CN109447589B - Engineering management method, device, system and computer readable storage medium - Google Patents

Engineering management method, device, system and computer readable storage medium Download PDF

Info

Publication number
CN109447589B
CN109447589B CN201811307248.7A CN201811307248A CN109447589B CN 109447589 B CN109447589 B CN 109447589B CN 201811307248 A CN201811307248 A CN 201811307248A CN 109447589 B CN109447589 B CN 109447589B
Authority
CN
China
Prior art keywords
identification information
user
engineering
project
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811307248.7A
Other languages
Chinese (zh)
Other versions
CN109447589A (en
Inventor
吴妙瑜
罗晓
林晓玲
许芳萃
胡海平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201811307248.7A priority Critical patent/CN109447589B/en
Publication of CN109447589A publication Critical patent/CN109447589A/en
Application granted granted Critical
Publication of CN109447589B publication Critical patent/CN109447589B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Water Supply & Treatment (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The disclosure provides an engineering management method, an engineering management device, an engineering management system and a computer readable storage medium, and relates to the technical field of smart power grids. The engineering management method comprises the following steps: the method comprises the steps that a server obtains engineering identification information and user identification information from a user; matching the acquired user identification information and the engineering identification information based on information provided by an equipment provider, wherein the information provided by the equipment provider comprises the engineering identification information of an engineering to which the equipment belongs and the user identification information of a user to which the engineering belongs; and binding the project of the user and the equipment attribution under the condition of successful matching. By the method, the server can match the project belonging to the user according to the project identification information and the user identification information acquired from the user side based on the information acquired from the equipment supplier, and realize the binding between the user and the project, thereby improving the convenience and efficiency of project binding.

Description

Engineering management method, device, system and computer readable storage medium
Technical Field
The present disclosure relates to the field of smart grid technologies, and in particular, to a method, an apparatus, a system, and a computer-readable storage medium for engineering management.
Background
With the development of the smart grid technology, the smart grid can be applied to the management of projects and projects. IEMS (information Energy Management System) local Energy internet System application occasions may include homes, communities, buildings, factories, gardens, etc., and each project may include a plurality of key products. The project needs to be bound with the user to establish the relation between the user and the project, so that the user can conveniently control the project.
The binding method adopted in the related art comprises the following steps:
1. the developer of the project provides a user account and a password for the user, and the user logs in the account corresponding to the project to perform project management.
2. The user registers firstly, then informs the account number to the developer, and the developer manually associates the account number and the project in the database.
3. After purchasing a product, a user obtains a product serial number, inputs a product key serial number and then obtains the management authority of the product.
Disclosure of Invention
The inventor finds that in the above related art, the former two schemes are more stressful and inefficient for developers, and in the latter scheme, the product serial number is generally longer and less easy to remember, time and labor consuming and easy to make mistakes.
One object of the present disclosure is to improve the convenience and efficiency of engineering binding.
According to an aspect of the present disclosure, an engineering management method is provided, including: the method comprises the steps that a server obtains engineering identification information and user identification information from a user; matching the acquired user identification information and the engineering identification information based on information provided by an equipment provider, wherein the information provided by the equipment provider comprises the engineering identification information of an engineering to which the equipment belongs and the user identification information of a user to which the engineering belongs; and binding the project of the user and the equipment attribution under the condition of successful matching.
In one embodiment, the information provided by the equipment provider also includes equipment information for one or more equipment used by the project to provide to a user of the bound project for viewing.
In one embodiment, obtaining user identification information and project identification information from a user comprises: receiving engineering identification information provided by a user through an engineering management account, wherein the engineering management account is associated with the user identification information; and the server determines the user identification information according to the engineering management account.
In one embodiment, the user identification information is one or more of a user telephone number, an identification number, a company code, or a department code.
In one embodiment, the project identification information is generated based on one or more of user identification information, project name, equipment type, or equipment code.
In one embodiment, the project identification information is different for different projects for which the user identification information is the same.
In one embodiment, the project identification information is a keyword or a keyword.
In one embodiment, the project identification information is bar code and/or two-dimensional code information of the device belonging to the project.
In one embodiment, the engineering management method further comprises: receiving a registration request of an engineering management account from a user, wherein the registration request comprises user identification information; guiding a user to register an engineering management account and setting a key; the project management account is associated with user identification information.
In one embodiment, the engineering binding of the user with device homing comprises: providing the user with permission to view the engineering information; and in the case that the administrator passes the verification, providing the user with the authority of managing the project.
In one embodiment, the engineering management method further comprises: in the event that a match between the received user identification information and the engineering identification information is unsuccessful based on the information provided by the device vendor, engineering binding instance information is provided to the user.
By the method, the server can match the project belonging to the user according to the project identification information and the user identification information acquired from the user side based on the information acquired from the equipment supplier, and realize the binding between the user and the project, thereby improving the convenience and efficiency of project binding.
According to another aspect of the present disclosure, a method for engineering management is provided, including: providing engineering identification information and user identification information to a server; under the condition that the server successfully matches the acquired user identification information and the engineering identification information according to the information provided by the equipment supplier: acquiring engineering information from a server, wherein the information provided by an equipment supplier comprises engineering identification information of an engineering to which the equipment belongs and user identification information of a user to which the engineering belongs; and displaying the engineering information to a user.
In one embodiment, the engineering information includes equipment information for one or more equipment used by the engineering.
In one embodiment, providing the engineering identification information and the user identification information to the server comprises: the engineering identification information is provided to the server through the engineering management account so that the server determines user identification information according to the engineering management account, wherein the engineering management account is associated with the user identification information.
In one embodiment, the user identification information is one or more of a telephone number, a user identification number, a company code, or a department code.
In one embodiment, the project identification information is generated based on one or more of user identification information, project name, equipment type, or equipment code.
In one embodiment, the project identification information is different for different projects for which the user identification information is the same.
In one embodiment, the project identification information is a keyword or a keyword, and the user provides the project identification information by inputting the keyword or the keyword.
In one embodiment, the project identification information is bar code and/or two-dimensional code information of equipment belonging to the project, and the user provides the project identification information by scanning the two-dimensional code information.
In one embodiment, the engineering management method further comprises: sending a registration request of the engineering management account to the server, wherein the registration request comprises user identification information, so that the server associates the engineering management account with the user identification information; and registering the engineering management account and setting a key according to the guidance of the server.
By the method, the user can provide the project identification information and the user identification information for the server, so that the server can match the project belonging to the user based on the information obtained from the equipment supplier, the binding between the user and the project is realized, and the convenience and the efficiency of project binding are improved.
According to still another aspect of the present disclosure, there is provided an engineering management apparatus including: a memory; and a processor coupled to the memory, the processor configured to perform any of the above engineering management methods based on instructions stored in the memory.
In the engineering management device, a user can provide engineering identification information and user identification information for the server, the server matches the project belonging to the user based on the information obtained from the equipment supplier and realizes the binding between the user and the engineering, and the convenience and the efficiency of engineering binding are improved.
According to yet another aspect of the present disclosure, a computer-readable storage medium is proposed, on which computer program instructions are stored, which instructions, when executed by a processor, implement the steps of any of the above engineering management methods.
By executing the instructions on such a computer-readable storage medium, a user can provide project identification information and user identification information to a server, and the server matches a project belonging to the user based on information obtained from a device supplier and realizes binding of the user and the project, thereby improving convenience and efficiency of project binding.
In addition, according to an aspect of the present disclosure, there is provided an engineering management system including: a server configured to perform any one of the engineering management methods performed by the server above; a user terminal configured to perform any one of the above engineering management methods performed by a user.
In the engineering management system, a user can provide engineering identification information and user identification information for the server, the server matches the project belonging to the user based on the information obtained from the equipment supplier and realizes the binding between the user and the engineering, and the convenience and the efficiency of engineering binding are improved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the disclosure and are incorporated in and constitute a part of this disclosure, illustrate embodiments of the disclosure and together with the description serve to explain the disclosure and not to limit the disclosure. In the drawings:
FIG. 1 is a flow chart of one embodiment of an engineering management method of the present disclosure.
Fig. 2 is a flowchart of another embodiment of an engineering management method of the present disclosure.
Fig. 3 is a flow chart of yet another embodiment of an engineering management method of the present disclosure.
Fig. 4 is a flowchart of yet another embodiment of an engineering management method of the present disclosure.
Fig. 5 is a schematic diagram of one embodiment of an engineering management device of the present disclosure.
Fig. 6 is a schematic diagram of another embodiment of an engineering management device of the present disclosure.
FIG. 7 is a schematic diagram of one embodiment of an engineering management system of the present disclosure.
Detailed Description
The technical solution of the present disclosure is further described in detail by the accompanying drawings and examples.
A flowchart of one embodiment of an engineering management method of the present disclosure is shown in fig. 1.
In step 101, the server obtains project identification information and user identification information from a user. In one embodiment, the engineering may be one or more applications in an energy management system. If energy information management needs to be performed on an enterprise, the equipment and software for energy information management related to the enterprise constitute one or more projects. The engineering can be monitored and managed by monitoring the state of the equipment in the engineering and modifying the configuration of the equipment. In one embodiment, the engineering identification information may be an identification code agreed by the device provider and the user.
In step 102, the obtained user identification information and the engineering identification information are matched based on the information provided by the equipment supplier, wherein the information provided by the equipment supplier comprises the engineering identification information of the engineering to which the equipment belongs and the user identification information of the user to which the engineering belongs. And after receiving the information provided by the equipment provider, the server stores the information into the database.
In one embodiment, the information provided by the equipment supplier may also include equipment information for one or more equipment in the project.
In one embodiment, the device provider may record and provide information about the user and the item to the server when the user purchases the device or negotiates purchase information. In another embodiment, the device supplier may provide the device information to the server when the device is shipped, thereby reducing the amount of information that the supplier needs to provide to the server when the user purchases the device.
In step 103, in case the matching process of step 102 is successful, step 104 is executed.
In step 104, the user is bound to the project to which the device belongs. In one embodiment, one or more of engineering description information, engineering architecture information, information of devices in engineering, status information of devices, and the like may be provided to a terminal of a user.
By the method, the server can match the project belonging to the user according to the project identification information and the user identification information acquired from the user side based on the information acquired from the equipment supplier, and realize the binding between the user and the project, thereby improving the convenience and efficiency of project binding.
The project is confirmed by the cooperation of the user identification information and the project identification information, and the project identification information of different projects is different only by aiming at the same user identification information, so that the length and the complexity required by the project identification information are greatly reduced, and the project identification information is convenient to remember and input.
In one embodiment, as shown in FIG. 1, in step 103, if the matching is not successful, step 105 is performed.
In step 105, engineering binding example information is provided to a user. The binding example information may be information for guiding a user how to bind a project, or may be demonstration information of a display effect and a use effect after the project is bound.
By the method, example information of the engineering binding can be provided for the user, so that the user can know the failure of the engineering binding on one hand, and the probability that the user continues to execute the binding process and the binding is successful on the other hand is improved.
A flow diagram of another embodiment of an engineering management method of the present disclosure is shown in fig. 2.
In step 201, a user provides project identification information and user identification information to a server through a user terminal. In one embodiment, the user terminal may be a computer, a mobile phone, or the like, and communicates with the server through an adapted client program or a web page.
In step 202, in the case where the server successfully matches the acquired user identification information and project identification information according to the information provided by the equipment provider, the user terminal acquires the project information from the server.
In step 203, the user terminal presents the engineering information to the user. In one embodiment, the engineering information may include equipment information for one or more equipment used by the engineering. In one embodiment, the engineering information may also include engineering description information, engineering architecture information, status information of the device, and the like.
By the method, the user can provide the project identification information and the user identification information for the server, so that the server can match the project belonging to the user based on the information obtained from the equipment supplier, the binding between the user and the project is realized, and the convenience and the efficiency of project binding are improved.
In one embodiment, the user identification information may be one or more of a user identification number, a telephone number, a company code or a department code, which can be conveniently memorized by the user and can be used as a user identifier, so that the user identification information can be used as authentication information for the user, and the convenience of inputting the information by the user is improved. A flow chart of yet another embodiment of the project management method of the present disclosure is shown in fig. 3.
In step 301, project identification information is provided to a server via a project management account. In one embodiment, the project management account of the user is associated with user identification information. In one embodiment, a user may register, log into, an engineering management account using user identification information.
In step 302, the server determines user identification information from the project management account. In one embodiment, the server extracts the name of the account from which the project identification information originated, and validates the user identification information.
In step 303, the server matches the acquired user identification information and project identification information based on information provided by the equipment provider.
In step 304, the user is bound with the engineering to which the device belongs if the matching is successful.
By the method, the user can bind the project by providing the project identification information after logging in the project management account, and the server determines the user identification information according to the name of the account providing the project identification information, so that the user friendliness is further improved. In addition, the mode can also support binding one or more projects under the same project management account, and further improves user experience.
In one embodiment, the project identification information is generated based on one or more of user identification information, project name, equipment type, or equipment code. In one embodiment, the project identification information may be a keyword or a keyword, for example, a keyword in a project name is used as the project identification information, and a unique project is identified based on a combination of the project identification information and the user identification information.
By the method, the project can be uniquely confirmed by using the information which is conveniently acquired, memorized or input by the user, the user is prevented from inputting a complex serial number, and the binding efficiency and the binding success rate are improved.
In another embodiment, the project identification information may be bar code and/or two-dimensional code information configured on a device (e.g., a concentrator) used in the project. The server stores the bar code and two-dimensional code information equipped on each device in the project. After a user logs in an engineering management account, the bar code or the two-dimensional code information is sent to the server for matching through scanning the bar code or the two-dimensional code of any concentrator in the engineering, so that the convenience and the efficiency of engineering binding are further improved.
In one embodiment, as shown in FIG. 3, the project management method may further include steps 305-307.
In step 305, the user is provided with permission to view the engineering information. In one embodiment, the authority to view the engineering information is a base authority, which the user can view but cannot modify.
In step 306, the administrator reviews the binding of the user account to the project. In one embodiment, the administrator may manually verify the authenticity of the user account and the executing agent of the engineering binding action, and after the verification is passed, execute step 307. If the authentication fails, step 305 is executed. In one embodiment, a user may be unbound from a project if the administrator verifies that the binding behavior is a false binding. In one embodiment, the administrator may verify by communicating the registered user's cell phone number.
In step 307, the user is provided with the right to manage the project. In one embodiment, the authority to manage the project may be the authority to modify the device information in the project.
By the method, the basic authority can be provided for the user after the binding is finished, and the management authority can be provided for the user after the binding is further verified, so that the safety of engineering is improved.
A flow chart of yet another embodiment of the project management method of the present disclosure is shown in fig. 4.
In step 401, a user sends a registration request of an engineering management account to a server, wherein the registration request includes user identification information. In one embodiment, the user may register with the user identification information (e.g., the user's cell phone number) as a username.
In step 402, the server directs the user to register for an engineering management account and set a key. In one embodiment, the server can guide the user to input the initial key, send a verification short message to the mobile phone number of the user, and complete registration according to correct verification information fed back by the user. In one embodiment, the server can also repeatedly verify the user identification information, and in the case of determining that the same account is provided, the account existing information is recovered so that the user can directly log in.
In step 403, the server associates the project management account with the user identification information. In one embodiment, if the user registers with the user identification information as a user name, the user name is recorded.
By the method, the user can be supported to register the engineering management account by using the user identification information, the developer is not required to provide the account, the burden of the developer is reduced, the registration process is convenient and fast, the developer and the user are not required to communicate and negotiate, and the engineering binding efficiency is improved.
A schematic structural diagram of an embodiment of an engineering management device according to the present disclosure is shown in fig. 5. The engineering management device comprises a memory 501 and a processor 502. Wherein: the memory 501 may be a magnetic disk, flash memory, or any other non-volatile storage medium. The memory is for storing instructions in the corresponding embodiments of the engineering management method above. The processor 502 is coupled to the memory 501 and may be implemented as one or more integrated circuits, such as a microprocessor or microcontroller. The processor 502 is configured to execute instructions stored in the memory, which can improve the convenience and efficiency of engineering binding.
In one embodiment, as also shown in FIG. 6, the engineering management device 600 includes a memory 601 and a processor 602. The processor 602 is coupled to the memory 601 by a BUS 603. The project management apparatus 600 may also be connected to an external storage 605 via a storage interface 604 to call external data, and may also be connected to a network or another computer system (not shown) via a network interface 606. And will not be described in detail herein.
In the embodiment, the data instruction is stored in the memory, and the instruction is processed by the processor, so that convenience and efficiency of engineering binding can be improved.
In another embodiment, a computer-readable storage medium has stored thereon computer program instructions which, when executed by a processor, implement the steps of the method in the corresponding embodiment of the engineering management method. As will be appreciated by one skilled in the art, embodiments of the present disclosure may be provided as a method, apparatus, or computer program product. Accordingly, the present disclosure may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present disclosure may take the form of a computer program product embodied on one or more computer-usable non-transitory storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
A schematic diagram of one embodiment of an engineering management system of the present disclosure is shown in fig. 7. The server 71 can execute any of the above engineering management methods executed by the server, and the user terminals 721 to 72n can execute any of the above engineering management methods executed by the users, where n is a positive integer.
In the engineering management system, a user can provide engineering identification information and user identification information for the server, the server matches the project belonging to the user based on the information obtained from the equipment supplier and realizes the binding between the user and the engineering, and the convenience and the efficiency of engineering binding are improved.
The present disclosure is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the disclosure. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
Thus far, the present disclosure has been described in detail. Some details that are well known in the art have not been described in order to avoid obscuring the concepts of the present disclosure. It will be fully apparent to those skilled in the art from the foregoing description how to practice the presently disclosed embodiments.
The methods and apparatus of the present disclosure may be implemented in a number of ways. For example, the methods and apparatus of the present disclosure may be implemented by software, hardware, firmware, or any combination of software, hardware, and firmware. The above-described order for the steps of the method is for illustration only, and the steps of the method of the present disclosure are not limited to the order specifically described above unless specifically stated otherwise. Further, in some embodiments, the present disclosure may also be embodied as programs recorded in a recording medium, the programs including machine-readable instructions for implementing the methods according to the present disclosure. Thus, the present disclosure also covers a recording medium storing a program for executing the method according to the present disclosure.
Finally, it should be noted that: the above examples are intended only to illustrate the technical solutions of the present disclosure and not to limit them; although the present disclosure has been described in detail with reference to preferred embodiments, those of ordinary skill in the art will understand that: modifications to the specific embodiments of the disclosure or equivalent substitutions for parts of the technical features may still be made; all such modifications are intended to be included within the scope of the claims of this disclosure without departing from the spirit thereof.

Claims (19)

1. A method of engineering management, comprising:
the method comprises the steps that a server obtains project identification information and user identification information from a user, wherein the project identification information is an identification code appointed by an equipment supplier and the user, only different projects with the same user identification information are ensured to have different project identification information, and a unique project is confirmed based on the combination of the project identification information and the user identification information;
matching the acquired user identification information and the engineering identification information based on information provided by an equipment provider, wherein the information provided by the equipment provider comprises engineering identification information of an engineering to which the equipment belongs and user identification information of a user to which the engineering belongs;
binding the user with the project to which the equipment belongs under the condition of successful matching;
in the event that the match is unsuccessful, the engineering binding instance information is provided to the user.
2. The method of claim 1, wherein the equipment provider provided information further includes equipment information for one or more equipment used by the project for providing to a user of the bound project for viewing.
3. The method of claim 1, wherein the obtaining user identification information and project identification information from a user comprises:
receiving the project identification information provided by a user through a project management account, wherein the project management account is associated with the user identification information;
and the server determines the user identification information according to the engineering management account.
4. The method of claim 1, wherein the user identification information is one or more of a telephone number, a user identification number, a company code, or a department code.
5. The method according to any one of claims 1 to 4, wherein the project identification information is generated according to one or more of the user identification information, project name, equipment type or equipment code.
6. The method of claim 5, wherein the project identification information is a keyword or a keyword;
and/or the engineering identification information is bar code and/or two-dimensional code information of equipment belonging to the engineering.
7. The method of claim 3, further comprising:
receiving a registration request of an engineering management account from a user, wherein the registration request comprises user identification information;
guiding a user to register an engineering management account and setting a key;
associating the project management account with the user identification information.
8. The method of any of claims 1 to 4, wherein the engineering binding of the user with the device attribution comprises:
providing the user with permission to view the engineering information;
and in the case that the administrator passes the verification, providing the user with the authority of managing the project.
9. The method of any of claims 1-4, further comprising:
and providing engineering binding example information to a user in the case that the received user identification information and the engineering identification information are not matched successfully based on the information provided by the equipment supplier.
10. A method of engineering management, comprising:
providing engineering identification information and user identification information to a server, wherein the engineering identification information is an identification code appointed by an equipment supplier and a user, only the engineering identification information of different projects with the same user identification information is different, and the unique project is confirmed based on the combination of the engineering identification information and the user identification information;
under the condition that the server successfully matches the acquired user identification information and the engineering identification information according to the information provided by the equipment supplier:
acquiring engineering information from a server, wherein the information provided by the equipment supplier comprises engineering identification information of an engineering to which the equipment belongs and user identification information of a user to which the engineering belongs;
displaying the engineering information to a user;
in the event that the match is unsuccessful, the engineering binding instance information is provided to the user.
11. The method of claim 10, wherein the engineering information includes equipment information for one or more equipment used by an engineering.
12. The method of claim 10, wherein the providing engineering identification information and user identification information to a server comprises:
providing the project identification information to the server through a project management account so that the server determines the user identification information according to the project management account, wherein the project management account is associated with the user identification information.
13. The method of claim 10, wherein the user identification information is one or more of a telephone number, a user identification number, a company code, or a department code.
14. The method of any one of claims 10 to 13, wherein the project identification information is generated according to one or more of the user identification information, project name, equipment type or equipment code.
15. The method of claim 14, wherein,
the project identification information is a keyword or a keyword, and a user provides the project identification information by inputting the keyword or the keyword; and/or the presence of a gas in the gas,
the engineering identification information is bar code and/or two-dimension code information belonging to equipment of the engineering, and a user provides the engineering identification information by scanning the two-dimension code information.
16. The method of claim 12, further comprising:
sending a registration request of a project management account to a server, wherein the registration request comprises user identification information so that the server associates the project management account with the user identification information;
and registering the engineering management account and setting a key according to the guidance of the server.
17. An engineering management apparatus comprising:
a memory; and
a processor coupled to the memory, the processor configured to perform the method of any of claims 1-16 based on instructions stored in the memory.
18. A computer readable storage medium having stored thereon computer program instructions which, when executed by a processor, implement the steps of the method of any one of claims 1 to 16.
19. An engineering management system, comprising:
a server configured to perform the method of any one of claims 1 to 9;
a user terminal configured to perform the method of any of claims 10 to 16.
CN201811307248.7A 2018-11-05 2018-11-05 Engineering management method, device, system and computer readable storage medium Active CN109447589B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811307248.7A CN109447589B (en) 2018-11-05 2018-11-05 Engineering management method, device, system and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811307248.7A CN109447589B (en) 2018-11-05 2018-11-05 Engineering management method, device, system and computer readable storage medium

Publications (2)

Publication Number Publication Date
CN109447589A CN109447589A (en) 2019-03-08
CN109447589B true CN109447589B (en) 2021-12-03

Family

ID=65550887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811307248.7A Active CN109447589B (en) 2018-11-05 2018-11-05 Engineering management method, device, system and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN109447589B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105721452A (en) * 2016-01-28 2016-06-29 沈文策 Unified login management method for multiple project management backgrounds
CN107085758A (en) * 2017-01-19 2017-08-22 北京恒华伟业科技股份有限公司 A kind of project management method, apparatus and system
CN108416701A (en) * 2018-03-06 2018-08-17 湖南建工集团有限公司 A kind of processing method of the Engineering Project Construction real data based on BIM
CN108428110A (en) * 2018-02-13 2018-08-21 武汉科技大学 A kind of acquisition methods of construction-engineering project management information

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160086290A1 (en) * 2013-04-19 2016-03-24 Aconex Limited Social project management

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105721452A (en) * 2016-01-28 2016-06-29 沈文策 Unified login management method for multiple project management backgrounds
CN107085758A (en) * 2017-01-19 2017-08-22 北京恒华伟业科技股份有限公司 A kind of project management method, apparatus and system
CN108428110A (en) * 2018-02-13 2018-08-21 武汉科技大学 A kind of acquisition methods of construction-engineering project management information
CN108416701A (en) * 2018-03-06 2018-08-17 湖南建工集团有限公司 A kind of processing method of the Engineering Project Construction real data based on BIM

Also Published As

Publication number Publication date
CN109447589A (en) 2019-03-08

Similar Documents

Publication Publication Date Title
CN109471865B (en) Offline data management method, system, server and storage medium
CN107547573B (en) authentication method applied to eSIM, RSP terminal and management platform
CN105897675A (en) Video service providing method, access authentication method, server and system
CN105554037A (en) Identity identification processing method and service platform
WO2015024261A1 (en) Internet account number management method, manager, server and system
CN104954383A (en) Application program login method and system
CN107086979B (en) User terminal verification login method and device
CN109272617B (en) Unlocking verification method, server, door lock, electronic device and storage medium
CN105262588A (en) Log-in method based on dynamic password, account number management server and mobile terminal
CN105187444A (en) Key information burning method and device
CN108234257B (en) Household appliance pairing method, household appliance and mobile terminal
KR20120070079A (en) User authenication system by using personal identification number, user terminal device, inquiry apparatus, authenication server, and user authenication method therefor
CN104579671A (en) Authentication method and system
CN105323094A (en) Safety management method based on equipment identification and system thereof
CN105515781A (en) Login system of application platform and login method thereof
CN105871903A (en) Information security control method and system as well as mobile terminal
CN113360217A (en) Rule engine SDK calling method and device and storage medium
CN105516054B (en) A kind of method and device of subscriber authentication
CN104079527A (en) Information processing method and electronic equipment
CN103559430B (en) application account management method and device based on Android system
CN109447589B (en) Engineering management method, device, system and computer readable storage medium
CN110942537B (en) Intelligent door lock unlocking system, method, device and medium
US10997539B2 (en) Supplier analysis and verification system and method
CN107633390B (en) Cloud wallet management method and server
CN110766388A (en) Virtual card generation method and system and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant