CN104674842B - Solidified earth barricade and constructional method thereof - Google Patents

Solidified earth barricade and constructional method thereof Download PDF

Info

Publication number
CN104674842B
CN104674842B CN201510078768.5A CN201510078768A CN104674842B CN 104674842 B CN104674842 B CN 104674842B CN 201510078768 A CN201510078768 A CN 201510078768A CN 104674842 B CN104674842 B CN 104674842B
Authority
CN
China
Prior art keywords
solidified earth
paves
base groove
middle level
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510078768.5A
Other languages
Chinese (zh)
Other versions
CN104674842A (en
Inventor
简洪钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jian Zhuan Geotechnical Engineering Co Ltd Of Fujian Province
Original Assignee
Jian Zhuan Geotechnical Engineering Co Ltd Of Fujian Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jian Zhuan Geotechnical Engineering Co Ltd Of Fujian Province filed Critical Jian Zhuan Geotechnical Engineering Co Ltd Of Fujian Province
Priority to CN201510078768.5A priority Critical patent/CN104674842B/en
Publication of CN104674842A publication Critical patent/CN104674842A/en
Application granted granted Critical
Publication of CN104674842B publication Critical patent/CN104674842B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention discloses a kind of solidified earth barricade and constructional method thereof, it is applied to the supporting of side slope, the method comprising the steps of: S01, base groove setting-out process, the long limit of setting base groove, wide limit and height length, and determine setting-out after base groove excavating sideline according to the long limit of default base groove and the physical length on wide limit; S02, base groove excavation process, and carry out slope excavation according to the excavating sideline after setting-out and base groove height and obtain former place soil and flattened by base groove bottom land and spreading process, wherein, excavate according to predetermined inclination angle near the side of side slope; S03, mixing solidified earth compound process, and according to the proportioning uniform mixing of setting, former place soil, cement and curing agent solution are obtained solidified earth compound; S04, wall body paving is built and element earthen backfill process; S05, wall body is carried out maintenance process. This scheme can be gathered materials on the spot, and reduces construction costs; The construction duration can be shortened, energy-conserving and environment-protective, and the over-all properties of body of wall can be improved.

Description

Solidified earth barricade and constructional method thereof
Technical field
The present invention relates to the slope retaining technology in geotechnical engineering field, particularly relate to a kind of solidified earth barricade and constructional method thereof.
Background technology
Retaining wall refers to that supporting roadbed bankets or the hillside soil body, prevents from banketing or the structure of soil deformation unstability. Traditional retaining wall pattern has gravity type boat davit, cantilevered, buttress type and reinforced earth bulkhead etc., gravity retaining wall, refers to rely on the retaining wall of wall body deadweight opposing soil body wall pressure. Gravity retaining wall available block stone, slabstone, concrete precast block are as masonry, or adopt sheet stone concrete, concrete to carry out entirety and build. Cantilever retaining wall is made up of base plate and the stalk that is fixed on base plate, main by the weight of banketing on base plate to maintain stable retaining wall, primarily of wall, toe board and heel slab three reinforced concrete members compositions. Counterfort retaining wall refers to the armstand along cantilever retaining wall, the counterfort that adds one at a certain distance, by the retaining wall that wall is connected with heel slab. Reinforced earth retaining wall refers to that the reinforced earth being with by banketing, draw and veneer building block forms bears the retaining wall of soil body wall pressure. The wall body of above-mentioned retaining wall is built by laying bricks or stones by Reinforced Concrete Materials mostly. Needing to carry out a large amount of soil excavation and backfilling working in retaining wall construction process, construction cost is big.
Soil-solidified-agent is a kind of novel energy-saving environment-friendly engineering materials for solidifying all kinds of soil by multiple inorganic, organic materials synthesis. The essence of soil-solidified-agent curing soil is that physical-chemical reaction occurs between soil particle, improves the contact surface between soil particle, the connection mechanism between reinforced soil particle. Its physical-chemical reaction can be concluded as solidifying agent and soil constituent carry out ionic adsorption and exchange, soil particle is made to be tending towards cohesion, chemical reaction generates novel substance and strengthens the connection between soil particle, and resultant volumetric expansion improves and hole between filling soil particle. Under the effect of Compaction Effort, make solidified earth be easy to compacting and stablize, thus form one-piece construction, and reach the conventional degree of consolidation that can not reach. Through the soil that soil-solidified-agent processed, the performances such as its intensity, degree of compactness, the modulus of resilience are obtained for very big raising, thus extend the work-ing life of engineering, save maintenance of works cost.
Soil-solidified-agent has mineral-type, ionic species, high score subclass and biological enzyme etc. dissimilar, and the development of current domestic soil-solidified-agent mainly concentrates on mineral-type solidifying agent aspect. Soil-solidified-agent can substitute the traditional building materials such as a large amount of lime, cement, flyash, rubble, gravel, saves resource, the energy, Economization on land, and protection vegetation, is conducive to ecological environmental protection, has good economy, environmental benefit. Gelling material more insoluble special problems when soil fixation such as cement, lime, flyash can also be solved, have in the middle of unique soil solidification effect and practicality, the basic unit being widely used in highway and the construction of the engineering such as subbase, water conservancy bank protection widely.
In view of this, it is necessary in conjunction with soil stabilization, the construction of existing soil barricade is further improved.
Summary of the invention
Technical problem to be solved by this invention is: provides a kind of solidified earth barricade and constructional method thereof, it is possible to gather materials on the spot, reduces construction costs; The construction duration can be shortened, energy-conserving and environment-protective, and the over-all properties of body of wall can be improved.
In order to solve the problems of the technologies described above, the technical solution used in the present invention is: the constructional method providing a kind of solidified earth barricade, it is applied to the supporting of side slope, comprises the steps:
S01, base groove setting-out process, the long limit of setting base groove, wide limit and height length, and determine base groove excavating sideline according to the long limit of default base groove and the physical length on wide limit, and excavating sideline is carried out setting-out;
S02, base groove excavation process, and carry out slope excavation according to the excavating sideline after setting-out and base groove height and obtain former place soil, and are flattened by the complete base groove bottom land of excavation and spreading process, wherein, excavate according to predetermined inclination angle near the side of side slope;
S03, mixing solidified earth compound process, and according to the proportioning uniform mixing of setting, former place soil, cement and curing agent solution are obtained solidified earth compound;
S04, wall body paving builds and element earthen backfill process, described wall body paving build process specifically comprise, a, according to base groove height is divided into the bottom that paves, pave middle level and the top layer that paves; B, the solidified earth compound of uniform mixing is laid to the bottom that paves until carry out spreading process after supporting side slope; C, bottom arranges the laying sideline in middle level of paving make to leave fill area between wall body and side slope paving, and lay solidified earth compound by layer and form the laggard row spreading process of the solidified earth mixing bed of material; D, the solidified earth compound of uniform mixing is laid to paving top layer and cover the top of fill area until carrying out spreading process after supporting side slope;
The earthen backfill process of described element is built synchronous the laying by layer of " solidified earth compound is laid in the middle level layering that paves " of step c in process and is carried out synchronous spreading to fill area with wall body paving;
S05, wall body is carried out maintenance process.
In order to solve the problems of the technologies described above, another technical scheme that the present invention adopts is: provides a kind of solidified earth barricade, comprises the base groove arranged near side slope, is divided into solidified earth compound and lays district and fill area in described base groove;
Described solidified earth compound lays that district comprises the top layer that paves laid in turn up and down, pave middle level and the bottom that paves form wall body, described wall body tilts to bury multiple water shoot underground, the water-in of described water shoot stretches into fill area, the water outlet of water shoot is obliquely installed to base trench bottom, and multiple water shoot is arranged up and down; Side slope is supported in one end of the described bottom that paves; The described middle level that paves comprises the multiple layers of cured soil mixing bed of material, and the middle level that paves is reserved with fill area near one end of side slope; The described top layer paving that paves extends to fill area and supports side slope;
The layering of described fill area backfills soil of being always or usually as specified and forms multilayer element soil layer, and in described element soil layer, any one layer of thickness mixing the bed of material with the corresponding solidified earth in the middle level that paves is identical.
The useful effect of the present invention is: be different from the solidified earth Retaining wall time of the prior art long, it is unfavorable for environmental protection, the problem that construction costs is high, the present invention provides the constructional method of a kind of solidified earth barricade, main adopts the place Min layers to wall body to build calendering forming, is specifically divided into the bottom that paves, pave middle level and the top layer that paves, and to middle level and the element synchronous spreading of earthen backfill of paving, the construction duration is short, spreads the solidified earth barricade wall body intensity height after building, impervious, cracking resistance, good frost resistance; Mixing solidifying agent in solidified earth compound, changed the character of soil by the ion exchange of self, this kind of effect has non-reversibility, and the weathering not hydrophilic, resistance to of the solidified soil material of formation, plays a kind of permanent strengthening effect to soil. Solidifying agent is a kind of environment-friendly materials, human body, livestock and plant etc. are all harmless, adopt solidified soil material can reduce exploitation and the carrying of raw-material discarded and novel material, make construction work that the infringement of environment is reduced to minimum degree, preserve the ecological environment to greatest extent; In addition, the middle level that paves has good expansion.
Accompanying drawing explanation
Fig. 1 is the constructional method schema of solidified earth barricade of the present invention;
Fig. 2 is that wall body of the present invention paving builds flow chart of steps;
Fig. 3 is the structure iron of an embodiment of solidified earth barricade of the present invention;
Fig. 4 is the cross section view of solidified earth reinforced retaining wall of the present invention;
Fig. 5 is the cross section view of the horizontal rib solidified earth barricade of band of the present invention;
Fig. 6 is the grid-like solidified earth barricade cross section view of the present invention.
Label illustrates:
1, base groove; 21, pave bottom; 22, pave middle level; 23, pave top layer;
3, element soil layer; 4, packed sand; 5, side slope; 6, rib tape;
7, horizontal rib; 8, reserved lattice room; 221, the solidified earth mixing bed of material; 222, water shoot.
Embodiment
By the technology contents of the present invention being described in detail, is realized object and effect, below in conjunction with enforcement mode and coordinate accompanying drawing to be explained.
The design of most critical of the present invention is: this scheme mainly adopts wall body paving to build and element earthen backfill treatment step, specifically be divided into the bottom that paves, pave middle level and the top layer that paves, and to middle level and the element synchronous spreading of earthen backfill of paving, the construction duration is short, spread the solidified earth barricade wall body intensity height after building, impervious, cracking resistance, good frost resistance; Solidified earth compound mixes solidifying agent, is conducive to environment protection.
Please refer to Fig. 1 and Fig. 2, the constructional method of a kind of solidified earth barricade of the present invention, it is applied to the supporting of side slope, comprises the steps:
S01, base groove setting-out process, the long limit of setting base groove, wide limit and height length, and determine base groove excavating sideline according to the long limit of default base groove and the physical length on wide limit, and excavating sideline is carried out setting-out;
S02, base groove excavation process, and carry out slope excavation according to the excavating sideline after setting-out and base groove height and obtain former place soil, and are flattened by the complete base groove bottom land of excavation and spreading process, wherein, excavate according to predetermined inclination angle near the side of side slope;
S03, mixing solidified earth compound process, and according to the proportioning uniform mixing of setting, former place soil, cement and curing agent solution are obtained solidified earth compound;
S04, wall body paving builds and element earthen backfill process, described wall body paving build process specifically comprise, a, according to base groove height is divided into the bottom that paves, pave middle level and the top layer that paves; B, the solidified earth compound of uniform mixing is laid to the bottom that paves until carry out spreading process after supporting side slope; C, bottom arranges the laying sideline in middle level of paving make to leave fill area between wall body and side slope paving, and lay solidified earth compound by layer and form the laggard row spreading process of the solidified earth mixing bed of material; D, the solidified earth compound of uniform mixing is laid to paving top layer and cover the top of fill area until carrying out spreading process after supporting side slope;
The earthen backfill process of described element is built synchronous the laying by layer of " solidified earth compound is laid in the middle level layering that paves " of step c in process and is carried out synchronous spreading to fill area with wall body paving;
S05, wall body is carried out maintenance process.
From foregoing description, the useful effect of the present invention is: be different from the solidified earth Retaining wall time of the prior art long, it is unfavorable for environmental protection, the problem that construction costs is high, the present invention provides the constructional method of a kind of solidified earth barricade, the place Min layers of wall body is built calendering forming by main employing, specifically be divided into the bottom that paves, pave middle level and the top layer that paves, and to middle level and the synchronous spreading of element soil of paving, the construction duration is short, spread the solidified earth barricade wall body intensity height after building, impervious, cracking resistance, good frost resistance; Mixing solidifying agent in solidified earth compound, changed the character of soil by the ion exchange of self, this kind of effect has non-reversibility, and the weathering not hydrophilic, resistance to of the solidified soil material of formation, plays a kind of permanent strengthening effect to soil. Solidifying agent is a kind of environment-friendly materials, human body, livestock and plant etc. are all harmless, adopt solidified soil material can reduce exploitation and the carrying of raw-material discarded and novel material, make construction work that the infringement of environment is reduced to minimum degree, preserve the ecological environment to greatest extent; In addition, the middle level that paves has good expansion.
Further, in described step S04, wall body paving is built and is also included in wall body in process to tilt to bury multiple water shoot underground, and the water-in making water shoot stretches into fill area, and the water outlet of water shoot tilts the step installed to base trench bottom. This water shoot is for discharging the discharge of fill area internal water accumulation.
Further, in described step S04, element earthen backfill also comprises by layer filling bag sand loading soil before processing, and makes packed sand near the laying sideline step of the solidified earth compound with layer. This packed sand can isolate element soil and solidified earth compound.
Further, in described step S04, element earthen backfill also comprises the step arranging rib tape by layer on the solidified earth mixing bed of material and element soil layer of same layer after processing. Utilizing the rubbing effect of rib tape and rolling earth behind retaining wall, improve the engineering characteristic of rolling earth behind retaining wall, solidified earth barricade and reinforced earth combine, it is to increase barricade props up gear ability, increase slope stability.
Further, the middle level that paves in described step S04 comprises the solidified earth mixing bed of material and extends laying process and form horizontal rib, and makes horizontal rib preset vertical distance every one and extend to fill area until lay to supporting side slope, and in horizontal rib the step of embedded ribs band. There is very big rubbing effect between this horizontal rib and rolling earth behind retaining wall, the existence of horizontal rib adds barricade deadweight simultaneously, and this type barricade has a very strong gear ability, can be used for the retaining wall that design height is higher.
Further, also comprise the step of at least one reserved lattice room in the middle level that paves in described step S04. Lattice room can be inserted the spoir of former place excavation, increase barricade deadweight. This soil barricade had both played a gear effect, realizes again spoir to the full extent and utilizes.
In sum, the constructional method of solidified earth barricade provided by the invention, the place Min layers of wall body is built calendering forming by main employing, specifically be divided into the bottom that paves, pave middle level and the top layer that paves, and to middle level and the synchronous spreading of element soil of paving, the construction duration is short, spreads the solidified earth barricade wall body intensity height after building, impervious, cracking resistance, good frost resistance; Mixing solidifying agent in solidified earth compound, changed the character of soil by the ion exchange of self, this kind of effect has non-reversibility, and the weathering not hydrophilic, resistance to of the solidified soil material of formation, plays a kind of permanent strengthening effect to soil. Solidifying agent is a kind of environment-friendly materials, human body, livestock and plant etc. are all harmless, adopt solidified soil material can reduce exploitation and the carrying of raw-material discarded and novel material, make construction work that the infringement of environment is reduced to minimum degree, preserve the ecological environment to greatest extent; In addition, the middle level that paves has good expansion, it is possible to arrange rib tape, Heng Lei reinforced bands mechanism with cell structure of passing, it is possible to improve intensity and the environmental-protecting performance of soil barricade.
Embodiment one
Please refer to Fig. 3, a kind of solidified earth barricade of the present invention, comprises the base groove 1 arranged near side slope 5, is divided into solidified earth compound and lays district and fill area in described base groove 1;
Described solidified earth compound lay district comprise lay in turn up and down the top layer 23 that paves, pave middle level 22 and the bottom 21 that paves forms wall body, described wall body tilts to bury multiple water shoot 222 underground, the water-in of described water shoot 222 stretches into fill area, the water outlet of water shoot 222 is arranged to base groove 1 bottom angled, and multiple water shoot about 222 is arranged; Side slope 5 is supported in described one end paving bottom 21; The described middle level 22 that paves comprises the multiple layers of cured soil mixing bed of material 221, and the middle level 22 that paves is reserved with fill area near one end of side slope 5; The described top layer 23 that paves spreads and extends to fill area and support side slope 5;
The layering of described fill area backfills soil of being always or usually as specified and forms multilayer element soil layer 3, and in described element soil layer 3, any one layer of thickness mixing the bed of material 221 with the corresponding solidified earth in the middle level 22 that paves is identical. Also being provided with packed sand 4 between the solidified earth mixing bed of material 221 that above-mentioned plain soil layer 3 is corresponding with the middle level 22 that paves, the thickness of packed sand 4 is identical with the plain soil layer 3 of same layer and thickness, and the water-in of water shoot 222 is arranged in packed sand 4.
The construction of this solidified earth barricade can be gathered materials on the spot, and a large amount of minimizing concrete and steel usage quantity, reduce engineering cost greatly. Solidified earth can in job mix, and place Min layers builds roller-compaction, and the construction duration is short, spreads the solidified earth barricade wall body intensity height after building, impervious, cracking resistance, good frost resistance.
Embodiment two
Consulting Fig. 4, Fig. 4 is the cross section view of solidified earth reinforced retaining wall, and this solidified earth reinforced retaining wall is the improvement based on embodiment one, is specially, and is equipped with rib tape 6 in the middle level 22 that paves on the plain soil layer 3 of any solidified earth mixing bed of material 221 and correspondence. When barricade design height is higher, can imbedding rib tape 6 in solidified earth barricade wall body paving process, rib tape 6 extends in rolling earth behind retaining wall. Utilizing the rubbing effect of rib tape 6 with rolling earth behind retaining wall, improve the engineering characteristic of rolling earth behind retaining wall, solidified earth barricade and reinforced earth combine, it is to increase barricade props up gear ability, increase side slope 5 stability.
Embodiment three
Consult Fig. 5, Fig. 5 is the cross section view of the horizontal rib 7 solidified earth barricade of band, the horizontal rib 7 solidified earth barricade of this band is the improvement based on embodiment two, concrete, the middle level 22 that paves also comprises horizontal rib 7, described horizontal rib 7 is preset vertical distance every one and is extended until laying is to side slope 5 to fill area, and is embedded with rib tape 6 in horizontal rib 7. In solidified earth reinforced retaining wall wall body and rolling earth behind retaining wall layering decking and rolling process, erect every one section and to spacing, solidified earth paving operation is extended to rolling earth behind retaining wall layer, form horizontal rib 7. There is very big rubbing effect between horizontal rib 7 and rolling earth behind retaining wall, the existence of horizontal rib 7 adds barricade deadweight simultaneously, and this type barricade has a very strong gear ability, can be used for the retaining wall that design height is higher.
Embodiment four
Consult Fig. 6, Fig. 6 is the sectional view of grid-like solidified earth barricade, this grid-like soil barricade is on the basis of embodiment one, to paving, middle level 22 is further processed, it is specially: also comprising at least one reserved lattice room 8 in middle level 22 paving, the quantity of this reserved lattice room 8 and size can design according to the requirement of reality. When barricade earth pressure is less, can by solidified earth barricade paving build be rolled into grid-like, can insert in lattice room former place excavation spoir, increase barricade deadweight. This type barricade had both played a gear effect, realizes again spoir to the full extent and utilizes.
The foregoing is only embodiments of the invention; not thereby the patent scope of the present invention is limited; every equivalents utilizing specification sheets of the present invention and accompanying drawing content to do, or directly or indirectly it is used in relevant technical field, all it is included in the scope of patent protection of the present invention with reason.

Claims (10)

1. a constructional method for solidified earth barricade, it is applied to the supporting of side slope, it is characterised in that, comprise the steps:
S01, base groove setting-out process, the long limit of setting base groove and the length on wide limit and height, and determine base groove excavating sideline according to the long limit of default base groove and the physical length on wide limit, and excavating sideline is carried out setting-out;
S02, base groove excavation process, and carry out slope excavation according to the excavating sideline after setting-out and base groove height and obtain former place soil, and are flattened by the complete base groove bottom land of excavation and spreading process, wherein, excavate according to predetermined inclination angle near the side of side slope;
S03, mixing solidified earth compound process, and according to the proportioning uniform mixing of setting, former place soil, cement and curing agent solution are obtained solidified earth compound;
S04, wall body paving builds process and element earthen backfill process, described wall body paving build process specifically comprise, a, according to base groove height is divided into the bottom that paves, pave middle level and the top layer that paves; B, the solidified earth compound of uniform mixing is laid to the bottom that paves until carry out spreading process after supporting side slope; C, bottom arranges the laying sideline in middle level of paving make to leave fill area between wall body and side slope paving, and lay solidified earth compound by layer and form the laggard row spreading process of the solidified earth mixing bed of material; D, the solidified earth compound of uniform mixing is laid to paving top layer and cover the top of fill area until carrying out spreading process after supporting side slope;
Described element earthen backfill process specifically comprises: element earthen backfill is built synchronous the laying by layer of middle level layering laying solidified earth compound that pave of step c in process and carried out synchronous spreading to fill area with wall body paving;
S05, wall body is carried out maintenance process.
2. the constructional method of solidified earth barricade according to claim 1, it is characterized in that, in described step S04 wall body paving build process is also included in wall body tilt bury multiple water shoot underground, and the water-in making water shoot stretches into fill area, the water outlet of water shoot tilts the step installed to base trench bottom.
3. the constructional method of solidified earth barricade according to claim 1, it is characterised in that, in described step S04, element earthen backfill also comprises by layer filling bag sand loading soil before processing, and makes packed sand near the laying sideline step of the solidified earth compound with layer.
4. the constructional method of solidified earth barricade according to claim 1, it is characterised in that, described step S04 also comprises the step arranging rib tape by layer on the solidified earth mixing bed of material and element soil layer of same layer.
5. the constructional method of solidified earth barricade according to claim 4, it is characterized in that, described step S04 paves middle level comprise solidified earth mixing the bed of material extend laying process form horizontal rib, and make horizontal rib preset vertical distance every one and extend to fill area until lay to supporting side slope, and in horizontal rib the step of embedded ribs band.
6. the constructional method of solidified earth barricade according to claim 4, it is characterised in that, also comprise the step of at least one reserved lattice room in the middle level that paves in described step S04.
7. an application rights requires the solidified earth barricade that the constructional method of the described solidified earth barricade of the arbitrary item of 1-3 obtains, it is characterised in that, comprise the base groove arranged near side slope, it is divided into solidified earth compound in described base groove and lays district and fill area;
Described solidified earth compound lays that district comprises the top layer that paves laid in turn up and down, pave middle level and the bottom that paves form wall body, described wall body tilts to bury multiple water shoot underground, the water-in of described water shoot stretches into fill area, the water outlet of water shoot is obliquely installed to base trench bottom, and multiple water shoot is arranged up and down; Side slope is supported in one end of the described bottom that paves; The described middle level that paves comprises the multiple layers of cured soil mixing bed of material, and the middle level that paves is reserved with fill area near one end of side slope; The described top layer paving that paves extends to fill area and supports side slope;
The layering of described fill area backfills soil of being always or usually as specified and forms multilayer element soil layer, and in described element soil layer, any one layer of thickness mixing the bed of material with the corresponding solidified earth in the middle level that paves is identical.
8. solidified earth barricade according to claim 7, it is characterised in that, described in pave any solidified earth mixing bed of material and correspondence in middle level plain soil layer on be equipped with rib tape.
9. solidified earth barricade according to claim 7, it is characterised in that, described in the middle level that paves also comprise horizontal rib, described horizontal rib is preset vertical distance every one and is extended to fill area until lay to side slope, and is embedded with rib tape in horizontal rib.
10. solidified earth barricade according to claim 7, it is characterised in that, described in pave and also comprise at least one reserved lattice room in middle level.
CN201510078768.5A 2015-02-13 2015-02-13 Solidified earth barricade and constructional method thereof Active CN104674842B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510078768.5A CN104674842B (en) 2015-02-13 2015-02-13 Solidified earth barricade and constructional method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510078768.5A CN104674842B (en) 2015-02-13 2015-02-13 Solidified earth barricade and constructional method thereof

Publications (2)

Publication Number Publication Date
CN104674842A CN104674842A (en) 2015-06-03
CN104674842B true CN104674842B (en) 2016-06-01

Family

ID=53310389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510078768.5A Active CN104674842B (en) 2015-02-13 2015-02-13 Solidified earth barricade and constructional method thereof

Country Status (1)

Country Link
CN (1) CN104674842B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592565B (en) * 2016-11-01 2019-06-04 西北农林科技大学 A kind of land control engineering soil-solidified-agent dyke strengthening guarantor bank construction method
CN109610502B (en) * 2018-12-11 2020-12-01 长沙理工大学 Construction method of concealed modified soil anti-slip retaining wall
CN111851527B (en) * 2020-07-28 2022-03-22 深圳市市政工程总公司 Foundation trench backfill construction method based on premixed fluidized solidified soil
CN112252336A (en) * 2020-10-16 2021-01-22 中建八局发展建设有限公司 Construction method for backfilling foundation trench of premixed fluidized solidified soil
CN112555503A (en) * 2020-12-01 2021-03-26 上海宝冶集团有限公司 Biological enzyme curing method for backfilling pipeline groove

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3897107B2 (en) * 2002-09-25 2007-03-22 積水化成品工業株式会社 Structure and its construction method by bubble lightweight mixed earth method
US8596928B1 (en) * 2007-05-17 2013-12-03 Henry G Justiniano Cement-treated soil blocks with vegetative faces
CN201534975U (en) * 2009-03-27 2010-07-28 朱海龙 Slope protection body with ribbed and core-wrapped structure
CN202323963U (en) * 2011-05-06 2012-07-11 北方工业大学 Drainage and anchoring combined device for side slope
CN102966119B (en) * 2012-12-05 2015-07-01 青岛旭域土工材料股份有限公司 Geogrid reinforced wall and construction method thereof
CN103410167B (en) * 2013-08-29 2015-07-15 深圳市福田建安建设集团有限公司 Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN203741868U (en) * 2013-10-11 2014-07-30 山西宏厦建筑工程有限公司 Reinforced concrete retaining wall structure with combined anchor wire
CN103572777B (en) * 2013-10-18 2016-04-20 中国航空港建设第九工程总队 A kind of geotechnical grid retaining wall and construction method thereof

Also Published As

Publication number Publication date
CN104674842A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN104278608B (en) The constructional method of a kind of highway embankment widened structure
CN104674842B (en) Solidified earth barricade and constructional method thereof
CN106193066B (en) A kind of Loess landslide administering method based on restoration of the ecosystem
CN203383119U (en) Novel widening structure of highway embankment
CN109736291A (en) One kind owing consolidation and blows on the base of alluvial plain that biological cement is reinforcing road bed and its construction method
CN104532857A (en) Flexible expansion reduced ecological slope protection construction
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN110419284A (en) A kind of strand greenery patches salt discharge alkali construction technology
CN105569071B (en) A kind of slip casting under water of cement-based material or mud jacking block ground mass foundation construction
CN106759104A (en) Ecological slope protection structure and construction method
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN211816174U (en) Foundation structure for foundation treatment in severe collapsible loess region
CN103806432A (en) Method for treating foundations in slope filling and digging joint part of wet and soft zone in loess region
RU2492290C1 (en) Method to construct motor roads and motor road design
CN203066104U (en) H-shaped plain concrete brick and small ecological soil-blocking wall bricked by same
CN109594442A (en) Garden path construction technology
CN106087880B (en) A kind of dam that 300 meter level is high and its construction technology
CN107152012A (en) Sluice construction technique
CN204356788U (en) Flexibility subtracts swollen ecological revetment structure
CN211596259U (en) Sponge city structure of mating formation of permeating water
CN102839647B (en) Stirring pile-permeable concrete pile compound foundation and treatment method thereof
CN112726638A (en) Expansive soil cutting slope protection structure and construction method
CN102071695A (en) Protection construction of vegetation concrete side slope
CN209194466U (en) A kind of Reservoir Bank leakage preventing structure
CN208039220U (en) A kind of old roadbed develops the base formation of stake reinforcing in column hammer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant