CN107223509A - The construction method that the improvement of arbor tree ball isolated island method soil in-situ is repaired - Google Patents

The construction method that the improvement of arbor tree ball isolated island method soil in-situ is repaired Download PDF

Info

Publication number
CN107223509A
CN107223509A CN201710404280.6A CN201710404280A CN107223509A CN 107223509 A CN107223509 A CN 107223509A CN 201710404280 A CN201710404280 A CN 201710404280A CN 107223509 A CN107223509 A CN 107223509A
Authority
CN
China
Prior art keywords
improvement
soil
arbor
isolated island
cave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710404280.6A
Other languages
Chinese (zh)
Other versions
CN107223509B (en
Inventor
刘洪峰
叶子易
张华�
王磊
代琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI LANDSCAPE ARCHITECTURE Corp
Original Assignee
SHANGHAI LANDSCAPE ARCHITECTURE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI LANDSCAPE ARCHITECTURE Corp filed Critical SHANGHAI LANDSCAPE ARCHITECTURE Corp
Priority to CN201710404280.6A priority Critical patent/CN107223509B/en
Publication of CN107223509A publication Critical patent/CN107223509A/en
Application granted granted Critical
Publication of CN107223509B publication Critical patent/CN107223509B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Botany (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention discloses the construction method that a kind of improvement of arbor tree ball isolated island method soil in-situ is repaired, the construction method comprises the following steps:Step 1, arbor pruning, step 2, arbor bracing and reinforcing, step 3 reserve tree ball isolated island, step 4, excavate improvement cave, step 5, set annular drainage ditch, step 6, set ventilative observation tube, step 7, the improvement of soil formula, 8, improved soil backfill.By step 4 excavate the improvement soil banked up of cave by scarifying, drying, removal of impurities, it is broken after addition improvement medium and turn uniform in proportion, obtain improved soil.Step backfills the improved soil that step 7 is obtained in the improvement cave of excavation, and the improved soil of backfill is layered and consolidated.This method carries out improvement reparation by original position soil evolutionary operation to arbor soil, the process such as eliminates the related balling-up of tree grafting growth, wraps up, lifts by crane, transporting, heeling in, reducing influence of the improvement construction to original arbor, improve the survival rate of improvement arbor.

Description

The construction method that the improvement of arbor tree ball isolated island method soil in-situ is repaired
Technical field
The invention belongs to garden soil improvement field, and in particular to a kind of arbor tree ball isolated island method soil in-situ improvement is repaired Construction method.
Background technology
Soil is as the basis of plant growth, and its various physicochemical property is directly connected to healthy growth and the flora of plant Fall the formation of landscape effect.As greenery patches opens the influence with mankind's activity, there is soil compression, plate in increasing greenery patches Knot, fertility are not enough, or even the situation such as soil pollution, have had a strong impact on growth and the green landscape effect of greenbelt plants.Soil changes It is good to improve soil physico-chemical property, increase soil fertility, it is that ornamental plant creates good growing environment, with important meaning Justice., it is necessary to first be transplanted, heeled in the arbor in improvement construction area in traditional soil improvement construction, underground soil is treated Earth improvement recovers field planting again after the completion of repairing.Due to the sequence of operations such as transplanting, heeling in root system, branches and leaves of arbor plant etc. all It can cause largely to damage, thus, fine maintenance is needed after transplanting, plant recovery after field planting is relatively slow, conserve so as to result in The problems such as managing cumbersome.
The content of the invention
For problems of the prior art, the present invention provides a kind of arbor tree ball isolated island method soil in-situ improvement and repaired Construction method, the present invention in soil improvement repairing construction, be farthest reduction improvement reparation initial stage to greening arbor Influence, accelerate and promote improvement repair after afforest arbor growth recovery, explore greening arbor original position improvement repair apply Work technology, and achieve good improved effect.
To achieve the above object, the present invention uses following technical scheme:
A kind of construction method that arbor tree ball isolated island method soil in-situ improvement is repaired, the construction method comprises the following steps:
Step 1, arbor pruning:Evolutionary operation needs to carry out trimming and finishing to trees before carrying out, remove withered branch, sick branch, Overstocked branch, the branch of excessive growth and bud petal, overall hat leaf pruning rate is 1/3-the 1/4 of complete crown;
Step 2, arbor bracing and reinforcing:Bracing and reinforcing, steel are carried out to tree body using steel wire stay bolt for the arbor after pruning The position of tying height is located at the 2/3 of trunk height on silk, a drawstring is fixed in arbor upwind side, wherein a drawstring The direction that must be in the wind is fixed, and remaining drawstring is uniformly distributed;
Step 3, tree ball isolated island is reserved:The reserved size of tree ball isolated island is determined according to the size of arbor specification, with the arbor diameter of a cross-section of a tree trunk 1.3 meters above the ground The 10-15 times of reserved size as tree ball isolated island, the reserved size maximum for setting ball isolated island is no more than the margin line of crown mapping, when The root system vigorous arbor kind of crosswise development or rare rare seeds are run into, the reserved size of tree ball isolated island can be extended to arbor 15 times of the diameter of a cross-section of a tree trunk 1.3 meters above the ground, maximum is no more than the margin line of crown mapping;
Step 4, improvement cave is excavated:Soil Surrounding outside tree ball isolated island is excavated and concentrated area is banked up, opening for cave is improved Dig width be 35-45cm, improvement cave cutting depth be 80 ~ 120cm;Such as more than diameter 5cm tree root in digging process, Note carrying out reservation protection;
Step 5, annular drainage ditch is set:Nonwoven layer is set in the improvement cave bottom of excavation, rubble is set in nonwoven layer Layer, the nonwoven layer parcel metalling formation annular drainage ditch, the width of the annular drainage ditch is identical with improvement cave, depth Not less than 10cm, the annular drainage ditch is connected with externally drained blind pipe;When annular drainage ditch is laid, notice that rubble spreads paving equal Even, non-woven fabrics overlap joint does not leak tightly, is connected unobstructed with externally drained blind pipe;
Step 6, ventilative observation tube is set:The symmetrically placed at least two ventilative observation tubes in the improvement cave, the ventilative sight Examine in the bottom insertion drainage blanket of pipe, backfill is exposed on the top of ventilative observation tube;
Step 7, soil formula is improved:By step 4 excavate the improvement soil banked up of cave by scarifying, drying, removal of impurities, it is broken after by The volume ratio of original soil and improvement medium is 5:3 or 5:4 ratio addition improvement medium is simultaneously turned uniformly, obtains improved soil,
Step 8, improved soil is backfilled:The improved soil that step 7 is obtained is backfilled in the improvement cave of excavation, by the improvement of backfill Soil layering consolidate, can not void fill out.
The particle diameter of the step 5 medium stone layer is 2-6cm.
Punched on the pvc pipe that ventilative observation tube is internal diameter 10-15cm in the step 6, the tube wall of the ventilative observation tube, The outer wall of ventilative observation tube is enclosed with 200g/m2Non-woven fabrics, backfill 8-12cm, one are exposed in the top of the ventilative observation tube As every plant of arbor two ventilative observation tubes of placement, especially big arbor or special seeds can set quantity according to actual conditions increase, see Examining ventilative pipe outer wall non-woven fabrics need to wrap up closely, in its bottom insertion rubble drainage blanket.
In the step 7 φ is checked whether there is during soil scarifying>10cm stone, through drying, soil breaking to φ ≤ 5cm, improved soil must fully scarifying, remove the stone that diameter is more than 10cm, soil block particle be crushed to less than 5cm through drying Fully mixed with improvement medium again afterwards.
Improvement medium in the step 7 is made up of organic substrate, organic fertilizer, coarse sand, desulfurated plaster, the improvement medium Proportioning be:5-6 parts of organic substrates, 3-4 parts of coarse sands, 1 part of organic fertilizer, 0.01 part of desulfurated plaster.Improvement medium changes according to soil Good to be formulated, soil improvement formula specifically can be adjusted determination according to original soil quality, arbor species etc..
The inventive method is suitable for soil improvement construction, big-and-middle-sized arbor or rare rare tree of the diameter of a cross-section of a tree trunk 1.3 meters above the ground in more than 10cm The soil in-situ improvement repair process planted.
Compared with prior art, beneficial effects of the present invention are:
1. the present invention improves cave soil to periphery by way of reserved tree ball isolated island and improved, and combine annular drainage blanket with The mode of ventilative peep hole, carries out improvement in situ to greening arbor, reduces evolutionary operation as far as possible on the basis of improved quality is ensured Influence to arbor, greatly improves arbor survival rate and landscape recovering speed;By way of the reserved tree ball isolated island, it is to avoid pair The transplanting of arbor, the operation such as heel in, the capillary root in can leave tree ball bottom and tree ball isolated island is reduced to Tree root system Damage, it is ensured that arbor maintains preferable water absorbing capacity, greatly improves arbor survival rate and landscape recovering speed;2. in the present invention Construction method is simple to operate, material is universal, wide material sources, strong applicability, is especially suitable for the arbor under ground portion soil intolerant to transplanting Earth is improved, and is conducive to the fast quick-recovery of garden landscape after the protection and improvement construction of trees in situ, is easy to promote the use of;3. lead to Soil progress removal of impurities, scarifying, the formula improvement that cave is improved to arbor periphery are crossed, the soil environment of arbor under ground portion is improved, Ensure growth and the landscape effect of arbor aerial part;4. this method is changed by original position soil evolutionary operation to arbor soil It is good to repair, the process such as the related balling-up of tree grafting growth is eliminated, wraps up, lift by crane, transporting, heeling in, greatly reducing improvement construction Operate influence to original arbor, significantly improve the survival rate of improvement arbor, shorten original place landscape recovering after improvement when Between, improvement constructing operation cost is not only effectively reduced, the cost depletions of arbor in improvement construction are also reduced.
Brief description of the drawings
Fig. 1 is the structure improved profile of arbor tree ball isolated island method soil in-situ of the present invention.
Fig. 2 is Fig. 1 of the present invention A-A direction views.
Embodiment
The construction method that the improvement of the present embodiment arbor tree ball isolated island method soil in-situ is repaired, it is characterised in that the construction method Comprise the following steps:
Step 1, arbor pruning:Evolutionary operation needs to carry out trimming and finishing to trees before carrying out, remove withered branch, sick branch, Overstocked branch, the branch of excessive growth and bud petal, overall hat leaf 1 pruning rate is 1/3-the 1/4 of complete crown;
Step 2, arbor bracing and reinforcing:Bracing and reinforcing, steel are carried out to tree body using the stay bolt of steel wire 2 for the arbor after pruning The position of tying height is located at the 2/3 of trunk height on silk, a drawstring is fixed in arbor upwind side, on arbor;
Step 3, tree ball isolated island is reserved:The reserved size of tree ball isolated island 3 is determined according to the size of arbor specification, with the arbor diameter of a cross-section of a tree trunk 1.3 meters above the ground The 10-15 times of reserved size as tree ball isolated island, the reserved size maximum for setting ball isolated island is no more than the margin line of crown mapping;
Step 4, improvement cave is excavated:Soil Surrounding outside tree ball isolated island is excavated and concentrated area is banked up, opening for cave 4 is improved Dig width be 35-45cm, improvement cave cutting depth be 80 ~ 120cm;
Step 5, annular drainage ditch is set:Nonwoven layer is set in the improvement cave bottom of excavation, rubble is set in nonwoven layer Layer, the nonwoven layer parcel metalling formation annular drainage ditch 5, the width of the annular drainage ditch 5 is identical with improvement cave 4, Depth is not less than 10cm, and the annular drainage ditch is connected with externally drained blind pipe 6;
Step 6, ventilative observation tube is set:The symmetrically placed at least two ventilative observation tubes 7 in the improvement cave, the ventilative sight Examine in the bottom insertion drainage blanket of pipe, backfill is exposed on the top of ventilative observation tube;
Step 7, soil formula is improved:By step 4 excavate the improvement soil banked up of cave by scarifying, drying, removal of impurities, it is broken after by The volume ratio of original soil and improvement medium is 5:3 or 5:4 ratio addition improvement medium is simultaneously turned uniformly, obtains improved soil;
Step 8, improved soil is backfilled:The improved soil that step 7 is obtained is backfilled in the improvement cave of excavation, by the improvement of backfill Soil layering is consolidated.
Preferably, the particle diameter of the present embodiment step 5 medium stone layer is 2-6cm.
It is described ventilative as further preferred, the pvc pipe that observation tube is internal diameter 10-15cm of being breathed freely in the present embodiment step 6 Punched on the tube wall of observation tube, the outer wall of ventilative observation tube is enclosed with 200g/m2Non-woven fabrics, the top of the ventilative observation tube Expose backfill 8-12cm.
As further preferred, φ is checked whether there is during soil scarifying in the present embodiment step 7>10cm stone, Through drying, soil breaking to φ≤5cm.
As still more preferably, the improvement medium in the present embodiment step 7 is by organic substrate, organic fertilizer, coarse sand, desulfurization Gypsum is made, and the proportioning of the improvement medium is:5-6 parts of organic substrates, 3-4 parts of coarse sands, 1 part of organic fertilizer, 0.01 part of desulfurization stone Cream, the proportioning for the improvement medium being adapted according to different Tree Species Selections.
The organic group produced for Huai'an Zhong Nuo developments in agricultural science and technology Co., Ltd that organic substrate is selected in the present embodiment Matter, the company standard that the organic substrate is performed is Q/320801BCN001-2015;Organic fertilizer is built for Shang Haiyuan in the present embodiment The organic fertilizer of organic fertilizer factory production.
The present embodiment must carry out bracing and reinforcing to tree body on request before excavating, and prevent side inverted inclination.During excavation attentively Underground pipelines, prevent from destroying wound by mistake, and soil excavation, scarifying, removal of impurities, crush, puddle improvement medium when note reduce airborne dust, Soil should nearby be concentrated to pick the brickbat cleaned out, stone in stacking, original soil and focus on and be stacked in process points and carry out at unified Reason.
Although above-described embodiment makes specific descriptions to the present invention, come for one of ordinary skill in the art Say, it is understood that can be modified within the spirit and scope for not departing from the present invention based on present disclosure Or improve, these modification and improvement are all within the spirit and scope of the present invention.

Claims (5)

1. the construction method that a kind of improvement of arbor tree ball isolated island method soil in-situ is repaired, it is characterised in that the construction method include with Lower step:
Step 1, arbor pruning:Evolutionary operation needs to carry out trimming and finishing to trees before carrying out, remove withered branch, sick branch, Overstocked branch, the branch of excessive growth and bud petal, overall hat leaf(1)Pruning rate be complete crown 1/3-1/4;
Step 2, arbor bracing and reinforcing:Steel wire is used for the arbor after pruning(2)Stay bolt carries out bracing and reinforcing to tree body, The position of tying height is located at the 2/3 of trunk height on steel wire, and a drawstring is fixed in arbor upwind side;
Step 3, tree ball isolated island is reserved:Tree ball isolated island is determined according to the size of arbor specification(3)Reserved size, with the arbor diameter of a cross-section of a tree trunk 1.3 meters above the ground 10-15 times be used as tree ball isolated island reserved size, set ball isolated island reserved size maximum be no more than crown mapping margin line;
Step 4, improvement cave is excavated:Soil Surrounding outside tree ball isolated island is excavated and concentrated area is banked up, cave is improved(4)'s Excavation width be 35-45cm, improvement cave cutting depth be 80 ~ 120cm;
Step 5, annular drainage ditch is set:Nonwoven layer is set in the improvement cave bottom of excavation, rubble is set in nonwoven layer Layer, the nonwoven layer parcel metalling formation annular drainage ditch(5), the annular drainage ditch(5)Width and improvement cave phase Together, depth is not less than 10cm, the annular drainage ditch and externally drained blind pipe(6)It is connected;
Step 6, ventilative observation tube is set:The symmetrically placed at least two ventilative observation tubes in the improvement cave(7), it is described ventilative The bottom of observation tube is inserted in annular drainage ditch, backfill is exposed on the top of ventilative observation tube;
Step 7, soil formula is improved:By step 4 excavate the improvement soil banked up of cave by scarifying, drying, removal of impurities, it is broken after by The volume ratio of original soil and improvement medium is 5:3 or 5:4 ratio addition improvement medium is simultaneously turned uniformly, obtains improved soil;
Step 8, improved soil is backfilled:The improved soil that step 7 is obtained is backfilled in the improvement cave of excavation, by the improvement of backfill Soil layering is consolidated.
2. the construction method that arbor tree ball isolated island method soil in-situ improvement according to claim 1 is repaired, it is characterised in that The particle diameter of the step 5 medium stone layer is 2-6cm.
3. the construction method that arbor tree ball isolated island method soil in-situ improvement according to claim 1 is repaired, it is characterised in that Observation tube of being breathed freely in the step 6 is to be punched on the pvc pipe that internal diameter is 10-15cm, the tube wall of the ventilative observation tube, breathes freely and sees The outer wall for examining pipe is enclosed with 200g/m2Non-woven fabrics, backfill 8-12cm is exposed on the top of the ventilative observation tube.
4. the construction method that arbor tree ball isolated island method soil in-situ improvement according to claim 1 is repaired, it is characterised in that In the step 7 φ is checked whether there is during soil scarifying>10cm stone, through drying, soil breaking to φ≤5cm.
5. the construction method that arbor tree ball isolated island method soil in-situ improvement according to claim 1 is repaired, it is characterised in that Improvement medium in the step 7 is made up of organic substrate, organic fertilizer, coarse sand, desulfurated plaster, the proportioning of the improvement medium For:5-6 parts of organic substrates, 3-4 parts of coarse sands, 1 part of organic fertilizer, 0.01 part of desulfurated plaster.
CN201710404280.6A 2017-06-01 2017-06-01 Construction method for soil in-situ improvement and restoration by arbor tree ball isolated island method Active CN107223509B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710404280.6A CN107223509B (en) 2017-06-01 2017-06-01 Construction method for soil in-situ improvement and restoration by arbor tree ball isolated island method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710404280.6A CN107223509B (en) 2017-06-01 2017-06-01 Construction method for soil in-situ improvement and restoration by arbor tree ball isolated island method

Publications (2)

Publication Number Publication Date
CN107223509A true CN107223509A (en) 2017-10-03
CN107223509B CN107223509B (en) 2020-12-22

Family

ID=59933907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710404280.6A Active CN107223509B (en) 2017-06-01 2017-06-01 Construction method for soil in-situ improvement and restoration by arbor tree ball isolated island method

Country Status (1)

Country Link
CN (1) CN107223509B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108605788A (en) * 2018-03-31 2018-10-02 江润实业(深圳)有限公司 Big tree high-survival rate complete crown transplanting system and construction method
CN110972788A (en) * 2019-12-13 2020-04-10 四川云辰园林科技有限公司 Micro-domain improvement method for tree pocket waterlogging in urban garden land

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0395321A1 (en) * 1989-04-24 1990-10-31 Holley Brothers (Pty) Limited Amelioration of soil for tree planting
CN102511264A (en) * 2011-12-05 2012-06-27 天津海林园艺环保科技工程有限公司 Coastal mud flat seedling out-of-season crested planting technology
CN106034459A (en) * 2016-06-21 2016-10-26 上海博大园林建设发展有限公司 Songnen plain saline-alkali soil comprehensive improvement method
CN205681963U (en) * 2016-06-04 2016-11-16 山东胜伟园林科技有限公司 The salt-soda soil arbor antibacterial pattern of farming of ventilation
CN206101044U (en) * 2016-10-19 2017-04-19 上海园林(集团)有限公司 A soil amelioration structure that is used for urban afforestation arbor kind plant hole

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0395321A1 (en) * 1989-04-24 1990-10-31 Holley Brothers (Pty) Limited Amelioration of soil for tree planting
CN102511264A (en) * 2011-12-05 2012-06-27 天津海林园艺环保科技工程有限公司 Coastal mud flat seedling out-of-season crested planting technology
CN205681963U (en) * 2016-06-04 2016-11-16 山东胜伟园林科技有限公司 The salt-soda soil arbor antibacterial pattern of farming of ventilation
CN106034459A (en) * 2016-06-21 2016-10-26 上海博大园林建设发展有限公司 Songnen plain saline-alkali soil comprehensive improvement method
CN206101044U (en) * 2016-10-19 2017-04-19 上海园林(集团)有限公司 A soil amelioration structure that is used for urban afforestation arbor kind plant hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108605788A (en) * 2018-03-31 2018-10-02 江润实业(深圳)有限公司 Big tree high-survival rate complete crown transplanting system and construction method
CN110972788A (en) * 2019-12-13 2020-04-10 四川云辰园林科技有限公司 Micro-domain improvement method for tree pocket waterlogging in urban garden land

Also Published As

Publication number Publication date
CN107223509B (en) 2020-12-22

Similar Documents

Publication Publication Date Title
CN101818499B (en) Revegetation system on steep rocky slopes and implementing method thereof
CN104805845B (en) A kind of flexible bank protecting method of feldspathic sandstone natural slope
CN104642054B (en) A kind of big specification Chinese scholar tree transplanting construction method in the north
CN110832964A (en) Building aggregate mine in-situ soil improvement and greening method
CN109122191A (en) Big specification metasequoia complete crown transplants construction method
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN106817944A (en) A kind of anti-drought mountain afforestation structure and greening method
CN110278804A (en) A kind of high steep hard greening side slope system and its application method
CN104294830A (en) Side slope ecological protection and recovery method and arrangement structure
CN107223509A (en) The construction method that the improvement of arbor tree ball isolated island method soil in-situ is repaired
CN113774934A (en) Ecological restoration method for coal gangue slag slope
CN104762946A (en) Filler and method for ecologically repairing damaged mountain
CN107881930A (en) Desert area railway bed both sides engineering and the sapling grid sand-protecting barrier of plant sand prevention
CN112272985A (en) Water-retention green plant construction method and application
CN111657091A (en) Planting method for greening trees and supporting bracket used for method
CN110495279A (en) A kind of afforestation vegetation implantation methods and soil layer construction
CN104412885B (en) Moisture-carrying and planting method of salix psammophila
CN116114546A (en) Water and soil conservation and re-greening method for alpine region
CN213153237U (en) Device for transplanting mature shrubs in arid and semi-arid regions
CN204298833U (en) Protecting slope ecology and recovery arrangement
CN208768521U (en) The shoal soil moved in improve the original of sloping bank greening near water transplants system
CN211037008U (en) Comprehensive treatment system for slope slag-adhering under plateau area road
CN114402733A (en) Construction method for changing hillside land into terrace
CN113767806A (en) Karst region stony desertification land comprehensive treatment method
CN106489343A (en) A kind of utilization sludge makes the method that desert or desertification soil are reclaimed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant