) right wall, the first fix bar (55) right wall rotates Formula is connected with arm-tie (56).
A kind of 4. petroleum pipeline conveying arrangement according to claim 3, it is characterised in that also include the second slide rail (6), Second sliding block (7), the first spring (8), the first block rubber (9), flap (10), the second block rubber (11), the second fix bar (12) With drawstring (13), placement plate (44) inner side of the left and right sides is respectively connected with the second slide rail (6), and slidingtype connects on the second slide rail (6) The second sliding block (7) is connected to, the first spring (8) is respectively connected between the second sliding block (7) bottom and placement plate (44), the left and right sides Rotary type is connected with flap (10) on the inside of second sliding block (7), and flap (10) bottom of the left and right sides is respectively connected with the second rubber Block (11), baffle plate (45) top are connected with the first block rubber (9), and flap (10) inside top of the left and right sides is respectively connected with second Fix bar (12), drawstring (13) is connected with second fix bar (12) in left side, and drawstring (13) right-hand member is wound in the second of right side In fix bar (12).
5. a kind of petroleum pipeline conveying arrangement according to claim 4, it is characterised in that also include the 3rd fix bar (14), head rod (15) and illuminating lamp (16), bull stick (41) top are connected with the 3rd fix bar (14), the 3rd fix bar (14) left upper portion is connected with head rod (15), and head rod (15) bottom left is connected with illuminating lamp (16).
6. a kind of petroleum pipeline conveying arrangement according to claim 5, it is characterised in that also include the second fixed block (17), the 3rd fixed block (19), second spring (21) and inserted link (22), flap (10) top right side in left side are connected with second and consolidated Determine block (17), first through hole (18) is provided with the second fixed block (17), the 3rd fixed block is connected with the top of the flap (10) on right side (19), the 3rd fixed block (19) left lower is provided with third through-hole (23), and it is logical that the 3rd fixed block (19) upper right is provided with second Hole (20), third through-hole (23) is interior to be provided with inserted link (22), and inserted link (22) passes through the second through hole (20), and the left side of inserted link (22) is located at In first through hole (18), second spring is connected between the 3rd fixed block (19) inner right wall downside on the downside of inserted link (22) right wall (21)。
7. a kind of petroleum pipeline conveying arrangement according to claim 6, it is characterised in that also include the second directive wheel (24), the second connecting rod (25), the 3rd directive wheel (26) and the second steel wire rope (27), bull stick (41) right wall downside are connected with second Connecting rod (25), the 3rd directive wheel (26) is connected with the second connecting rod (25), and being connected with second on the downside of bull stick (41) right wall leads To wheel (24), the second directive wheel (24) is located at below the 3rd directive wheel (26), and the first sliding block (43) bottom is connected with the second steel wire Restrict (27), the second steel wire rope (27) bypasses the 3rd directive wheel (26) and the second directive wheel (24), and the second steel wire rope (27) is wound in On reel (52).
CN201710694790.1A 2017-08-15 2017-08-15 A kind of petroleum pipeline transport device Active CN107487747B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710694790.1A CN107487747B (en) 2017-08-15 2017-08-15 A kind of petroleum pipeline transport device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710694790.1A CN107487747B (en) 2017-08-15 2017-08-15 A kind of petroleum pipeline transport device

Publications (2)

Publication Number Publication Date
CN107487747A true CN107487747A (en) 2017-12-19
CN107487747B CN107487747B (en) 2019-02-22

Family

ID=60645586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710694790.1A Active CN107487747B (en) 2017-08-15 2017-08-15 A kind of petroleum pipeline transport device

Country Status (1)

Country Link
CN (1) CN107487747B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374470A (en) * 2018-02-24 2018-08-07 张勤 For concrete duct to the equipment of subdrain channel safe transport
CN108382881A (en) * 2018-02-24 2018-08-10 张勤 The free conveying equipment of high-low-position of cement tubular part
CN108382892A (en) * 2018-02-24 2018-08-10 张勤 The stabilization Transporting equipment of cement tubular part

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD120182A1 (en) * 1975-06-16 1976-06-05
EP1172323A1 (en) * 2000-07-11 2002-01-16 Jean-Marc Yerly Articulated jib crane
CN203319572U (en) * 2013-06-26 2013-12-04 胜利油田胜利石油化工建设有限责任公司 Transporting and hoisting device
CN203754347U (en) * 2014-03-04 2014-08-06 合肥安利聚氨酯新材料有限公司 Lifting hydraulic cart
US20160319612A1 (en) * 2012-08-15 2016-11-03 Liberty Holdings, LLC. Pipe Handler

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD120182A1 (en) * 1975-06-16 1976-06-05
EP1172323A1 (en) * 2000-07-11 2002-01-16 Jean-Marc Yerly Articulated jib crane
US20160319612A1 (en) * 2012-08-15 2016-11-03 Liberty Holdings, LLC. Pipe Handler
CN203319572U (en) * 2013-06-26 2013-12-04 胜利油田胜利石油化工建设有限责任公司 Transporting and hoisting device
CN203754347U (en) * 2014-03-04 2014-08-06 合肥安利聚氨酯新材料有限公司 Lifting hydraulic cart

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374470A (en) * 2018-02-24 2018-08-07 张勤 For concrete duct to the equipment of subdrain channel safe transport
CN108382881A (en) * 2018-02-24 2018-08-10 张勤 The free conveying equipment of high-low-position of cement tubular part
CN108382892A (en) * 2018-02-24 2018-08-10 张勤 The stabilization Transporting equipment of cement tubular part

Also Published As

Publication number Publication date
CN107487747B (en) 2019-02-22

Similar Documents

Publication Publication Date Title
CN107487747A (en) A kind of petroleum pipeline conveying arrangement
CN205709587U (en) Crawler type pipe laying pipe collecting machine
CN106927298A (en) A kind of power construction cable unwinding device
CN108083163B (en) A kind of small-sized rack of municipal works summer circuit emergency maintenance
CN206371351U (en) Double-deck floatable fishing net
CN206328111U (en) A kind of power station mounting bracket for being easy to power distribution cabinet to repair
CN106508707A (en) Portable drinking water device and drinking water system for sheep
CN204251100U (en) Fixed oil bailing device
CN107518600A (en) A kind of natural gas line open air design desk
CN107626596A (en) Goods size separation device is used in a kind of lorry unloading
CN208456591U (en) A kind of the Towing Device of Tunneller
CN207132603U (en) Reservoir and compressor
CN107957173A (en) A kind of efficient herbal medicine drying unit
CN206654603U (en) A kind of power construction cable unwinding device
CN103444615B (en) Self-closing culture cage
CN209142335U (en) A kind of unmanned lifeboat facilitating traction
CN107298291B (en) Position transfer device on a kind of petroleum pipeline production line
CN206953402U (en) A kind of network transformer pulls sheet devices
CN107471174B (en) Part placing device for maintaining household natural gas pipeline
CN206273520U (en) A kind of chain tightener
CN210439256U (en) Adjustable water surface oil spill intercepting device
CN207749813U (en) A kind of street lamp for town road checks ladder
CN206433550U (en) Portable sheep is with drinking device and sheep drinking-water system
CN107333670A (en) A kind of cowboying automatic water-replenishing device
CN109156307A (en) A kind of pear sapling field planting seedlings plugging positioning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190115

Address after: 325000 Hetian Village, Oubei Street, Yongjia County, Wenzhou City, Zhejiang Province

Applicant after: CHENGBO VALVE CO.,LTD. WENZHOU

Address before: 350007 No. 116 Shoushan Road, Cangshan District, Fuzhou City, Fujian Province

Applicant before: Zhao Weixiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231106

Address after: No. 299 Xinxing East 1st Road, Zonghan Street, Cixi City, Ningbo City, Zhejiang Province, 315300

Patentee after: Cixi Taixin Metal Products Co.,Ltd.

Address before: 325000 Ou Bei Jie Dao He Tian Cun, Yongjia County, Wenzhou City, Zhejiang Province

Patentee before: CHENGBO VALVE CO.,LTD. WENZHOU

TR01 Transfer of patent right