CN107264537A - Public transport train - Google Patents

Public transport train Download PDF

Info

Publication number
CN107264537A
CN107264537A CN201710492561.1A CN201710492561A CN107264537A CN 107264537 A CN107264537 A CN 107264537A CN 201710492561 A CN201710492561 A CN 201710492561A CN 107264537 A CN107264537 A CN 107264537A
Authority
CN
China
Prior art keywords
railway carriage
split
main body
door
hanger rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710492561.1A
Other languages
Chinese (zh)
Inventor
熊生银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710492561.1A priority Critical patent/CN107264537A/en
Publication of CN107264537A publication Critical patent/CN107264537A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61KAUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
    • B61K1/00Transferring passengers, articles, or freight to and from moving trains; Slipping or coupling vehicles from or to moving trains

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

Public transport train, especially with the separable technology of railway carriage, meets station is not parking can just leave first point railway carriage, and the second point railway carriage for being loaded with people is taken away;Railway carriage is especially divided to can ensure that comfortably using the method for getting on and off as hanger rail technology, subway;Also ensure servant, up and down express delivery do not act hurriedly in a messy situation;Mixed mud, which is built up, leaves one " seam " at " door " shape, volume, " 7 " font suspension hook top half extend into that " seam " is inner, and screw is fastened on the abundant place of " door " volume;Bottom is just stretched into the middle of " H " shape of hanger rail (3) top half, is fastened with several screws;Main body railway carriage width is divided into two the room of the split railway carriage for having dug out a ship shape, and front is provided with draw hook hydraulic jack, railway carriage the digital control center that is provided with;Split railway carriage is overlooked as ship shape, shorter than main body railway carriage, is easy to case top to put split facility, stress is also on railway carriage top;Bottom is flat to contact and be placed on above without wheel, and the room of the split railway carriage of main body railway carriage ship shape.

Description

Public transport train
Technical field
Public transport train, especially with the separable technology of railway carriage, meets station is not parking can just leave first point railway carriage, And take away the second point railway carriage for being loaded with people;Railway carriage is especially divided to can ensure that using the method for getting on and off as hanger rail technology, subway Comfortably;Also ensure servant, up and down express delivery goods it is unhurried.
Background technology
Category of trains is finally a lot, and subway is not included, and has slow train, express, express train, goes back motor-car;Express, express train, motor-car, stop All it is major station, small station is not stopped with regard to many cars;The people of Poor Mountainous Area are in, entrance is exactly railway station, but it is too remote slow Car does not stop, and the railway on entrance is in addition to bringing noise, and what benefit does not have yet.
For train:Parking will first slow down, then stop 3 minutes, start, accelerate to run, thus delay Many strokes, even if the train of 120 kilometers of speed per hour (motor-car just not to mention), slows down, stop 3 minutes, start, accelerate At least 4-5 minutes have just been delayed, 8-10 kilometers are run less;Stop if meeting station, be just that high ferro also can not run gesture.
In summary, it is a kind of to meet station is not parking can just be left with the first of car point railway carriage, and the second point that people and thing will be loaded with Railway carriage just arises at the historic moment with the public transport train walked with car.
The content of the invention
Public transport train, it is characterised in that:Mixed mud builds one that (1) is built up in the middle of larger " door " shape, " door " volume Split-phase to thiner, at " door " post and " door " post on both sides one section it is more abundant, " door " post leaves one at " door " volume " seam ";The top half of " 7 " font suspension hook (2) extend into that " seam " is inner, and loins is fastened on the abundant of " door " volume with several screws Place;Hanger rail (3) top half is " H " shape, and top half is being kissed as the L of left and right two;Just stretch the bottom of " 7 " font suspension hook (2) In the middle of " H " shape for entering hanger rail (3) top half, fastened with several screws;Xian Shangzhui roads, powered wire (4), rail on ground (5) it is exactly original vary without;It is long with regard to 1 km that public transport train station to be reconstructed.
Main body railway carriage (6) length, wheel and chassis facility and other railway carriages are just the same, and simply railway carriage center section is wide The room for the split railway carriage (7) for having dug out a ship shape that is divided into two is spent, such main body railway carriage (6) is exactly that half has railway carriage, Height is as other cars, and split railway carriage (7) room of ship shape is exactly average, and as flat car, but outside has more 10 upwards again The side of centimetre, for keeping a grip on split railway carriage (7);Main body railway carriage (6) front is provided with draw hook hydraulic jack (8) and movable hook liquid Digital control center is provided with compressing cylinder (9), railway carriage, for controlling draw hook hydraulic jack (8), movable hook hydraulic jack (9), traction telescopic mast (10A), digital control center controls the starting of traction electric machine (14), speed, and digital control center is also Control split railway carriage adhesion wheel (12), the brake gear of split railway carriage driven wheel (13) and split railway carriage bus stop hydraulic pressure Damping oil cylinder (16);
Split railway carriage (7) is overlooked as ship shape, and shorter than main body railway carriage (6), case top is easy on split railway carriage stress top (7A) Put split facility;Bottom is flat to contact and be placed on without wheel, and the room of the split railway carriage (7) of main body railway carriage (6) ship shape Face;There is door fenestrate as wanting the one side of division with main body railway carriage (6), be multiple tracks as subway door;The door of main body railway carriage (6) It is in alignment with the door of split railway carriage (7), can respective automatic switch;Regardless of one side equally have door fenestrate, and door and The same method of switching of subway door, split railway carriage inlet/outlet (7B);To day provided with 8 wheels on top, wherein it is driven to have 6 Wheel, split railway carriage driven wheel (13) is one group of back;Traction electric machine (14) is provided with sprocket wheel, and driving chain (11) drives Split railway carriage adhesion wheel (12) only one of which, another is driven pulley, in addition the setting phase of also one traction electric machine (14) Instead;The both sides of so hanger rail (3) respectively have a driving wheel, a driven pulley to be exactly one group of front, traction split railway carriage (7) Walk about;The front of split railway carriage (7) is additionally provided with traction main force's post (10), traction telescopic mast (10A);The work of main body railway carriage (6) Dynamic hook hydraulic jack (9) shortens, and draw hook hydraulic jack (8) is retracted, and split railway carriage (7) just divides with main body railway carriage (6) Open;The movable hook hydraulic jack (9) of main body railway carriage (6) increases, and draw hook hydraulic jack (8) is released, split railway carriage (7) Just close up with main body railway carriage (6);It is digital control when the hook of movable hook hydraulic jack (9) hook up to traction main force post (10) Center just makes traction telescopic mast (10A) stretch out, and so draws main force's post (10) preceding, draws telescopic mast (10A) and work is kept a grip on after The hook of dynamic hook hydraulic jack (9), split railway carriage (7) is with regard to main body railway carriage (6) " being connected as a single entity ".
When train will enter the station, digital control center control is slowed down, and causes 60 kilometers of speed per hour, the master on split railway carriage (7) top Digital control center just makes movable hook hydraulic jack (9) shorten after motor car wheel (12) and hanger rail (3) contact, draw hook hydraulic pressure Oil cylinder (8) is retracted, because beginning to deviate after hanger rail (3) is parallel with rail on ground (5) about 100 meters, while there is 3--4 degree Upward slope, digital control center just make split railway carriage adhesion wheel (12), split railway carriage driven wheel (13) start brake mode, At this moment the weight of split railway carriage (7) is complete on hanger rail (3), after complete and main body railway carriage (6) is separated, the brake of split railway carriage (7) side Side goes up a slope, turns, and the speed of split railway carriage (7) is slow soon to get off, and hanger rail (3) is exactly flat after 300 meters, to 800 Rice place speed it is complete it is slow get off, at this moment arrived split railway carriage bus stop (15);Number when split railway carriage (7) has just gone up hanger rail (3) Word control centre just makes split railway carriage bus stop hydraulic shock-absorption oil cylinder (16) stretch, split railway carriage (7) traction main force post (10) just tangled, first railway carriage stops;When split railway carriage (7) just upper hanger rail (3), digital control center, which just makes, first stops AT STATION, upper good person, install goods second railway carriage departing from split railway carriage bus stop hydraulic shock-absorption oil cylinder (16), start Less, but descending all the way will be walked faster and faster, at digital control center motor code power on traction electric machine (14), second railway carriage Under control, more than 200 meters (many parts are to bow out) is covered within 1 minute, just the main body railway carriage (6) with 60 kilometers per minute
Brief description of the drawings
In appended figure, in nonrestrictive citing form, illustrate one embodiment of the present of invention, then, detailed Description in, more clearly show the present invention other characteristic and advantage.In appended figure,
Accompanying drawing 1 is public transport train, mixed mud building, track, hanger rail and power line schematic diagram;
Accompanying drawing 2 is public transport train station schematic diagram;
The part A of accompanying drawing 3 is that separately schematic diagram, part B are public transport train master for the main railway carriage of public transport train and point railway carriage Railway carriage and a point railway carriage close up schematic diagram;
Accompanying drawing 4 closes up schematic top plan view for mixed mud building, track and the hanger rail of public transport train;
Accompanying drawing 5 is that public transport train hydraulic shock-absorption stops schematic top plan view by force;
Accompanying drawing 6 separates schematic top plan view for mixed mud building, track and the hanger rail of public transport train.
1 in figure:Mixed mud is built;2:7 font suspension hooks;3:Hanger rail;4:Powered wire;5:Rail on ground;6:Main body car Case;7:Split railway carriage;7A:Split railway carriage stress top;7B:Split railway carriage inlet/outlet;8:Draw hook hydraulic jack;9:Movable hook Hydraulic jack;10:Draw main force's post;10A:Draw telescopic mast;11:Driving chain;12:Split railway carriage adhesion wheel; 13:Point Body railway carriage driven wheel;14:Traction electric machine;15:Split railway carriage bus stop;16:Split railway carriage bus stop hydraulic shock-absorption oil cylinder.
Embodiment
Public transport train, it is characterised in that:Mixed mud builds one that (1) is built up in the middle of larger " door " shape, " door " volume Split-phase to thiner, at " door " post and " door " post on both sides one section it is more abundant, " door " post leaves one at " door " volume " seam ";The top half of 7 font suspension hooks (2) extend into that " seam " is inner, and loins is fastened on the abundant place of " door " volume with several screws; Hanger rail (3) top half is " H " shape, and top half is being kissed as the L of left and right two;The bottom of 7 font suspension hooks (2), which is just stretched into, hangs In the middle of " H " shape of rail (3) top half, (referring to Fig. 1) is fastened with several screws;Xian Shangzhui roads, powered wire (4), ground Track (5) is exactly original varies without;What public transport train station to be reconstructed (refers to Fig. 4, Fig. 5, figure with regard to 1 km length 6)。
Main body railway carriage (6) length, wheel and chassis facility and other railway carriages are just the same, and simply railway carriage center section is wide The room for the split railway carriage (7) for having dug out a ship shape that is divided into two is spent, such main body railway carriage (6) is exactly that half has railway carriage, Height is as other cars, and split railway carriage (7) room of ship shape is exactly average, and as flat car, but outside has more 10 upwards again Many centimeters of side, for keeping a grip on split railway carriage (7);Main body railway carriage (6) front is provided with draw hook hydraulic jack (8) and movable hook Digital control center is provided with hydraulic jack (9), railway carriage, for controlling draw hook hydraulic jack (8), movable hook hydraulic jack (9), traction telescopic mast (10A), digital control center controls the starting of traction electric machine (14), speed, and digital control center is also Control split railway carriage adhesion wheel (12), the brake gear of split railway carriage driven wheel (13) and split railway carriage bus stop hydraulic pressure Damping oil cylinder (16);Main body railway carriage (6) regardless of one side have door fenestrate as other railway carriages, one side and the split of division Railway carriage (7) equally has door fenestrate, as subway door, is multiple tracks;The door of main body railway carriage (6) and the door of split railway carriage (7) are pair It is accurate, can respective automatic switch.
Split railway carriage (7) is overlooked as ship shape, and shorter than main body railway carriage (6), case top is easy on split railway carriage stress top (7A) Put split facility;Bottom is flat to contact and be placed on without wheel, and the room of the split railway carriage (7) of main body railway carriage (6) ship shape Face;There is door fenestrate as wanting the one side of division with main body railway carriage (6), be multiple tracks as subway door;The door of main body railway carriage (6) It is in alignment with the door of split railway carriage (7), can respective automatic switch;Regardless of one side equally have door fenestrate, and door and The same method of switching of subway door, split railway carriage inlet/outlet (7B);To day provided with 8 wheels on top, wherein it is driven to have 6 Wheel, split railway carriage driven wheel (13) is one group of back;Traction electric machine (14) is provided with sprocket wheel, and driving chain (11) drives Split railway carriage adhesion wheel (12) only one of which, another is driven pulley, in addition the setting phase of also one traction electric machine (14) Instead;The both sides of so hanger rail (3) respectively have a driving wheel, a driven pulley to be exactly one group of front, traction split railway carriage (7) Walk about;The front of split railway carriage (7) is additionally provided with traction main force's post (10), traction telescopic mast (10A);The work of main body railway carriage (6) Dynamic hook hydraulic jack (9) shortens, and draw hook hydraulic jack (8) is retracted, and split railway carriage (7) is just separated with main body railway carriage (6) (A for referring to Fig. 3);The movable hook hydraulic jack (9) of main body railway carriage (6) increases, and draw hook hydraulic jack (8) is released, point Body railway carriage (7) just closes up with main body railway carriage (6);The hook of movable hook hydraulic jack (9) hook up to draw main force's post (10) when Wait, digital control center just makes traction telescopic mast (10A) stretch out, so draw main force's post (10) in preceding, traction telescopic mast (10A) keeps a grip on the hook of movable hook hydraulic jack (9) after, and split railway carriage (7) " has been connected as a single entity " with regard to main body railway carriage (6) and (referred to Fig. 3 B).
When train will enter the station, digital control center control is slowed down, and causing 60 kilometers of speed per hour, (such as 120 kilometers of speed per hour, digital control Center will control split railway carriage (7) to run through that more than 200 meters at 30 seconds), the adhesion wheel on split railway carriage (7) top (12) and after hanger rail (3) contact digital control center just makes movable hook hydraulic jack (9) shorten, draw hook hydraulic jack (8) Retract, because beginning to deviate after hanger rail (3) is parallel with rail on ground (5) about 100 meters, while have the upward slope of 3--4 degree, Digital control center just makes split railway carriage adhesion wheel (12), split railway carriage driven wheel (13) start brake mode, this time-division The weight of body railway carriage (7) (refers to Fig. 2) on hanger rail (3) entirely, after complete and main body railway carriage (6) is separated, split railway carriage (7) side Side of braking goes up a slope, turns, and the speed of split railway carriage (7) is slow soon to get off, hanger rail (3) be exactly after 300 meters it is flat, Speed is completely slow to 800 meters gets off, and has at this moment arrived split railway carriage bus stop (15);Split railway carriage (7) just goes up hanger rail (3) digital control center just makes split railway carriage bus stop hydraulic shock-absorption oil cylinder (16) stretch when, split railway carriage (7) traction Main force's post (10) is just tangled, and first railway carriage stops;When split railway carriage (7) just upper hanger rail (3), digital material controlling center is just Second railway carriage being first parked in station, having gone up good person, installed goods is made departing from split railway carriage bus stop hydraulic shock-absorption oil cylinder (16), The motor code power started on traction electric machine (14), second railway carriage is little, but descending all the way, will walk faster and faster, in digital control Under the control of the heart, more than 200 meters (many parts are to bow out) is covered within 1 minute, just the main body railway carriage with 60 kilometers per minute (6) merge, while hook (B for referring to Fig. 3) by the hook of draw hook hydraulic jack (8) on main body railway carriage (6), at this moment hanger rail (3) Had started to after turning it is parallel with rail on ground (5), then through one section of parallel descending, split railway carriage (7) main body railway carriage (6) to On have more under " management " on 10 centimeters of sides, smoothly fall on the room of main body railway carriage (6), completely disengage from hanger rail (3), hanger rail (3) also without.
Split railway carriage (7) and main body railway carriage (6) are generally placed upon section second from the bottom or Section three, and can only go ahead;From The people of origin-to-destination is sitting in former sections, and they will not just be called broadcast exposure of getting on or off the bus;Split railway carriage (7) is by draw hook liquid The hook of compressing cylinder (8) is hooked, and traction main force's post (10) is preceding, and traction telescopic mast (10A) stretches out at once keeps a grip on movable hook liquid after The hook of compressing cylinder (9), split railway carriage (7) inherently comes on the run, is hooked and has added power as relay race, but hydraulic pressure subtracts Shake, vibrations will not be big;Digital control center notes that driver can full speed ahead simultaneously;Meet station is not parking just can be by first point Railway carriage leaves, and servant, lower goods can take your time;And take away the second point railway carriage for being loaded with people, main body railway carriage (6) and split car After case (7) fits like a glove, the door communicated is opened, the people of split railway carriage (7) respectively looks for each seat into main body railway carriage (6);It is next The master worker that the people to be got off that stands hastens to enter goods above and below split railway carriage (7) will also do soon, be arrived at a station again after a few minutes.
What the major station of public transport train provincial city still to be stopped, because people up and down is too many, and to add water and add each Plant articles for use.Chengdu to Guangzhou is suppose, just only Chongqing, Kweiyang, Changsha, the 4th terminal of arriving that stops;There is more than 100 station Do not stop, but each station can go up servant, can goods up and down, both people's convenience to remote mountain area, can make train contained again Express Mail Service be changed into the fast special delivery of iron to each small station, a small amount of byproduct of farmers' can quickly go down town to the dining table of relatives; Scholar's weekend in the mountain area (railway station periphery) read in big city can be gone home;Also to illustrate in addition:Main body railway carriage (6) and split railway carriage (7) must unified standard standard size, be easy to all trains general;High ferro will do public transport train, The unified and standard of high standard is more wanted, could be general.

Claims (3)

1. public transport train, it is characterised in that:A part of phase that mixed mud building 1 is built up in the middle of larger " door " shape, " door " volume To thiner, at " door " post and " door " post on both sides one section it is more abundant, " door " post leaves one " seam " at " door " volume;7 The top half of font suspension hook 2 extend into that " seam " is inner, and loins is fastened on the abundant place of " door " volume with several screws;The upper half of hanger rail 3 Part is " H " shape, and top half is being kissed as the L of left and right two;The top half of hanger rail 3 is just stretched into the bottom of 7 font suspension hooks 2 In the middle of " H " shape, fastened with several screws;Xian Shangzhui roads, powered wire 4, rail on ground 5 are exactly original vary without;It is public It is long with regard to 1 km that friendshipization train station to be reconstructed;
The length of main body railway carriage 6, wheel and chassis facility and other railway carriages are just the same, and simply railway carriage center section is one point of width For the room of the two split railway carriages 7 for having dug out a ship shape, such main body railway carriage 6 is exactly that half has railway carriage, highly and other Car is the same, and the room of split railway carriage 7 of ship shape is exactly average, and as flat car, but outside has more 10 centimeters of side upwards again, is used for Keep a grip on split railway carriage 7;The front of main body railway carriage 6 is provided with draw hook hydraulic jack 8 and movable hook hydraulic jack 9, railway carriage provided with number Word control centre, for controlling draw hook hydraulic jack 8, movable hook hydraulic jack 9, traction telescopic mast 10A, digital control center Starting, the speed of traction electric machine 14 are controlled, digital control center also controls split railway carriage adhesion wheel 12, split railway carriage driven The brake gear and split railway carriage bus stop hydraulic shock-absorption oil cylinder 16 of wheel 13;Main body railway carriage 6 regardless of one side and other railway carriages Equally there is door fenestrate, the one side of division has door fenestrate as split railway carriage 7, is multiple tracks as subway door;Main body railway carriage What 6 door and the door of split railway carriage 7 were in alignment with, can respective automatic switch.
2. public transport train according to claim 1, it is characterised in that:Split railway carriage 7 is overlooked as ship shape, than main body railway carriage (6) shorter, split railway carriage stress top 7A is easy to case top to put split facility;Bottom is flat without wheel, and the ship shape of main body railway carriage 6 The room of split railway carriage 7 contact and be placed on above;There is door fenestrate as wanting the one side of division with main body railway carriage 6, and subway door Equally, it is multiple tracks;What the door of main body railway carriage 6 and the door of split railway carriage 7 were in alignment with, can respective automatic switch;Regardless of one Face equally has door fenestrate, and method of switching of the door as subway door, split railway carriage inlet/outlet 7B;On top 8 are provided with to day Wheel, wherein it is driven pulley to have 6, split railway carriage driven wheel 13 is one group of back;Traction electric machine 14 is provided with sprocket wheel, passes Dynamic chain 11 drives the only one of which of split railway carriage adhesion wheel 12, and another is driven pulley, in addition also one traction electric machine 14 Setting it is opposite;So the both sides of hanger rail 3 respectively have a driving wheel, a driven pulley to be exactly one group of front, draw split car Case 7 is walked about;The front of split railway carriage 7 is additionally provided with traction main force post 10, traction telescopic mast 10A;The movable hook liquid of main body railway carriage 6 Compressing cylinder 9 shortens, and draw hook hydraulic jack 8 is retracted, and split railway carriage 7 is just separated with main body railway carriage 6;The work of main body railway carriage 6 Dynamic hook hydraulic jack 9 increases, and draw hook hydraulic jack 8 is released, and split railway carriage 7 just closes up with main body railway carriage 6;Movable hook liquid When the hook of compressing cylinder 9 hook up to traction main force post 10, digital control center just makes traction telescopic mast 10A stretch out, and so leads Draw main force's post 10 preceding, traction telescopic mast 10A keeps a grip on the hook of movable hook hydraulic jack 9 after, and split railway carriage 7 is with regard to main body railway carriage 6 " being connected as a single entity ".
3. public transport train according to claim 1, it is characterised in that:When train will enter the station, digital control center control Slow down, cause 60 kilometers of speed per hour, digital control center just makes work after the adhesion wheel 12 on the top of split railway carriage 7 and the contact of hanger rail 3 Dynamic hook hydraulic jack 9 shortens, and draw hook hydraulic jack 8 is retracted because 0 meter of hanger rail 3 about 1 () parallel with rail on ground 5 with After begin to deviate, while there is the upward slope of 3--4 degree, digital control center just make split railway carriage adhesion wheel 12, split railway carriage from Motor car wheel 13 starts brake mode, and at this moment the weight of split railway carriage 7 is complete on hanger rail 3, after complete and main body railway carriage 6 is separated, point Body railway carriage 7 goes up a slope, turned in brake, and the speed of split railway carriage 7 is slow soon to get off, and hanger rail 3 is exactly to put down after 300 meters , to 800 meters at speed is completely slow gets off, at this moment arrived split railway carriage bus stop 15;On split railway carriage 7 is firm during hanger rail 3 Digital control center just makes split railway carriage bus stop hydraulic shock-absorption oil cylinder 16 stretch, and the traction of split railway carriage 7 main force post 10 is just Tangled, first railway carriage stops;When the just upper hanger rail 3 of split railway carriage 7, digital control center just make first be parked in station, Through upper good person, the second railway carriage for installing goods departing from split railway carriage bus stop hydraulic shock-absorption oil cylinder 16, traction electric machine 14, second have been started Motor code power on railway carriage is little, but descending all the way, will walk faster and faster, and under the control at digital control center, cover within 1 minute More than 200 meters, just the main body railway carriage 6 with 60 kilometers per minute merge, while by draw hook hydraulic jack 8 on main body railway carriage 6 Hook is hooked, and at this moment hanger rail 3 has started to parallel with rail on ground 5 after turning, then through one section of parallel descending, split railway carriage 7 is in master Body railway carriage 6 is had more under " management " on more than 10 centimeters of side upwards, is smoothly fallen on the room of main body railway carriage 6, is completely disengaged from hanger rail 3, hanger rail 3 also without.
CN201710492561.1A 2017-06-26 2017-06-26 Public transport train Pending CN107264537A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710492561.1A CN107264537A (en) 2017-06-26 2017-06-26 Public transport train

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710492561.1A CN107264537A (en) 2017-06-26 2017-06-26 Public transport train

Publications (1)

Publication Number Publication Date
CN107264537A true CN107264537A (en) 2017-10-20

Family

ID=60068453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710492561.1A Pending CN107264537A (en) 2017-06-26 2017-06-26 Public transport train

Country Status (1)

Country Link
CN (1) CN107264537A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1366811A (en) * 1963-05-06 1964-07-17 Automatisme & Technique Continuous train
DE3136858A1 (en) * 1981-09-14 1983-03-31 Klaus Dipl.-Ing. 1000 Berlin Homann Track-bound vehicle with transferrable transport component for transportation without intermediate stops in a local traffic system which has a number of stopping points
DE4436194A1 (en) * 1994-10-11 1996-04-18 Rasmus Dr Krevet Passenger carriage for magnetic levitation rail vehicle
CN101152870A (en) * 2006-09-30 2008-04-02 上海外国语大学附属大境中学 Method by which passenger can be on-off without stopping train
CN201405876Y (en) * 2009-06-08 2010-02-17 蔡长茂 Device for embarking and debarking passengers quickly without need of stopping train
CN102442322A (en) * 2011-03-05 2012-05-09 杜文娟 Rapid passenger train structure combining a single-rail short-distance train with a nonstop train
CN104908753A (en) * 2014-05-30 2015-09-16 赵毅 Large-transport-capacity nonstop rail traffic system
CN105416316A (en) * 2015-10-14 2016-03-23 郑州大学 Passenger shuttle bus for fixed-wheel external electric-driven non-stop cyclic running railway train

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1366811A (en) * 1963-05-06 1964-07-17 Automatisme & Technique Continuous train
DE3136858A1 (en) * 1981-09-14 1983-03-31 Klaus Dipl.-Ing. 1000 Berlin Homann Track-bound vehicle with transferrable transport component for transportation without intermediate stops in a local traffic system which has a number of stopping points
DE4436194A1 (en) * 1994-10-11 1996-04-18 Rasmus Dr Krevet Passenger carriage for magnetic levitation rail vehicle
CN101152870A (en) * 2006-09-30 2008-04-02 上海外国语大学附属大境中学 Method by which passenger can be on-off without stopping train
CN201405876Y (en) * 2009-06-08 2010-02-17 蔡长茂 Device for embarking and debarking passengers quickly without need of stopping train
CN102442322A (en) * 2011-03-05 2012-05-09 杜文娟 Rapid passenger train structure combining a single-rail short-distance train with a nonstop train
CN104908753A (en) * 2014-05-30 2015-09-16 赵毅 Large-transport-capacity nonstop rail traffic system
CN105416316A (en) * 2015-10-14 2016-03-23 郑州大学 Passenger shuttle bus for fixed-wheel external electric-driven non-stop cyclic running railway train

Similar Documents

Publication Publication Date Title
CN203118227U (en) Pedestrian flow and traffic flow based intelligent traffic control system
CN205059593U (en) System for train does not stop and realizes that passenger gets on or off bus
CN203977321U (en) A kind of liftable brake flap based on speed of a motor vehicle sensing control
CN205153653U (en) Multilayer garage parking
CN106740975A (en) A kind of train does not stop the method for upper and lower passenger
CN107035179A (en) A kind of side parking double-deck three-dimensional
CN206971837U (en) A kind of new double-layer parking field
CN103924529A (en) Rolling drag device and construction method thereof
CN109501810A (en) A kind of not parking passenger safety Transfer System of high-speed rail and its control method
CN206874017U (en) One kind can preengage radial column and knee type parking systems
CN203268033U (en) Exchange carriage allowing passengers to get on or get off without parking during running of passenger train
CN204416849U (en) Multi-storied garage double-decker live ladder
CN205187048U (en) On -vehicle automatic rubbish liter turns over mechanism
KR102423656B1 (en) Aerial cableway transport installation and method
CN107264537A (en) Public transport train
CN204081596U (en) Up-down cross sliding type multi-storied garage
CN105329682B (en) Car carrying equipment
CN105257040B (en) A kind of and supporting multi-storied garage of building
CN209397984U (en) A kind of wall type stereo garage suitable for residential area
CN206797385U (en) The ultralight overhead rail train of the outer power of compartment side hanging
CN105545043B (en) Building Elevator secret multi-storied garage
CN203807952U (en) Rolling drag device
CN203222404U (en) Double-station automobile elevator of underground parking lot
CN207526184U (en) Shared bicycle mobile parking library
CN209308507U (en) A kind of bus lifting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020