CN107268369A - A kind of sponge-type gardens road surface construction method - Google Patents

A kind of sponge-type gardens road surface construction method Download PDF

Info

Publication number
CN107268369A
CN107268369A CN201710443332.0A CN201710443332A CN107268369A CN 107268369 A CN107268369 A CN 107268369A CN 201710443332 A CN201710443332 A CN 201710443332A CN 107268369 A CN107268369 A CN 107268369A
Authority
CN
China
Prior art keywords
layer
water purification
purification layer
sponge
ppr
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710443332.0A
Other languages
Chinese (zh)
Inventor
赵永军
翟利
丁平
刘鵾
刘涛
房瑶瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710443332.0A priority Critical patent/CN107268369A/en
Publication of CN107268369A publication Critical patent/CN107268369A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/04Pavings made of prefabricated single units made of bricks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of sponge-type gardens road surface construction method, including:A. preparation of construction, B. roadbed treatments, C. setting cushions, D. laying rainwater-collectings layer, E. layings basic unit, F. set drainage fastener, G. laying water purification layer, H. layings packed layer, I. layings to put forth effort layer, the J. laying several steps of surface layer, the sponge-type gardens road surface construction method, it is simple in construction that current sponge-type gardens Pavement Design is solved well, permeable effect is poor, and realize the shortcoming of effectively water circulation, the road surface so built, it is not only sturdy and durable, and the permeable and big function of water purification two can be realized, be conducive to the realization of Ecological water cycle.

Description

A kind of sponge-type gardens road surface construction method
Technical field
The present invention is more particularly directed to a kind of sponge-type gardens road surface construction method.
Background technology
Sponge city, is new generation of city storm water man- agement concept, refers to that city is adapting to environmental change and reply rainwater band There is good " elasticity ", also referred to as " water elasticity city " in terms of the natural calamity come.International term is " low shadow Ring exploitation storm-water system to build ".Water suction when raining, retaining, infiltration, water purification, it is necessary to when by the water stored " release " and be subject to profit With.
When sponge city of the prior art is built on road surface, simply drain off floodwaters, do not have in view of simple robustness and prevention waterlogging Have the concept of some details, such as water circulation concept is implanted into, it is also relatively rough that the sponge urban project of prior art is done.
The content of the invention
The technical problem to be solved in the present invention is:In order to overcome the deficiencies in the prior art, there is provided a kind of sponge-type gardens road Face construction method.
The technical solution adopted for the present invention to solve the technical problems is:The construction method comprises the following steps:
A. preparation of construction:Site clearing, arranges normal line as requested, arranges what is be interconnected in normal line position Feed pipe, the tube wall of feed pipe is provided with inlet opening, and inlet opening is set upward;
B. roadbed treatment:Feed pipe is filled with hack, fiberglass composite fiber plate, each glass are set in the top of feed pipe Glass steel composite fiber plate is provided with some through holes straight down, with tamping machine or road roller by the original soil rammed or compacting of roadbed, Form original subgrade;
C. setting cushion:Clay content is less than in 3% to sand flat and is layered on original subgrade layer;
D. rainwater-collecting layer is laid:The metalling that first laying depth is 15-20mm on bed course, then re-lays aperture small In 5mm steel wire, thickness >=2mm of steel wire;
E. basic unit is laid:After rainwater-collecting layer is set, continue the crushed rock base course that laying depth is more than 120mm, use forklift It is bulldozed, then with shower nozzle water drenching 2 hours, is then compacted again with road roller;
F., drainage fastener is set:Some vertically arranged PPR pipes side by side are set in basic unit, PPR pipe it is a diameter of 600-800mm, the tube wall of each PPR pipe is tangent, and the tube wall of the PPR pipe is provided with some permeable holes;
G. water purification layer is laid:Fill water purification layer in PPR pipe, water purification layer includes upper water purification layer, middle water purification layer and lower net Water layer, the thickness of upper water purification layer, middle water purification layer and lower water purification layer is 10mm, wherein, upper water purification layer is active carbon layer, middle water purification Layer is ceramic particle layer, and lower water purification layer is active carbon layer;
H. packed layer is laid:Gap between two adjacent PPR pipes is filled up with cement;
I. layer is puted forth effort in laying:Square concrete brick, the junction of two blocks of adjacent concrete bricks are laid above water purification layer It is placed exactly in PPR pipe diametrically, the length of side of concrete brick is equal to the diameter of PPR pipe;
J. surface layer is laid:Permeable pavement brick is laid, french drain is set between two adjacent row's pavior bricks.
Preferably, in order to ensure water quality, the feed pipe is PPR nano-antibacterial pipes.
Preferably, in the step H, joint filling sand is additionally provided between two adjacent PPR pipes, the joint filling sand includes body Product is than being 2.5:The mixture of 1 dry fine sand and rubble formation.
Preferably, in the step J, sidewalk for visually impaired people is additionally provided with surface layer.
The beneficial effects of the invention are as follows the sponge-type gardens road surface construction method solves current sponge-type garden well Woods Pavement Design is simple in construction, and permeable effect is poor, and realizes the shortcoming of effectively water circulation, the road surface so built, It is not only sturdy and durable, and the permeable and big function of water purification two can be realized, be conducive to the realization of Ecological water cycle.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 be the present invention a kind of sponge-type gardens road surface construction method in PPR pipe and concrete brick attachment structure Schematic diagram.
In figure:1.PPR is managed, 2. concrete bricks.
Embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These accompanying drawings are simplified schematic diagram, only with Illustration illustrates the basic structure of the present invention, therefore it only shows the composition relevant with the present invention.
Embodiment 1
The construction method comprises the following steps:
A. preparation of construction:Site clearing, arranges normal line as requested, arranges what is be interconnected in normal line position Feed pipe, the tube wall of feed pipe is provided with inlet opening, and inlet opening is set upward;
The setting of normal line, primarily to construction gets up to have individual benchmark, the setting of feed pipe is mainly easily beneath Current intercommunication.
B. roadbed treatment:Feed pipe is filled with hack, fiberglass composite fiber plate, each glass are set in the top of feed pipe Glass steel composite fiber plate is provided with some through holes straight down, with tamping machine or road roller by the original soil rammed or compacting of roadbed, Form original subgrade;Here it is actually that feed pipe is protected using fiberglass composite fiber plate, and it is compound in fiberglass Through hole is set on fiberboard, is to seep water for convenience.And material of fiberglass composite fiber plate itself is harder, held with certain Beijing South Maxpower Technology Co. Ltd's power, and underground is embedded in for a long time, will not also occur aging.
C. setting cushion:Clay content is less than in 3% to sand flat and is layered on original subgrade layer;
D. rainwater-collecting layer is laid:The metalling that first laying depth is 15-20mm on bed course, then re-lays aperture small In 5mm steel wire, thickness >=2mm of steel wire;Here steel wire is actually to play to hold work to metalling top layer With so that the entire firmness of metalling is bigger.
E. basic unit is laid:After rainwater-collecting layer is set, continue the crushed rock base course that laying depth is more than 120mm, use forklift It is bulldozed, then with shower nozzle water drenching 2 hours, is then compacted again with road roller;
It is after preventing current to local impact, to cause rugged phenomenon, so using the method for shower nozzle water drenching Water spray can be than more uniform.
F., drainage fastener is set:Some vertically arranged PPR pipes 1 side by side, the diameter of PPR pipe 1 are set in basic unit For 600-800mm, the tube wall of each PPR pipe 1 is tangent, and the tube wall of the PPR pipe 1 is provided with some permeable holes;
Each PPR pipe 1 is mutually tangent to be prevented, a supporting role can be being played each other so that total is more Firmly.
G. water purification layer is laid:The filling water purification layer in the PPR pipe 1, water purification layer includes upper water purification layer, middle water purification layer and lower net Water layer, the thickness of upper water purification layer, middle water purification layer and lower water purification layer is 10mm, wherein, upper water purification layer is active carbon layer, middle water purification Layer is ceramic particle layer, and lower water purification layer is active carbon layer;
Here upper water purification layer, middle water purification layer and lower water purification layer mainly plays certain filtering to the water that earth's surface is oozed down Effect.
H. packed layer is laid:Gap between two adjacent PPR pipes 1 is filled up with cement;
I. layer is puted forth effort in laying:Laying square concrete brick 2, the connection of two blocks of adjacent concrete bricks 2 above water purification layer Place is placed exactly in PPR pipe 1 diametrically, and the length of side of concrete brick 2 is equal to the diameter of PPR pipe 1;
Herein, as shown in figure 1, can actually form a stable and firm branch between PPR pipe 1 and concrete brick 2 Support mechanism.
J. surface layer is laid:Permeable pavement brick is laid, french drain is set between two adjacent row's pavior bricks, herein, if French drain is put primarily to when occurring flood, rapidly draining can be played a part of.
Preferably, in order to ensure water quality, the feed pipe is PPR nano-antibacterial pipes.
Preferably, in the step H, joint filling sand is additionally provided between two adjacent PPR pipes 1, the joint filling sand includes Volume ratio is 2.5:The mixture of 1 dry fine sand and rubble formation.
Preferably, in the step J, sidewalk for visually impaired people is additionally provided with surface layer.
Preferably, the sponge-type gardens road surface construction method, solves current sponge-type gardens Pavement Design well Simple in construction, permeable effect is poor, and realizes the shortcoming of effectively water circulation, and the road surface so built is not only firm resistance to With, and the permeable and big function of water purification two can be realized, be conducive to the realization of Ecological water cycle.
Using the above-mentioned desirable embodiment according to the present invention as enlightenment, by above-mentioned description, relevant staff is complete Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention Property scope is not limited to the content on specification, it is necessary to its technical scope is determined according to right.

Claims (4)

1. a kind of sponge-type gardens road surface construction method, it is characterised in that the construction method comprises the following steps:
A. preparation of construction:Site clearing, arranges normal line as requested, and interconnected feedwater is arranged in normal line position Pipe, the tube wall of feed pipe is provided with inlet opening, and inlet opening is set upward;
B. roadbed treatment:Feed pipe is filled with hack, fiberglass composite fiber plate, each fiberglass are set in the top of feed pipe Composite fiber plate is provided with some through holes straight down, with tamping machine or road roller by the original soil rammed or compacting of roadbed, is formed Original subgrade;
C. setting cushion:Clay content is less than in 3% to sand flat and is layered on original subgrade layer;
D. rainwater-collecting layer is laid:The metalling that first laying depth is 15-20mm on bed course, then re-lays aperture and is less than 5mm steel wire, thickness >=2mm of steel wire;
E. basic unit is laid:After rainwater-collecting layer is set, continue the crushed rock base course that laying depth is more than 120mm, be bulldozed with forklift, Then with shower nozzle water drenching 2 hours, then it is compacted again with road roller;
F., drainage fastener is set:Some vertically arranged PPR pipes side by side, a diameter of 600- of PPR pipe are set in basic unit 800mm, the tube wall of each PPR pipe is tangent, and the tube wall of the PPR pipe is provided with some permeable holes;
G. water purification layer is laid:Water purification layer is filled in PPR pipe, water purification layer includes upper water purification layer, middle water purification layer and lower water purification layer, The thickness of upper water purification layer, middle water purification layer and lower water purification layer is 10mm, wherein, upper water purification layer is active carbon layer, and middle water purification layer is Ceramic particle layer, lower water purification layer is active carbon layer;
H. packed layer is laid:Gap between two adjacent PPR pipes is filled up with cement;
I. layer is puted forth effort in laying:Square concrete brick is laid above water purification layer, the junction of two blocks of adjacent concrete bricks is just Positioned at PPR pipe diametrically, the length of side of concrete brick is equal to the diameter of PPR pipe;
J. surface layer is laid:Permeable pavement brick is laid, french drain is set between two adjacent row's pavior bricks.
2. sponge-type gardens as claimed in claim 1 road surface construction method, it is characterised in that the feed pipe is PPR nanometers Antibacterial pipe.
3. sponge-type gardens as claimed in claim 1 road surface construction method, it is characterised in that in the step H, adjacent two Joint filling sand is additionally provided between individual PPR pipe, it is 2.5 that the joint filling sand, which includes volume ratio,:The mixing of 1 dry fine sand and rubble formation Thing.
4. sponge-type gardens as claimed in claim 1 road surface construction method, it is characterised in that in the step J, on surface layer It is additionally provided with sidewalk for visually impaired people.
CN201710443332.0A 2017-06-13 2017-06-13 A kind of sponge-type gardens road surface construction method Pending CN107268369A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710443332.0A CN107268369A (en) 2017-06-13 2017-06-13 A kind of sponge-type gardens road surface construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710443332.0A CN107268369A (en) 2017-06-13 2017-06-13 A kind of sponge-type gardens road surface construction method

Publications (1)

Publication Number Publication Date
CN107268369A true CN107268369A (en) 2017-10-20

Family

ID=60066162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710443332.0A Pending CN107268369A (en) 2017-06-13 2017-06-13 A kind of sponge-type gardens road surface construction method

Country Status (1)

Country Link
CN (1) CN107268369A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160210A (en) * 2020-09-17 2021-01-01 浙江同济科技职业学院 Landscape road construction process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2811075A1 (en) * 2013-06-03 2014-12-10 Haner Infra Innovatie B.V. Tunnel drainage arrangement
CN204753304U (en) * 2015-06-19 2015-11-11 苏州金螳螂园林绿化景观有限公司 Layer structure is laid to gardens road surface stone material
CN105672451A (en) * 2016-02-23 2016-06-15 南开大学 Method for laying percolation type rainwater drainage pipes in Sponge City Construction
CN205502122U (en) * 2016-04-05 2016-08-24 韩博宸 A rainwater collection clean system for urban afforestation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2811075A1 (en) * 2013-06-03 2014-12-10 Haner Infra Innovatie B.V. Tunnel drainage arrangement
CN204753304U (en) * 2015-06-19 2015-11-11 苏州金螳螂园林绿化景观有限公司 Layer structure is laid to gardens road surface stone material
CN105672451A (en) * 2016-02-23 2016-06-15 南开大学 Method for laying percolation type rainwater drainage pipes in Sponge City Construction
CN205502122U (en) * 2016-04-05 2016-08-24 韩博宸 A rainwater collection clean system for urban afforestation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160210A (en) * 2020-09-17 2021-01-01 浙江同济科技职业学院 Landscape road construction process

Similar Documents

Publication Publication Date Title
CN203295913U (en) Novel ecological permeable road structure
CN107034767A (en) A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
WO2020244177A1 (en) Roadside tree planting hole structure and construction method therefor
CN111074844A (en) Construction method of ecological interlocking revetment of river channel
CN101403209B (en) Fast water-permeable brick for stopping pad and laying method
CN204125814U (en) A kind of garden path structure
CN105951672B (en) A kind of construction technology of novel embankment and bank protection
CN107152012A (en) Sluice construction technique
CN106381796A (en) Concrete water-permeable road surface as well as paving method thereof and maintenance and restoration method thereof
CN107938480A (en) A kind of microorganism cures the desert highway embankment and its construction method of joint TGXG
CN208219340U (en) A kind of new city road permeable pavement structure
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN205653671U (en) Bituminous paving permeates water in sponge type city
CN206736675U (en) A kind of cell pavement
CN104674842B (en) Solidified earth barricade and constructional method thereof
CN106436523A (en) New-structure grass planting brick produced by recycled aggregates
CN207143633U (en) A kind of pervious concrete grass planting land earth construction
CN206189241U (en) Concrete permeable pavement
CN208748462U (en) Can rapid construction high-bearing capacity pervious surface
CN107268369A (en) A kind of sponge-type gardens road surface construction method
CN110184874A (en) A kind of garden landscape road and its construction technology
CN108611948A (en) A kind of urban road permeable pavement structure
CN209636588U (en) A kind of inside has the reinforcement subgrade and pavement of geotechnological water-permeable pipe
CN207659813U (en) A kind of pervious concrete pavement constructing structure
CN107795145B (en) Cave collapse filling and soil organic reconstruction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020

RJ01 Rejection of invention patent application after publication