CN107085758A - A kind of project management method, apparatus and system - Google Patents

A kind of project management method, apparatus and system Download PDF

Info

Publication number
CN107085758A
CN107085758A CN201710043898.4A CN201710043898A CN107085758A CN 107085758 A CN107085758 A CN 107085758A CN 201710043898 A CN201710043898 A CN 201710043898A CN 107085758 A CN107085758 A CN 107085758A
Authority
CN
China
Prior art keywords
data
management
server
engineering
progress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710043898.4A
Other languages
Chinese (zh)
Inventor
陈显龙
陈晓龙
杨志鹏
江春华
罗新伟
李坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Forever Technology Co Ltd
Original Assignee
Beijing Forever Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Forever Technology Co Ltd filed Critical Beijing Forever Technology Co Ltd
Priority to CN201710043898.4A priority Critical patent/CN107085758A/en
Publication of CN107085758A publication Critical patent/CN107085758A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Quality & Reliability (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of project management method, apparatus and system, it is applied to the mobile terminal in the engineering progress management system under Engineering Management Patterns EPC, the engineering progress management system includes server and at least one mobile terminal, the mobile terminal is wirelessly connected with the server, the mobile terminal is used for design management information, the typing of construction management information and handling of goods and materials information, realize and managed on line, finish the offline way to manage that project management mode is mostly fallen behind using paper Report Server Management, cause the serious waste of paper, the efficiency of management is low, management information obtains the outmoded mode of series of malpractice such as delayed, progress situation can be reflected administrative staff well in real time simultaneously, realize becoming more meticulous and various dimensions management for project progress.

Description

A kind of project management method, apparatus and system
Technical field
It is to be related to a kind of project management method, device in particular the present invention relates to project progress monitoring technology field And system.
Background technology
EPC (Engineer Procure Construct, general contract of civil engineering management) application has developed into current market Main flow, it is the grand strategy that domestic engineering corporation moves towards market to accept construction project in EPC forms, is also that state is built-in If the road of the survival and development of engineering company.With the development of domestic undertaking of construction overseas project construction project continually and steadily, very Many undertaking of construction are changed into large-scale synthesis International General Contract construction management enterprise via single installing construction enterprise Industry.Especially each engineering designing institute has begun to change the operating mode of enterprise, and the survey and design single by being engaged in the past works, Gradually to engineering consulting and general contract of civil engineering business development.The general contract of civil engineering carried out by main body of designing unit relies on itself Feature and resources advantage, embody the developing direction of general contract of civil engineering, are gradually favored by owner.
Can engineering project smoothly complete in the given time, the performance of direct relation Project Economy Benefit;Progress monitoring Target and control of investment, the target of quality control be the unity of opposites, it is, in general, that progress will increase investment, but work soon Phase, which shifts to an earlier date, can also increase investment returns;Progress may influence quality soon, and quality control may strictly influence progress;But if Quality control is strict and avoids and does over again, and can accelerate progress again;Therefore, three targets of progress, quality and investment are a systems, Engineering management seeks to resolve the contradiction of three, should progress it is fast, reduced investment, quality are good again, are reacted in engineering management It is design, three big cores of construction and buying.Reasonably the progress of control integrated engineering project is highly important, certain engineering Progress has been similarly subjected to the influence of factors, for example:Human factor, technical factor, material and facility factor, equipment factor, Ground axoneme, fund factor, climatic factor, environmental factor etc..
Current project management mode mostly using way to manage under the line of paper Report Server Management backwardness, causes paper Serious waste, the efficiency of management is low, management information obtains the outmoded mode of series of malpractice such as delayed, while this mode without Progress situation is reflected administrative staff there by method well in real time, causes engineering for various reasons can not be normally complete Work, it is impossible to realize becoming more meticulous and various dimensions management for project progress.
The content of the invention
In view of this, the invention provides a kind of project management method, apparatus and system, to solve work of the prior art The offline way to manage that journey project management mode is mostly fallen behind using paper Report Server Management, causes serious waste, the management of paper Inefficiency, management information obtain the outmoded mode of series of malpractice such as delayed, while this mode can not be in real time progress Situation reflects administrative staff there well, causes engineering can not normally complete for various reasons, it is impossible to realize engineering The problem of being managed with various dimensions that become more meticulous of progress.
To achieve the above object, the present invention provides following technical scheme:
A kind of project management method, applied to the mobile end in the engineering progress management system under Engineering Management Patterns EPC End, the engineering progress management system includes server and at least one mobile terminal, the mobile terminal and the server Wirelessly connect, the mobile terminal is used for the record of design management information, construction management information and handling of goods and materials information Enter, methods described includes:
The data inputting instruction of real-time reception user input, and data inputting instruction is sent to the server;
Receive the whois lookup to instruct the default template that matches with the data inputting;
The default template is parsed, corresponding data form is obtained;
Operation of the user to the data form is received, engineering progress data is obtained;
The engineering progress data is sent to the server and carries out data storage, the engineering progress data is described Server generates the administration base of real-time engineering design schedule, construction speed and goods and materials progress according to preset algorithm.
It is preferred that, in addition to:
Receive the design management instruction of user's input, design management instruction include the design drawing after design alteration with Design alteration record information;
The design drawing that user specifies is called, the design drawing after the design alteration and the design alteration are recorded Information is sent to the server, so that the server determines text corresponding with the design drawing according to the design drawing Part is pressed from both sides;
By the design drawing after the design alteration and design alteration record information storage into the file.
It is preferred that, in addition to:
The handling of goods and materials instruction of user's input is received, the handling of goods and materials instruction includes the purchasing management of goods and materials, prison tubing Reason, transportation management and warehousing management information;
Handling of goods and materials instruction is sent to the server, so that the server is instructed according to the handling of goods and materials Transfer the purchasing management with the goods and materials, supervise the management parameters of tubing reason, transportation management and warehousing management information match, connect Receive the management parameters returned by the server;
Operation of the user to the management parameters is received, handling of goods and materials letter corresponding with handling of goods and materials instruction is obtained Breath;
The handling of goods and materials information is sent to the server and carries out data storage.
It is preferred that, in addition to:
The construction management instruction of user's input is received, the construction management instruction includes construction plan information, construction speed Information and labor management information;
Construction management instruction is sent to the server, so that the server is instructed according to the construction management Transfer the management parameters with the construction plan information, construction speed information and labor management information match, and receive by The management parameters that the server is returned;
Operation of the user to the management parameters is received, construction management letter corresponding with construction management instruction is obtained Breath;
The construction management information is sent to the server and carries out data storage.
Wherein, the operation for receiving user to the data form, obtaining engineering progress data includes:
The data form is shown in the display interface of the mobile terminal;
User is received to be operated according to the typing of each item data in the data form;
When the equal typing of each item data in the data form is completed, the data form that typing is completed is used as engineering Progress data.
Wherein, described that the engineering progress data is sent into the server, the engineering progress data is the clothes The administration base that business device generates real-time engineering design schedule, construction speed and goods and materials progress according to preset algorithm includes:
The server receives the engineering progress data;
Each item data in the engineering progress data is parsed as source data;
The source data is obtained into output result as input parameter using preset algorithm;
The form that the output result is converted into form is entered as real-time engineering design schedule, construction speed and goods and materials Degree.
A kind of engineering management device, including:
Data inputting instruction reception unit, the data inputting instruction inputted for real-time reception user, and by the data Typing instruction is sent to the server;
Template receiving unit, for receive the whois lookup to match default is instructed with the data inputting Template;
Resolution unit, for being parsed to the default template, obtains corresponding data form;
Engineering progress data generation unit, for receiving operation of the user to the data form, obtains project progress number According to;
Engineering progress data transmitting element, is deposited for the engineering progress data to be sent into the server progress data Storage, the engineering progress data is that the server generates real-time engineering design schedule, construction speed and thing according to preset algorithm The administration base of money progress.
Wherein, the engineering progress data generation unit includes:
Display unit, for the data form to be shown in the display interface of the mobile terminal;
Input receiving unit, is operated for receiving user according to the typing of each item data in the data form;
Processing unit, when being completed for the equal typing of each item data in the data form, the number that typing is completed Engineering progress data is used as according to list.
Wherein, the engineering progress data transmitting element includes:
Receiving subelement, the engineering progress data is received for the server;
Subelement is parsed, for parsing each item data in the engineering progress data as source data;
Subelement is exported, for the source data to be obtained into output result as input parameter using preset algorithm;
Conversion subunit, for the output result is converted into the form of form as real-time engineering design schedule, apply Work progress and goods and materials progress.
A kind of project management system, including:At least one mobile terminal and server, the mobile terminal and the service Device is wirelessly connected, wherein:
Data inputting instruction is simultaneously sent to by the data inputting instruction of the mobile terminal real-time reception user input The server;
The server receives the data inputting instruction, searches and instructs the default mould matched with the data inputting Plate, and the default template is returned into the mobile terminal;
The mobile terminal receives the default template and the default template is parsed, and obtains data form;
The mobile terminal receives operation of the user to the data form, obtains engineering progress data, and by the work Journey progress data is sent to the server;
The engineering progress data is generated real-time engineering design schedule, construction speed by the server according to preset algorithm With goods and materials progress.
Understand that compared with prior art, the invention discloses a kind of project management method, dress via above-mentioned technical scheme Put and system, it is applied to the mobile terminal in the engineering progress management system under Engineering Management Patterns EPC, the project progress Management system includes server and at least one mobile terminal, and the mobile terminal wirelessly connects with the server Connect, the mobile terminal is used for the typing of design management information, construction management information and handling of goods and materials information, realize and managed on line Reason, finishes the offline way to manage that project management mode is mostly fallen behind using paper Report Server Management, causes the tight of paper Waste again, the efficiency of management is low, management information obtains the outmoded mode of series of malpractice such as delayed, while can be in real time entering Degree situation reflects administrative staff well, realizes becoming more meticulous and various dimensions management for project progress.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of project management method schematic flow sheet provided in an embodiment of the present invention;
Fig. 2 is a kind of management block diagram of project management system provided in an embodiment of the present invention;
Fig. 3 is the business framework schematic diagram that user terminal provided in an embodiment of the present invention is design side;
Fig. 4 is the business framework schematic diagram that user terminal provided in an embodiment of the present invention is goods and materials side;
Fig. 5 is the business framework schematic diagram that user terminal provided in an embodiment of the present invention is construction party;
Fig. 6 is mobile terminal application structure block diagram provided in an embodiment of the present invention;
Fig. 7 is a kind of engineering management apparatus structure schematic diagram provided in an embodiment of the present invention;
Fig. 8 is a kind of project management system structural representation provided in an embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
The present invention is using the EPC general contract of civil engineering managerial experiences that are accumulated at present as key foundation, with project management information For important means, developing and the complementary EPC general contract of civil engineering management software of EPC management modes will turn into work after EPC patterns EPC management philosophy after journey implementation management new development trend implements another inexorable trend of mode.
Accompanying drawing 1 is referred to, Fig. 1 is a kind of project management method schematic flow sheet provided in an embodiment of the present invention.Such as Fig. 1 institutes Show, the invention discloses a kind of project management method, it is applied in the engineering progress management system under Engineering Management Patterns EPC Mobile terminal, the engineering progress management system includes server and at least one mobile terminal, the mobile terminal and institute State server wirelessly to connect, the mobile terminal is used for design management information, construction management information and handling of goods and materials The typing of information, methods described specific steps include as described below:
S101, the data inputting instruction of real-time reception user input, and data inputting instruction is sent to server.
In the embodiment of the present invention, mobile terminal wirelessly carries out data communication with server and is connected.For example:3G Or 4G etc..In practical work process, user can use the typing of mobile terminal input data to instruct, mobile terminal real-time reception The data inputting instruction of user's input, and send an instruction to server.
What S102, the reception server were found instructs the default template matched with data inputting.
In the server of the present invention, a variety of default templates are prefixed, because in this area, various data are corresponding default Template number is more, and the Data Entry of typing required in each default template is also more, therefore, is set in default template It is extremely complex on meter.In the present invention, with reference to existing working experience and the correlation properties of system, a variety of default moulds are devised Plate, including:The default template such as goods and materials, design, construction.Also include progress and make a report on template.
The data inputting that mobile terminal inputs user is instructed, and is sent in server, server is received after instruction, from Matching default template is found in a variety of default templates and mobile terminal is returned to.
Mobile terminal receives the default template returned from server.For example, design management template, handling of goods and materials template and Construction management template.
S103, default template is parsed, obtain corresponding data form.
The operation of S104, reception user to data form, obtains engineering progress data.
Mobile terminal is received after default template, and preset template is parsed, and obtains corresponding data form.User can With in real time according to project progress situation, project progress relevant information is uploaded onto the server storage using mobile terminal in real time.
Wherein, the operation for receiving user to the data form, obtaining engineering progress data includes:
The data form is shown in the display interface of the mobile terminal;
User is received to be operated according to the typing of each item data in the data form;
When the equal typing of each item data in the data form is completed, the data form that typing is completed is used as engineering Progress data.
S105, engineering progress data be sent to server carry out data storage, engineering progress data be server according to The administration base of preset algorithm generation real-time engineering design schedule, construction speed and goods and materials progress.
After the completion of user is to the default template operation in mobile terminal, what the typing that can be sent by receiving user was completed Template data, is sent in server, server is called according to the template data by instruction after the instruction of the completion is received Default algorithm, automatically generates engineering progress data.
Wherein, described that the engineering progress data is sent into the server, the engineering progress data is the clothes The administration base that business device generates real-time engineering design schedule, construction speed and goods and materials progress according to preset algorithm includes:
The server receives the engineering progress data;
Each item data in the engineering progress data is parsed as source data;
The source data is obtained into output result as input parameter using preset algorithm;
The form that the output result is converted into form is entered as real-time engineering design schedule, construction speed and goods and materials Degree.
It should be noted that referring to accompanying drawing 2, Fig. 2 is a kind of pipe of project management system provided in an embodiment of the present invention Manage block diagram.As shown in Fig. 2 the application is intended to using EPC general contract of civil engineering management mode as foundation, EPC Project portion is tie, Design, goods and materials, construction are synthesized and coordinated, three big construction links promote construction task to smoothly complete comprehensively.I.e.:The use of mobile terminal Family end can be design side, goods and materials side or construction party, the shared inquiry of the data between three can be carried out by mobile terminal, such as Fruit is other data forms, according to default algorithm, generates project progress, the project progress information can be chart or progress Bar so that the real-time project progress situation of higher authority's more intuitive understanding.
In actual use, server is configured with engineering statistics module, is entered by the template data sent by mobile terminal The technological means such as row excavation, statistical analysis, intuitively show engineering site situation with figure, form mode, strengthen corporate decision Macroscopical management and control of the layer to Process of Engineering Construction, including project progress, safety inspection problem rectification statistics, the rectification of quality examination problem Statistics, chronicle of events etc..The progress for checking each engineering, safety, quality, chronicle of events information are drilled through layer by layer.
In actual use, server is also configured with comprehensive management module, from the angle that project is overall, with list, figure Various professional files and data in project management process are analyzed and showed respectively etc. form, including project profile, item The contents such as mesh portion management information, engineering address list, management file.File and data can by construction site by user's root According to actual conditions typing.
In actual use, server is configured with handling of goods and materials module, for being specially managed to project goods and materials, construction Project management department works out engineering material inventory, and record arrival/return of goods information according to live practice of construction situation and schedule.System The content that system is made a report on according to construction, automatically generates goods and materials and flows to record sheet.
In actual use, also configure Management of engineering schedule module, it is the core content of system, from project milestone/ One-level plan, two grades of plans, three-level plan, site operation progress are made a report on, project process gunter drawing, engineering construction weekly, monthly magazine Real-time, effective management and control is carried out to engineering project progress etc. multi-angle, ensures that Engineering Project Construction runs smooth.
On the basis of above-described embodiment, this method also includes:
Receive the design management instruction of user's input, design management instruction include the design drawing after design alteration with Design alteration record information;
The design drawing that user specifies is called, the design drawing after the design alteration and the design alteration are recorded Information is sent to the server, so that the server determines text corresponding with the design drawing according to the design drawing Part is pressed from both sides;
By the design drawing after the design alteration and design alteration record information storage into the file.
In the present embodiment, accompanying drawing 3 is referred to, Fig. 3 is the business frame that user terminal provided in an embodiment of the present invention is design side Frame schematic diagram.As shown in figure 3, carrying out business diagnosis with combing mainly for design phase core business, function covers:Feasibility study, The engineerings such as preliminary design, construction drawing (record containing design alteration and process version drawing file), as-built drawing, drawing declaration, drawing filing Design phase links related management content.
Wherein, construction drawing goes out figure link according to Practical Project construction needs, is carried out by site operation unit and designing unit After the check and correction of drawing content and successive ignition renewal, final output as-constructed drawing, and declaration extremely filing.
Finally realize design Whole Course Management of the service coverage by feasibility study to the one-touch filing of design data.
On the basis of above-described embodiment, this method also includes:
The handling of goods and materials instruction of user's input is received, the handling of goods and materials instruction includes the purchasing management of goods and materials, prison tubing Reason, transportation management and warehousing management information;
Handling of goods and materials instruction is sent to the server, so that the server is instructed according to the handling of goods and materials Transfer the purchasing management with the goods and materials, supervise the management parameters of tubing reason, transportation management and warehousing management information match, connect Receive the management parameters returned by the server;
Operation of the user to the management parameters is received, handling of goods and materials letter corresponding with handling of goods and materials instruction is obtained Breath;
The handling of goods and materials information is sent to the server and carries out data storage.
In the present embodiment, accompanying drawing 4 is referred to, Fig. 4 is the business frame that user terminal provided in an embodiment of the present invention is goods and materials side Frame schematic diagram.As shown in figure 4, managing goods and materials link correlation mainly for general contract of civil engineering:Buying, prison are made, transported, storing in a warehouse four Big core business carries out business diagnosis with combing, and function mainly covers:Procurement plan, the prison plan of making, production planning and sequencing, prison were made The relevant supplies such as journey, Material Transportation, warehousing management manage content.
Wherein, during goods and materials prison is made, row constraint is entered to goods and materials manufacturing schedule by production planning and sequencing, such as can not be according to schedule Progress is produced, then is sent and notified to relevant departments and shareholder by alarm mode, and take corresponding measure to carry out problem coordination Or reduction Schedule schema of deploying to ensure effective monitoring and control of illegal activities in advance;Delay as production planning and sequencing is produced, then remind shareholder to unify subsequent production plan Adjustment.
During Material Transportation, it is actually needed according to engineering construction, Material Transportation circuit is tracked and goods and materials are safeguarded Tracking mode, by the related logistics information real-time update of Material Transportation;Tracking process supports domestic and international transportation route.
To sum up, by the informatization to this module, it can effectively cover and make to goods and materials from purchase of goods and materials, scheduling, prison Factory, transport, stock management overall process, realize goods and materials production, transport, warehousing management links information can look into online, state can Control, process all standing.
On the basis of above-described embodiment, this method also includes:
The construction management instruction of user's input is received, the construction management instruction includes construction plan information, construction speed Information and labor management information;
Construction management instruction is sent to the server, so that the server is instructed according to the construction management Transfer the management parameters with the construction plan information, construction speed information and labor management information match, and receive by The management parameters that the server is returned;
Operation of the user to the management parameters is received, construction management letter corresponding with construction management instruction is obtained Breath;
The construction management information is sent to the server and carries out data storage.
In the present embodiment, accompanying drawing 5 is referred to, Fig. 5 is the business frame that user terminal provided in an embodiment of the present invention is construction party Frame schematic diagram.As shown in figure 5, construction management is as core management link in general contract of civil engineering management mode, significance level is not sayed And explain, in this application, weight analysis and control are carried out for construction management content, its business tine and function cover from:Enter Degree planning, process of construction management and control, collect to construction progress, comprising:Progress, safety, quality, civilized construction, file administration The Construction stage Whole Course Managements such as indices progress, project profile statistics.
Benign communication bridge is built between general contract unit and each unit in charge of construction by information-based means, breaks through and respectively takes part in building Information island formula obstacle between unit, data barrier is got through, realize processing, clear definiton of powers on engineering construction coordination of tasks line, have According to can look into, state is controllable, business is covered comprehensively.
Accompanying drawing 6 is referred to, Fig. 6 is mobile terminal application structure block diagram provided in an embodiment of the present invention.As shown in fig. 6, this Application is planning in the range of construction management business and while correlation function, by Mobile solution technology further to unit in charge of construction In engineering construction scene workmen system apply and experience in terms of, carry out supplement improve with it is abundant, wherein, pass through movement The mode of application, is solved because construction environment factor causes that the problem that field data makes a report on work can not be carried out whenever and wherever possible;It is logical The mode that Mobile solution client off-line uploads data is crossed, is solved because part job site is because signal quality is low and causes nothing Method carries out the problem of data are made a report on, i.e., after the completion of data can be made a report on by offline client, be transferred to network signal preferably Area carries out supplement upload.
1. realization design, purchases, on the line for each stage business datum of constructing intersection with merging
Effectively reduction design, buying, the big core link routine matter of construction three link up cost, improve cooperation efficiency, so that Realize project progress, cost and quality three comprehensive coordination;By information-based means in general contract unit and design, goods and materials, apply Information island formula obstacle between benign communication bridge, each unit of taking part in building of breakthrough is built between work order position, data barrier is got through, realized Processing, clear definiton of powers on engineering construction coordination of tasks line, have good grounds.
2. set up engineering construction status early warning mechanism
By the system in the pre-construction phase stage, you can for design, goods and materials, construction three big core business links point Do not work out:A series of project documentations such as schedule, drawing plan of needs, purchasing plan of materials and equipment, the prison plan of making, production planning and sequencing; According to above-mentioned project documentation content, this project carries out status tracking to actual progress with collecting in milestone node control mode, It is intended to content to be combined with actual progress, sets up engineering construction early warning mechanism, risks of construction and problem is informed into decision-making in time Layer, aids in it to carry out building coordination and other key issue processing work;In this way, improve data promptnesses, it is accuracy, true Reality, reduces engineering construction risk, realizes that engineering construction state is traced to source, depth collects, real-time update, is finally reached engineering The controllable purpose of setup state.
3. realize that Process of Engineering Construction manages all standing
By combining the existing EPC schema management experiences of domestic many general contract units, to design, thing in EPC management modes Each core content is analysed in depth and arranged for money, three big links of construction, each link core business of making rational planning for, and for it Feature designs correlation function array.
In summary, the invention discloses a kind of project management method, it is applied to the engineering under Engineering Management Patterns EPC Mobile terminal in progress control system, the engineering progress management system includes server and at least one mobile terminal, institute State mobile terminal to be wirelessly connected with the server, the mobile terminal is used for design management information, construction management The typing of information and handling of goods and materials information, realizes and is managed on line, finishes project management mode and mostly uses paper form Way to manage under line backward in management, causes that the serious waste of paper, the efficiency of management be low, management information obtains delayed etc. one and is The outmoded mode of row drawback, while progress situation can be reflected administrative staff well in real time, realizes project progress Become more meticulous and various dimensions management.
On the basis of method disclosed above, the invention also discloses a kind of device.
Accompanying drawing 7 is referred to, Fig. 7 is a kind of engineering management apparatus structure schematic diagram provided in an embodiment of the present invention.Such as Fig. 7 institutes State, the invention discloses a kind of engineering management device, the device concrete structure includes as follows:
Data inputting instruction reception unit 701, the data inputting instruction inputted for real-time reception user, and by the number The server is sent to according to typing instruction;
Template receiving unit 702, for receive the whois lookup to instruct and match with the data inputting Default template;
Resolution unit 703, for being parsed to the default template, obtains corresponding data form;
Engineering progress data generation unit 704, for receiving operation of the user to the data form, obtains project progress Data;
Engineering progress data transmitting element 705, line number is entered for the engineering progress data to be sent into the server According to storage, the engineering progress data is that the server generates real-time engineering design schedule, construction speed according to preset algorithm With the administration base of goods and materials progress.
Wherein, the engineering progress data generation unit 704 includes:
Display unit, for the data form to be shown in the display interface of the mobile terminal;
Input receiving unit, is operated for receiving user according to the typing of each item data in the data form;
Processing unit, when being completed for the equal typing of each item data in the data form, the number that typing is completed Engineering progress data is used as according to list.
Wherein, the engineering progress data transmitting element 705 includes:
Receiving subelement, the engineering progress data is received for the server;
Subelement is parsed, for parsing each item data in the engineering progress data as source data;
Subelement is exported, for the source data to be obtained into output result as input parameter using preset algorithm;
Conversion subunit, for the output result is converted into the form of form as real-time engineering design schedule, apply Work progress and goods and materials progress.
The invention discloses a kind of engineering management device, realize and managed on line, finish project management mode mostly The offline way to manage fallen behind using paper Report Server Management, causes that the serious waste of paper, the efficiency of management be low, management information is obtained The mode for taking the series of malpractice such as delayed outmoded, while progress situation can be reflected administrative staff well in real time, it is real Show becoming more meticulous and various dimensions management for project progress.
The invention also discloses a kind of system, accompanying drawing 8 is referred to, Fig. 8 is a kind of engineering pipe provided in an embodiment of the present invention Manage system structure diagram.As shown in figure 8, the invention discloses a kind of project management system, specifically, the system architecture bag Include:At least one mobile terminal 1 and server 2, mobile terminal 1 are wirelessly connected with server 2, wherein:
Data inputting instruction is simultaneously sent to the service by the data inputting instruction of mobile terminal real-time reception user input Device;
Server receives data inputting instruction, searches and instructs the default template that matches with data inputting, and by default mould Plate returns to mobile terminal;
Mobile terminal receives default template and default template is parsed, and obtains data form;
Mobile terminal receives operation of the user to data form, obtains engineering progress data, and engineering progress data is sent out Give server;
Engineering progress data is generated real-time engineering design schedule, construction speed and goods and materials according to preset algorithm and entered by server Degree.
It should be noted that a kind of engineering management device and project management system of the present embodiment can use the above method A kind of project management method in embodiment, for realizing whole technical schemes in above method embodiment, its modules Function can be implemented according to the method in above method embodiment, it implements process and can refer in above-described embodiment Associated description, here is omitted.
In summary, the invention discloses a kind of project management method, apparatus and system, it is applied to Engineering Management Patterns The mobile terminal in engineering progress management system under EPC, the engineering progress management system includes server and at least one Mobile terminal, the mobile terminal is wirelessly connected with the server, and the mobile terminal is believed for design management The typing of breath, construction management information and handling of goods and materials information, realizes and is managed on line, finish project management mode and mostly adopt The offline way to manage fallen behind with paper Report Server Management, causes that the serious waste of paper, the efficiency of management be low, management information is obtained The outmoded mode of the series of malpractice such as delayed, while progress situation can be reflected administrative staff well in real time, is realized Project progress become more meticulous and various dimensions management.
The engineering management referred in the application obtains general contract, sets up project management department and works out progress from general contract unit Plan, makes figure plan to designing unit, goes out figure, goods and materials unit is produced according to production planning and sequencing, transported, and unit in charge of construction is according to always Contract, design, goods and materials, unit provides resource and constructed, be completed;Conscientiously planned that engineering construction task assigns beginning, extremely The overall process management and control of engineering construction Life cycle between completion of works finishes;Effectively solve current EPC management of engineering construction mistake Cheng Zhong, without height correspondence therewith, the Information software problem of matching.
It should be noted that each embodiment in this specification is described by the way of progressive, each embodiment weight Point explanation be all between difference with other embodiment, each embodiment identical similar part mutually referring to.
Method proposed by the invention is exemplarily described above in association with accompanying drawing, the explanation of above example is It is used to help understand the core concept of the present invention.For those of ordinary skill in the art, according to the thought of the present invention, specific It will change in embodiment and application, such as front-rear axle has motor to participate in the hybrid power system driven. In summary, this specification content should not be construed as limiting the invention.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (10)

1. a kind of project management method, it is characterised in that applied in the engineering progress management system under Engineering Management Patterns EPC Mobile terminal, the engineering progress management system includes server and at least one mobile terminal, the mobile terminal and institute State server wirelessly to connect, the mobile terminal is used for design management information, construction management information and handling of goods and materials The typing of information, methods described includes:
The data inputting instruction of real-time reception user input, and data inputting instruction is sent to the server;
Receive the whois lookup to instruct the default template that matches with the data inputting;
The default template is parsed, corresponding data form is obtained;
Operation of the user to the data form is received, engineering progress data is obtained;
The engineering progress data is sent to the server and carries out data storage, the engineering progress data is the service Device generates the administration base of real-time engineering design schedule, construction speed and goods and materials progress according to preset algorithm.
2. project management method according to claim 1, it is characterised in that also include:
The design management instruction of user's input is received, the design management instruction includes the design drawing after design alteration and design Change record information;
The design drawing that user specifies is called, by the design drawing after the design alteration and the design alteration record information The server is sent to, so that the server determines file corresponding with the design drawing according to the design drawing Folder;
By the design drawing after the design alteration and design alteration record information storage into the file.
3. project management method according to claim 1, it is characterised in that also include:
The handling of goods and materials instruction of user's input is received, the handling of goods and materials instruction includes the purchasing management of goods and materials, prison tubing reason, fortune Defeated management and warehousing management information;
Handling of goods and materials instruction is sent to the server, so that the server is transferred according to handling of goods and materials instruction Purchasing management with the goods and materials, prison tubing reason, the management parameters of transportation management and warehousing management information match, receive by The management parameters that the server is returned;
Operation of the user to the management parameters is received, handling of goods and materials information corresponding with handling of goods and materials instruction is obtained;
The handling of goods and materials information is sent to the server and carries out data storage.
4. project management method according to claim 1, it is characterised in that also include:
The construction management instruction of user's input is received, the construction management instruction includes construction plan information, construction speed information And labor management information;
Construction management instruction is sent to the server, so that the server is transferred according to construction management instruction With the management parameters of the construction plan information, construction speed information and labor management information match, and receive by described The management parameters that server is returned;
Operation of the user to the management parameters is received, construction management information corresponding with construction management instruction is obtained;
The construction management information is sent to the server and carries out data storage.
5. 1 project management method according to claim, it is characterised in that the reception user is to the data form Operation, obtaining engineering progress data includes:
The data form is shown in the display interface of the mobile terminal;
User is received to be operated according to the typing of each item data in the data form;
When the equal typing of each item data in the data form is completed, the data form that typing is completed is used as project progress Data.
6. project management method according to claim 5, it is characterised in that described to be sent to the engineering progress data The server, the engineering progress data is that the server generates real-time engineering design schedule, construction according to preset algorithm The administration base of progress and goods and materials progress includes:
The server receives the engineering progress data;
Each item data in the engineering progress data is parsed as source data;
The source data is obtained into output result as input parameter using preset algorithm;
The form that the output result is converted into form is used as real-time engineering design schedule, construction speed and goods and materials progress.
7. a kind of engineering management device, it is characterised in that including:
Data inputting instruction reception unit, the data inputting instruction inputted for real-time reception user, and by the data inputting Instruction is sent to the server;
Template receiving unit, for receive the whois lookup to instruct the default mould that matches with the data inputting Plate;
Resolution unit, for being parsed to the default template, obtains corresponding data form;
Engineering progress data generation unit, for receiving operation of the user to the data form, obtains engineering progress data;
Engineering progress data transmitting element, data storage is carried out for the engineering progress data to be sent into the server, The engineering progress data is that the server enters according to preset algorithm generation real-time engineering design schedule, construction speed and goods and materials The administration base of degree.
8. the 7 engineering management device according to claim, it is characterised in that the engineering progress data generation unit bag Include:
Display unit, for the data form to be shown in the display interface of the mobile terminal;
Input receiving unit, is operated for receiving user according to the typing of each item data in the data form;
Processing unit, when being completed for the equal typing of each item data in the data form, the tables of data that typing is completed Nonoculture is engineering progress data.
9. engineering management device according to claim 8, it is characterised in that the engineering progress data transmitting element bag Include:
Receiving subelement, the engineering progress data is received for the server;
Subelement is parsed, for parsing each item data in the engineering progress data as source data;
Subelement is exported, for the source data to be obtained into output result as input parameter using preset algorithm;
Conversion subunit, for the output result is converted into the form of form as real-time engineering design schedule, construct into Degree and goods and materials progress.
10. a kind of project management system, it is characterised in that including:At least one mobile terminal and server, the mobile terminal Wirelessly it is connected with the server, wherein:
Data inputting instruction is simultaneously sent to described by the data inputting instruction of the mobile terminal real-time reception user input Server;
The server receives the data inputting instruction, searches and instructs the default template matched with the data inputting, and The default template is returned into the mobile terminal;
The mobile terminal receives the default template and the default template is parsed, and obtains data form;
The mobile terminal receives operation of the user to the data form, obtains engineering progress data, and the engineering is entered Degrees of data is sent to the server;
The engineering progress data is generated real-time engineering design schedule, construction speed and thing by the server according to preset algorithm Money progress.
CN201710043898.4A 2017-01-19 2017-01-19 A kind of project management method, apparatus and system Pending CN107085758A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710043898.4A CN107085758A (en) 2017-01-19 2017-01-19 A kind of project management method, apparatus and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710043898.4A CN107085758A (en) 2017-01-19 2017-01-19 A kind of project management method, apparatus and system

Publications (1)

Publication Number Publication Date
CN107085758A true CN107085758A (en) 2017-08-22

Family

ID=59614415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710043898.4A Pending CN107085758A (en) 2017-01-19 2017-01-19 A kind of project management method, apparatus and system

Country Status (1)

Country Link
CN (1) CN107085758A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107886247A (en) * 2017-11-14 2018-04-06 中国铁路总公司 A kind of railway electronics fortune 46 systems of system of identity-based certification
CN108171383A (en) * 2017-12-30 2018-06-15 广州供电局有限公司 Electric Power Capital Construction engineering management optimization method and system
CN108256826A (en) * 2018-01-09 2018-07-06 上海隧道工程有限公司 Construction regulations control system and method
CN108830515A (en) * 2018-09-25 2018-11-16 晋能清洁能源光伏发电有限责任公司 A kind of photovoltaic plant capital construction information management system
CN109359125A (en) * 2018-08-27 2019-02-19 中铁建工集团有限公司 A kind of progress fine-grained management method and its system for construction project
CN109389358A (en) * 2018-08-23 2019-02-26 上海水顿智能科技有限公司 Project management system and method based on GIS
CN109447589A (en) * 2018-11-05 2019-03-08 珠海格力电器股份有限公司 Project management method, device, system and computer readable storage medium
CN109492059A (en) * 2019-01-03 2019-03-19 北京理工大学 A kind of multi-source heterogeneous data fusion and Modifying model process management and control method
CN109903008A (en) * 2019-01-25 2019-06-18 国电南瑞科技股份有限公司 A kind of subway work construction project progress visualization managing and control system and management-control method
CN110930025A (en) * 2019-11-21 2020-03-27 中国十九冶集团有限公司 Project management system for engineering construction
CN111080112A (en) * 2019-12-09 2020-04-28 北京电旗连江科技发展有限公司 Communication engineering progress management system and method based on data analysis
CN111260328A (en) * 2020-01-20 2020-06-09 深圳市赛易特信息技术有限公司 Gas engineering drawing generation method, intelligent terminal and storage medium
CN111444698A (en) * 2020-03-30 2020-07-24 陕西合友网络科技有限公司 Building project management method and system
CN111881194A (en) * 2020-06-22 2020-11-03 国网河北省电力有限公司信息通信分公司 System and method for collecting engineering test data
CN113962622A (en) * 2021-09-16 2022-01-21 湖南亘晟门窗幕墙有限公司 Door and window production management system
TWI825298B (en) * 2020-03-26 2023-12-11 臺灣銀行股份有限公司 Financial business undertaking and review integration system and method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102855546A (en) * 2012-08-31 2013-01-02 天津博信汽车零部件有限公司 Integrated project management system
CN103136618A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress plan
CN105094329A (en) * 2015-07-23 2015-11-25 武汉沃思财务外包服务有限公司 Data entry method and device and electronic equipment applying same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136618A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress plan
CN102855546A (en) * 2012-08-31 2013-01-02 天津博信汽车零部件有限公司 Integrated project management system
CN105094329A (en) * 2015-07-23 2015-11-25 武汉沃思财务外包服务有限公司 Data entry method and device and electronic equipment applying same

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107886247A (en) * 2017-11-14 2018-04-06 中国铁路总公司 A kind of railway electronics fortune 46 systems of system of identity-based certification
CN107886247B (en) * 2017-11-14 2024-04-02 中国铁路总公司 Railway electronic operation system 46 system based on identity authentication
CN108171383A (en) * 2017-12-30 2018-06-15 广州供电局有限公司 Electric Power Capital Construction engineering management optimization method and system
CN108256826A (en) * 2018-01-09 2018-07-06 上海隧道工程有限公司 Construction regulations control system and method
CN109389358A (en) * 2018-08-23 2019-02-26 上海水顿智能科技有限公司 Project management system and method based on GIS
CN109359125A (en) * 2018-08-27 2019-02-19 中铁建工集团有限公司 A kind of progress fine-grained management method and its system for construction project
CN108830515A (en) * 2018-09-25 2018-11-16 晋能清洁能源光伏发电有限责任公司 A kind of photovoltaic plant capital construction information management system
CN109447589B (en) * 2018-11-05 2021-12-03 珠海格力电器股份有限公司 Engineering management method, device, system and computer readable storage medium
CN109447589A (en) * 2018-11-05 2019-03-08 珠海格力电器股份有限公司 Project management method, device, system and computer readable storage medium
CN109492059A (en) * 2019-01-03 2019-03-19 北京理工大学 A kind of multi-source heterogeneous data fusion and Modifying model process management and control method
CN109492059B (en) * 2019-01-03 2020-10-27 北京理工大学 Multi-source heterogeneous data fusion and model correction process control method
CN109903008A (en) * 2019-01-25 2019-06-18 国电南瑞科技股份有限公司 A kind of subway work construction project progress visualization managing and control system and management-control method
CN109903008B (en) * 2019-01-25 2022-09-09 国电南瑞科技股份有限公司 Visual management and control system and method for subway construction project progress
CN110930025A (en) * 2019-11-21 2020-03-27 中国十九冶集团有限公司 Project management system for engineering construction
CN111080112A (en) * 2019-12-09 2020-04-28 北京电旗连江科技发展有限公司 Communication engineering progress management system and method based on data analysis
CN111260328A (en) * 2020-01-20 2020-06-09 深圳市赛易特信息技术有限公司 Gas engineering drawing generation method, intelligent terminal and storage medium
CN111260328B (en) * 2020-01-20 2023-11-07 深圳市赛易特信息技术有限公司 Gas engineering drawing generation method, intelligent terminal and storage medium
TWI825298B (en) * 2020-03-26 2023-12-11 臺灣銀行股份有限公司 Financial business undertaking and review integration system and method thereof
CN111444698A (en) * 2020-03-30 2020-07-24 陕西合友网络科技有限公司 Building project management method and system
CN111881194A (en) * 2020-06-22 2020-11-03 国网河北省电力有限公司信息通信分公司 System and method for collecting engineering test data
CN113962622A (en) * 2021-09-16 2022-01-21 湖南亘晟门窗幕墙有限公司 Door and window production management system

Similar Documents

Publication Publication Date Title
CN107085758A (en) A kind of project management method, apparatus and system
CN110909972B (en) BIM-based steel structure full life cycle management system and method
CN203165006U (en) Engineering project management system
CN105303306B (en) Electric power material dispatching platform system
Liu et al. Automatically updating maintenance information from a BIM database
CN105868926A (en) Management platform for achieving task decomposition and automated distribution and performance assessment of power supply station
CN106845919A (en) Construction information collection processing method
CN101556475B (en) Real-time tracking system for processing materials and production process based on radio frequency technique
CN110033197A (en) A kind of equipment files lifecycle management system
CN104951905A (en) Equipment dynamic ledger management system
CN102646224A (en) Management integrating system of enterprise standardization
CN108154340A (en) Prefabricated component informationization management system based on BIM cloud platforms
CN109558412A (en) The data growing method and device of assembled architecture construct platform
CN101477655A (en) Layered MES software system architecture
CN103150618A (en) Generating system and method for working plan of power transmission network
CN103616855A (en) Three-dimensional simulation assembly-based cutting tool management system and management method thereof
CN109919676A (en) A kind of intelligent environment protection bag accounting management method and system
CN116562802A (en) Intelligent construction application platform of track traffic based on BIM
CN108665022A (en) A kind of digitlization yard management system
Akhavan et al. Blockchain technology in the construction industry: integrating BIM in project management and IOT in supply chain management
US20150073845A1 (en) Wireless coverage infrastructure design
KR100791475B1 (en) Architectural design management system for cooperating with active partners
KR100971123B1 (en) Earthwork management system for intelligence excavator
CN113449374B (en) Equipment self-organization strategy optimization method and system adaptive to steel structure construction characteristics
CN114493138A (en) Land-air integrated intelligent construction system and management method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170822