CN107160162A - A kind of sensor chip assembles equipment - Google Patents

A kind of sensor chip assembles equipment Download PDF

Info

Publication number
CN107160162A
CN107160162A CN201710475648.8A CN201710475648A CN107160162A CN 107160162 A CN107160162 A CN 107160162A CN 201710475648 A CN201710475648 A CN 201710475648A CN 107160162 A CN107160162 A CN 107160162A
Authority
CN
China
Prior art keywords
sensor chip
mounting seat
feeding
sensor
driving element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710475648.8A
Other languages
Chinese (zh)
Other versions
CN107160162B (en
Inventor
王钊
吴旭红
龙小军
张海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Desay Automation Technology Co Ltd
Original Assignee
Huizhou Desay Automation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Desay Automation Technology Co Ltd filed Critical Huizhou Desay Automation Technology Co Ltd
Priority to CN201710475648.8A priority Critical patent/CN107160162B/en
Publication of CN107160162A publication Critical patent/CN107160162A/en
Application granted granted Critical
Publication of CN107160162B publication Critical patent/CN107160162B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/004Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automatic Assembly (AREA)

Abstract

Equipment is assembled present invention is disclosed a kind of sensor chip, it includes sensor chip assembling frame, sensor chip feeding device, sensor chip grabbing device, height measuring device and coat peeling unit;Sensor chip feeding device is arranged at sensor chip assembling frame;Sensor chip grabbing device is arranged at sensor chip assembling frame, and positioned at the side of sensor chip feeding device, sensor chip grabbing device respective sensor chip feeding device;Height measuring device is arranged at sensor chip assembling frame, and coat peeling unit is arranged at sensor chip assembling frame, and coat peeling unit is located at the side of height measuring device, coat peeling unit respective sensor chip grabbing device.The standby automatic charging first sensor chip of sensor of the invention chipset installing, and first sensor chip is assembled to protecgulum, the assembler of enterprise is reduced, the production efficiency of enterprise reduces the labor intensity of assembler.

Description

A kind of sensor chip assembles equipment
Technical field
The present invention relates to automation equipment field, more particularly to a kind of sensor chip assembling equipment.
Background technology
More and more extensive with the application of mobile unit, on-vehicle lens quantity required is also to greatly promote.At present, it is existing On-vehicle lens assembly line is taken manually is assembled to protecgulum by first sensor chip and second sensor chip.Such a assemble method Enterprise is needed under more assembler, the production efficiency of enterprise, and the labor intensity of assembler is big.
The content of the invention
In order to solve the above-mentioned technical problem, equipment is assembled present invention is disclosed a kind of sensor chip, it includes sensor Chip kludge frame, sensor chip feeding device, sensor chip grabbing device, height measuring device and coat peeling unit;Sensor Chip kludge frame connects protecgulum charging equipment by conveyer respectively and the installing of second sensor chipset is standby;Sensor core Piece feeding device is arranged at sensor chip assembling frame, and positioned at the side of conveyer;Sensor chip grabbing device is set Sensor chip assembling frame is placed in, and positioned between sensor chip feeding device and conveyer, sensor chip crawl is filled Put respective sensor chip feeding device and conveyer respectively;Height measuring device is arranged at sensor chip assembling frame, surveys high Device is located at the opposite side of conveyer, height measuring device correspondence conveyer;Coat peeling unit is arranged at sensor chip kludge Frame, coat peeling unit is located at the opposite side for passing conveyer, and coat peeling unit is located at the side of height measuring device, and coat peeling unit is to inductive sensing Device chip grabbing device.
According to an embodiment of the present invention, the sensor chip feeding device include feeding mounting seat, storehouse mechanism, Feeding drive mechanism and clamping body;Feeding mounting seat is arranged at sensor chip assembling frame, and on sensor chip Expect the side of device;Storehouse mechanism is located at the side of feeding mounting seat;Feeding drive mechanism is arranged at feeding mounting seat, and is located at The side of storehouse mechanism, feeding drive mechanism correspondence storehouse mechanism and sensor chip grabbing device;Clamping body is arranged at Expect the side of mounting seat, and positioned at the side of feeding drive mechanism, clamping body correspondence feeding drive mechanism.
According to an embodiment of the present invention, above-mentioned storehouse mechanism includes storage mounting seat, stock shelf and storage driving member Part;Mounting seat of storing in a warehouse is located at the side of feeding mounting seat;Stock shelf is arranged at storage mounting seat, stock shelf correspondence feeding driving machine Structure;Storage driving element is arranged at storage mounting seat, the output end connection stock shelf of storage driving element.
According to an embodiment of the present invention, above-mentioned storehouse mechanism also includes first sensor, and first sensor is arranged at Sensor chip assembles frame, and positioned at the side of stock shelf.
According to an embodiment of the present invention, above-mentioned feeding drive mechanism includes loading guide, feeding driving element and drawing Materials and parts;Loading guide is layed in feeding mounting seat, and positioned at the side of storehouse mechanism;Feeding driving element is arranged at feeding installation Seat, and positioned between loading guide and storehouse mechanism;Draw materials and parts to be arranged at loading guide, draw materials and parts connection feeding driving element Output end, draws materials and parts correspondence storehouse mechanism and sensor chip grabbing device.
According to an embodiment of the present invention, above-mentioned feeding drive mechanism also includes second sensor, and second sensor is set Sensor chip assembling frame is placed in, and positioned at the side of loading guide, second sensor correspondence draws materials and parts.
According to an embodiment of the present invention, above-mentioned clamping body includes clamping driving element and Fastener;Clamping drives Element is arranged at feeding mounting seat, and positioned at the side of loading guide;Fastener is arranged at the output end of clamping driving element, card Tight part correspondence draws materials and parts.
According to an embodiment of the present invention, the sensor chip grabbing device includes the first catching robot arm, the One crawl fixture, the first crawl CCD, barcode scanning gun and the first electronic clamping jaw of crawl;First catching robot arm is arranged at sensing Device chip kludge frame, and positioned between sensor chip feeding device and conveyer;First crawl fixture is arranged at the One catching robot arm;First crawl CCD is arranged at the first crawl fixture, and respective sensor chip feeding device;Barcode scanning Rifle is arranged at the first crawl fixture, and positioned at the first crawl CCD side, barcode scanning gun respective sensor chip feeding device; The first electronic clamping jaw of crawl is arranged at the first crawl fixture, and between the first crawl CCD and barcode scanning gun, the first crawl is electronic Clamping jaw respective sensor chip feeding device and conveyer.
According to an embodiment of the present invention, above-mentioned height measuring device includes surveying high mounting seat, surveys High Linear slide rail, surveys high move Moving part, the high driving element of survey and the high sensor of survey;Survey high mounting seat and be arranged at sensor chip assembling frame, survey high installation seat In the opposite side of conveyer;Survey High Linear slide rail and be arranged at the high mounting seat of survey, survey high moving member and be arranged at survey High Linear slide rail, Survey high moving member and be located at the top for surveying high mounting seat;Survey high driving element and be arranged at the high mounting seat of survey, survey high driving element and be located at The side of High Linear slide rail is surveyed, high moving member is surveyed in the output end connection for surveying high driving element;Survey high sensor and be arranged at the high shifting of survey Moving part, surveys high sensor and is located at the side for surveying high driving element, surveys high sensor correspondence conveyer.
According to an embodiment of the present invention, above-mentioned coat peeling unit includes dyestripping mounting seat, adhesive tape placement wheel, adhesive tape recovery Wheel, dyestripping driving element, dyestripping synchronous pulley and electrostatic ionic blower duct;Dyestripping mounting seat is arranged at sensor chip assembling Frame, dyestripping mounting seat is located at the opposite side of conveyer, and dyestripping mounting seat is located at the side of height measuring device;Adhesive tape is placed wheel and set It is placed in dyestripping mounting seat;Adhesive tape recycling round is arranged at dyestripping mounting seat, and adhesive tape recycling round is located at the side that adhesive tape places wheel;Dyestripping Driving element is arranged at dyestripping mounting seat, and dyestripping driving element is located at the side of adhesive tape recycling round;Dyestripping synchronous pulley covers respectively Located at adhesive tape recycling round and dyestripping driving element;Electrostatic ionic blower duct is arranged at dyestripping mounting seat, electrostatic ionic blower Road is located at adhesive tape and placed between wheel and adhesive tape recycling round.
Compared with prior art, the present invention has advantages below
The standby automatic charging first sensor chip of sensor of the invention chipset installing, and by first sensor chipset Protecgulum is filled to, the assembler of enterprise is reduced, the production efficiency of enterprise reduces the labor intensity of assembler.
Brief description of the drawings
Fig. 1 is the schematic diagram of the on-vehicle lens production and assembly line of one embodiment of the invention.
Fig. 2 is another schematic diagram of the on-vehicle lens production and assembly line of one embodiment of the invention.
Fig. 3 assembles the schematic diagram of equipment for the sensor chip of one embodiment of the invention.
Fig. 4 is the schematic diagram of the sensor chip grabbing device of one embodiment of the invention.
Fig. 5 is the schematic diagram of the sensor chip grabbing device of one embodiment of the invention.
Fig. 6 is the schematic diagram of the height measuring device of one embodiment of the invention.
Fig. 7 is the schematic diagram of the coat peeling unit of one embodiment of the invention.
Embodiment
Multiple embodiments of the present invention, as clearly stated, the details in many practices will be disclosed with schema below It will be explained in the following description.It should be appreciated, however, that the details in these practices is not applied to limit the present invention.
On its " first sensor chip " used herein, " second sensor chip " etc., not especially censure secondary The meaning of sequence or cis-position, be also not used to limit the present invention, its just for the sake of difference with constructed term describe component or Operation.
Fig. 1 and Fig. 2 is referred to, it is respectively two signals of the on-vehicle lens production and assembly line of one embodiment of the invention Figure.As illustrated, assembling equipment present invention is disclosed a kind of sensor chip, it is used for production and assembly on-vehicle lens, sensor The standby automatic charging first sensor chip of chipset installing, and first sensor chip is assembled to protecgulum and position location. Protecgulum charging equipment 1, the sensor chip that on-vehicle lens production and assembly line includes sequentially connecting by conveyer 4 assemble equipment 2 and second sensor chipset installing standby 3.At least a protecgulum charging tray 6 is placed in protecgulum charging equipment 1, at least a first sensor Chip tray 7 is placed in sensor chip assembling equipment 2, and an at least second sensor chip tray 8 is placed in second sensor chip Assemble equipment 3;Thereafter, the automatic charging protecgulum of protecgulum charging equipment 1 is to conveyer 4, and conveyer 4 transmits protecgulum to the first biography Sensor chip assembles 2 equipment;Thereafter, first sensor chip is assembled to protecgulum by sensor chip assembling equipment 2;Thereafter, pass Device 4 is sent to transmit protecgulum and first sensor chip to second sensor chipset installing standby 3, the installing of second sensor chipset Second sensor chip is assembled to protecgulum by standby 3, and second sensor chip is located at the top of first sensor chip;Thereafter, Two sensor chips assemble the burning first sensor chip of equipment 3 and second sensor chip, complete the work of assembling on-vehicle lens Make.
Refer to Fig. 3 in the lump again, it assembles the schematic diagram of equipment 2 for the sensor chip of one embodiment of the invention.As schemed Show, sensor chip assembling equipment 2 includes sensor chip assembling frame 21, sensor chip feeding device 22, sensor core Piece grabbing device 23, height measuring device 24 and coat peeling unit 25.Sensor chip assembling frame 21 is connected respectively by conveyer 4 Protecgulum assembles frame 11 and second sensor chipset installing standby 3.Sensor chip feeding device 22 is arranged at sensor chip Frame 21 is assembled, sensor chip feeding device 22 is located at the side of conveyer 4.Sensor chip grabbing device 23 is arranged at Sensor chip assembles frame 21, and sensor chip grabbing device 23 is located at sensor chip feeding device 22 and conveyer 4 Between, the difference respective sensor chip of sensor chip grabbing device 23 feeding device 22 and conveyer 4.Height measuring device 24 is set Frame 21 is assembled in sensor chip, height measuring device 24 is located at the opposite side of conveyer 4, the corresponding conveyer of height measuring device 24 4.Coat peeling unit 25 is arranged at sensor chip assembling frame 21, and coat peeling unit 25 is located at the opposite side of conveyer 4, dyestripping dress Put 25 sides for being located at height measuring device 24, the respective sensor chip grabbing device 23 of coat peeling unit 25.Fig. 1, vehicle-mounted mirror are referred to again Head assembly line also includes lock screws apptss 5.Lock screws apptss 5 are arranged at sensor chip assembling frame 21, and lock screw is set Standby 5 are located at the side of coat peeling unit 25, the lock correspondence conveyer 4 of screws apptss 5.Screw feeding machine 9 is placed in sensor chip group Installation frame 21, the correspondence lock screws apptss 5 of screw feeding machine 9.Conveyer 4 transmits protecgulum to respective sensor chip grabbing device 23 station;Thereafter, first sensor core of the detection of sensor chip grabbing device 23 positioned at sensor chip feeding device 22 Piece angle and coordinate, first sensor core of the crawl of sensor chip grabbing device 23 positioned at sensor chip feeding device 22 Piece;Thereafter, the driving of sensor chip grabbing device 23 first sensor chip is moved to the station of correspondence coat peeling unit 25, dyestripping Device 25 tears the gummed paper of first sensor chip surface;Thereafter, the transmission of sensor chip grabbing device 23 first sensor core Piece is to the station for corresponding to conveyer 4, and sensor chip grabbing device 23 detects the angle and coordinate of the protecgulum of conveyer 4, Sensor chip assembling equipment 2 is matched first sensor chip angle and coordinate with the angle and coordinate of protecgulum, is sensed The standby 2 control sensor chip grabbing device 23 of device chipset installing is worked, and the driving of sensor chip grabbing device 23 first is sensed Device chip is rotated to the angle of correspondence protecgulum and coordinate, before first sensor chip is assembled to by sensor chip grabbing device 23 The precalculated position of lid;Thereafter, the transmission protecgulum of conveyer 4 and first sensor chip are surveyed to the station of correspondence height measuring device 24 The height of high the detection protecgulum of device 24 and first sensor chip, if the height of protecgulum and first sensor chip is unqualified, Sensor chip assembling equipment 2 sends alarm;If the height of protecgulum and first sensor chip is qualified, conveyer 4 Protecgulum and first sensor chip are transmitted to the station of correspondence lock screws apptss 5;Thereafter, sensor chip grabbing device 23 is detected The coordinate of four screw holes of protecgulum and first sensor chip, sensor chip grabbing device 23 is by protecgulum and first sensor The coordinate of four screw holes of chip is sent to sensor chip assembling equipment 2, the sensor chip assembling control lock screw of equipment 2 Four screw spiral shells are located at protecgulum and first sensor chip by equipment 5 so that protecgulum and first sensor chip fix stably;You Afterwards, conveyer 4 transmits protecgulum and first sensor chip to next station, simultaneously, sensor chip grabbing device 23 The station of correspondence conveyer 4 is moved to, sensor chip grabbing device 23 detects whether spiral shell is set to position, sensor to four screws Chip grabbing device 23 transmits four screws, and whether spiral shell is set to a signal to sensor chip assembling equipment 2;If four screws do not have There is spiral shell to be set to position, sensor chip assembling equipment 2 sends alarm;If four screw spiral shells are set to position, conveyer 4 is transmitted Protecgulum and first sensor chip are to the installing of second sensor chipset for 3.
Refer to Fig. 4 in the lump again, it is the schematic diagram of the sensor chip feeding device 22 of one embodiment of the invention.As schemed Show, sensor chip feeding device 22 includes feeding mounting seat 221, storehouse mechanism 222, feeding drive mechanism 223 and clamping machine Structure 224.Storehouse mechanism 222 is located at the side of feeding mounting seat 221.Feeding drive mechanism 223 is arranged at feeding mounting seat 221, Feeding drive mechanism 223 is located at the side of storehouse mechanism 222, the correspondence storehouse mechanism 222 of feeding drive mechanism 223.Clamping body 224 are arranged at sensor chip assembling frame 21, and positioned at the side of feeding mounting seat 221, the correspondence feeding of clamping body 224 drives Motivation structure 223.During concrete application, above-mentioned storehouse mechanism 222 includes storage mounting seat 2221, stock shelf 2222 and storage driving Element 2223.Mounting seat 2221 of storing in a warehouse is located at the side of feeding mounting seat 221.Stock shelf 2222 is arranged at storage mounting seat 2221, the corresponding feeding drive mechanism 223 of stock shelf 1222.Storage driving element 2223 is arranged at storage mounting seat 2221, storage The output end connection stock shelf 2222 of driving element 2223.At least a first sensor chip tray 7 is placed in stock shelf 2222;On Expect the driving stock shelf 2222 of drive mechanism 223 so that at least corresponding feeding drive mechanism 223 of a first sensor chip tray 7; Thereafter, feeding drive mechanism 223 drives an at least first sensor chip tray 7 to corresponding then sensor chip grabbing device 23 Station, simultaneously, the clamping first sensor chip tray 7 of clamping body 124 prevents sensor chip grabbing device 23 from grabbing When taking first sensor chip, first sensor chip tray 7 is moved.During concrete application, above-mentioned storage driving element 2223 For servomotor, certainly, storage driving element 2223 or other driving elements are repeated no more in this.
Fig. 4 is referred to again, and above-mentioned storehouse mechanism 222 also includes first sensor 2224, and first sensor 2224 is arranged at Sensor chip assembles frame 21, and positioned at the side of stock shelf 2222.First sensor 2224 senses at least one first sensing Whether in place device chip tray 7 is placed in stock shelf 2222, if at least a first sensor chip tray 7 is placed in stock shelf 2222 not In place, sensor chip assembling equipment 2 sends alarm, points out staff to check;If an at least first sensor chip Charging tray 7 is placed in stock shelf 2222 in place, then the sensor chip assembling normal work of equipment 2;Also, first sensor 2224 also rises Whether there is first sensor chip tray 7 to detection stock shelf 2222, if stock shelf 2222 is without first sensor chip tray 7, then sensor chip assembling equipment 2 send alarm, point out staff to place first sensor chip tray 7;If storehouse Storing up frame 2222 has first sensor chip tray 7, then the sensor chip assembling normal work of equipment 2.
Fig. 4 is referred to again, and feeding drive mechanism 223 includes loading guide 2231, feeding driving element 2232 and draws materials and parts 2233.Loading guide 2231 is layed in feeding mounting seat 2232, and loading guide 2231 is located at the side of storehouse mechanism 222.Feeding Driving element 2232 is arranged at feeding mounting seat 221, and feeding driving element 2232 is located at loading guide 2231 and storehouse mechanism 222 Between.Draw materials and parts 2233 to be arranged at loading guide 2231, draw the output end of the connection feeding of materials and parts 2233 driving element 2232, draw material The correspondence storehouse mechanism 222 of part 2233.Clamping body 224 includes clamping driving element 2241 and Fastener 2242.Clamping driving member Part 2241 is arranged at feeding mounting seat 221, and clamping driving element 2241 is located at the side of loading guide 2231.Fastener 2242 is set The output end of clamping driving element 2241 is placed in, the correspondence of Fastener 2242 draws materials and parts 2233.An at least first sensor chip material Disk 7 is placed in stock shelf 2222;Feeding drive mechanism 223 drives stock shelf 2222 so that an at least first sensor chip tray 7 Correspondence feeding drive mechanism 223;Thereafter, the driving of feeding driving element 2232 draws materials and parts 2233 to be moved to pair along loading guide 2231 An at least first sensor chip tray 7 is answered, draws materials and parts 2233 to pull first sensor chip tray 7;Thereafter, feeding driving member The driving of part 2232 draws materials and parts 2233 and first sensor chip tray 7 to be moved to respective sensor chip along loading guide 2231 and grab Take the station of device 23;Thereafter, the driving of clamping driving element 2241 Fastener 2242 is moved, and the clamping of Fastener 2,242 first is sensed Device chip tray 7;Thereafter, the crawl of sensor chip grabbing device 23 protecgulum.During concrete application, above-mentioned feeding driving element 2232 be servomotor, certainly, feeding driving element 2232 or other driving elements, is repeated no more in this.
Fig. 4 is referred to again, and feeding drive mechanism 223 also includes second sensor 2234, and second sensor 2234 is arranged at biography Sensor chip kludge frame 21, and positioned at the side of loading guide 2231, the correspondence of second sensor 2234 draws materials and parts 2233.Feeding The driving of driving element 2232 is drawn materials and parts 2233 and first sensor chip tray 7 to be moved to correspondence second along loading guide 2231 and passed The station of sensor 2234, second sensor 2234 senses single protecgulum charging tray 6 and moved into place, and feeding driving element 2232 stops driving Start building to make, simultaneously, the driving Fastener 2242 of clamping driving element 2241 is moved, the clamping first sensor core of Fastener 2242 Piece charging tray 7;Treat that sensor chip grabbing device 23 captures first sensor, second sensor 2234 senses single first sensor core Whether piece charging tray 7 has protecgulum, if second sensor 2234 senses single first sensor chip tray 7 with first sensor Chip, then sensor chip grabbing device 23 work on;If second sensor 2234 senses single first sensor chip material Disk 7 sends alarm without first sensor, then sensor chip assembling equipment 2, points out staff to move away from sky first and senses Device chip tray 7.
Refer to Fig. 5 in the lump again, it is the schematic diagram of the sensor chip grabbing device 23 of one embodiment of the invention.As schemed Show, sensor chip grabbing device 23 includes the first catching robot arm 231, first crawl fixture 232, first and captured CCD233, barcode scanning gun 234 and first capture electronic clamping jaw 235.First catching robot arm 231 is arranged at sensor chip assembling Frame 21, and positioned between sensor chip feeding device 22 and conveyer 4.First crawl fixture 232 is arranged at first and grabbed Take mechanical arm 231.First crawl CCD233 is arranged at the first crawl fixture 232, and respective sensor chip feeding device 22.Barcode scanning gun 234 is arranged at the first crawl fixture 232, and positioned at the first crawl CCD233 side, the correspondence of barcode scanning gun 234 Sensor chip feeding device 22.The first electronic clamping jaw 235 of crawl is arranged at the first crawl fixture 232, and is grabbed positioned at first Take between CCD233 and barcode scanning gun 234, the first electronic respective sensor chip feeding device 22 of clamping jaw 235 of crawl and conveyer 4. Sensor chip feeding device 22 senses an at least first sensor chip tray 7 with first sensor chip;Thereafter, first The driving of catching robot arm 231 first captures the work that fixture 232 is moved to a correspondence at least first sensor chip tray 7 Position, the first crawl fixture 232 drives first to capture CCD233, barcode scanning gun 234 and first and capture electronic clamping jaw 235 and is moved to pair Answer the station of an at least first sensor chip tray 7;Thereafter, the first crawl CCD233, which is shot, is located at an at least first sensor Whether the profile and size of the first sensor chip of chip tray 7 are qualified, the first crawl CCD233 transmission first sensor cores The profile and size of piece to sensor chip assemble equipment 2;Thereafter, the first catching robot arm 231 driving barcode scanning gun 234 is moved To the station of a correspondence at least first sensor chip tray 7, barcode scanning gun 234 scans the coordinate of first sensor chip, barcode scanning The coordinate of first sensor chip is sent to sensor chip assembling equipment 2 by rifle 234;Thereafter, the first catching robot arm 231 The electronic clamping jaw 235 of the crawl of driving first is moved to the station of a correspondence at least first sensor chip tray 7, and the first crawl is electronic Clamping jaw 235 grips first sensor chip;Thereafter, the first catching robot arm 231 driving first captures fixture 232, first Crawl CCD233, barcode scanning gun 234, first capture electronic clamping jaw 235 and first sensor chip is moved to correspondence coat peeling unit 25 Station, coat peeling unit 25 tears the gummed paper of first sensor chip;Thereafter, the first catching robot arm 231 driving first is grabbed Take fixture 232, first to capture CCD233, barcode scanning gun 234, first and capture electronic clamping jaw 235 and the movement of first sensor chip To the station of correspondence conveyer 4;Thereafter, the first crawl CCD233 shoots the protecgulum coordinate positioned at conveyer 4, the first crawl CCD233 transmits protecgulum coordinate to sensor chip and assembles equipment 2, and sensor chip assembling equipment 2 calculates first sensor chip Coordinate and protecgulum coordinate so that first sensor chip is matched with protecgulum;Thereafter, first CCD233 is captured by first sensor core Piece is placed in protecgulum;Thereafter, the transmission protecgulum of conveyer 4 locks spiral shell with first sensor chip to the station of corresponding lock screws apptss 5 Four screw spiral shells are located at protecgulum and first sensor chip by silk equipment 2;Thereafter, the first catching robot arm 231 driving first Capture the crawl of fixture 232, first CCD233, barcode scanning gun 234, first and capture electronic clamping jaw 235 and the shifting of first sensor chip Move to the station of correspondence conveyer 4, the first crawl CCD233 shoots protecgulum, and whether spiral shell is set to position with first sensor chip, the One crawl CCD233 transmits four screws, and whether spiral shell is set to a signal to sensor chip assembling equipment 2;If four screws do not have Spiral shell is set to position, and sensor chip assembling equipment 2 sends alarm;If four screw spiral shells are set to position, before conveyer 4 is transmitted Lid and first sensor chip to sensor chip assemble equipment 2.
Refer to Fig. 6 in the lump again, it is the schematic diagram of the height measuring device 24 of one embodiment of the invention.As illustrated, surveying high dress Putting 24 includes surveying high mounting seat 241, surveys High Linear slide rail 242, surveys high moving member 243, surveys high driving element 244 and survey high sensing Device 245.Survey high mounting seat 241 and be arranged at sensor chip assembling frame 21, survey high mounting seat 241 and be located at the another of conveyer 4 Side.Survey High Linear slide rail 242 and be arranged at the high mounting seat 241 of survey, survey high moving member 243 and be arranged at survey High Linear slide rail 242, survey High moving member 243 is located at the top for surveying high mounting seat 241.Survey high driving element 244 and be arranged at the high mounting seat 241 of survey, survey high drive Dynamic element 244 is located at the side for surveying High Linear slide rail 242, and high moving member 243 is surveyed in the output end connection for surveying high driving element 244. Survey high sensor 245 and be arranged at the high moving member 243 of survey, survey high sensor 245 and be located at the side for surveying high driving element 244, survey high The correspondence conveyer 4 of sensor 245.Conveyer 4 transmits protecgulum and first sensor chip to the work of correspondence height measuring device 24 Position;Thereafter, survey the high moving member 243 of the high driving of driving element 244 survey to move along High Linear slide rail 242 is surveyed, survey the high band of moving member 243 It is dynamic to survey the station that high sensor 245 is moved to correspondence conveyer 4 along survey High Linear slide rail 242;Thereafter, high sensor 245 is surveyed Detection is positioned at the protecgulum of conveyer 4 and the height of first sensor chip, and the height for surveying the high transmission of sensor 245 protecgulum is extremely passed Sensor chipset installing standby 2, sensor chip assembling equipment 2 judges whether the height of protecgulum and first sensor chip is qualified; If the height of protecgulum and first sensor chip is unqualified, sensor chip assembling equipment 2 sends alarm;If protecgulum and The height of first sensor chip is qualified, then the transmission protecgulum of conveyer 4 and first sensor chip to correspondence lock screws apptss 5 Station.
Refer to Fig. 7 in the lump again, it is the schematic diagram of the coat peeling unit 25 of one embodiment of the invention.As illustrated, dyestripping is filled Putting 25 includes dyestripping mounting seat 251, adhesive tape placement wheel 252, adhesive tape recycling round 253, dyestripping driving element 254, dyestripping timing belt Wheel 255 and electrostatic ionic blower duct 256.Dyestripping mounting seat 251 is arranged at sensor chip assembling frame 21, dyestripping mounting seat 251 are located at the opposite side of conveyer 4, and dyestripping mounting seat 251 is located at the side of height measuring device 24.Adhesive tape is placed wheel 252 and set In dyestripping mounting seat 251.Adhesive tape recycling round 253 is arranged at dyestripping mounting seat 251, and adhesive tape recycling round 253 is located at adhesive tape and places wheel 252 side.Dyestripping driving element 254 is arranged at dyestripping mounting seat 251, and dyestripping driving element 254 is located at adhesive tape recycling round 253 Side.Dyestripping synchronous pulley 255 is sheathed on adhesive tape recycling round 253 and dyestripping driving element 254 respectively.Electrostatic ionic blower Road 256 is arranged at dyestripping mounting seat 251, and electrostatic ionic blower duct 256 is located at adhesive tape and places wheel 252 and adhesive tape recycling round 253 Between.Gummed paper is placed in adhesive tape and places wheel 252, and adhesive tape recycling round 253, electrostatic ionic blower duct 256 are fixed in one end of gummed paper It is passed through electrostatic ionic wind regime;Thereafter, the driving dyestripping of dyestripping driving element 254 synchronous pulley 255 is rotated, dyestripping synchronous pulley 255 Adhesive tape recycling round 253 is driven to rotate, adhesive tape recycling round 253, which drives, is located at the gummed paper movement that adhesive tape places wheel 252;Thereafter, sense The driving first sensor chip of device chip grabbing device 23 is moved to the station of correspondence electrostatic ionic blower duct 256;Electrostatic from Sub- blower duct 256 blows gummed paper, and gummed paper glues fetch bit in the gummed paper of first sensor chip.
During concrete application, above-mentioned storage driving element 2223, first sensor 2224, feeding driving element 2232, card Tight driving element 2241, second sensor 2234, the first catching robot arm 231, first crawl CCD233, barcode scanning gun 234, the The one electronic clamping jaw 235 of crawl, the high driving element 244 of survey, the high sensor 245 of survey and dyestripping driving element 254 electrically connect sensing The control PLC of device chipset installing standby 2, the control PLC control storage driving element 2223 of sensor chip assembling equipment 2, the One sensor 2224, feeding driving element 2232, clamping driving element 2241, second sensor 2234, the first catching robot The crawl of arm 231, first CCD233, barcode scanning gun 234, first capture electronic clamping jaw 235, survey high driving element 244, survey high sensor 245 and the start of dyestripping driving element 254, to reach the effect of sensor chip assembles 2 Automated condtrol of equipment.
In one or more embodiments of the present invention, the standby automatic charging first of sensor of the invention chipset installing is sensed Device chip, and first sensor chip is assembled to protecgulum, reduce the assembler of enterprise, the production efficiency of enterprise, drop The labor intensity of low assembler.
In summary, in one or more embodiments of the invention, embodiments of the present invention are above are only, not For limiting the present invention.To those skilled in the art, the present invention can have various modifications and variations.It is all the present invention Interior made any modification, equivalent substitution and improvements etc. of spirit and principle, all should be included in scope of the presently claimed invention it It is interior.

Claims (10)

1. a kind of sensor chip assembles equipment, it is characterised in that including:Sensor chip assembling frame (21), sensor core Piece feeding device (22), sensor chip grabbing device (23), height measuring device (24) and coat peeling unit (25);The sensor core Piece assembling frame (21) connects protecgulum charging equipment (1) by conveyer (4) respectively and the installing of second sensor chipset is standby (3);The sensor chip feeding device (22) is arranged at the sensor chip assembling frame (21), and positioned at the transmission The side of device (4);The sensor chip grabbing device (23) is arranged at the sensor chip assembling frame (21), and position Between the sensor chip feeding device (22) and the conveyer (4), the sensor chip grabbing device (23) point Dui Ying not the sensor chip feeding device (22) and conveyer (4);The height measuring device (24) is arranged at the sensing Device chip kludge frame (21), the height measuring device (24) is located at the opposite side of the conveyer (4), the height measuring device (24) the correspondence conveyer (4);The coat peeling unit (25) is arranged at the sensor chip assembling frame (21), described Coat peeling unit (25) is located at the opposite side for passing the conveyer (4), and the coat peeling unit (25) is located at the height measuring device (24) side, coat peeling unit (25) correspondence sensor chip grabbing device (23).
2. sensor chip according to claim 1 assembles equipment, it is characterised in that the sensor chip feeding device (22) include:Feeding mounting seat (221), storehouse mechanism (222), feeding drive mechanism (223) and clamping body (224);It is described Feeding mounting seat (221) is arranged at the sensor chip assembling frame (21), and positioned at the sensor chip feeding device (22) side;The storehouse mechanism (222) is located at the side of the feeding mounting seat (221);The feeding drive mechanism (223) the feeding mounting seat (221) is arranged at, and positioned at the side of the storehouse mechanism (222), the feeding drive mechanism (223) the correspondence storehouse mechanism (222) and the sensor chip grabbing device (23);The clamping body (224) is set In the side of the feeding mounting seat (221), and positioned at the side of the feeding drive mechanism (223), the clamping body (224) the correspondence feeding drive mechanism (223).
3. sensor chip according to claim 2 assembles equipment, it is characterised in that the storehouse mechanism (222) includes: Mounting seat of storing in a warehouse (2221), stock shelf (2222) and storage driving element (2223);The storage mounting seat (2221) is located at institute State the side of feeding mounting seat (221);The stock shelf (2222) is arranged at the storage mounting seat (2221), the stock shelf (2222) the correspondence feeding drive mechanism (223);The storage driving element (2223) is arranged at the storage mounting seat (2221), the output end of the storage driving element (2223) connects the stock shelf (2222).
4. protecgulum charging equipment according to claim 3, it is characterised in that the storehouse mechanism (222) also includes first Sensor (225), the first sensor (225) is arranged at the sensor chip assembling frame (21), and positioned at the storehouse Store up the side of frame (2222).
5. protecgulum charging equipment according to claim 2, it is characterised in that the feeding drive mechanism (223) includes:On Expect guide rail (2231), feeding driving element (2232) and draw materials and parts (2233);The loading guide (2231) is layed on described Expect mounting seat (221), and positioned at the side of the storehouse mechanism (122);The feeding driving element (2232) is arranged at described Feeding mounting seat (221), and positioned between the loading guide (2231) and the storehouse mechanism (222);The drawing materials and parts (2233) loading guide (2231) is arranged at, it is described to draw materials and parts (2233) to connect the defeated of the feeding driving element (2232) Go out end, drawing materials and parts (2233) correspondence storehouse mechanism (222) and the sensor chip grabbing device (23).
6. protecgulum charging equipment according to claim 5, it is characterised in that the feeding drive mechanism (223) also includes Second sensor (226), the second sensor (226) is arranged at the sensor chip assembling frame (21), and positioned at institute State the side of loading guide (2231), second sensor (226) the correspondence drawing materials and parts (2233).
7. protecgulum charging equipment according to claim 6, it is characterised in that the clamping body (124) includes:Clamping is driven Dynamic element (2241) and Fastener (2242);The clamping driving element (2241) is arranged at the feeding mounting seat (221), and Side positioned at the loading guide (2231);The Fastener (2242) is arranged at the defeated of the clamping driving element (2241) Go out end, Fastener (2242) the correspondence drawing materials and parts (2233).
8. sensor chip according to claim 1 assembles equipment, it is characterised in that the sensor chip grabbing device (23) include:First catching robot arm (231), the first crawl fixture (232), the first crawl CCD (233), barcode scanning gun And the first electronic clamping jaw (235) of crawl (234);The first catching robot arm (231) is arranged at the sensor chip group Installation frame (21), and positioned between the sensor chip feeding device (22) and the conveyer (4);First crawl Fixture (232) is arranged at the first catching robot arm (231);The first crawl CCD (233) is arranged at described first Capture fixture (232), and the correspondence sensor chip feeding device (22);The barcode scanning gun (234) is arranged at described One crawl fixture (232), and positioned at the described first crawl CCD (233) side, barcode scanning gun (234) correspondence is described to be passed Sensor chip feeding device (22);The electronic clamping jaw (235) of first crawl is arranged at the first crawl fixture (232), And between the described first crawl CCD (233) and the barcode scanning gun (234), electronic clamping jaw (235) the correspondence institute of the first crawl State sensor chip feeding device (22) and conveyer (4).
9. sensor chip according to claim 1 assembles equipment, it is characterised in that the height measuring device (24) includes: High mounting seat (241) is surveyed, High Linear slide rail (242) is surveyed, surveys high moving member (243), surveys high driving element (244) and survey high sensing Device (245);The high mounting seat (241) of survey is arranged at the sensor chip assembling frame (21), described to survey high mounting seat (241) it is located at the opposite side of the conveyer (4);The survey High Linear slide rail (242) is arranged at the high mounting seat of survey (241), the high moving member (243) of survey is arranged at the survey High Linear slide rail (242), and the high moving member (243) of survey is located at The top for surveying high mounting seat (241);The high driving element (244) of survey is arranged at the high mounting seat (241) of survey, described Survey the side that high driving element (244) is located at the survey High Linear slide rail (242), the output of the high driving element of survey (244) End connection is described to survey high moving member (243);The high sensor (245) of survey is arranged at the high moving member (243) of survey, described to survey High sensor (245) is located at the side for surveying high driving element (244), the high sensor of survey (245) correspondence transmission Device (4).
10. sensor chip according to claim 1 assembles equipment, it is characterised in that the coat peeling unit (25) includes: Dyestripping mounting seat (251), adhesive tape place wheel (252), adhesive tape recycling round (253), dyestripping driving element (254), dyestripping timing belt Take turns (255) and electrostatic ionic blower duct (256);The dyestripping mounting seat (251) is arranged at the sensor chip kludge Frame (21), the dyestripping mounting seat (251) is located at the opposite side of the conveyer (4), and the dyestripping mounting seat (251) is located at The side of the height measuring device (24);The adhesive tape places wheel (252) and is arranged at the dyestripping mounting seat (251);The adhesive tape Recycling round (253) is arranged at the dyestripping mounting seat (251), and the adhesive tape recycling round (253) is located at the adhesive tape and places wheel (252) side;The dyestripping driving element (254) is arranged at the dyestripping mounting seat (251), the dyestripping driving element (254) it is located at the side of the adhesive tape recycling round (253);The dyestripping synchronous pulley (255) is sheathed on the adhesive tape and returned respectively Receive wheel (253) and the dyestripping driving element (254);The electrostatic ionic blower duct (256) is arranged at the dyestripping and installed Seat (251), the electrostatic ionic blower duct (256) is located at the adhesive tape and places wheel (252) and the adhesive tape recycling round (253) Between.
CN201710475648.8A 2017-06-21 2017-06-21 Sensor chip equipment Active CN107160162B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710475648.8A CN107160162B (en) 2017-06-21 2017-06-21 Sensor chip equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710475648.8A CN107160162B (en) 2017-06-21 2017-06-21 Sensor chip equipment

Publications (2)

Publication Number Publication Date
CN107160162A true CN107160162A (en) 2017-09-15
CN107160162B CN107160162B (en) 2023-07-04

Family

ID=59819455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710475648.8A Active CN107160162B (en) 2017-06-21 2017-06-21 Sensor chip equipment

Country Status (1)

Country Link
CN (1) CN107160162B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107803639A (en) * 2017-11-13 2018-03-16 江苏杰士德精密工业有限公司 Automatic assembly equipment wireless charging chip being installed in chip body
CN109396826A (en) * 2018-10-23 2019-03-01 王朝火 Temperature sensor automated production equipment and rivet assembling device
CN112222820A (en) * 2020-09-30 2021-01-15 苏州富强科技有限公司 Tear film assembly integral type assembly line
CN112917145A (en) * 2021-01-22 2021-06-08 领联汽车零部件制造(上海)有限公司 Automobile wheel ABS sensor chip assembly machine
CN113685406A (en) * 2021-09-13 2021-11-23 北京清大天达光电科技股份有限公司 Automatic bonding device of acceleration sensor
CN114226172A (en) * 2021-12-28 2022-03-25 上海无线电设备研究所 Automatic assembling device for optical assembly

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05207621A (en) * 1992-01-23 1993-08-13 Mitsubishi Electric Corp Apparatus for automatically feeding cable
CN103552346A (en) * 2013-10-29 2014-02-05 深圳市联得自动化装备股份有限公司 Full-automatic laminating machine and laminating method
CN205200998U (en) * 2015-12-01 2016-05-04 长沙长泰机器人有限公司 Work piece letter sorting and equipment system based on vision
CN106475682A (en) * 2016-11-02 2017-03-08 深圳锦帛方激光科技有限公司 A kind of cell sealing laser welding apparatus
CN106629042A (en) * 2016-12-28 2017-05-10 苏州富强科技有限公司 Feeding method for full-automatic feeding assembly line
CN207026937U (en) * 2017-06-21 2018-02-23 惠州市德赛自动化技术有限公司 A kind of sensor chip assembles equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05207621A (en) * 1992-01-23 1993-08-13 Mitsubishi Electric Corp Apparatus for automatically feeding cable
CN103552346A (en) * 2013-10-29 2014-02-05 深圳市联得自动化装备股份有限公司 Full-automatic laminating machine and laminating method
CN205200998U (en) * 2015-12-01 2016-05-04 长沙长泰机器人有限公司 Work piece letter sorting and equipment system based on vision
CN106475682A (en) * 2016-11-02 2017-03-08 深圳锦帛方激光科技有限公司 A kind of cell sealing laser welding apparatus
CN106629042A (en) * 2016-12-28 2017-05-10 苏州富强科技有限公司 Feeding method for full-automatic feeding assembly line
CN207026937U (en) * 2017-06-21 2018-02-23 惠州市德赛自动化技术有限公司 A kind of sensor chip assembles equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107803639A (en) * 2017-11-13 2018-03-16 江苏杰士德精密工业有限公司 Automatic assembly equipment wireless charging chip being installed in chip body
CN109396826A (en) * 2018-10-23 2019-03-01 王朝火 Temperature sensor automated production equipment and rivet assembling device
CN109396826B (en) * 2018-10-23 2019-11-26 瑞安市任想科技有限责任公司 Temperature sensor automated production equipment and rivet assembling device
CN112222820A (en) * 2020-09-30 2021-01-15 苏州富强科技有限公司 Tear film assembly integral type assembly line
CN112917145A (en) * 2021-01-22 2021-06-08 领联汽车零部件制造(上海)有限公司 Automobile wheel ABS sensor chip assembly machine
CN113685406A (en) * 2021-09-13 2021-11-23 北京清大天达光电科技股份有限公司 Automatic bonding device of acceleration sensor
CN114226172A (en) * 2021-12-28 2022-03-25 上海无线电设备研究所 Automatic assembling device for optical assembly

Also Published As

Publication number Publication date
CN107160162B (en) 2023-07-04

Similar Documents

Publication Publication Date Title
CN107160162A (en) A kind of sensor chip assembles equipment
CN107175506A (en) A kind of on-vehicle lens production and assembly line
CN206343399U (en) A kind of X-ray detection equipment
CN205771617U (en) Automatic Conveying circuit board testing station
CN107132230A (en) Pcb board glue surface covers automatic detection device and detection method
CN207326390U (en) A kind of on-vehicle lens production and assembly line
CN206276628U (en) A kind of express mail automatic sorting device of view-based access control model
CN104399675A (en) Automatic sorting system for electric energy meters, and method
CN106670116A (en) Magnetic material detecting and sorting device
CN206960365U (en) Pcb board glue surface covers automatic detection device
CN206631953U (en) A kind of automatic Weighing classifier
CN206588032U (en) A kind of magnetic material detection and sorting equipment
CN207026937U (en) A kind of sensor chip assembles equipment
CN112916431A (en) Detection equipment and system for coil electrical performance test
CN108722915A (en) A kind of battery testing system
CN113829016B (en) Intelligent assembling system and method for aging of electronic components
CN207272602U (en) A kind of protecgulum charging equipment
CN207524552U (en) A kind of material-transporting system with detection function
CN109850540A (en) Apparatus for grouping and group technology
CN105764321A (en) Chip mounter material feeder material disc catching mechanism
CN206720211U (en) AOI return wires
CN206344147U (en) A kind of material grasping mechanism
CN103743431A (en) On-line multifunctional nut detection apparatus
CN110936147A (en) Novel intelligent automatic screw machine
CN109813237A (en) Thickness of glass detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant