CN107127225A - A kind of elevator based on experts database technology is led from dynamic rail method for aligning - Google Patents
A kind of elevator based on experts database technology is led from dynamic rail method for aligning Download PDFInfo
- Publication number
- CN107127225A CN107127225A CN201710334625.5A CN201710334625A CN107127225A CN 107127225 A CN107127225 A CN 107127225A CN 201710334625 A CN201710334625 A CN 201710334625A CN 107127225 A CN107127225 A CN 107127225A
- Authority
- CN
- China
- Prior art keywords
- point
- pressure point
- guide rail
- normalized
- bending
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000005516 engineering process Methods 0.000 title claims abstract description 18
- 238000005452 bending Methods 0.000 claims abstract description 86
- 238000007405 data analysis Methods 0.000 claims abstract description 7
- 238000010606 normalization Methods 0.000 claims abstract description 4
- 238000013001 point bending Methods 0.000 claims description 10
- 238000001514 detection method Methods 0.000 claims description 4
- 238000004458 analytical method Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000011161 development Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000000205 computational method Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000004438 eyesight Effects 0.000 description 1
- 210000003746 feather Anatomy 0.000 description 1
- 210000003127 knee Anatomy 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000013517 stratification Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D3/00—Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts
- B21D3/10—Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts between rams and anvils or abutments
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C51/00—Measuring, gauging, indicating, counting, or marking devices specially adapted for use in the production or manipulation of material in accordance with subclasses B21B - B21F
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The present invention discloses a kind of elevator based on experts database technology and led from dynamic rail method for aligning, and successful empirical data is manually aligned first with early stage and constitutes experts database;Then the linearity information of guide rail is gathered, is write music line according to gathered data fitting a straight line, and data analysis is carried out to the curve of fitting using traversal Extremal point algorithm and chooses pressure point reference point;Found out then according to the qualified index of guide rail linearity and do not conform to lattice point, final pressure point is determined from pressure point reference point;Readjust and determine after pressure point, further according to the maximized principle of span, position of the fulcrum is symmetrically determined on pressure point both sides;Finally the bending value and span of pressure point are normalized, corresponding volume under pressure is matched in experts database according to the bending value and span of the pressure point after normalization to align guide rail, required if the indices after aligning are met, then each achievement data is saved in database, otherwise aligned next time.Present invention reduces the cost of labor of production, the yields of producing line is improved.
Description
Technical field
The invention belongs to automatic detection field, more particularly to a kind of elevator based on experts database technology is led from dynamic rail aligning
Method.
Background technology
With the propulsion of the high stratification in house, elevator is while increasingly as people's essential walking-replacing tool, and it is pacified
Quan Xing, comfortableness also become focus of concern.Whole elevator device is mainly made up of eight parts, including:Traction system,
Guidance system, car, door system, weight balancing system, electric drive system, electric control system and safety system.Electricity
Terraced guide rail is the important component of elevator guidance system, is the guider that elevator up-down is sailed, not only guides elevator
Up and down, and the comfortableness and security of elevator ride are decide, if guide rail surface out-of-flatness, when can cause the elevator to run
Horizontal jitter simultaneously produces noise, has a strong impact on the security and comfort level of elevator operation.As shown in figure 1, the conventional guide rail of elevator
It is " T " font guide rail, the length of guide rail is generally 5 meters.
According to statistics, the speed of super high speed elevator reaches 18m/s in the world now.The development of elevator operation high speed is even more pair
The glacing flatness of guide rail surface proposes higher requirement, excites the demand to high-precision guide rail.
Traditional straightening of elevator guided technology, relies primarily on artificial hydraulic pressure aligning mode and is aligned, due to the eyesight of people
There is uncertainty with judgment so that align in a traditional way, precision reach just can not be carried out after certain small scope it is more smart
True aligning.And manually align without normalization, the depression distance of hydraulic cylinder is fixed, cause artificial aligning without one
Individual standard, it is impossible to realize standardization so that traditional aligning mode can not meet the demand of elevator enterprises.
In recent years with the development of computer technology, we can be using the automation of computer software design one, high-precision
Straightening of elevator guided system is spent, and is realized the function of aligning algorithm by program language.The development of photoelectric technology, Laser Measuring
Range and precision away from sensor have very big improvement, under same precision conditions, and the range of sensor can amplify number
Times, provide physical basis for the high accuracy aligning of guide rail.
The content of the invention
Technical problem solved by the invention be provide it is a kind of to cage guide carry out linearity automatic detection and from
Dynamic method for aligning, can fast and accurately align to cage guide, improve the product yield of manufacturing enterprise.
The technical solution for realizing the object of the invention is:A kind of elevator based on experts database technology is led from dynamic rail aligning side
Method, comprises the following steps:
Step 1:Successful empirical data is manually aligned using early stage, be normalized and analysis be bent value and
Correspondence volume under pressure, constitutes experts database;
Step 2:The linearity information of guide rail is gathered, is write music line according to gathered data fitting a straight line;
Step 3:Data analysis is carried out to the curve of fitting using traversal Extremal point algorithm, pressure point reference point is chosen;
Step 4:Found out according to the qualified index of guide rail linearity and do not conform to lattice point, the position of lattice point is not conformed to from pressure point according to index
Final pressure point is determined in reference point;
Step 5:Readjust and determine after pressure point, it is symmetrical really on pressure point both sides further according to the maximized principle of span
Determine position of the fulcrum;
Step 6:Determine after pressure point and fulcrum, the bending value and span of pressure point are normalized, according to normalizing
The bending value and span of pressure point after change match corresponding volume under pressure in experts database, and briquetting motor is used as with the volume under pressure
Displacement guide rail is aligned;
Step 7:Linearity surveying is carried out to guide rail again, required if the indices of guide rail are met, by each of guide rail
Achievement data is saved in database, if guide rail index is unqualified, return to step 3 is aligned next time.
Compared with prior art, its remarkable advantage is the present invention:1) present invention breaches artificial aligning nothing for a long time
The difficult point that the transfer point that method standardization, common automatic flattening machine can not be carried out is aligned in high precision, by automated production, is reduced
The cost of labor of manufacturing enterprise, improves the yields of whole piece producing line, promotes elevator industry standard to develop to more high-precision direction,
Not only in terms of cage guide, can have broad application prospects in the production and living of the high-precision guide rail of other needs.2) this hair
The accurate calculating of bright utilization computer, can accurately be aligned so that guide rail or so for less knee above cage guide
Bending value and every meter of bending value can be remedied within 0.15mm at 500mm, and this is the very indiscernible bending range of human eye, is also
Human hand aligning scope very rambunctious, due to bending value very little, it is easy to produce overvoltage so that guide rail is aligned back and forth, it is impossible to reached
Mark, span size when can control to align guide rail with experts database system is determined according to the size of pressure point bending value and span
Go out one and accurately push value so that guide rail can carry out accurate aligning so as to meet quality index, substantially increase elevator
The security and comfortableness of cage operation.
Brief description of the drawings
Fig. 1 is the workpiece figure of cage guide.
Fig. 2 is flow chart of the method for the present invention.
Fig. 3 is the unqualified movement curve figure that the present invention is collected.
Fig. 4 is branch pressure point adjustable strategies flow chart of the present invention.
Fig. 5 is curve map up to standard after guide rail of the present invention is aligned.
Embodiment
A kind of elevator based on experts database technology is led from dynamic rail method for aligning, is comprised the following steps:
Step 1:Successful empirical data is manually aligned using early stage, place is normalized to span and pressure point bending value
Reason, determines span, pressure point bending value and corresponding volume under pressure, constitutes experts database;What stride values were normalized is specific
Method is:Span is more than the unified of 1000mm and sets span as 1000mm, the span between 800mm to 1000mm is normalized to
The span that span between 800mm, 600mm to 800mm is normalized between 600mm, 0mm to 600mm is normalized to 400mm.
It is to the specific method that pressure point bending value is normalized:It will be greater than in the case of 1000mm spans and 800mm spans
Bending value equal to 2mm is uniformly normalized to 2mm, will be greater than uniformly being normalized to equal to the bending value that 1.5mm is less than 2mm
1.5mm, is uniformly normalized to 1.3mm more than or equal to the 1.3mm bending values for being less than 1.5mm, is less than 1.3mm's more than or equal to 1mm
Bending value is uniformly normalized to 1mm, 0.8mm is uniformly normalized to more than or equal to the 0.8mm bending values for being less than 1mm, less than 0.8mm
Bending value be uniformly normalized to 0.5mm;The bending value equal to 1mm is will be greater than in the case of 600mm spans and 400mm spans
1mm is uniformly normalized to, will be greater than uniformly being normalized to 0.8mm equal to the bending value that 0.8mm is less than 1mm, more than or equal to 0.6mm
Bending value less than 0.8mm is uniformly normalized to 0.6mm, and the bending value more than or equal to 0.4 less than 0.6mm is uniformly normalized to
0.4mm, is uniformly normalized to 0.3mm, the bending value less than 0.3mm is uniformly returned more than or equal to the 0.3mm bending values for being less than 0.4mm
One turns to 0.2mm.
Step 2:The linearity information of guide rail is gathered, is write music line according to gathered data fitting a straight line, fitting a straight line is write music line
Specific method be:
Step 2.1:The guide rail linearity information of laser range finder detection, i.e. laser range finder is gathered every 10 milliseconds to sense
Device is the distance between to guide rail;
Step 2.2:Draw before linearity curve, the transverse and longitudinal coordinate ratio of last point is calculated, according to this ratio pair
All points are moved up or moved down accordingly adjustment;First is collected a little as origin,
Step 2.3:Using first point as origin, the data after adjustment are fitted, and draw curve.
Step 3:Data analysis is carried out to the curve of fitting using traversal Extremal point algorithm, pressure point reference point is chosen, chooses pressure
Point reference point specific method be:
Step 3.1:Since the 21st point of curve, compare the ordinate size of current point and front and rear each 20 points, if than
The ordinate absolute value of 20 points of the right and left is all big, then judge the point can as pressure point reference point, otherwise cannot function as
The reference point of pressure point;
Step 3.2:According to the method for step 2.1, traversal removes the institute of first 20 and latter 20 a little, from whole piece guide rail straight line
Write music in line can as pressure point reference point;
Step 3.3:Remove the point that bending value is less than minimum precision from pressure point reference point.
Step 4:Found out according to the qualified index of guide rail linearity and do not conform to lattice point, joined according to the position of unqualified index from pressure point
Final pressure point is determined in examination point;
Step 4.1:The qualified index of guide rail linearity is set, including whole long bending value, every meter of bending value, left and right 500mm curved
Song value and B/A values;
Step 4.2:Calculate each index actual value, choose the pressure point reference point before and after unqualified index location in 20 points and make
For pressure point:First by one priority of these setup measures, whole long bending value priority is set to curved at highest, left and right 500mm
Bent value is taken second place, and then considers B/A values, and every meter of qualified index is last, and the high first aligning of priority makes it meet requirement;If whole length is curved
Song value is unqualified, then pressure point reference point is aligned as pressure point;If whole length is qualified, left and right 500mm is unqualified, then does not consider
The position of pressure point reference point, directly using or so 500mm be used as pressure point;If whole length is qualified, left and right 500mm is qualified, and B/A is unqualified,
The position for then B/A not being conformed to lattice point is used as pressure point;If whole length, left and right 500mm, B/A values are qualified, every meter unqualified, then every meter
The position of lattice point is not conformed to as pressure point, the absolute value of its corresponding ordinate value of the pressure point chosen is the bending value of the point.
Step 5:Readjust and determine after pressure point, it is symmetrical really on pressure point both sides further according to the maximized principle of span
Determine position of the fulcrum, the selection principle of fulcrum is:Fulcrum is symmetrically distributed in pressure point both sides, and the span of adjacent fulcra can not influence
To other pressure points, and the whole long scope of guide rail can not be exceeded, it is tried one's best greatly in the case where meeting condition.
Step 6:Experts database data are matched for convenience, are determined after pressure point and fulcrum, to the bending value and span of pressure point
It is normalized, corresponding volume under pressure is matched in experts database according to the bending value and span of the pressure point after normalization,
Guide rail is aligned as the displacement of briquetting motor with the volume under pressure, is to the method for normalizing of span:Span is big
Unified in 1000mm sets span as 1000mm, and the span between 800mm to 1000mm is normalized to 800mm, and 600mm is arrived
The span that span between 800mm is normalized between 600mm, 0mm to 600mm is normalized to 400mm.Thus obtain,
The span of pressure point.It is to the specific method that pressure point bending value is normalized:In 1000mm spans and the feelings of 800mm spans
The bending value equal to 2mm is will be greater than under condition and is uniformly normalized to 2mm, will be greater than uniformly returning equal to the bending value that 1.5mm is less than 2mm
One turns to 1.5mm, is uniformly normalized to 1.3mm more than or equal to the 1.3mm bending values for being less than 1.5mm, is less than more than or equal to 1mm
1.3mm bending value is uniformly normalized to 1mm, and 0.8mm is uniformly normalized to more than or equal to the 0.8mm bending values for being less than 1mm, small
0.5mm is uniformly normalized in 0.8mm bending value;It will be greater than being equal to 1mm in the case of 600mm spans and 400mm spans
Bending value be uniformly normalized to 1mm, will be greater than be equal to 0.8mm be less than 1mm bending value be uniformly normalized to 0.8mm, be more than
0.6mm is uniformly normalized to equal to the 0.6mm bending values for being less than 0.8mm, the bending value more than or equal to 0.4 less than 0.6mm is unified
0.4mm is normalized to, 0.3mm is uniformly normalized to more than or equal to the 0.3mm bending values for being less than 0.4mm, the bending less than 0.3mm
Primary system one is normalized to 0.2mm.
Step 7:Linearity surveying is carried out to guide rail again, required if the indices of guide rail are met, by each of guide rail
Achievement data is saved in database, if guide rail index is unqualified, return to step 3 is aligned next time.
The inventive method can accurate straightening rail, substantially increase the security and comfortableness of lift car operation.
Below in conjunction with the accompanying drawings the present invention program is elaborated with specific embodiment.
Before method for aligning is implemented, putting up first should be by platform, by the data transmit-receive signal of laser range sensor
Line is connected with the serial ports of the RS on PC -232, and motion control board and each motor servo driver and PLC are connected
Connect, determine that hardware platform smooth can be run.The logic flow of experts database guide rail aligning algorithm is as shown in Fig. 2 specific real
Apply step as follows:
Step 1:Successful empirical data is manually aligned using early stage, place is normalized to span and pressure point bending value
Reason, determines span, pressure point bending value and corresponding volume under pressure, constitutes experts database;
Step 2:With serial port communication technology, every 10 milliseconds of sensors for measuring laser range sensor to guide rail it
Between distance pass PC back, be stored in array, and the point that first is collected connects as origin in rectangular coordinate system
Point retouches line.The track and the guide rail line that is linked to be of ending that are translated due to sensor is simultaneously not parallel, so last point of guide rail does not exist
, it is necessary to which according to the transverse and longitudinal coordinate ratio of last point, the point retouched above line all is carried out into phase by this ratio above reference axis
That answers moves up or moves down adjustment.Then new data is fitted and handles and draw curve, and the value that each is put by new curve
It is saved in array, it is convenient followed by data analysis.Final curves are as shown in figure 3, the curve is contained from guide rail head altogether
To 500 data points at guide rail end, curvilinear abscissa shows rail bends value situation, the more remote bending of ordinate absolute value
Value is bigger.
Step 3:As seen from Figure 3, it is characterized in that ordinate is a range of more than both sides as pressure point bending point
Point, carries out data analysis to the curve of fitting using the method for traversal extreme point, chooses pressure point reference point.Due to hardware platform limit
System, is 20cm as the distance between briquetting of pressure point, so the 21st point is traveled through above curve, compares the point with before
The ordinate size of each 20 points, if all bigger than the ordinate absolute value of other points in 20 point ranges of the right and left, sentences afterwards
Break the point can as pressure point reference point, otherwise not as guide rail align reference point.The point time from 20th o'clock to the 480th
Going through one time just can determine all aligning reference points of the guide rail.Bending value, which is selected, in these aligning reference points is less than minimum essence
The point of degree removes, and other ungratified points are saved in array, is referred to as aligning.Only one of which pressure point reference point in Fig. 3.
Step 4:Guide rail aligning is to remove aligning according to certain accuracy standard index, is not that finally guide rail is aligned
For a smooth straight line, therefore it is determined that when final pressure point, not only to consider the whole piece guide rail traveled through out in step 3
On bending point, i.e. pressure point reference point, it is also contemplated that removing aligning for guide rail criterion of acceptability, can so greatly improve guide rail
Align efficiency.The qualified index of guide rail mainly has whole long bending value, every meter of bending value, left and right 500mm bending values and B/A values.
Whole long bending value, intuitively reflects the bending situation of guide rail, is defined as on straightness error curve ordinate most
Big value y1With minimum value y2Difference.
B/A values, reflection is the limitation to curve peak position, is defined as movement curve ordinate absolute value most
The absolute value of the ordinate of big point and the abscissa of the point are to the ratio of the nearer distance in two ends, and B/A value is:
In formula, y1It is the ordinate value of the point of ordinate maximum absolute value in curve, x1It is the corresponding abscissa value of point.
Bending value at the 500mm of left and right, as the term suggests the bending value on guide rail at 500mm and 4500mm, reflection is to work as
After many guide rails are by cloudy tenon and positive feather joint, the planarization of integrated guide rail, when calculating, with the absolute of 2 points of the ordinate
Value is used as record.
Every meter of maximum deflection value, reflection is whole long bending value of the guide rail in the range of one meter, is to ensure that whole guide rail is
At most the important indicator of the flatness of root guide rail connection, is defined as, each rice in the range of guide rail linearity error progressive with 100mm
Each whole long bending value in maximum, that is, at [0mm, 1000mm], [100mm, 1100mm] ... [3900mm,
4900mm], the corresponding whole long bending of the maximum area segments of whole long bending value in [4000mm, 5000mm] this 41 sections of one meter of regions
Value.
By four kinds of computational methods above, each index actual value is calculated, index nonconformance is found out, generally whole length
The pressure point tackled when unqualified is corresponding with bending point, when in left and right, 500mm is unqualified, and generally the point is not time
The pressure point gone through out.Therefore pressure point is adjusted, it is some or all of to give up the pressure point traveled through out, again according to unqualified feelings
Condition is to pressure point.Specific adjustable strategies:First, by one priority of these setup measures, the high first aligning of priority meets it
It is required that.Here whole long bending value priority is set into bending value at highest, left and right 500mm to take second place, remaining two indices are last.
Because a large amount of scene aligning data displays:It is general after whole long bending value and left and right 500mm place bending value are all qualified, remaining finger
The mark overwhelming majority can meet requirement, if it is not satisfied, being aligned again individually for it.Then, if only whole long bending value is unqualified,
The branch pressure point information then calculated according to original algorithm is aligned;If there is other indexs unqualified, and former algorithm is in influence
Pressure point is not calculated near the index, then increases a pressure point specifically designed for the index.Finally, if whole long bending value is to meet
It is required that, then pressure point is adjusted to first mainly for the index at the 500mm of left and right, finally solves B/A values and every meter of maximum deflection
Value.Adjustable strategies flow is as shown in Figure 4.
Step 5:Readjust and determine after pressure point, it is symmetrical really on pressure point both sides further according to the maximized principle of span
Determine position of the fulcrum.It is determined that during position of the fulcrum, first having to consider that the span on the left side pressure point left side can not be than Far Left pressure point to song
The lateral separation of line starting point is long, and the span on the right of the pressure point of the right can not be longer than the lateral separation of rightmost pressure point to End of Curve.
Secondly consider that the abscissa of left side fulcrum can not be bigger than the abscissa of the right fulcrum.Under the conditions of the two are met, as far as possible greatly
Selection stride values.Experts database data are matched for convenience, and the stride values calculated are normalized, span is more than
The unified of 1000mm sets span as 1000mm, and the span between 800mm to 1000mm is normalized to 800mm.The like, one
No longer reduce span when the minimum value 400mm of stride values, be uniformly normalized to 400mm.Thus obtain, pressure point it is curved
Song value and span.
Step 6:When determining volume under pressure according to the bending value and span of pressure point, due to contains only major part in experts database just
True volume under pressure, not comprising whole volumes under pressure under whole spans, therefore also needs to enter the bending value that bending value is similar
Row normalized.For example, 2mm bending value is uniformly normalized into 2mm in the case of 1000mm spans, it will be greater than
The bending value that 1.5mm is less than 2mm is uniformly normalized to 1.5mm, the like, place is also normalized in each bending value
Reason, so as to realize the standardization of experts database matching, improves the efficiency of guide rail aligning.Mechanical part is provided down according to experts database
Pressure amount is aligned to the bending point of guide rail.
Step 7:After guide rail aligning terminates, then Linearity surveying is carried out to guide rail, because experts database is to employ a large amount of realities
Obtained accurate data is tested, success can be aligned as Fig. 5 according to the most of guide rail of given volume under pressure, then will be closed
The data of lattice are saved in database.But there is small part guide rail due to material difference, it is impossible to disposably align successfully, need by
The data detected again are sent to data analysis module and analyzed, so as to be aligned, until aligning successfully next time.
Claims (7)
1. a kind of elevator based on experts database technology is led from dynamic rail method for aligning, it is characterised in that comprised the following steps:
Step 1:Successful empirical data is manually aligned using early stage, is normalized and analysis is bent being worth and correspondingly
Volume under pressure, constitutes experts database;
Step 2:The linearity information of guide rail is gathered, is write music line according to gathered data fitting a straight line;
Step 3:Data analysis is carried out to the curve of fitting using traversal Extremal point algorithm, pressure point reference point is chosen;
Step 4:Found out according to the qualified index of guide rail linearity and do not conform to lattice point, referred to according to the position that index does not conform to lattice point from pressure point
Final pressure point is determined in point;
Step 5:Readjust and determine after pressure point, further according to the maximized principle of span, branch is symmetrically determined on pressure point both sides
Point position;
Step 6:Determine after pressure point and fulcrum, the bending value and span of pressure point are normalized, after normalization
Pressure point bending value and span corresponding volume under pressure is matched in experts database, with position of the volume under pressure as briquetting motor
Shifting amount is aligned to guide rail;
Step 7:Linearity surveying is carried out to guide rail again, required if the indices of guide rail are met, by each index of guide rail
Data are saved in database, if guide rail index is unqualified, return to step 3 is aligned next time.
2. the elevator according to claim 1 based on experts database technology is led from dynamic rail method for aligning, it is characterised in that described
The write music specific method of line of step 2 fitting a straight line is:
Step 2.1:The guide rail linearity information of laser range finder detection is gathered every 10 milliseconds, i.e. laser range finder sensor is arrived
The distance between guide rail;
Step 2.2:Draw before linearity curve, the point that first is collected calculates the transverse and longitudinal of last point as origin
Coordinate ratio, adjustment is moved up or is moved down accordingly according to this ratio to all points;
Step 2.3:Data after adjustment are fitted, and draw curve.
3. the elevator according to claim 1 based on experts database technology is led from dynamic rail method for aligning, it is characterised in that described
Step 3 choose pressure point reference point specific method be:
Step 3.1:Since the 21st point of curve, compare the ordinate size of current point and front and rear each 20 points, if than left and right
The ordinate absolute value of 20, both sides point is all big, then judge the point can as pressure point reference point, otherwise cannot function as pressure point
Reference point;
Step 3.2:According to the method for step 3.1, traversal removes the institute of first 20 and latter 20 a little, bent from whole piece guide rail linearity
In line choose can as pressure point reference point;
Step 3.3:Remove the point that bending value is less than minimum precision from pressure point reference point.
4. the elevator according to claim 1 based on experts database technology is led from dynamic rail method for aligning, it is characterised in that described
Step 4 determines that the specific method of final pressure point is:
Step 4.1:The qualified index of guide rail linearity, including whole long bending value, every meter of bending value, left and right 500mm bending values are set
And B/A values;
Step 4.2:Calculate each index actual value, choose the pressure point reference point before and after unqualified index location in 20 points as most
Final pressure point:First by one priority of these setup measures, whole long bending value priority is set to curved at highest, left and right 500mm
Bent value is taken second place, and then considers B/A values, and every meter of qualified index is last, and the high first aligning of priority makes it meet requirement;If whole length is curved
Song value is unqualified, then pressure point reference point is aligned as pressure point;If whole length is qualified, left and right 500mm is unqualified, then does not consider
The position of pressure point reference point, directly using or so 500mm be used as pressure point;If whole length is qualified, left and right 500mm is qualified, and B/A is unqualified,
The position for then B/A not being conformed to lattice point is used as pressure point;If whole length, left and right 500mm, B/A values are qualified, every meter unqualified, then every meter
The position of lattice point is not conformed to as pressure point, the absolute value of its corresponding ordinate value of the pressure point chosen is the bending value of the point..
5. the elevator according to claim 1 based on experts database technology is led from dynamic rail method for aligning, it is characterised in that described
The selection principle of step 5 fulcrum is:Fulcrum is symmetrically distributed in pressure point both sides, and the span of adjacent fulcra can not have influence on other
Pressure point, and the whole long scope of guide rail can not be exceeded, it is tried one's best greatly in the case where meeting condition.
6. the elevator according to claim 1 based on experts database technology is led from dynamic rail method for aligning, it is characterised in that described
The specific method that step 1 and 6 pairs of stride values are normalized is:By span be more than 1000mm it is unified set span as
The span that span between 1000mm, 800mm to 1000mm is normalized between 800mm, 600mm to 800mm is normalized to
Span between 600mm, 0mm to 600mm is normalized to 400mm.
7. the elevator according to claim 1 based on experts database technology is led from dynamic rail method for aligning, it is characterised in that described
The specific method that step 1 and 6 pairs of pressure point bending values are normalized is:In 1000mm spans and the situation of 800mm spans
Under the bending value that will be greater than equal to 2mm be uniformly normalized to 2mm, will be greater than being equal to 1.5mm and be less than 2mm bending value and unify normalizing
1.5mm is turned to, 1.3mm is uniformly normalized to more than or equal to the 1.3mm bending values for being less than 1.5mm, is less than more than or equal to 1mm
1.3mm bending value is uniformly normalized to 1mm, and 0.8mm is uniformly normalized to more than or equal to the 0.8mm bending values for being less than 1mm, small
0.5mm is uniformly normalized in 0.8mm bending value;It will be greater than being equal to 1mm in the case of 600mm spans and 400mm spans
Bending value be uniformly normalized to 1mm, will be greater than be equal to 0.8mm be less than 1mm bending value be uniformly normalized to 0.8mm, be more than
0.6mm is uniformly normalized to equal to the 0.6mm bending values for being less than 0.8mm, the bending value more than or equal to 0.4 less than 0.6mm is unified
0.4mm is normalized to, 0.3mm is uniformly normalized to more than or equal to the 0.3mm bending values for being less than 0.4mm, the bending less than 0.3mm
Primary system one is normalized to 0.2mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710334625.5A CN107127225B (en) | 2017-05-12 | 2017-05-12 | A kind of cage guide automatic flattening method based on experts database technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710334625.5A CN107127225B (en) | 2017-05-12 | 2017-05-12 | A kind of cage guide automatic flattening method based on experts database technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107127225A true CN107127225A (en) | 2017-09-05 |
CN107127225B CN107127225B (en) | 2018-09-25 |
Family
ID=59731577
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710334625.5A Expired - Fee Related CN107127225B (en) | 2017-05-12 | 2017-05-12 | A kind of cage guide automatic flattening method based on experts database technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107127225B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108637038A (en) * | 2018-05-07 | 2018-10-12 | 中北大学 | A kind of full-automatic gun barrel straightener and straightening technology |
CN113385554A (en) * | 2021-08-18 | 2021-09-14 | 马拉兹(江苏)电梯导轨有限公司 | Elevator guide rail bending degree evaluation method, elevator guide rail straightening method and system |
CN113399500A (en) * | 2021-08-19 | 2021-09-17 | 马拉兹(江苏)电梯导轨有限公司 | T-shaped guide rail straightening device and method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101934308A (en) * | 2010-08-20 | 2011-01-05 | 浙江大学 | Method and device for straightening multi-scale bending guide rail |
US20130160514A1 (en) * | 2010-08-30 | 2013-06-27 | Manfred Mitze | Bending-straightening machine for a long workpiece, device for feeding in and removing said workpiece and method for bend-straightening long workpieces |
CN103394550A (en) * | 2013-07-29 | 2013-11-20 | 长春机械科学研究院有限公司 | Non-contact straightening point confirming method for straightness of rectangular-section long-rail work piece |
CN103418642A (en) * | 2012-05-18 | 2013-12-04 | 长江润发机械股份有限公司 | Elevator guide rail precision leveler |
CN104588447A (en) * | 2014-12-23 | 2015-05-06 | 上海理工大学 | Guide rail straightening device |
CN104759494A (en) * | 2015-04-23 | 2015-07-08 | 长江润发机械股份有限公司 | Precise straightening machine for elevator rail |
-
2017
- 2017-05-12 CN CN201710334625.5A patent/CN107127225B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101934308A (en) * | 2010-08-20 | 2011-01-05 | 浙江大学 | Method and device for straightening multi-scale bending guide rail |
US20130160514A1 (en) * | 2010-08-30 | 2013-06-27 | Manfred Mitze | Bending-straightening machine for a long workpiece, device for feeding in and removing said workpiece and method for bend-straightening long workpieces |
CN103418642A (en) * | 2012-05-18 | 2013-12-04 | 长江润发机械股份有限公司 | Elevator guide rail precision leveler |
CN103394550A (en) * | 2013-07-29 | 2013-11-20 | 长春机械科学研究院有限公司 | Non-contact straightening point confirming method for straightness of rectangular-section long-rail work piece |
CN104588447A (en) * | 2014-12-23 | 2015-05-06 | 上海理工大学 | Guide rail straightening device |
CN104759494A (en) * | 2015-04-23 | 2015-07-08 | 长江润发机械股份有限公司 | Precise straightening machine for elevator rail |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108637038A (en) * | 2018-05-07 | 2018-10-12 | 中北大学 | A kind of full-automatic gun barrel straightener and straightening technology |
CN108637038B (en) * | 2018-05-07 | 2020-02-07 | 中北大学 | Full-automatic barrel straightener and straightening process |
CN113385554A (en) * | 2021-08-18 | 2021-09-14 | 马拉兹(江苏)电梯导轨有限公司 | Elevator guide rail bending degree evaluation method, elevator guide rail straightening method and system |
CN113399500A (en) * | 2021-08-19 | 2021-09-17 | 马拉兹(江苏)电梯导轨有限公司 | T-shaped guide rail straightening device and method |
Also Published As
Publication number | Publication date |
---|---|
CN107127225B (en) | 2018-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107127225B (en) | A kind of cage guide automatic flattening method based on experts database technology | |
CN108089544B (en) | Trajectory generation method and control system for sole glue spraying robot | |
CN102699534B (en) | Scanning type laser vision sensing-based narrow-gap deep-groove automatic laser multilayer welding method for thick plate | |
CN110227876A (en) | Robot welding autonomous path planning method based on 3D point cloud data | |
CN108614944A (en) | A kind of shield track axis correction parameter prediction technique | |
CN201653373U (en) | Triaxial non-contact image measuring system | |
US20120215334A1 (en) | Tool path generation method and device | |
CN103020956B (en) | Image matching method for judging Hausdorff distance based on decision | |
CN107526875A (en) | A kind of aerial blade type face mismachining tolerance method for visualizing | |
CN104076743B (en) | A kind of interpolation control method of self-identifying interpolation kind | |
CN109933057A (en) | The local guide tracks method and device for planning of dilatory machine automatic drive system | |
CN109739181B (en) | Machine tool spindle thermal error modeling detection method based on detection neural network | |
CN104089599B (en) | Quasi morphological filtering method for extracting two-dimensional contour in contact measuring head measurement | |
CN109782692A (en) | A kind of method of 3C Product housing transition machining path Adaptive Planning | |
CN105676779A (en) | Tracing method for determining local interference region boundary of free-form surface machining | |
CN103163837B (en) | A kind of cutter path adaptive management system and method towards five-shaft numerical control processing | |
CN107272597A (en) | A kind of nurbs curve interpolation based on advance and retreat method quickly pre-reads processing method | |
CN105258647A (en) | Visual detection method of automobile lock catch rivet point | |
CN102322819B (en) | Gear chamfer laser measuring instrument | |
CN101825883A (en) | Tubing intelligent forming detection and correction method and tubing forming system | |
CN107103136B (en) | Rail vehicle wheel-rail contact point calculation method based on distance field | |
CN104992236A (en) | Automatic layout method of bending machine processes | |
CN103868455A (en) | Method for achieving visual reconstruction of space coordinates of target point in water tank | |
CN111950434B (en) | Lane line structuralization method and system based on discrete point scanning | |
CN100424468C (en) | Measuring device and method for numerical control rib cold bending machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180925 |